This federal contract opportunity notice seeks design-build services for replacement of buildings and site work at the London Ranger District compound in London, Kentucky. The U.S. Department of Agriculture Forest Service will demolish all existing structures and construct a new 7,500 square foot office, 4,000 square foot warehouse and shop, and 3,200 square foot covered storage building. Additional prefabricated storage structures will also be built. The project is subject to a cost ceiling of $5.4 million and must achieve at least LEED Silver or two Green Globes certification. The solicitation will be available on August 5th, 2022 via www.sam.gov, with a Phase I pre-proposal conference scheduled for August 12th. Phase I responses are due by September 15th, and award is planned for fall 2022. The opportunity is set aside for small businesses under NAICS 236220 with a size standard of $39.5 million.

View the file

Other files

File Type Posted
12445122R0041 Questions 07 NOV 2022 GENERAL RELEASEABLE.doc DOC document
12445122R0041 Questions 03 NOV 2022 GENERAL RELEASEABLE.doc DOC document
12445122R0041 Questions 02 NOV 2022 GENERAL RELEASEABLE.doc DOC document
12445122R0041 Questions 31 OCT 2022 GENERAL RELEASEABLE.doc DOC document
12445122R0041 0004.pdf PDF
12445122R0041 0003.pdf PDF
12445122R0041 0002.pdf PDF
12445122R0041 SAM.GOV PHASE I ANNOUNCEMENT SIGNED.pdf PDF
12445122R0041 Questions Asked As Of 09082022.doc DOC document
12445122R0041 Questions Asked As Of 08312022.doc DOC document
12445122R0041 Phase I Preproposal Conference_ TRANSCRIPT 2022-08-12.docx DOCX document
12445122R0041 Preproposal Conference SIgn Up 08122022.docx DOCX document
12445122R0041 Questions Asked As Of 08122022.doc DOC document
12445122R0041 Preproposal Conference Briefing Final London DBC 08122022.ppt PPT presentation
12445122R0041 00001.pdf PDF
12445122R0041 SF1442 COMPLETE.pdf PDF
London Admin Office - Chemical Inventory_10May21.xlsx XLSX spreadsheet
Attachment L - Section L - Submission Instructions 08012022 FINAL.pdf PDF
London Admin Office - Project Program_08Dec21.docx DOCX document
Appendix D - Attachment A Contractor Performance Questionnaire Fillable.pdf PDF
Attachment B - SCHEDULE B - Schedule of Items FINAL FILLABLE.pdf PDF
Design and Construction Standards for Southern Region Facilities_10Dec21.docx DOCX document
Croatan Admin Office - Concept Documents Arch_16Sep20.pdf PDF
Appalachian Admin Office - 100 CDs Arch_14Sep07.pdf PDF
London Admin Office - Project Manual_27Jun22.docx DOCX document
Appalachian Work Center - 100 CDs Arch_18Apr16.pdf PDF
Existing Plans London Office.pdf PDF
Attachment F-PARTICIPATION GOALS FOR MINORITIES AND FEMALES.pdf PDF
London Admin Office - Guiding Principles Scorecard_07Dec21.xlsx XLSX spreadsheet
London Admin Office - Program Tables_02Nov21.xlsx XLSX spreadsheet
Attachment C - Section C - DESCRIPTION SPECIFICATIONS STATEMENT OF WORK 08032022 FINAL.pdf PDF
Appendix D - Attachment C BETTERMENTS FORM FILLABLE.pdf PDF
Attachment N - WDOL LAUREL COUNTY KY20220025.pdf PDF
Room Templates for Southern Region Facilities_24May19.pdf PDF
Attachment M - Section M - Evaluation Factors for Award 08012022 FINAL.pdf PDF
London Admin Office - KYDOT Site Plan.pdf PDF
Chattooga River Work Center - 100 CDs Arch_05May17.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12445122R0015 London Complex Design Build

Appendix B

Source Selection Information - See FAR 2.101 and 3.104 For Official Use Only

Attachment E - CONFIRMATION OF DESIGN DEVELOPMENT IN ACCORDANCE WITH THE RFP

See RFP For Complete Details

Submission Requirements:

This firm, , confirms that we shall develop the design in accordance with the RFP criteria. shall provide a detailed listing of proposed betterments (Appendix D, Attachment F), if any.

The final design must comply with the RFP requirements except that accepted betterments

(Appendix D, Attachment F) become the new contract minimum requirements. Completion of the design shall conform to the design standards in accordance with the RFP.

AUTHORIZED SIGNATURE/DATE

Attachment E - CONFIRMATION OF DESIGN DEVELOPMENT IN ACCORDANCE WITH THE RFP