Appendix B1-SBP-6.131 Alternates.pdf
PDF 309 KB Posted
- Solicitation number
- IFB1 GJTA 2027000021 2
- Issued by
- Pueblo County, Colorado
About this file
Appendix B1-SBP-6.131 Alternates
This document is an alternates specification appendix for the EM2624 Yaeger Structural Stabilization and Repairs project managed by the State of Colorado. The appendix outlines alternate work items and specifications that bidders may propose as modifications or additions to the base project scope. The document establishes the framework for presenting alternative construction methods, materials, or phasing approaches that could enhance project outcomes or provide cost efficiencies. Bidders are permitted to submit alternates in accordance with the specifications outlined in this appendix, provided they clearly identify and justify any proposed deviations from the primary scope of work. The alternates process allows for flexibility in project delivery while maintaining compliance with the overall project objectives for structural stabilization and repairs at the Yaeger facility.
The alternates submission requirements specify pricing structures for each proposed alternate, including separate line-item costs that must be clearly itemized and added to or subtracted from the base bid amount. Bidders must provide detailed documentation supporting the feasibility, cost implications, and technical benefits of any proposed alternates. The document establishes evaluation criteria for comparing alternate proposals and ensures that any accepted alternates remain consistent with project specifications and Colorado state procurement regulations. This structured approach to alternates allows the state to consider innovative solutions while maintaining budget control and project schedule adherence throughout the structural stabilization and repair work.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SBP-6.131
Rev 7/2025 R1
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
BID ALTERNATES
Institution or Agency:
Project No./Project Name:
INSTRUCTIONS:
1. Refer to Item #8 in the Instructions to Bidders (SBP-6.12) for additional alternate information.
2. Additive alternates will not be used if deductible alternates are used. Deductible alternates will not be used if additive alternates are used.
3. Refer to the contract documents for thorough description(s) of the alternates.
4. If alternates are accepted, the base bid will be modified by the amount entered below.
ADDITIVE ALTERNATES
Alt. # Description of Additive Alternate Spec. Section Pricing
A.A.1 $
A.A.2 $
A.A.3 $
A.A.4 $
A.A.5 $
A.A.6 $
A.A.7 $
A.A.8 $
A.A.9 $
A.A.10 $ lanexxTX Line lanexxTX Line
SBP-6.131
Rev 7/2025 R1
DEDUCTIVE ALTERNATES
Alt. # Description of Deductive Alternate Spec. Section Pricing
D.A.1
D.A.2 $
D.A.3 $
D.A.4 $
D.A.5 $
D.A.6 $
D.A.7 $
D.A.8 $
D.A.9 $
D.A.10 $
THE BIDDER
BY_________________________________________________________________
Company Name
BY__________________________________________________________________
Signature Date
| BID ALTERNATES |
| INSTRUCTIONS: |
| ADDITIVE ALTERNATES |
| DEDUCTIVE ALTERNATES |
| THE BIDDER |
| TextInput.127: Colorado Northwestern Community College / GJTA |
| TextInput.173: EM2624 / Yaeger Structural Stabilization and Repairs |
| TextInput: |
| AA1: |
| 0: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: |
| AA1S: |
| 0: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: |
| AA1P: |
| 0: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: |
| DA1: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| DA1S: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| DA1P: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
Company Name:
File details come from the government source that posted it. Updated .