This document is an Appendix E Safety Requirements section of a federal contract, specifically detailing comprehensive safety protocols and accident prevention requirements for contractors performing work on government property. The document provides extensive guidelines covering multiple safety-related areas, including personal protective equipment (PPE), crane operations, equipment usage, accident reporting, and emergency response planning.

Key requirements include mandatory compliance with federal safety regulations, specific requirements for crane entry and operation, detailed accident and near-miss reporting procedures, and the need for contractors to submit a comprehensive Accident Prevention Plan (APP). The APP must address multiple safety aspects such as emergency response, hazard communication, fall protection, fire prevention, severe weather preparedness, site lighting, drug and alcohol prevention, and specific plans for specialized operations like mobile crane use, jacking operations, and potential hazardous material handling (asbestos, lead). Contractors must have competent personnel, provide proper training, maintain detailed documentation, and follow strict safety protocols to ensure workplace safety during government contract work.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

APPENDIX E

Safety Requirements (Accident Prevention Plan)

Page E-1 Rev. 0

APPENDIX E

SAFETY

1. SAFETY REGULATIONS. Work performed on Government property shall be in conformance with applicable Code of Federal Regulations (CFR); National Fire Protection Association (NFPA) 10, 70, and 241; state laws and the following:

1.1. The Contractor shall comply with activity-specific safety regulations contained in Appendix H of this contract.

1.2. The Contractor shall comply with activity-specific regulations pertaining to crane safety and operation

(including allowable crane access routes and ground loading limitations). The Contractor shall allow spot checks of crane operations by the Contracting Officer.

1.3. Government safety and health inspectors, and any explicit or implicit approvals, do not relieve the

Contractor of an obligation to comply with all applicable safety regulations. The Government will investigate all complaints of unsafe or unhealthful working conditions received in writing from Contractor employees, federal civilian employees, or military personnel.

2. PERSONAL PROTECTIVE EQUIPMENT (PPE). All Contractor employees shall wear the appropriate

PPE (e.g. protective footwear, protective gloves, hard hats/hard caps, reflective safety vests, safety glasses, hearing protection, body harnesses and lanyards) when on the Government jobsite. All construction/crane erection areas are considered hard hat areas. The identification and analysis of personnel hazards shall be documented in the accident prevention plan and activity hazard analysis.

3. CRANES ENTERING GOVERNMENT PROPERTY. If mobile cranes are required, the Contractor shall submit a Contractor Mobile Crane Entry Package for review and approval in accordance with Exhibit A, Contract

Data Requirements List. Following approval of the Mobile Crane Entry Package, the Contractor shall notify the

Contracting Officer no less than 2 working days in advance of the intent to bring a Contractor-operated crane onto

Government property. The Contractor shall notify the Contracting Officer when crane entry onto Government property is scheduled during back-shift, weekend, or holiday hours of operation. All entries shall be through a prearranged entry point (e.g., truck inspection station).

4. EQUIPMENT MANUFACTURER’S SPECIFICATIONS. The Contractor shall comply with the manufacturer’s specifications and limitations for erection and operation of cranes and hoists used in support of the work. Erection of a crane used to assemble the crane under this contract shall be performed under the supervision of a person experienced in erection and operation of the crane. All testing shall be performed in accordance with manufacturer’s recommended procedures.

5. EQUIPMENT USAGE. Only equipment and/or vehicles designed to perform the intended work are authorized for use by Contractor personnel. Contractor cranes being operated on Government property shall comply with the requirements contained in the “Mobile Cranes and Articulating Boom Cranes” paragraph in this appendix.

6. AUDITS OF OPERATIONS AND EQUIPMENT. The Government reserves the right to perform audits to ensure Contractor operations and equipment brought onto Government property conform to the requirements of the contract. Cranes used by the Contractor shall have in the cab of the crane a “summary sheet” of all pertinent documentation such as, inspection records, crane manufacturer operating manual (including crane equipped operator aids), crane log book that records operating hours, and all crane inspections, tests, maintenance, and repair records.

The crane records referenced in the “summary sheet” shall be stored at a location such that they can be made

Page E-2 Rev. 0 available to the Government upon request. A copy of the crane’s load rating chart shall be located in the cab.

7. CONTRACTOR AND OTHER NON-NAVY OWNED WEIGHT HANDLING EQUIPMENT

7.1. The following requirements apply to any contracted work utilizing cranes (and multi-purpose machines, materials handling equipment (MHE), and construction equipment used to lift loads suspended by rigging gear) and to all rigging equipment used in weight handling operations at a naval activity. These requirements do not apply to shipboard cranes or rigging equipment; commercial truck mounted and articulating boom cranes used solely to deliver material and supplies where the lift consists of moving materials and supplies (not prefabricated components, structural steel, or components of a systems-engineered metal building) from a truck or trailer to the ground; cranes installed on mechanic’s trucks that are utilized solely in the repair of shore-based equipment; cranes that enter the activity but are not used for lifting; nor other machines not used to lift loads suspended by rigging equipment.

However, WHE accidents, near misses, and unplanned occurrences shall be reported in accordance with paragraphs

7.1.h and 7.1.i.

a. The Contractor shall comply with specific activity regulations pertaining to crane safety and operation

(including allowable access routes and ground loading limitations) and notify the Contracting Officer at least 25 hours in advance of any cranes entering the activity or of any multi-purpose machines, MHE, or construction equipment that may be used in a crane-like application to lift suspended loads. The Contractor shall comply with applicable ANSI,ASME, or other appropriate industry/national/international consensus standards (e.g., ASME B30.5 for mobile cranes, ASME B30.22 for articulating boom cranes, ASME B30.3 for tower cranes, and ASME B30.8 for floating cranes, ASME B30.9 for slings, ASME B30.16 for overhead hoists, ASME B30.20 for below-the-hook lifting devices, ASME B30.21 for lever hoists, ASME

B30.26 for rigging hardware, ASME B30.29 for self-erecting tower cranes, ANSI/ITSDF B56.6 for rough terrain forklifts, ANSI A10.31 for digger derricks, ANSI A92.2 for aerial lifts/platforms with hoists or

“sign trucks”, ASSE A10.22 for personnel hoists, ANSI/ASSP A10.48 for hoists used in communication structures). For cranes, machines, and rigging equipment at naval activities in foreign countries, the cranes, machines, and rigging equipment shall comply with the appropriate host nation safety standards. For floating cranes and barge-mounted mobile cranes, a third party certification from an OSHA-accredited organization (or a third party certification from a state-accredited organization for those states with OSHA-approved state plans), a load indicating device, a wind speed indicating device, and a marine type list and trim indicator readable in one-half degree increments are required. Additionally, for mobile cranes mounted on barges, the rules of 29 CFR 1926.1437 shall be followed. Third party certification is not required for floating cranes and barge-mounted mobile cranes at Navy activities in foreign countries.

b. The Contractor shall provide a Certificate of Compliance (per NAVFAC P-307, Figure P-1 available on the

Navy Crane Center website, https://ncc.navfac.navy.mil) stating that the crane (or other machine if used to lift suspended loads) and the rigging equipment meet applicable OSHA and ANSI/ASME regulations (with the Contractor citing which OSHA and ANSI/ASME regulations are applicable, e.g., equipment used in cargo transfer shall comply with 29 CFR 1917; equipment used in construction, demolition, or maintenance shall comply with 29 CFR 1926; equipment used in shipbuilding, ship repair, or shipbreaking shall comply with 29 CFR 1915; aerial lifts/platforms (sign trucks) with hoists shall comply with 29 CFR 1926.453 and

ANSI A92.2; personnel hoists shall comply with 29 CFR 1926.552 and ASSE A10.22; slings shall comply with ASME B30.9; rigging hardware shall comply with ASME B30.26; operations near airfields shall comply with 14 CFR 77). Other industry/national/international consensus standards that may be equivalent to ASME are acceptable provided the contractor and activity note equivalent ASME standard. For cranes

(or other machines used to lift suspended loads) and rigging equipment at naval activities in foreign countries, the Contractor shall certify that the crane (or other machine) and the rigging equipment conform to the appropriate host nation safety standards. The Contractor shall also certify that all of its crane (or other machine) operational safety devices (operator aids in ASME documents) are enabled and functioning properly, that all personnel working on the naval activity jobsite have been trained to not stand under or in the fall zone of a suspended load unless specifically allowed by USACE EM 385-1-1 or 29 CFR

1926.1425, and that operators have been trained to not bypass safety devices (e.g., anti-two block devices, Page E-3 Rev. 0

LMI’s) during lifting operations. The Certificate of Compliance shall be posted in a conspicuous location on or in the cab of the crane/vehicle to which it pertains and shall remain posted while the equipment is on

Government property. When a crane, such as truck mounted crane, on Government property is not intended for use, the Contractor shall tag out the crane controls for this equipment.

c. The Contractor shall certify (per NAVFAC P-307, Figure P-1, available on the Navy Crane Center website, https://ncc.navfac.navy.mil) that personnel operating cranes on Government property are qualified and trained to operate the crane to be used, including physical qualifications of the applicable ANSI, ASME, or other appropriate industry/national/international consensus standards (e.g., ASME B30.5 for mobile cranes, ANSI A92.2 for aerial lifts/platforms with hoists or “sign trucks”), are qualified to perform the assigned work, and have passed a practical operating examination for the specific type of crane being operated.

Proof of current qualification shall be provided and be by a source that qualifies crane operators (i.e., a union, a government agency, or an organization that tests and qualifies crane operators). Operators of cranes used in construction at activities under US jurisdiction shall follow the qualification and certification requirements of 29 CFR 1926.1427. For Navy activities in foreign countries, follow host nation requirements as applicable in lieu of the CFR.

d. The Contractor shall certify (per NAVFAC P-307, Figure P-1, available on the Navy Crane Center website, https://ncc.navfac.navy.mil) that signal persons employed in construction work are qualified in accordance with 29 CFR 1926.1428. For Navy activities in foreign countries, follow host nation requirements as applicable in lieu of the CFR.

e. The Contractor shall certify (per NAVFAC P-307, Figure P-1, available on the Navy Crane Center website, https://ncc.navfac.navy.mil) that the riggers are qualified to perform the work by either signing a statement of compliance, providing proof of successful completion of a rigging apprenticeship by a union or other organization providing apprenticeship training, or proof of successful completion of training courses from a recognized source such as a trade union, a government agency, or an organization that tests and qualifies riggers.

f. For multi-purpose machines, MHE, and construction equipment used to lift loads suspended by rigging equipment, proof of authorization from the original equipment manufacturer that the machine is capable of making lifts of loads suspended by rigging equipment shall be provided. Written approval from a registered professional engineer, after a safety analysis is performed, is allowed in lieu of the OEM’s approval. The

Contractor shall demonstrate that the equipment is properly configured to make such lifts and is equipped with a load chart.

g. All hooks used on cranes, hoists, other machines, and rigging gear shall have self-closing latches or the throat opening shall be "moused" (secured with wire, rope, heavy tape, etc.) or otherwise secured to prevent the attached item from coming free of the hook under a slack condition. The following exceptions apply and shall be approved by the Contractor’s technical organization: items where the hook throat is fully obstructed and not available for manual securing; and lifts where securing the hook throat increases the danger to personnel, such as forge shop, dip tank, or underwater work.

h. The Contractor shall notify the Contracting Officer as soon as practical, but not later than four hours, after any WHE accident including lower threshold crane accidents (LTCAs), near miss, or unplanned occurrence

(see definitions in section 7.2). For other than an LTCA, the Contractor shall secure the site and protect evidence until released by the Contracting Officer. The Contractor shall conduct an investigation to establish the root cause(s) of any WHE accident, near miss, or unplanned occurrence. Except for an LTCA, crane operations shall not proceed until the cause is determined and corrective actions have been implemented to the satisfaction of the Contracting Officer. For an LTCA, the evolution may be allowed to continue, with supervisor authorization and correction of the immediate cause. Upon completion of the job or evolution, the contractor shall stop operations and follow normal accident protocol (i.e., investigation to determine causes and required corrective actions).The Contractor shall certify (per NAVFAC P-307, Figure

P-1, available on the Navy Crane Center website, https://ncc.navfac.navy.mil) that the operators, riggers and company officials are aware of the actions required in the event of an accident, near miss, or unplanned

Page E-4 Rev. 0 occurrence as specified in the contract.

i. The Contractor shall provide the Contracting Officer a report for any accident, near miss, or unplanned occurrence within 30 days using the appropriate form provided, (per NAVFAC P-307, Figure 12-1, 12-2 or

12-3 available on the Navy Crane Center website, https://ncc.navfac.navy.mil), consisting of a summary of circumstances, an explanation of causes(s), photographs (if available), and corrective actions taken. These notifications and reporting requirements are in addition to those promulgated by OPNAVINST 5100.23 and related command instructions.

j. The Contractor shall provide for Government approval the following additional documentation for contracts involving tower cranes:

(1) Foundation design and requirements.

(2) Installation instructions.

(3) Assembly and disassembly instructions including climbing/jumping instructions if applicable.

(4) Operating manual, limitations, and precautions.

(5) Periodic inspection and maintenance requirements.

For tower cranes at Navy activities in foreign countries, the tower cranes shall comply with the appropriate host nation safety standards and industry consensus safety standards (e.g., EN or ISO standards).

7.2. ACCIDENTS, NEAR MISSES, AND UNPLANNED OCCURRENCES

7.2.1. General. Weight handling accidents, near misses, and unplanned occurrences shall be investigated and reported in accordance with this section. The Contractor shall promptly investigate all suspected accidents commensurate with the seriousness/severity of the event.

7.2.2. Categories. There are two general categories of accidents as defined below. Crane accidents are those that occur during operation of a category 1, 2, or 3 crane. Rigging accidents are those that occur when gear and equipment identified in NAVFAC P-307 Section 14 is used by itself in a weight handling operation, i.e., without category 1 through 3 cranes, or when NAVFAC P-307 Section 14 gear is used with multi-purpose machines, MHE

(e.g., forklifts), and equipment covered by NAVFAC P-300 in a weight handling operation.

7.2.3. Significant Accident. A significant accident is an accident that typically has a greater potential to result in serious injury or substantial property damage. The following accident types are considered significant accidents:

injuries (regardless of severity), overloads, dropped loads, two-blocks, crane derailments, overturned cranes, or contact with overhead electrical power lines

7.2.4. Crane Accidents. For the purpose of this definition, it is assumed there is an "operating envelope" around any crane. The operating envelope consists of any of the following elements:

a. The crane.

b. The operator.

c. The riggers, signal persons, and crane walker.

d. Other personnel involved in the operation (supervisor, mechanic, tagline handler, engineer, etc.).

e. The rigging gear between the hook and the load.

f. The load.

g. The crane’s supporting structure (ground, rail, etc.).

h. The lift procedure.

7.2.4.1. Definition. A crane accident occurs when any of the elements in the crane operating envelope fails to perform correctly during a crane operation (see Appendix A of the NAVFAC P-307), including operation during maintenance or testing, resulting in any of the following:

Page E-5 Rev. 0

a. Personnel injury or death. (Minor injuries that are inherent in any industrial operation, including strains and repetitive motion related injuries, shall be reported by the normal personnel injury reporting process of the activity in lieu of these requirements.) Personnel injuries occurring within the operating envelope not directly related to the weight handling operations shall be reported as unplanned occurrences in addition to the normal personnel injury reporting process of the activity.

b. Material or equipment damage.

c. Dropped load (includes any part of the load or rigging gear and any item lifted with the load or rigging gear).

d. Derailment.

e. Two-blocking.

f. Overload (includes load tests when the nominal test load is exceeded).

g. Collision (avoidable contact between the load, crane, and/or other objects). Avoidable contact is defined as contact that would have been prevented with proper lift planning and execution. Simply briefing that contact will occur is not sufficient.

Notes:

1. Collision accidents (paragraph 7.2.4.1.g) that result in no damage or only superficial cosmetic damage, such as scratched paint, scuffs, or paint transfer that would not normally require repair or replacement are categorized as lower threshold crane accidents (LTCAs). Reporting of LTCAs benefits an activity’s weight handling program through recognition of events at the lowest possible level. Collisions resulting in dents or deformation regardless of whether repairs are required are not considered LTCAs, nor are collisions involving lifts of high value or sensitive equipment/components, molten metals, nuclear materials, or hazardous materials. The LTCA categorization may be used for ordnance lifts only if engineered protection/safety features are present.

2. Items c, d, e, f, and g are considered accidents even though no material damage or injury occurs. For item c

(dropped loads), exceptions include paper signs, tie wraps, and other minor loose material (debris) such as gravel stuck to the bottom of a pallet, that fall off during the lift. These events are not considered dropped loads if there is no potential for injury or damage. These events may be reported as near misses; however, final classification determination is at the discretion of the Navy Crane Center.

3. For a crane overhaul, an accident attributed to equipment failure may also be a reportable deficiency by the using activity per paragraphs 3.2.3 and 14.5.2 of NAVFAC P-307. The contractor shall not discarded the deficient part or component until the activity has discussed the issue with Navy Crane Center per paragraph 3.2.3 of NAVFAC P-

307.

7.2.4.2. Exceptions.

a. A component failure (e.g., motor burnout, gear tooth failure, bearing failure) shall be considered an accident only if damage to the load or another crane component occurs as a result of the failure.

b. An accident involving a mobile crane that is configured for transit is considered an unplanned occurrence and shall be reported in accordance with paragraph 7.5.16

7.2.5. Rigging Accidents. For the purpose of this definition, it is assumed there is an “operating envelope” around any rigging or other NAVFAC P-307 Section 14 equipment operation, and inside the envelope are the following:

a. Rigging gear or miscellaneous equipment identified in NAVFAC P-307, Section 14.

b. The user of the gear or equipment (including operators of multi-purpose machines, MHE, and construction equipment)

c. Other personnel involved in the operation (supervisor, mechanic, tagline handler, etc.).

d. The load.

Page E-6 Rev. 0

e. The gear or equipment’s supporting structure (padeyes, ship’s structure, building structure, etc.).

f. The load’s rigging path.

g. The rigging or lift procedure.

7.2.5.1. Definition. A rigging accident occurs when any of the elements in the operating envelope fails to perform correctly during a rigging operation (see Appendix A of the NAVFAC P-307) resulting in any of the following:

a. Personnel injury or death. (Minor injuries that are inherent in any industrial operation, including strains and repetitive motion related injuries, shall be reported by the normal personnel injury reporting process of the activity in lieu of these requirements.) Personnel injuries occurring within the operating envelope not directly related to the weight handling operations shall be reported as unplanned occurrences in addition to the normal personnel injury reporting process of the activity.

b. Material or equipment damage that requires the damaged item to be repaired because it can no longer perform its intended function. This does not include superficial damage such as scratched paint, minor lagging damage, or normal wear on rigging gear.

c. Dropped load (includes any part of the load or rigging gear and any item lifted with the load or rigging gear).

d. Two-blocking of crane structures and hoists identified in NAVFAC P-307, Section 14.

e. Overload (Includes overload of supporting structures and load tests when the test load tolerance is exceeded).

Notes:

1. Items c, d, and e are considered accidents even though no material damage or injury occurs. For item c (dropped loads), exceptions include paper signs, tie wraps, and other minor loose material (debris) such as gravel stuck to the bottom of a pallet, that fall off during the lift. These events are not considered dropped loads if there is no potential for injury or significant damage. These events may be reported as near misses; however, final classification determination is at the discretion of the Navy Crane Center.

2. An accident attributed to equipment failure may also be a reportable deficiency. See paragraph 14.5.2 of

NAVFAC P-307

7.2.5.2. Exception. A component failure (e.g., motor burnout, gear tooth failure, bearing failure) shall be considered an accident only if damage to the load or another component occurs as a result of the failure. Report applicable deficiencies to Navy Crane Center in accordance with paragraph 14.5.2 of NAVFAC P-307 and as unplanned occurrences (if due to a significant maintenance error) in accordance with paragraph 12.7.3 of NAVFAC P-307.

7.2.6. Action. Upon having an accident or having seen evidence of damage (suspected accident), the crane team, riggers, equipment users, etc., shall stop all operations and notify immediate supervisor(s). If there is impending danger to the equipment or personnel, place the crane and/or load in a safe position prior to notifying supervision.

Ensure the accident scene is secured and undisturbed so as to facilitate the investigation. The supervisor shall review the situation and take any further emergency action, including stopping production work or other operations that could aggravate the situation. The supervisor shall notify management personnel as well as the activity safety office.

The Contractor shall notify the Contracting Officer in accordance with paragraphs 7.1.h and 7.1.i. For LTCAs (see paragraph 7.2.4.1, Note 1), actions taken should allow for personnel to return to work without significant delay. The ongoing evolution (e.g., shore power cable installation, removal of brows, stores loads, assembly of components) may be allowed to continue with supervisor authorization and correction of the immediate cause. Upon completion of the job or evolution, the supervisor(s) shall make proper notification to activity management and the activity safety office.

7.2.7. Near Misses. A near miss is an unplanned event during a weight handling operation or maintenance that did not result in a definable accident but easily had the potential to do so. A near miss is an accident that could have and almost did take place. A near-miss report can be used to learn from lower-level situations so that a more severe event can be averted. By focusing on and learning from near misses, it is possible to reduce the probability of an

Page E-7 Rev. 0 actual accident from occurring. Near-miss reporting provides an opportunity to identify risks and mitigate the potential for an accident, in addition to increasing awareness of those personnel involved in or performing work. It is not intended that a near-miss investigation and report be as thorough as that for a crane or rigging accident;

however, the investigation and report should be commensurate with the significance of the event.

Unplanned Occurrences. An “unplanned occurrence” is an event involving weight handling equipment that does not meet the definition of a crane or rigging accident but results in injury or damage. Examples include, but are not limited to, injury or damage caused by weather, damage to a mobile crane in transit, damage to a parked or stationary crane caused by another moving object (e.g. vehicle, forklift), damage or injury caused by significant maintenance errors (e.g., loss of hazardous energy control, procedural failure, personnel error), and flooding or fire damage.

For each unplanned occurrence, the Contractor shall promptly perform an investigation commensurate with the seriousness/severity of the event similar to paragraph 12.6.2 of NAVFAC P-307 for accidents. For a crane overhaul, an unplanned occurrence or near miss attributed to equipment failure may also be a reportable deficiency by the using activity per paragraphs 3.2.3 and 14.5.2 of NAVFAC P-307. The contractor shall not discarded the deficient part or component until the activity has discussed the issue with Navy Crane Center.

7.2.8. Initial Accident, Near Miss, or Unplanned Occurrence Notification. For accidents, near misses, and unplanned occurrences, notify the Contracting Officer as soon as practical but not later than four hours following the incident. Initial notification shall include the following (as applicable):

a. Name

b. Contact information (name/phone and email)

c. Date and location of the event

d. A brief description of the event

e. Event type (e.g. accident, near miss) and crane type (Navy identification number if known)

f. Description of any injuries or damage associated with the accident

7.2.8.1. Crane/rigging operations shall not resume until the cause is determined and corrective actions have been implemented to the satisfaction of the Contracting Officer.

7.2.9. Accident Investigation and Reporting. For each suspected accident, the Contractor shall promptly perform an investigation commensurate with the seriousness/severity of the event. The investigation and report shall include a detailed description of the events, problems identified, contributing factors, root causes, and short and long-term corrective actions. The investigation should identify if there were organizational influences (e.g., production pressure, changes in mission), supervision and/or management issues, any preconditions, or unsafe acts that led to the event. Photographs of the accident scene and material/property damage shall be taken, if possible, and attached to the report.

The Contractor shall prepare a crane and rigging accident report (per NAVFAC P-307, Figure 12-1, available on the

Navy Crane Center website, https://ncc.navfac.navy.mil) and forward a copy to Navy Crane Center within 30 days of the accident. In the absence of an (Memorandum of Understanding/Agreement) MOU/MOA between the involved stakeholders that clearly defines the roles and responsibilities for accident and near miss reporting, the contractor or government activity that is responsible for the weight handling operation at the time of the accident

(for accidents involving a rigger-in-charge (RIC), the activity that assigned the RIC) shall initiate the investigation and submit the accident report. If the crane or rigging gear is owned by another entity, concurrence shall be obtained from the contractor or government entity that owns the equipment prior to submitting to Navy Crane Center. If another entity is responsible for the accident, obtain concurrence from the entity responsible per the root cause of the accident. Concurrence shall also be obtained from the weight handling program manager, if applicable, and for crane accidents occurring during the overhaul of a government owned crane, the certifying official. For contractor accidents, concurrence shall also be obtained from the Contracting Officer or their representative. Forms shall be routed to NCC and marked in accordance with the activity’s security and marking policies if they deem it necessary

Page E-8 Rev. 0 per the details of the incident. All entities shall ensure reports submitted to the Navy Crane Center do not contain

PII. Navy Crane Center will review accident reports and issue lessons learned and other directives as appropriate.

Any request for copies of these reports should be directed to Navy Crane Center.

7.2.10. Reporting of Near Misses and Unplanned Occurrences. Near misses and unplanned occurrences shall be reported using the forms found in NAVFAC P-307 Figures 12-2 and 12-3 (available on the Navy Crane Center website, https://ncc.navfac.navy.mil). These reports shall be submitted in accordance with this section within 30 days of the event. Forms should be routed to and marked in accordance with the activity’s security and marking policies if they deem it necessary per the details of the incident. The Contractor shall ensure reports submitted to the

Navy Crane Center do not contain PII. Near misses and unplanned occurrence reports should not be used to report equipment deficiencies. Reportable equipment deficiencies shall be reported in accordance with paragraph 3.2.3 of

NAVFAC P-307.

8. ACCIDENT PREVENTION PLAN (APP). Prior to performing any work on a Government jobsite, the

Contractor shall provide an Accident Prevention Plan.

8.1. The APP shall be prepared in accordance with the Army Corps of Engineers EM 385-1-1, “Safety and

Occupational Health Requirements” as applicable, shall be site specific, and as a minimum, contain the following analyses and plans:

a. Emergency Response Plan

b. Activity Hazard Analysis

c. Hazard Communication Plan

d. Hazardous Energy Control Plan

e. Fall Protection and Prevention Plan

f. Fire Protection and Prevention Plan

g. Severe Weather Plan (if outside work is involved)

h. Work Site Lighting Plan

i. Emergency Lighting Plan (may incorporate building emergency lighting plan)

j. Drug and Alcohol Prevention Plan

k. Site Sanitation Plan

l. Mobile Cranes and Articulating Boom Cranes (if this equipment is being used)

m. Jacking Operations Plan (if applicable)

n. Asbestos Hazard Abatement Plan (if applicable)

o. Material Containing Lead Removal Plan (if applicable)

8.2. The APP shall provide identification and accountability of personnel responsible for accident prevention.

The identified personnel must have completed OSHA 30-hour general industry or construction safety training, and maintain competency by taking 24 hours of documented formal safety and occupational health related training within the past three years (Note: the initial OSHA-30 hour training does not count toward the 24 hour competency training requirement). The APP shall be signed by the plan preparer, the plan approver, and to show concurrence signed by an officer of the Contractor’s firm, the Contractor’s on-site safety representative, the Contractor’s project manager, the Contractor’s superintendent, and representatives of the Subcontractors.

8.3. Prior to site mobilization the Contractor and Subcontractors shall meet with representatives of the

Contracting Officer to discuss and develop a mutual understanding relative to administration of the overall safety program.

Page E-9 Rev. 0

8.4. The plan shall require that all aerial work platform equipment operators will be properly trained, qualified, or licensed (if applicable) for the equipment used. A copy of these licenses shall be included in the APP for record purposes.

8.5. The Contractor will not be allowed to commence work on site until the APP is determined to be acceptable by NAVCRANECEN. Any revisions made to the APP after the plan has been approved by NANCRANECEN must be submitted to the Contracting Officer or Contracting Officer’s Representative for acceptance prior to implementation. The APP shall be kept at the Government jobsite and made available for employee review.

8.6. Other information that shall be included in the plan is as follows:

a. The Contractor’s corporate Safety and Health policy statement.

b. Statement noting that no work shall be performed unless a designated competent person is present on the jobsite and the plan must identify these personnel. The plan shall also designate the assignment of the daily jobsite safety and health inspection duties with procedures for documenting inspections and deficiency tracking system.

c. Procedure for coordinating the safety activities with subcontractors.

d. Accident reporting procedures as identified in the contract.

8.7. Should the APP reference a Corporate Safety Manual for information, copies of the applicable manual sections shall be included with the APP for user reference.

8.8. The APP must clearly state the mishap (accident) reporting requirements.

9. EMERGENCY RESPONSE PLAN. An emergency response plan shall be prepared by the Contractor and submitted as part of the APP. The emergency response plan shall contain the following procedure, duties, maps, names and plans:

a. Emergency escape procedure and emergency escape route assignments including a predetermined assembly meeting area after an evacuation.

b. Emergency rescue procedures (e.g. for employees working at heights or in confined spaces).

c. Rescue and medical duties for those employees who are to perform them.

d. The preferred means of reporting fires and other emergencies (e.g. location of phones at the jobsite, and the posting of emergency telephone numbers and reporting instructions for ambulance, physician, hospital, fire, and police).

e. Sketch or map that will be posted at the jobsite highlighting the route to the nearest medical facility and hospital.

f. Names and job title of persons who can be contacted for further information of duties under the accident prevention plan.

g. Spill containment plan to contain and isolate the entire volume of a spilled hazard substance.

h. Person overboard plan for work over water, or immediately adjacent to an unguarded waterfront edge, including the wearing of U.S. Coast Guard approved life jackets and the immediate availability of a skiff, and a person trained in operating it.

10. ACTIVITY HAZARD ANALYSIS

10.1. Definitions.

a. Activity hazard analysis: a documented process by which the steps (procedures) required to accomplish a work activity are outlined, the actual or potential hazards of each step are identified and measures for the elimination or control of those hazards are developed.

Page E-10 Rev. 0

b. Competent person: one who is capable of identify existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to personnel, and who has authorization to take prompt corrective measures to eliminate them. (Note: the person must be competent with respect to the application in which they are working, i.e., the Competent Person for welding is not necessarily qualified to serve as the Competent Person for jacking operations).

10.2. An Activity Hazard Analysis shall be prepared by a competent person as defined in the paragraph above for all non-routine phases of work and hazardous activities (install/removal, commissioning, inspection, testing, etc.), and for work requiring additional or unusual safety precautions that will be performed under this contract on the

Government jobsite. This Activity Hazard Analysis shall be submitted as part of the APP.

a. Analyses will define the activities being performed and identify the sequences of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level.

b. Work shall not begin on a work activity until the hazard analysis for the work activity has been accepted by the Contracting Officer and discussed with all engaged in the activity including the Contractor, Sub-

Contractor(s), crane operator and riggers (if involving a lift), and the Contracting Officer’s on-site representative.

11. CRITICAL LIFT PLAN

11.1. Definition. The following operations are considered critical lifts: lifts of major crane components that require detailed planning or special safety precautions and include lifts of bridge crane structures where there are only a few inches of clearance between the load being lifted and the building roof beams, joists, purlins, and/or elevated building equipment; lifts made with more than one crane or hoist; lifts involving technically difficult rigging arrangement; lifts exceeding 75% of the rated capacity of the crane(s) or hoist (lifts over 50% of the capacity of a barge mounted mobile crane’s hoist) at any radius of lift; lifts of personnel; lifts involving unusual safety risks;

lifts of sensitive equipment; lifts made in the vicinity of overhead power lines; erection of cranes; lifts of submerged or partially submerged objects; lifts involving binding conditions; lifts of hazardous materials; and any lift which the crane operator believes should be considered critical. Specific lifts identified as critical lifts in the technical specification shall also be treated as such. Lifts of personnel suspended by rigging equipment from multi-purpose machines, MHE, and construction equipment are prohibited.

a. Exceptions: The following lifts of submerged or partially submerged objects are not considered critical lifts unless classified as critical due to other constraints: removal of valves, rotors, pipes, etc., from dip tanks for cleaning or coating purposes; lifting boats of known weight from the water if the boats are of open design with bilge compartments accessible for visual inspection, the boats have label plates indicating weights, and the boats have pre-determined lifting points established by the OEM or the activity engineering organization; lifts of objects verified to not contain fluid in pockets and/or voids that is unaccounted for in the weight of the object, not be stuck by suction or adhesion by corrosion, marine growth, excessive surface tension, mud, etc., and clear of obstructions, such as other objects in the water. The following lifts of hazardous materials are not considered critical lifts unless classified as critical due to other constraints:

palletized unit loads of ordnance; and oxygen, acetylene, propane, diesel fuel, and gasoline in cans or tanks properly secured in racks or stands designed for lifting and transporting by crane.

11.2. Critical lifts require additional job planning (a critical lift plan) to ensure the safety of equipment and personnel. A critical lift plan shall be prepared by the Contractor. Critical lift plans shall be developed, reviewed, and signed by all personnel involved in the lift and shall:

a. Specify the exact size and weight of the load to be lifted and all crane and rigging components which add to the weight.

b. Specify the manufacturer's maximum load limits for the entire range of the lift as listed in the load charts.

c. Specify the lift geometry and procedures, including the crane (or other machine) position, the center of gravity of the load, height of the lift, the load radius, and the boom length and angle, for the entire range of

Page E-11 Rev. 0 the lift.

d. For lifts of personnel, demonstrate compliance with the requirements of 29 CFR 1926.1431.

e. Include a rigging plan, which shows the lift points and describes rigging procedures and gear requirements.

f. Describe the ground condition and outrigger or crawler track requirements (and, if necessary, the design of mats) needed to achieve a level, stable foundation of sufficient bearing capacity for the lift.

g. For floating cranes or derricks describe the operating base (platform) condition (for mobile cranes mounted on barges) and any potential list. For barge-mounted mobile cranes provide barge stability calculations identifying list and trim based on anticipated loading; and charts based on calculated list and trim. The amount of list and trim shall be within the manufacturer’s requirements.

h. List of environmental conditions under which lift operations are to be stopped.

i. Specify coordination and communication requirements for the lift operation.

j. For tandem or tailing crane lifts, specify the make and model of the cranes, the line, boom, and swing speeds, and the requirements for an equalizer beam.

k. For lifts in the vicinity of overhead power lines (i.e., if any part of the crane or other machine, including the fully extended boom of a telescoping boom crane or machine, or the load could approach the distances noted in

Figure 10-3 of NAVFAC P-307 during a proposed operation), the plan shall demonstrate compliance to 29

CFR 1926.1407-1411. For Navy activities in foreign countries follow host nation requirements as applicable in lieu of the CFR.

12. HAZARD COMMUNICATION PLAN

12.1. Definition. A hazard communication plan is a written plan for protecting personnel and property during the transport, storage and use of hazardous materials.

12.2. A hazard communication plan shall be prepared by a competent person (as defined in paragraph 10), shall be submitted as part of the APP, and shall address the following:

a. Items required by 29 CFR 1926.59(e).

b. Emergency procedures for spill response and disposal of hazardous materials.

c. Hazardous Material Exclusions. That notwithstanding any other hazardous material used in this contract, the following materials are prohibited within the limits of the Government jobsite or activity following

(exceptions to the use of any of these excluded materials may be considered by the Contracting Officer upon written request by the Contractor):

(1) radioactive materials or instruments capable of producing ionizing/nonionizing radiation.

(2) mercury, mercury compounds, and components containing mercury or mercury compounds.

Fluorescent and mercury vapor lamps contain mercury and the breakage of a lamp containing mercury within a naval activity constitutes a mercury spill and must be reported to the activity’s Mercury

Control Coordinator.

(3) asbestos or materials which contain asbestos.

(4) materials which contain polychlorinated biphenyls or di-isocynates.

(5) lead-based paints.

d. Yellow Plastic Exclusion. Yellow packaging materials are not permitted on naval activities. Yellow colored materials are used by activities to contain and/or identify material. Loose yellow colored material, especially plastic, is a potential incident which results in considerable lost production time.

e. Construction equipment, including cranes, regardless of location, shall have adequate oil absorbent material

Page E-12 Rev. 0 staged at the crane to contain a hydraulic component/system failure/leak. Contractors are responsible to clean up non-emergency oil and hazardous substance spills from their equipment. (The Contractor shall notify the Contracting Officers designated representative when setting up a crane for HAZMAT conditions.)

f. Labeling system to identify contents on all containers on-site.

g. Current inventory of hazardous chemicals on site.

h. Location and use of Safety Data Sheets (SDS) and that:

(1) a SDS for each hazardous substance at the Government jobsite will be maintained in an inventory, provided to the Contracting Officer, and made available to all potentially exposed employees.

(2) for emergency response purposes, each entry in the inventory shall include the approximate quantities

(e.g. liters, kilograms, gallons, pounds) that will be on site at any given time.

(3) a site map will be attached to the inventory showing where inventoried hazardous substances are stored.

(4) the inventory and the site map shall be updated as frequently as necessary to ensure accuracy.

i. Training (to include potential safety and health effects from exposure to hazardous substances).

j. The notification process when hazardous substances are brought onto the Government jobsite and that all employees potentially exposed to the substance will be advised of information in the SDS for the substance.

13. HAZARDOUS ENERGY CONTROL PLAN.

13.1. Definition. An OSHA-compliant Energy Control Program provides the procedures and methods for the control of hazardous energy during the installation, maintenance and inspection of all equipment where the unexpected energization or movement of this machinery could result in a release of energy that might cause injury to personnel and/or property damage.

13.2. A hazardous energy control plan shall be prepared by a competent person (as defined in paragraph 10), shall be submitted as part of the APP, and shall describe specific energy control requirements and lockout/tagout procedures for the equipment being installed, inspected and/or maintained in accordance with an established OSHA-compliant energy control program.

13.3. The Contractor shall comply with 29 CFR 1910.147 and 29 CFR 1910.333 and the procedures provided in

Appendix H when on activity property. The Contractor may use OSHA Standard STD 1-7.3 “Control of Hazardous

(Lockout/Tagout) - Inspection Procedures and Interpretive Guidance” as a guide on procedures to follow in the control of hazardous energy when on the jobsite except in cases where specific guidance is provided in Appendix H.

13.4. The Contractor shall use the colors designated by the activity for the “locks” used in lockout/tagout for the respective energy sources when on activity property.

13.5. Lockout/tagout tags are “danger tags” and shall comply with the colors required by 29 CFR 1926.200(b).

14. FALL PROTECTION AND PREVENTION PLAN

14.1. Definitions.

a. Fall Protection and Prevention Plan: a fall protection and prevention plan is a document prepared for the purpose of planning, designing, installing, and monitoring protection and prevention methods or systems intended to protect workers exposed to fall hazards and prevent fall accidents from occurring on Government property during work performed under this contract. In addition to fall protection and prevention, the plan details rescue procedures in the event of a fall event.

b. Competent Person for Fall Protection: a person knowledgeable of fall protection equipment, including the

Page E-13 Rev. 0 manufacturer recommendations and instructions for the proper use, inspection, and maintenance; who is capable of identifying hazardous or dangerous conditions in the personal fall arrest system or any component thereof, as well as in their application and use with related equipment; who is knowledgeable of rules and regulations regarding the erection of fall protection equipment and systems, and who has the authority to take prompt correct measures to eliminate the hazards of falling.

c. Qualified Person for Fall Protection: a person is one with a recognized engineering degree or professional certificate, and with extensive knowledge, training, and experience in the subject field of fall protection; who is capable of performing design, analysis, and evaluation of fall protection systems and equipment.

14.2. A fall protection and prevention plan shall be written by a competent person (as defined in the definitions paragraph above) and shall be submitted as part of the APP. The plan shall include the following, as a minimum:

a. Description of the fall hazards at the jobsite.

b. Type of fall protection/prevention methods or systems to be used.

c. Training requirements for employees exposed to fall hazards.

d. Type of fall protection equipment and systems provided to the employees that might be exposed to fall hazards.

e. Identify the tie-off points (anchorages) to be used for attachment of personal fall arrest equipment that are capable of supporting at least 5,000 pounds per employee attached, or have been designed, installed, and used as follows:

(1) as part of a complete personal fall arrest system which maintains a safety factor of at least two; and

(2) under the supervision of a qualified person (as defined in the definitions paragraph above).

If there is a need to devise an anchor point from existing structures such as beams or eyebolts, a qualified person shall be used to evaluate the anchorages.

15. FIRE PROTECTION AND PREVENTION PLAN

15.1. Definition. A fire protection and prevention plan is a plan prepared by the Contractor covering the items described in NFPA 241 including fire prevention (e.g. fire watch) during hot work (e.g. welding/grinding).

15.2. A fire protection and prevention plan shall be prepared by a competent person (as defined in paragraph 10), shall be submitted as part of the APP, and shall state that welding, burning, and open flame work will only be performed on the Government jobsite when:

a. the methods have been approved by the activity (cognizant Safety Office) where the jobsite is located.

b. the activity where the jobsite is located has been notified that hot work is going to be performed, when it is going to be performed, and the number of days needed.

c. a fire watch is provided by the Contractor, and must remain in place a minimum of 30 minutes after exposure has ended.

d. adequate fire extinguishing equipment is available.

e. fuel bottles are placed by the Contractor at ground level and outside…