12445122R0041 Questions 31 OCT 2022 GENERAL RELEASEABLE.doc

DOC document 252 KB Posted

Attached to
GAOA Design-Build Construction, USDA, Forest Service, Daniel Boone National Forest, London Ranger District Office Compound, London, KY
Solicitation number
12445122R0041
Issued by

About this file

This federal contract opportunity solicitation seeks design-build services for replacement of buildings and site work for the London Ranger District Office compound located in London, Kentucky. The U.S. Forest Service will demolish all existing buildings and constructs a new 7,500 square foot office, 4,000 square foot warehouse and shop, 3,200 square foot covered storage building, and prefabricated oil, chemical, paint and seedling storage buildings. The project requires at least two Green Globes or LEED Silver certification and must incorporate mass timber into the office and warehouse designs. The small business set-aside contract has a performance period ceiling of $5.4 million. Interested parties must attend the August 12th pre-proposal conference and submit SF-330 responses by September 15th. The agency aims to award the design-build contract in fall 2022.

View the file

Other files

File Type Posted
12445122R0041 Questions 07 NOV 2022 GENERAL RELEASEABLE.doc DOC document
12445122R0041 Questions 03 NOV 2022 GENERAL RELEASEABLE.doc DOC document
12445122R0041 Questions 02 NOV 2022 GENERAL RELEASEABLE.doc DOC document
12445122R0041 0004.pdf PDF
12445122R0041 0003.pdf PDF
12445122R0041 0002.pdf PDF
12445122R0041 SAM.GOV PHASE I ANNOUNCEMENT SIGNED.pdf PDF
12445122R0041 Questions Asked As Of 09082022.doc DOC document
12445122R0041 Questions Asked As Of 08312022.doc DOC document
12445122R0041 Phase I Preproposal Conference_ TRANSCRIPT 2022-08-12.docx DOCX document
12445122R0041 Preproposal Conference SIgn Up 08122022.docx DOCX document
12445122R0041 Questions Asked As Of 08122022.doc DOC document
12445122R0041 Preproposal Conference Briefing Final London DBC 08122022.ppt PPT presentation
12445122R0041 00001.pdf PDF
12445122R0041 SF1442 COMPLETE.pdf PDF
London Admin Office - Chemical Inventory_10May21.xlsx XLSX spreadsheet
Attachment L - Section L - Submission Instructions 08012022 FINAL.pdf PDF
London Admin Office - Project Program_08Dec21.docx DOCX document
Appendix D - Attachment A Contractor Performance Questionnaire Fillable.pdf PDF
Appendix D - Attachment B CONFIRMATION OF DESIGN DEVELOPMENT FILLABLE.pdf PDF
Attachment B - SCHEDULE B - Schedule of Items FINAL FILLABLE.pdf PDF
Design and Construction Standards for Southern Region Facilities_10Dec21.docx DOCX document
Croatan Admin Office - Concept Documents Arch_16Sep20.pdf PDF
Appalachian Admin Office - 100 CDs Arch_14Sep07.pdf PDF
London Admin Office - Project Manual_27Jun22.docx DOCX document
Appalachian Work Center - 100 CDs Arch_18Apr16.pdf PDF
Existing Plans London Office.pdf PDF
Attachment F-PARTICIPATION GOALS FOR MINORITIES AND FEMALES.pdf PDF
London Admin Office - Guiding Principles Scorecard_07Dec21.xlsx XLSX spreadsheet
London Admin Office - Program Tables_02Nov21.xlsx XLSX spreadsheet
Attachment C - Section C - DESCRIPTION SPECIFICATIONS STATEMENT OF WORK 08032022 FINAL.pdf PDF
Appendix D - Attachment C BETTERMENTS FORM FILLABLE.pdf PDF
Attachment N - WDOL LAUREL COUNTY KY20220025.pdf PDF
Room Templates for Southern Region Facilities_24May19.pdf PDF
Attachment M - Section M - Evaluation Factors for Award 08012022 FINAL.pdf PDF
London Admin Office - KYDOT Site Plan.pdf PDF
Chattooga River Work Center - 100 CDs Arch_05May17.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMENTS MATRIX FOR USDA-FS ISSUANCES: 12445122R0041 London Design Build PHASE II (Please read instructions on back before completing form.)

#
DATE OF RFI

Page /Para

PROPRIETARY

OR

GENERAL*

*general questions will be releasable to all bidders Comments, Justification, and Originator Justification for Resolution

A/R/P

GENERAL QUESTIONS ASKED

1
12 Oct 2022
GENERAL
Bidder Comment: Were the buildings assessed for lead and asbestos?

Resolution: Yes, FS will provide the London Ranger District Office Phase I Environmental Site Assessment, asbestos, and lead based paint report.

2
12 Oct 2022
GENERAL
Bidder Comment: Does the secure area require concrete pavement?

Resolution: Secure area should be a hard surface

3
12 Oct 2022
GENERAL
Bidder Comment: Required separation of stormwater from hazmat building?

Resolution: Not a concern as containment will be in hazmat building

4
12 Oct 2022
GENERAL
Bidder Comment: What is the grade for the new road?

Resolution: KYTC anticipates updated drawings week of 10/24/2022

5
12 Oct 2022
GENERAL
Bidder Comment: Number of road entrances, public entrance separate from employee/secure entrance?

Resolution: No need for more than two entrances, can use public entrance to access employee/secure area.

6
12 Oct 2022
GENERAL
Bidder Comment: Is there a preferred orientation?

Resolution: No preference on which road the buildings face. Do not want public in secure/back of house area. The Built Environment Guide provided.

7
12 Oct 2022
GENERAL
Bidder Comment: What rooms will the public have access to in the office?

Resolution: Customer Service Kiosk, Conference Room, Bathroom, Lobby

8
12 Oct 2022
GENERAL
Bidder Comment: What are the number of customers per day?

Resolution: Not a constant flow, less than 30 per day on average

9
12 Oct 2022
GENERAL
Bidder Comment: What extent do RV’s access the office?

Resolution: Picking up permits/passes and leaving.

10
12 Oct 2022
GENERAL
Bidder Comment: How much of a public facing presence?

Resolution: Want to be seen, inviting to the public, “screen” back of house/secure area, security without being a fortress.

11
12 Oct 2022
GENERAL
Bidder Comment: What is the staff use during the day?

Resolution: Approximately 30 employees in which 70% are in the field/woods during the day, depending on the weather – more office use during bad weather. More use in the mornings and evenings when employees leave and return from the field/woods

12
12 Oct 2022
GENERAL
Bidder Comment: What works well in the existing building?

Resolution: Functional area – front desk, support services, Ranger office, and core office services being in close proximity.

13
12 Oct 2022
GENERAL
Bidder Comment: What is the preferred floor covering?

Resolution: Meet or exceed standards listed in the Facility Design and Construction Standards as well as the example designs provided.

14
12 Oct 2022
GENERAL
Bidder Comment: Must haves vs wants?

Resolution: See requirements and goals in Section C of the Solicitation

15
12 Oct 2022
GENERAL
Bidder Comment: Issues with the existing building?

Resolution: Major issues with mold

16
12 Oct 2022
GENERAL
Bidder Comment: What sustainable aspects of building should be highlighted?

Resolution: Use practical approach.

17
12 Oct 2022
GENERAL
Bidder Comment: What overall design look are you trying to achieve?

Resolution: Transitional design – incorporation of FS history, local community, traditional to FS “Brand”. See The Built Environment Image Guide provided. No Flat Roofs

18
12 Oct 2022
GENERAL
Bidder Comment: Are you open to wood substitutes?

Resolution: No “pictures of wood”- meaning no pressboard wood, fiberboard that looks like wood. Should be appropriate for character and maintainable.

19
12 Oct 2022
GENERAL
Bidder Comment: Preferences for location for using wood?

Resolution: Public facing and where it makes the most sense, solid interior durable material, and structure.

20
12 Oct 2022
GENERAL
Bidder Comment: Preference on type of window and do they need to open?

Resolution: Meet or exceed standards listed in the Facility Design and Construction Standards as well as the example designs provided.

21
12 Oct 2022
GENERAL
Bidder Comment: What are you looking for in the collaborate team area?

Resolution: Should be an open area with some storage.

22
12 Oct 2022
GENERAL
Bidder Comment: What type of stone material can be used?

Resolution: Cultured stone is acceptable.

23
12 Oct 2022
GENERAL
Bidder Comment: Can you describe the storage areas near open office?

Resolution: Storage used for “stuff” more than files, such as survey gear and field gear

24
12 Oct 2022
GENERAL
Bidder Comment: What are you looking for in the Hazmat buildings?

Resolution: Contractor may use prefab commercial Hazmat buildings. Contractor responsible for sizing and siting. Examples can be obtained from GSAAdvantage.gov.

25
12 Oct 2022
GENERAL
Bidder Comment: What are you looking for in bulk fuel storage?

Resolution: Clarification to Program at 5.7: Add Aboveground Storage Tank to requirement.

26
12 Oct 2022
GENERAL
Bidder Comment: Is $5.4M a hard budget number?

Resolution: $5.4M contract ceiling. As described in Criterions 5 – 8 and Sections C, L, & M.

27
12 Oct 2022
GENERAL
Bidder Comment: Is there O&M money for betterments/longer lasting materials?

Resolution: Assume there is no extra money. Focus on long term viability.

28
12 Oct 2022
GENERAL
Bidder Comment: Do you want the entire site NetZero?

Resolution: Requirements for Net Zero are specified in Section C of the Solicitation and the Project Program

29
12 Oct 2022
GENERAL
Bidder Comment: Will every building need to be metered?

Resolution: Submeter for each building and meter shall be as specified in facility design standards. No substitutions are allowed for this product.

30
12 Oct 2022
GENERAL
Bidder Comment: USDA/FS Policy on the use of CO2 sensors?

Resolution: Acceptable to utilize CO2 sensors

31
12 Oct 2022
GENERAL
Bidder Comment: Approach on HVAC/Ventilation?

Resolution: See Facility Design Standards.

32
12 Oct 2022
GENERAL
Bidder Comment: Is radon mitigation required?

Resolution: Passive radon controls are required. Active only if testing requires it.

33
12 Oct 2022
GENERAL
Bidder Comment: What are the fire protection needs?

Resolution: See Facility Design Standards for requirements.

34
12 Oct 2022
GENERAL
Bidder Comment: DDC Control requirements?

Resolution: Network controls are allowed, but they need to be a separate network than FS network. No integration with FS network and cannot rely on internet connectivity. Internet connection for installation is the responsibility of the contractor and must disconnected prior to completion.

35
12 Oct 2022
GENERAL
Bidder Comment: What is the estimated quantity of timber on the property?

Resolution: See provided timber reports

36
12 Oct 2022
GENERAL
Bidder Comment: Is there a metes and bounds map?

Resolution: Scanned copy is provided.

37
12 Oct 2022
GENERAL
Bidder Comment: What are the utility locations?

Resolution: See provided Existing Site Plan.

38
12 Oct 2022
GENERAL
Bidder Comment: Can you share the PowerPoint presentation of the Appalachian Office?

Resolution: Yes

39
12 Oct 2022
GENERAL
Bidder Comment: Can you provide CAD drawings of KYTC project?

Resolution: Updated drawings from KYTC anticipated week of 10/24/2022

40
12 Oct 2022
GENERAL
Bidder Comment: Is there a development plan for utility locations?

Resolution: KYTC has developed plans. Designer (Contractor) will be required to coordinate with KYTC. May be with drawings to be available week of 10/24/2022.

41
12 Oct 2022
GENERAL
Bidder Comment: Is there an employee census by program area?

Resolution: All employees will have office space. There is a surge number of employees during the Spring/Fall fire seasons.

42
12 Oct 2022
GENERAL
Bidder Comment: Schedule of items – where does construction of office (or other buildings) fit?

Resolution: Amendment 3 will be issued, remove/replace Schedule B

43
12 Oct 2022
GENERAL
Bidder Comment: Will trees belong to the contractor?

Resolution: Yes

44
12 Oct 2022
GENERAL
Bidder Comment: Is there an existing site plan with utilities?

Resolution: See provided Existing Site Plan.

45
12 Oct 2022
GENERAL
Bidder Comment: Is there a colorboard requirement?

Resolution: Acceptable to be entire digital for proposal. Physical samples will be required by contractor during design.

46
12 Oct 2022
GENERAL
Bidder Comment: Will KYTC grade and pave entrances?

Resolution: See KYTC Plans

47
12 Oct 2022
GENERAL
Bidder Comment: Confirmation of required structures?

Resolution: All listed in the Program.

48
12 Oct 2022
GENERAL
Bidder Comment: Can buildings be combined?

Resolution: Needs to meet functional space requirements.

49
12 Oct 2022
GENERAL
Bidder Comment: Are the Appalachian RD building finishes within range for what you are looking for at London?

Resolution: Yes, see provided Southeast Mountain Province in the Built Environment Image Guide Finishes should reflect FS History and local community.

50
12 Oct 2022
GENERAL
Bidder Comment: Is there a preference on roof materials?

Resolution: See facility design standards.

51
12 Oct 2022
GENERAL
Bidder Comment: Can the bulk fuel storage be exposed?

Resolution: Yes, Aboveground Storage Tanks will be used for small equipment and drip torch fuel.

52
12 Oct 2022
GENERAL
Bidder Comment: Would one entrance from the KYTC project be acceptable?

Resolution: Can have one entrance plus emergency exit.

53
12 Oct 2022
GENERAL
Bidder Comment: Storage for LEI Guns and Ammo?

Resolution: These are stored in FS provided gun safe but will require supplemental exhaust ventilation in the LEI secure storage room.

54
12 Oct 2022
GENERAL
Bidder Comment: Reference to Phase II RFP?

Resolution: Everything was provided in Phase I, Phase II Amendment issued and posted same day as selection notices, on SAM.gov and emailed to the contractors.

55
12 Oct 2022
GENERAL
Bidder Comment: Do EV parking spaces need to be separate?

Resolution: These can be integrated with regular parking.

56
12 Oct 2022
GENERAL
Bidder Comment: Is there an anticipated number of future EV’s?

Resolution: See requirements in the program at 4.3 Electric Vehicle Charging

57
12 Oct 2022
GENERAL
Bidder Comment: Will there be fire marshal involvement?

Resolution: Contractor’s responsibility to ensure compliance. Federal Agencies do not pay for building permits.

58
12 Oct 2022
GENERAL
Bidder Comment: Is there a location preference for PV Cells/Arrays?

Resolution: Roofs are fine, arrays can be seen.

60
13 Oct 2022
GENERAL
Bidder Comment: Do the light ballasts contain any PCB’s?

Resolution: Unknown, only lead based paint and asbestos was assessed.

61
13 Oct 2022
GENERAL
Bidder Comment: When will KYTC build road?

Resolution: Letting is currently set for February 2024 anticipates an approximate 2 year project. Contractor will coordinate with KYTC.

62
13 Oct 2022
GENERAL
Bidder Comment: What type of Access Control System?

Resolution: Must be LENEL for use with government PIV/CAC cards, see facility design standards.

63
13 Oct 2022
GENERAL
Bidder Comment: Is there a specific HVAC filter size requirement?

Resolution: No

64
13 Oct 2022
GENERAL
Bidder Comment: Is there a specific ventilation/piping material the FS prefers?

Resolution: No

65
13 Oct 2022
GENERAL
Bidder Comment: Will government shelving / scissor lift be provided for the workcenter/shop?

Resolution: The government will provide shelving, lockers, and tool cabinets under a separate contract. Scissor lift will be provided by the DBC

66
13 Oct 2022
GENERAL
Bidder Comment: References to Grove Workcenter?

Resolution: Ignore all references to Grove Workcenter in RFP. See Amendment 3.

67
13 Oct 2022
GENERAL
Bidder Comment: Where is the flexibility in the budget for priorities?

Resolution: $5.4M contract ceiling. As described in Criterions 5 – 8 and Sections C, L, & M.

68
13 Oct 2022
GENERAL
Bidder Comment: Should construction cost of each facility be separate?

Resolution: Will be addressed in Amendment 3.

69
13 Oct 2022
GENERAL
Bidder Comment: What if we can reach LEED silver with X additional dollars, but we can achieve LEED bronze with current funding amount?

Resolution: Must achieve LEED silver or Two Green Globes

70
13 Oct 2022
GENERAL
Bidder Comment: Is there a building hierarchy given funding?

Resolution: Revised Schedule B will be provided in Amendment 3. Contract ceiling unchanged at $5.4M.

71
13 Oct 2022
GENERAL
Bidder Comment: Would FS be open to early approvals of materials at 35% design?

Resolution: See Criteria 6. Specific strategies can be discussed post-award

72
13 Oct 2022
GENERAL
Bidder Comment: What are the best performing FS buildings by EUI?

Resolution: EUI values have typically been less than 35, with values between 30-35. FS did not specify an EUI because there is no historical data.

73
13 Oct 2022
GENERAL
Bidder Comment: Any details on building automation?

Resolution: LENEL is the only system that can be connected to the FS network. Everything else needs to be standalone

74
13 Oct 2022
GENERAL
Bidder Comment: Can the FS provide support to contractors for tax credits?

Resolution: Contractor is to provide request to CO in writing.

75
13 Oct 2022
GENERAL
Bidder Comment: Fire protection assumptions?

Resolution: FS provided hydrant information from London Utility Commission.

76
13 Oct 2022
GENERAL
Bidder Comment: What are the EV charging locations and priority?

Resolution: See requirements in the program at 4.3 Electric Vehicle Charging

77
13 Oct 2022
GENERAL
Bidder Comment: Is the use of radiant floor heating acceptable?

Resolution: Must describe the benefit to FS in proposal.

78
13 Oct 2022
GENERAL
Bidder Comment: What do you envision for the fire engine water fill structure?

Resolution: Typically located outside and fills water tanks; 2.5 inch hydrant with a top fill mount for a fire truck.

79
13 Oct 2022
GENERAL
Bidder Comment: Can proposal due dates be adjusted? Does funding need to be obligated prior to a certain date? Our preference is wait until January 2023.

Resolution: No. No.

80
13 Oct 2022
GENERAL
Bidder Comment: Is the FS open to fast-tracking civil design?

Resolution: See Criteria 6. Specific strategies can be discussed post-award.

81
13 Oct 2022
GENERAL
Bidder Comment: Is there an FS Sign Design Guide?

Resolution: Replicate existing sign. Contractor will provide the sign base. Government will furnish sign for contractor installation.

82
13 Oct 2022
GENERAL
Bidder Comment: What type of landscaping is required near the office?

Resolution: See FS Facility Design Standards

83
13 Oct 2022
GENERAL
Bidder Comment: What are the requirements for site lighting after dark?

Resolution: See FS Facility Design Standards.

84
13 Oct 2022
GENERAL
Bidder Comment: Is the FS open to automated night lighting?

Resolution: See FS Facility Design Standards.

85
13 Oct 2022
GENERAL
Bidder Comment: Why was the storm detention pond installed at the Appalachian Office?

Resolution: Managing stormwater is a fundamental program requirement.

86
13 Oct 2022
GENERAL
Bidder Comment: Can the FS provide saplings for tree replacement?

Resolution: No, FS will not provide.

87
17 OCT 2022
GENERAL
Bidder Comment: During the site visit on 13 OCT 2022, it was mentioned that an environmental survey of the existing ranger station has been completed and NO ACM or lead based paint is present. Please confirm the building(s) scheduled for demolition are free of ACM, lead, and other hazardous materials. Please provide copy of environmental survey reports for the existing facilities to be demolished under this contract.

Resolution: No ACM or LBP was discovered at the buildings to be conveyed to KYTC. However, Two office building floor tile samples under the carpet tested positive for asbestos. Two office building exterior wall and exterior trim tested positive for lead. See Asbestos and Lead Based Paint reports.

88
17 OCT 2022
GENERAL
Bidder Comment: Please confirm this construction contract will not require federal permitting for this project. Please confirm.

Resolution: Contractor’s responsibility to ensure compliance. Federal Agencies do not pay for building permits.

89
17 OCT 2022
GENERAL
Bidder Comment: It is understood that local permitting and plan submission / plan review processes may need to be provided as part of this contract. Please confirm which local entity has jurisdiction and provide contact information if available.

Resolution: Contractor’s responsibility to ensure compliance

90
17 OCT 2022
GENERAL
Bidder Comment: A slide show describing the completed Appalachian Ranger Station project was presented during the site visit held on 13 OCT 2022. Please provide a copy of this presentation for reference.

Resolution: FS will provide.

91
17 OCT 2022
GENERAL
Bidder Comment: During the site visit held on 13 OCT 2022, new fire sprinkler requirements were discussed. The User indicated that new sprinkler systems would be required, and a fire pump was not desired, and that an existing water flow test is not available. Please confirm a flow test does not currently exist for the site and that a fire pump is NOT to be included in this contract proposal.

Resolution: See Facility Design Requirement for fire suppression. See provided Hydrant info spreadsheet.

92
17 OCT 2022
GENERAL
Bidder Comment: During the site visit on 13 OCT 2022, the question was asked about KYTC providing (2) two access drives off the new proposed road onto USFS property (as indicated in the proposal documents), and when the KYTC project would be complete. Please confirm KYTC to provide (2) two access drives onto USFS property and the KYTC project will be completed in time to allow for new drives to be included and tied into as part of this contract.

Resolution: KYTC anticipates updated drawings week of 10/24/2022

93
17 OCT 2022
GENERAL
Bidder Comment: During the site visit on 13 OCT 2022, EV charging stations were discussed. Please confirm EV charging stations to be required for public use as well as USFS car and light duty truck use (public parking area AND employee parking area).

Resolution: See Program at 4.3 for requirements. Scope clarification: Integrate charging stations into regular parking.

94
17 OCT 2022
GENERAL
Bidder Comment: The RFP indicates a new ranger station will be designed and constructed as well as a new warehouse building for forestry equipment, etc. Does the new warehouse building need to be able to have vehicles pass through one side of the building and exit through the other, or is access through only one side acceptable?

Resolution: See Program at 4.6

95
17 OCT 2022
GENERAL
Bidder Comment: The RFP did not include any detailed contour plans or CAD files of the site. In order for offerors to adequately price the project, we will need to develop preliminary site and building plans with the limited information we have in order to capture reasonable quantities of installed construction. The development of bid documents for our subcontractors and vendors to quantify pricing will take some time both to generate and to review. We are concerned that the current proposal submission date will make it difficult to provide enough detail to minimize contingency and risk cost allocation to the project. With that said, we feel it is in the best interest of the government to consider a proposal due date extension of approximately 2-3 weeks. While we understand there may be concerns with the timing of tree removal prior to April of 2023, we believe that an extension will provide for more reasonable pricing and still allow for trees scheduled for removal to be felled and decked (without land disturbance) prior to April 2023 with gov approval of the general site plan so that individual trees within building footprints and utility corridors can be marked for removal even if the full site/civil design is not yet complete and approved. Please consider a proposal due date extension for phase 2 proposals of 2-3 weeks.

Resolution: Posted to bidders sharepoints on 10/25 and 10/26

96
27 Oct 2022
GENERAL
Bidder Comment: Please provide a detailed explanation for the Central Compaction Storage listed in the Project Program and what should be provided by the contractor as part of this construction contract. Is this area for public display/view?

Resolution: See sheets A132 and A133 of the Room Templates for Southern Region Facilities for two examples of the type and layouts. The Forest Service will furnish and provide the compaction storage as part of our contract for the furniture. A normal generic term is “mobile shelving”. The DBC will include the space for the compaction storage as part of the floor plan and coordinate installation with the FS’s furniture contractor.

97
31 Oct 2022
General
Bidder Comment: What are the required dimensions for the Workshop overhead doors?

Resolution: See “Chattooga River Work Center” CDs.

98
31 Oct 2022
General
Bidder Comment: The BEIG architectural guide for the Southeast Mountain Province advises not to use single slope roof, but if a single slope roof assists the net zero energy design strategy, would a single slope roof be allowed on the Office Building, Warehouse/Shop, and/or Pole Shed?

Resolution: The BEIG is a guide, not a prescriptive standard. Contractors have the flexibility to propose solutions that integrate appropriate architectural character, FS identity, and performance requirements as part of the design solution

99
31 Oct 2022
General
Bidder Comment: Can portions of the existing buildings on site be left in place and repurposed to meet program elements as a cost savings and sustainable design approach?

Resolution: Contractors are free to provide creative and innovative design solutions to the Government’s Project Definition Documents and demonstrate the benefit to the Government of the proposed design solution.

100
31 Oct 2022
General
Bidder Comment: Are sliding glass walls required for the large meeting space in the new ranger station as shown in the Room Templates for Southern Region Facilities?

Resolution: There is no requirement to have or not to have. The Space Tools includes the option to allow a means for designers to provide greater flexibility in their design solutions.

101
31 Oct 2022
General
Bidder Comment: Please describe requirements of the “vault storage”. Is vault storage to include a high-density compaction storage device as shown in the Room Templates for Southern Region Facilities? If the Office Building does require a Central Compaction Storage space can additional information regarding the type of storage commodities and desired shelving be provided?

Resolution: Vault storage includes all items as shown in the Space Tools attachment. A separate Central Compaction Storage is required. The Government will provide the compaction storage systems and coordinate design and installation with the successful contractor.

102
31 Oct 2022
General
Bidder Comment: In R-08 SOUTHERN REGION OFFICE SPACE TOOLS & TEMPLATES provided, sheet 133 requires a clean agent fire suppression system for Vault Storage; however it is not mentioned in the Project Program. Can you please confirm that a clean agent fire suppression system is needed for the vault storage in the Office Building ?

Resolution: A clean agent system is not mentioned in the program because the requirement is defined in the Space Tools.

103
31 Oct 2022
General
Bidder Comment: Please describe the “Collaborative Landing” space for the Office building? Is this an interior or exterior space?

Resolution: Interior space with a high top table and storage within the open office used to help break up workstation clusters

104
31 Oct 2022
General
Bidder Comment: Is the Point of Sale Computer Station for public access or is this behind the reception counter?

Resolution: Behind reception

105
31 Oct 2022
General
Bidder Comment: The USDA space requirements summary table spreadsheet shows (34) 6x6 workstations required, but the 5.2.B Space Program Table calls for a quantity of 36. Please clarify the number of workstations required.

Resolution: Use the Space Program Table

106
31 Oct 2022
General
Bidder Comment: The USDA space requirements summary table spreadsheet shows Collaborative Team Area at 100 sf, but the 5.2.B Space Program Table calls for 120 sf. Please clarify which preferred.

Resolution: Use the Space Program Table

107
31 Oct 2022
General
Bidder Comment: The USDA space requirements summary table spreadsheet shows (3) Small Secure Storage rooms at 36 sf each, but the 5.2.B Space Program Table calls for 1 Medium Secure Storage at 150 sf. Please clarify which is preferred.

Resolution: Use the Space Program Table

108
31 Oct 2022
General
Bidder Comment: D3060 of the Design and Construction Standards says “Do not use DDC systems without the prior approval of the Forest Service.” Is a DDC system approved for this project? If so, what protocol do you use, BACnet or Lonworks? Demand control ventilation (DVC) with CO2 sensors requires logic usually done with DDC systems.

Resolution: All controls shall be able to operate without access to any wide area network. Network access for initial startup and commissioning is the responsibility of the contractor. Proposed designs with DDC systems should demonstrate the benefit to the government of the additional complexity of the control systems proposed.

109
31 Oct 2022
General
Bidder Comment: Which spaces in the workshop require cooling or dehumidification?

Resolution: Restrooms, Shower rooms, Janitor, and the workroom

110
31 Oct 2022
General
Bidder Comment: Please clarify if a security fence is required around the office and office parking area of the site. Also, if office area of the site and warehouse area of the site have a combined security perimeter fence, is a security fence between the two areas of the site required?

Resolution: The Government’s intent is for a secure perimeter clearly separating the secure zone from the public zone. Contractors have flexibility in which zone the employee parking is located and should demonstrate the benefit to the government as part of the integrated design solution. There are no requirements for separate site zones within the secure perimeter

Bidder Comment:

Resolution:

Bidder Comment:

Bidder Comment:

Bidder Comment:

Bidder Comment:

Bidder Comment:

Bidder Comment:

Bidder Comment:

Bidder Comment:

Bidder Comment:

PAGE

SD FORM 818, JAN 09

PREVIOUS EDITION IS OBSOLETE

File details come from the government source that posted it. Updated .