Addendum 1 Q&A_ CNCC FY26-002 Yaeger.pdf

PDF 203 KB Posted

Attached to
EM2624 Yaeger Structural Stabilization and Repairs
Solicitation number
IFB1 GJTA 2027000021 2
Issued by
Pueblo County, Colorado

About this file

This Addendum #1, issued September 9, 2026, provides bid questions and answers for Colorado's EM2624 Yaeger Structural Stabilization and Repairs project (CNCC FY27-002). The project scope includes structural repairs and stabilization work at the Yaeger building, originally constructed circa 1973 and remodeled in 1983/1984. Key project elements include sistering 30% of damaged studs in designated areas, removal and replacement of damaged bottom plates, drywall replacement in multiple locations, door installation in Lab 112, metal and horizontal siding replacement with transition trim, masonry repairs, floor joist work at the mezzanine (13'10" span in a 13'10" by 15' room), ceiling height adjustment in Classroom 101, landscape restoration with weed barrier and rocks, and electrical reinstatement of existing fixtures to code. Bidders are instructed to provide unit pricing for studding and other components, with means and methods determined by the general contractor.

The addendum addresses critical clarifications regarding quantities, material specifications, and project logistics. Drywall paint is required only in disturbed areas rather than entire walls. Existing metal siding is to remain in place with new siding added to match. Excess dirt disposal will be accommodated at a dedicated area behind the Maintenance facility on campus. Regarding boulder wall materials, bidders should assume new boulder purchases rather than relying on limited on-campus stockpile availability, though reuse of existing rock on the building's north side is acceptable at the general contractor's discretion if cost-effective. The project requires LCP Tracker compliance, and all electrical work must meet current code standards.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum # 1 09/09/2026

CNCC FY27-002 / EM 2624

Yaeger Structural Stabilization and Repairs Addendum #1- Bid Questions and Answers

Q1. How are we to accurately bid the quantity of studs, bottom plate and drywall to be replaced? Can owner provide standardized quantities for all bidders?

A. Unit pricing, provide an allowance for 30% of studs to be “sistered” in area indicated as Note 1 on pg.

S101. Otherwise, see notes for details

Q2. Can Detail Be provided for sistering damaged studs? How should the studding be priced? Unit pricing?

A. Unit pricing, provide an allowance for 30% of studs to be “sistered” in area indicated as Note 1 on pg.

S101. Otherwise, see notes for details

Q3. Can detail be provided for removal and replacement of damaged bottom plate?

A. Means and methods by GC

Q4. Multiple locations throughout the building have had drywall removed that is not called out in the drawings. Can and estimated SF be provided?

A. See drawings for details.

Q5. Please confirm where doors are needed and not needed in Lab 112.

A. See drawings for details

Q6. Please confirm metal siding is to be removed to existing transition piece?

A. Siding to remain in place, new siding to match. See A200

Q7. Please provide detail for horizontal siding termination to existing. This siding is typically installed from the bottom up.

A. Existing siding to remain. New siding to be provided with transition trim

Q8. At walls the receive drywall replacement. Is paint desired for entire wall (corner to corner) or just at the disturbed area?

A. Just disturbed area

Q9. Can owner provide an allowance to carry for masonry repairs? How should masonry be priced A. Masonry repairs is note 5 on S101.

Q10. Please confirm excess dirt can be disposed on campus.

A. There will be a dedicated area for dumping/disposing of excess dirt located behind the Maintenance facility.

Q11. Please provide confirmed span for floor joists at mezzanine. Please also provide mezzanine measurements.

A. 13'10" floor joice(joist). Room is 13'10" by 15'

Q12. The drawings do not show any kind of landscape repair for the disturbed areas. Can iformation be provided?

A. Landscape to be replaced with weed barrier and rocks.

Q13. During the site visit, it was mentioned that the existing rock on the N side of the building might be reused. Can you confirm if this is to be repurposed or discarded?

A. GC to determine which is most cost-effective. Reuse is acceptable

Q14. Please confirm that owner is provided boulder wall boulders from stockpile on campus.

A. Owner supply is limited. Assume boulder wall to be purchased new

Q15. Can you provide the age of the building?

A. Original ~1973. Remodeled in 1983/1984

Q16. Please confirm the area where the ceiling will be raised.

A. Classroom 101 in NE corner, pg. A100

Q17. How should we handle electrical?

A. Assume electrical is to code, reinstall existing light fixtures.

Q18. Please confirm the LCP Tracker process/requirement.

A. LCP Tracker is required for this project