Appendix B2-SBP-6.133 Unit Pricing.docx
DOCX document 42 KB Posted
- Solicitation number
- IFB1 GJTA 2027000021 2
- Issued by
- Pueblo County, Colorado
About this file
This is a Unit Pricing Form from the State of Colorado Office of the State Architect State Buildings Program for the Yaeger Structural Stabilization and Repairs project (EM2624) at Colorado Northwestern Community College. The form establishes a framework for unit pricing that will be applied to determine adjustments to the contract sum should changes in the work become necessary during project execution. The unit prices are valid through the date of contract completion as established on the Notice to Proceed. Nine unit pricing line items (U1 through U9) are provided with blank fields for descriptions and corresponding unit prices, though the specific descriptions and quantities are not completed in this template document.
All unit prices submitted by bidders must include the pro-rata share of all costs associated with materials, equipment, and disposal required to complete each work item. Overhead, profit, and bond costs will be calculated separately on a Change Order Proposal form (SC-6.312) and are not included in the unit price submissions. This unit pricing structure allows the project to manage scope changes systematically while maintaining cost control through pre-established rates for anticipated modifications to the work.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
UNIT PRICING FORM
Institution or Agency: Colorado Northwestern Community College / GJTA Project No./Project Name: EM2624 / Yaeger Structural Stabilization and Repairs
INSTRUCTIONS:
The unit prices below shall be used to determine adjustment to the contract sum when changes in the work involving said items are deemed necessary.
Unit Prices shall apply until the date of contract completion established on the Notice to Proceed.
All unit prices shall include the pro-rata share of all costs of materials, equipment and disposal required to complete the work item. Overhead, profit and bond will be calculated on a Change Order Proposal (SC-6.312).
(Architect/Engineer should complete a brief description below based on their complete description provided in Division 01 of their specification before inserting into the solicitation)
UNIT PRICING
| Number |
| Description |
Unit of Measure
Unit Price
U1
U2
U3
U4
U5
U6
U7
U8
U9
THE BIDDER
BY_________________________________________________________________
Company Name
BY__________________________________________________________________
Signature Date
SBP-6.131
Rev 7/2025 image1.jpeg
File details come from the government source that posted it. Updated .