Appendix B - Matrix.pdf
PDF 363 KB Posted
- Attached to
- CM Services - KSC Student Center, Mabel Brown Room Theatrical and House Lighting Upgrades
- Solicitation number
- 212027989
- Issued by
- New Hampshire
About this file
This document is a Construction Management (CM) Services Fee and General Conditions Matrix prepared for Keene State College (KSC), part of the University System of New Hampshire (USNH), for the Student Center Mabel Brown Room Theatrical and House Lighting Upgrades project. The matrix is designed to be completed by short-listed firms and requires bidders to provide preliminary assumptions including preconstruction and construction phase dates (in MM/YYYY format) along with a construction cost estimate. The form establishes a comprehensive framework for categorizing project costs and fees across multiple service delivery models.
The matrix enables bidders to allocate approximately 100+ line items across five cost categories: General Conditions, CM Fee, Pre-Construction Fee, Owner Supplied, and Cost of Work. Line items span personnel (project executive, managers, engineers, superintendents), project management and administration, temporary facilities and services (toilets, plumbing, power, heating), equipment and tools, insurance and bonding, waste management, site protection, office expenses, and specialized services such as building commissioning and hazardous materials abatement. Specific items already marked with an "X" by the College indicate predetermined allocations, including Builder's Risk Insurance, General Liability Insurance, Worker's Compensation Insurance, Performance Bonds, Materials Testing Services, Building Commissioning, Hazardous Materials Abatement and Disposal, Punchlist development, HVAC Commissioning, and Demonstration and Training. Bidders must complete the matrix by inserting "X" marks under appropriate categories for each item and provide total dollar amounts for General Conditions with supporting comments as needed.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
August 21, 2026 Page 1
APPENDIX B – CM SERVICES FEE AND GENERAL CONDITIONS MATRIX
(to be submitted by short-listed firms only)
Firm: _________________________________________
PRELIMINARY ASSUMPTIONS:
Preconstruction: (list dates in MM/YYYY - MM/YYYY format) _______________________________________ Construction: (list dates in MM/YYYY - MM/YYY format) ______________________________________ Construction Cost Estimate: ____________________________________
DESCRIPTION (Insert an X under the appropriate category for each item below.)
General
Conditions
CM
Fee
Pre- Con Fee
Owner Supplied
Cost of Work
Provide Total Dollar Amount for General Conditions Comments
General Profit Corporate Officers’ Salaries & Benefits Home Office Rent Home Office Autos and Travel Home Office Overhead Interest on Borrowed Capital Payroll/Bookkeeping Other:
Other:
Other:
Project Management Project Executive Project Manager Project Engineer Estimator Scheduler Superintendent Field Engineers Accounting Support Safety Officer/Director Admin. Support Labor Relations/Personnel Purchasing
August 21, 2026 Page 2 CM Services Fee and General Conditions Matrix
CM
Fee
Pre- Con Fee
Owner Supplied
Cost of Work
Provide Total Dollar Amount for General Conditions Comments
Travel/Tolls Lodging Temporary Housing Project Vehicles Surveying Shop Drawings As-Built Drawings O+M Manuals Mobilize/Demobilize Safety Program Mock-Ups Materials Testing Services X Other Other Insurance/Bonding/Taxes/Permits Builder's Risk Insurance X General Liability Insurance Worker's Compensation Insurance Performance Bond Other Temporary Services Temp. Toilets Temp. Plumbing Temp. Power/Lighting Temp. Heat & Cooling Equip.
Temp. Fire Protection Temp. Fire Alarm Temp. Parking Area Off-Campus Parking Shuttle to Parking Dust & Noise Control Safety Procedures Temp. Heat Fuel Electric Power Consumption Winter Conditions
August 21, 2026 Page 3 CM Services Fee and General Conditions Matrix
CM
Fee
Pre- Con Fee
Owner Supplied
Cost of Work
Provide Total Dollar Amount for General Conditions Comments
Tool Rental Enclosures Storage Trailers Snow Removal Construction Fencing Staging Area/Access Roads Equipment Rentals Guardrail & Protection at Openings Barriers Watchman/Guard Services/Traffic Controls Police Detail Lull Lifts Scaffolding Shoring Ladders/Ramps and Temp. Stairs Pest Control Hoisting, Rigging and Cranes Other:
Other:
Other:
Temporary Protection General Protection & Safety - Materials Protect Finish Work First Aid Fire Extinguishers Other Other Other Rubbish, Recycling & Cleanup Trash Chutes Dumpsters & Tipping Fees Recycling Containers Street Cleaning Storm Drain Cleaning
August 21, 2026 Page 4 CM Services Fee and General Conditions Matrix
CM
Fee
Pre- Con Fee
Owner Supplied
Cost of Work
Provide Total Dollar Amount for General Conditions Comments
General Cleaning Final Cleaning Exterior Window Cleaning Other Other Field Office Expenses Field Office Rental Office Computers Office Furniture Office Equip.
Supplies Project Sign Temp. Signage Telephone/Facsimile Postage, Messengers Reproduction/Printing 2-Way Radios Cellular Phones Travel Progress Photos Misc. General Expenses Sanitary Facilities Small Tools Tools & Consumables Engineer's Layout Supplies Weather Gear for Staff Plan and Spec Reproduction for GMP Bid Other Other Other Other Other Building Commissioning X X Building Commissioning Mutual
Collaboration between Contractor and College Commissioning Agent
August 21, 2026 Page 5 CM Services Fee and General Conditions Matrix
CM
Fee
Pre- Con Fee
Owner Supplied
Cost of Work
Provide Total Dollar Amount for General Conditions Comments
Haz Mat Abatement X Haz Mat Disposal X Punchlist X X Keene State College will develop a
Punchlist to supplement CM's Punchlist
HVAC Commissioning X Demonstration & Training
| Firm: |
| Preconstruction list dates in MMYYYY MMYYYY format: |
| Construction list dates in MMYYYY MMYYY format: |
| Construction Cost Estimate: |
| DESCRIPTION Insert an X under the appropriate category for each item below: |
| General ConditionsGeneral: |
| CM FeeGeneral: |
| Pre Con FeeGeneral: |
| Owner SuppliedGeneral: |
| Cost of WorkGeneral: |
| Provide Total Dollar Amount for General ConditionsGeneral: |
| CommentsGeneral: |
| General ConditionsProfit: |
| CM FeeProfit: |
| Pre Con FeeProfit: |
| Owner SuppliedProfit: |
| Cost of WorkProfit: |
| Provide Total Dollar Amount for General ConditionsProfit: |
| CommentsProfit: |
| General ConditionsCorporate Officers Salaries Benefits: |
| CM FeeCorporate Officers Salaries Benefits: |
| Pre Con FeeCorporate Officers Salaries Benefits: |
| Owner SuppliedCorporate Officers Salaries Benefits: |
| Cost of WorkCorporate Officers Salaries Benefits: |
| Provide Total Dollar Amount for General ConditionsCorporate Officers Salaries Benefits: |
| CommentsCorporate Officers Salaries Benefits: |
| General ConditionsHome Office Rent: |
| CM FeeHome Office Rent: |
| Pre Con FeeHome Office Rent: |
| Owner SuppliedHome Office Rent: |
| Cost of WorkHome Office Rent: |
| Provide Total Dollar Amount for General ConditionsHome Office Rent: |
| CommentsHome Office Rent: |
| General ConditionsHome Office Autos and Travel: |
| CM FeeHome Office Autos and Travel: |
| Pre Con FeeHome Office Autos and Travel: |
| Owner SuppliedHome Office Autos and Travel: |
| Cost of WorkHome Office Autos and Travel: |
| Provide Total Dollar Amount for General ConditionsHome Office Autos and Travel: |
| CommentsHome Office Autos and Travel: |
| General ConditionsHome Office Overhead: |
| CM FeeHome Office Overhead: |
| Pre Con FeeHome Office Overhead: |
| Owner SuppliedHome Office Overhead: |
| Cost of WorkHome Office Overhead: |
| Provide Total Dollar Amount for General ConditionsHome Office Overhead: |
| CommentsHome Office Overhead: |
| General ConditionsInterest on Borrowed Capital: |
| CM FeeInterest on Borrowed Capital: |
| Pre Con FeeInterest on Borrowed Capital: |
| Owner SuppliedInterest on Borrowed Capital: |
| Cost of WorkInterest on Borrowed Capital: |
| Provide Total Dollar Amount for General ConditionsInterest on Borrowed Capital: |
| CommentsInterest on Borrowed Capital: |
| General ConditionsPayrollBookkeeping: |
| CM FeePayrollBookkeeping: |
| Pre Con FeePayrollBookkeeping: |
| Owner SuppliedPayrollBookkeeping: |
| Cost of WorkPayrollBookkeeping: |
| Provide Total Dollar Amount for General ConditionsPayrollBookkeeping: |
| CommentsPayrollBookkeeping: |
| General ConditionsOther: |
| CM FeeOther: |
| Pre Con FeeOther: |
| Owner SuppliedOther: |
| Cost of WorkOther: |
| Provide Total Dollar Amount for General ConditionsOther: |
| CommentsOther: |
| General ConditionsOther_2: |
| CM FeeOther_2: |
| Pre Con FeeOther_2: |
| Owner SuppliedOther_2: |
| Cost of WorkOther_2: |
| Provide Total Dollar Amount for General ConditionsOther_2: |
| CommentsOther_2: |
| General ConditionsOther_3: |
| CM FeeOther_3: |
| Pre Con FeeOther_3: |
| Owner SuppliedOther_3: |
| Cost of WorkOther_3: |
| Provide Total Dollar Amount for General ConditionsOther_3: |
| CommentsOther_3: |
| Project Management: |
| Project Executive: |
| Project Manager: |
| Project Engineer: |
| Estimator: |
| Scheduler: |
| Superintendent: |
| Field Engineers: |
| Accounting Support: |
| Safety OfficerDirector: |
| Admin Support: |
| Labor RelationsPersonnel: |
| Purchasing: |
| DESCRIPTION Insert an X under the appropriate category for each item below_2: |
| General ConditionsTravelTolls: |
| CM FeeTravelTolls: |
| Pre Con FeeTravelTolls: |
| Owner SuppliedTravelTolls: |
| Cost of WorkTravelTolls: |
| Provide Total Dollar Amount for General ConditionsTravelTolls: |
| CommentsTravelTolls: |
| General ConditionsLodging: |
| CM FeeLodging: |
| Pre Con FeeLodging: |
| Owner SuppliedLodging: |
| Cost of WorkLodging: |
| Provide Total Dollar Amount for General ConditionsLodging: |
| CommentsLodging: |
| General ConditionsTemporary Housing: |
| CM FeeTemporary Housing: |
| Pre Con FeeTemporary Housing: |
| Owner SuppliedTemporary Housing: |
| Cost of WorkTemporary Housing: |
| Provide Total Dollar Amount for General ConditionsTemporary Housing: |
| CommentsTemporary Housing: |
| General ConditionsProject Vehicles: |
| CM FeeProject Vehicles: |
| Pre Con FeeProject Vehicles: |
| Owner SuppliedProject Vehicles: |
| Cost of WorkProject Vehicles: |
| Provide Total Dollar Amount for General ConditionsProject Vehicles: |
| CommentsProject Vehicles: |
| General ConditionsSurveying: |
| CM FeeSurveying: |
| Pre Con FeeSurveying: |
| Owner SuppliedSurveying: |
| Cost of WorkSurveying: |
| Provide Total Dollar Amount for General ConditionsSurveying: |
| CommentsSurveying: |
| General ConditionsShop Drawings: |
| CM FeeShop Drawings: |
| Pre Con FeeShop Drawings: |
| Owner SuppliedShop Drawings: |
| Cost of WorkShop Drawings: |
| Provide Total Dollar Amount for General ConditionsShop Drawings: |
| CommentsShop Drawings: |
| General ConditionsAsBuilt Drawings: |
| CM FeeAsBuilt Drawings: |
| Pre Con FeeAsBuilt Drawings: |
| Owner SuppliedAsBuilt Drawings: |
| Cost of WorkAsBuilt Drawings: |
| Provide Total Dollar Amount for General ConditionsAsBuilt Drawings: |
| CommentsAsBuilt Drawings: |
| General ConditionsOM Manuals: |
| CM FeeOM Manuals: |
| Pre Con FeeOM Manuals: |
| Owner SuppliedOM Manuals: |
| Cost of WorkOM Manuals: |
| Provide Total Dollar Amount for General ConditionsOM Manuals: |
| CommentsOM Manuals: |
| General ConditionsMobilizeDemobilize: |
| CM FeeMobilizeDemobilize: |
| Pre Con FeeMobilizeDemobilize: |
| Owner SuppliedMobilizeDemobilize: |
| Cost of WorkMobilizeDemobilize: |
| Provide Total Dollar Amount for General ConditionsMobilizeDemobilize: |
| CommentsMobilizeDemobilize: |
| General ConditionsSafety Program: |
| CM FeeSafety Program: |
| Pre Con FeeSafety Program: |
| Owner SuppliedSafety Program: |
| Cost of WorkSafety Program: |
| Provide Total Dollar Amount for General ConditionsSafety Program: |
| CommentsSafety Program: |
| General ConditionsMockUps: |
| CM FeeMockUps: |
| Pre Con FeeMockUps: |
| Owner SuppliedMockUps: |
| Cost of WorkMockUps: |
| Provide Total Dollar Amount for General ConditionsMockUps: |
| CommentsMockUps: |
| General ConditionsMaterials Testing Services: |
| CM FeeMaterials Testing Services: |
| Pre Con FeeMaterials Testing Services: |
| Cost of WorkX: |
| Provide Total Dollar Amount for General ConditionsX: |
| CommentsX: |
| General ConditionsOther_4: |
| CM FeeOther_4: |
| Pre Con FeeOther_4: |
| XOther: |
| Cost of WorkOther_4: |
| Provide Total Dollar Amount for General ConditionsOther_4: |
| CommentsOther_4: |
| General ConditionsOther_5: |
| CM FeeOther_5: |
| Pre Con FeeOther_5: |
| XOther_2: |
| Cost of WorkOther_5: |
| Provide Total Dollar Amount for General ConditionsOther_5: |
| CommentsOther_5: |
| General ConditionsInsuranceBondingTaxesPermits: |
| CM FeeInsuranceBondingTaxesPermits: |
| Pre Con FeeInsuranceBondingTaxesPermits: |
| XInsuranceBondingTaxesPermits: |
| Cost of WorkInsuranceBondingTaxesPermits: |
| Provide Total Dollar Amount for General ConditionsInsuranceBondingTaxesPermits: |
| CommentsInsuranceBondingTaxesPermits: |
| General ConditionsBuilder s Risk Insurance: |
| CM FeeBuilder s Risk Insurance: |
| Pre Con FeeBuilder s Risk Insurance: |
| Cost of WorkX_2: |
| Provide Total Dollar Amount for General ConditionsX_2: |
| CommentsX_2: |
| General ConditionsGeneral Liability Insurance: |
| CM FeeGeneral Liability Insurance: |
| Pre Con FeeGeneral Liability Insurance: |
| XGeneral Liability Insurance: |
| Cost of WorkGeneral Liability Insurance: |
| Provide Total Dollar Amount for General ConditionsGeneral Liability Insurance: |
| CommentsGeneral Liability Insurance: |
| General ConditionsWorker s Compensation Insurance: |
| CM FeeWorker s Compensation Insurance: |
| Pre Con FeeWorker s Compensation Insurance: |
| XWorker s Compensation Insurance: |
| Cost of WorkWorker s Compensation Insurance: |
| Provide Total Dollar Amount for General ConditionsWorker s Compensation Insurance: |
| CommentsWorker s Compensation Insurance: |
| General ConditionsPerformance Bond: |
| CM FeePerformance Bond: |
| Pre Con FeePerformance Bond: |
| XPerformance Bond: |
| Cost of WorkPerformance Bond: |
| Provide Total Dollar Amount for General ConditionsPerformance Bond: |
| CommentsPerformance Bond: |
| General ConditionsOther_6: |
| CM FeeOther_6: |
| Pre Con FeeOther_6: |
| XOther_3: |
| Cost of WorkOther_6: |
| Provide Total Dollar Amount for General ConditionsOther_6: |
| CommentsOther_6: |
| General ConditionsTemporary Services: |
| CM FeeTemporary Services: |
| Pre Con FeeTemporary Services: |
| XTemporary Services: |
| Cost of WorkTemporary Services: |
| Provide Total Dollar Amount for General ConditionsTemporary Services: |
| CommentsTemporary Services: |
| General ConditionsTemp Toilets: |
| CM FeeTemp Toilets: |
| Pre Con FeeTemp Toilets: |
| XTemp Toilets: |
| Cost of WorkTemp Toilets: |
| Provide Total Dollar Amount for General ConditionsTemp Toilets: |
| CommentsTemp Toilets: |
| General ConditionsTemp Plumbing: |
| CM FeeTemp Plumbing: |
| Pre Con FeeTemp Plumbing: |
| XTemp Plumbing: |
| Cost of WorkTemp Plumbing: |
| Provide Total Dollar Amount for General ConditionsTemp Plumbing: |
| CommentsTemp Plumbing: |
| General ConditionsTemp PowerLighting: |
| CM FeeTemp PowerLighting: |
| Pre Con FeeTemp PowerLighting: |
| XTemp PowerLighting: |
| Cost of WorkTemp PowerLighting: |
| Provide Total Dollar Amount for General ConditionsTemp PowerLighting: |
| CommentsTemp PowerLighting: |
| General ConditionsTemp Heat Cooling Equip: |
| CM FeeTemp Heat Cooling Equip: |
| Pre Con FeeTemp Heat Cooling Equip: |
| XTemp Heat Cooling Equip: |
| Cost of WorkTemp Heat Cooling Equip: |
| Provide Total Dollar Amount for General ConditionsTemp Heat Cooling Equip: |
| CommentsTemp Heat Cooling Equip: |
| General ConditionsTemp Fire Protection: |
| CM FeeTemp Fire Protection: |
| Pre Con FeeTemp Fire Protection: |
| XTemp Fire Protection: |
| Cost of WorkTemp Fire Protection: |
| Provide Total Dollar Amount for General ConditionsTemp Fire Protection: |
| CommentsTemp Fire Protection: |
| General ConditionsTemp Fire Alarm: |
| CM FeeTemp Fire Alarm: |
| Pre Con FeeTemp Fire Alarm: |
| XTemp Fire Alarm: |
| Cost of WorkTemp Fire Alarm: |
| Provide Total Dollar Amount for General ConditionsTemp Fire Alarm: |
| CommentsTemp Fire Alarm: |
| General ConditionsTemp Parking Area: |
| CM FeeTemp Parking Area: |
| Pre Con FeeTemp Parking Area: |
| XTemp Parking Area: |
| Cost of WorkTemp Parking Area: |
| Provide Total Dollar Amount for General ConditionsTemp Parking Area: |
| CommentsTemp Parking Area: |
| General ConditionsOffCampus Parking: |
| CM FeeOffCampus Parking: |
| Pre Con FeeOffCampus Parking: |
| XOffCampus Parking: |
| Cost of WorkOffCampus Parking: |
| Provide Total Dollar Amount for General ConditionsOffCampus Parking: |
| CommentsOffCampus Parking: |
| General ConditionsShuttle to Parking: |
| CM FeeShuttle to Parking: |
| Pre Con FeeShuttle to Parking: |
| XShuttle to Parking: |
| Cost of WorkShuttle to Parking: |
| Provide Total Dollar Amount for General ConditionsShuttle to Parking: |
| CommentsShuttle to Parking: |
| General ConditionsDust Noise Control: |
| CM FeeDust Noise Control: |
| Pre Con FeeDust Noise Control: |
| XDust Noise Control: |
| Cost of WorkDust Noise Control: |
| Provide Total Dollar Amount for General ConditionsDust Noise Control: |
| CommentsDust Noise Control: |
| General ConditionsSafety Procedures: |
| CM FeeSafety Procedures: |
| Pre Con FeeSafety Procedures: |
| XSafety Procedures: |
| Cost of WorkSafety Procedures: |
| Provide Total Dollar Amount for General ConditionsSafety Procedures: |
| CommentsSafety Procedures: |
| General ConditionsTemp Heat Fuel: |
| CM FeeTemp Heat Fuel: |
| Pre Con FeeTemp Heat Fuel: |
| XTemp Heat Fuel: |
| Cost of WorkTemp Heat Fuel: |
| Provide Total Dollar Amount for General ConditionsTemp Heat Fuel: |
| CommentsTemp Heat Fuel: |
| General ConditionsElectric Power Consumption: |
| CM FeeElectric Power Consumption: |
| Pre Con FeeElectric Power Consumption: |
| XElectric Power Consumption: |
| Cost of WorkElectric Power Consumption: |
| Provide Total Dollar Amount for General ConditionsElectric Power Consumption: |
| CommentsElectric Power Consumption: |
| General ConditionsWinter Conditions: |
| CM FeeWinter Conditions: |
| Pre Con FeeWinter Conditions: |
| XWinter Conditions: |
| Cost of WorkWinter Conditions: |
| Provide Total Dollar Amount for General ConditionsWinter Conditions: |
| CommentsWinter Conditions: |
| DESCRIPTION Insert an X under the appropriate category for each item below_3: |
| General ConditionsTool Rental: |
| CM FeeTool Rental: |
| Pre Con FeeTool Rental: |
| Owner SuppliedTool Rental: |
| Cost of WorkTool Rental: |
| Provide Total Dollar Amount for General ConditionsTool Rental: |
| CommentsTool Rental: |
| General ConditionsEnclosures: |
| CM FeeEnclosures: |
| Pre Con FeeEnclosures: |
| Owner SuppliedEnclosures: |
| Cost of WorkEnclosures: |
| Provide Total Dollar Amount for General ConditionsEnclosures: |
| CommentsEnclosures: |
| General ConditionsStorage Trailers: |
| CM FeeStorage Trailers: |
| Pre Con FeeStorage Trailers: |
| Owner SuppliedStorage Trailers: |
| Cost of WorkStorage Trailers: |
| Provide Total Dollar Amount for General ConditionsStorage Trailers: |
| CommentsStorage Trailers: |
| General ConditionsSnow Removal: |
| CM FeeSnow Removal: |
| Pre Con FeeSnow Removal: |
| Owner SuppliedSnow Removal: |
| Cost of WorkSnow Removal: |
| Provide Total Dollar Amount for General ConditionsSnow Removal: |
| CommentsSnow Removal: |
| General ConditionsConstruction Fencing: |
| CM FeeConstruction Fencing: |
| Pre Con FeeConstruction Fencing: |
| Owner SuppliedConstruction Fencing: |
| Cost of WorkConstruction Fencing: |
| Provide Total Dollar Amount for General ConditionsConstruction Fencing: |
| CommentsConstruction Fencing: |
| General ConditionsStaging AreaAccess Roads: |
| CM FeeStaging AreaAccess Roads: |
| Pre Con FeeStaging AreaAccess Roads: |
| Owner SuppliedStaging AreaAccess Roads: |
| Cost of WorkStaging AreaAccess Roads: |
| Provide Total Dollar Amount for General ConditionsStaging AreaAccess Roads: |
| CommentsStaging AreaAccess Roads: |
| General ConditionsEquipment Rentals: |
| CM FeeEquipment Rentals: |
| Pre Con FeeEquipment Rentals: |
| Owner SuppliedEquipment Rentals: |
| Cost of WorkEquipment Rentals: |
| Provide Total Dollar Amount for General ConditionsEquipment Rentals: |
| CommentsEquipment Rentals: |
| General ConditionsGuardrail Protection at Openings: |
| CM FeeGuardrail Protection at Openings: |
| Pre Con FeeGuardrail Protection at Openings: |
| Owner SuppliedGuardrail Protection at Openings: |
| Cost of WorkGuardrail Protection at Openings: |
| Provide Total Dollar Amount for General ConditionsGuardrail Protection at Openings: |
| CommentsGuardrail Protection at Openings: |
| General ConditionsBarriers: |
| CM FeeBarriers: |
| Pre Con FeeBarriers: |
| Owner SuppliedBarriers: |
| Cost of WorkBarriers: |
| Provide Total Dollar Amount for General ConditionsBarriers: |
| CommentsBarriers: |
| General ConditionsWatchmanGuard ServicesTraffic Controls: |
| CM FeeWatchmanGuard ServicesTraffic Controls: |
| Pre Con FeeWatchmanGuard ServicesTraffic Controls: |
| Owner SuppliedWatchmanGuard ServicesTraffic Controls: |
| Cost of WorkWatchmanGuard ServicesTraffic Controls: |
| Provide Total Dollar Amount for General ConditionsWatchmanGuard ServicesTraffic Controls: |
| CommentsWatchmanGuard ServicesTraffic Controls: |
| General ConditionsPolice Detail: |
| CM FeePolice Detail: |
| Pre Con FeePolice Detail: |
| Owner SuppliedPolice Detail: |
| Cost of WorkPolice Detail: |
| Provide Total Dollar Amount for General ConditionsPolice Detail: |
| CommentsPolice Detail: |
| General ConditionsLull: |
| CM FeeLull: |
| Pre Con FeeLull: |
| Owner SuppliedLull: |
| Cost of WorkLull: |
| Provide Total Dollar Amount for General ConditionsLull: |
| CommentsLull: |
| General ConditionsLifts: |
| CM FeeLifts: |
| Pre Con FeeLifts: |
| Owner SuppliedLifts: |
| Cost of WorkLifts: |
| Provide Total Dollar Amount for General ConditionsLifts: |
| CommentsLifts: |
| General ConditionsScaffolding: |
| CM FeeScaffolding: |
| Pre Con FeeScaffolding: |
| Owner SuppliedScaffolding: |
| Cost of WorkScaffolding: |
| Provide Total Dollar Amount for General ConditionsScaffolding: |
| CommentsScaffolding: |
| General ConditionsShoring: |
| CM FeeShoring: |
| Pre Con FeeShoring: |
| Owner SuppliedShoring: |
| Cost of WorkShoring: |
| Provide Total Dollar Amount for General ConditionsShoring: |
| CommentsShoring: |
| General ConditionsLaddersRamps and Temp Stairs: |
| CM FeeLaddersRamps and Temp Stairs: |
| Pre Con FeeLaddersRamps and Temp Stairs: |
| Owner SuppliedLaddersRamps and Temp Stairs: |
| Cost of WorkLaddersRamps and Temp Stairs: |
| Provide Total Dollar Amount for General ConditionsLaddersRamps and Temp Stairs: |
| CommentsLaddersRamps and Temp Stairs: |
| General ConditionsPest Control: |
| CM FeePest Control: |
| Pre Con FeePest Control: |
| Owner SuppliedPest Control: |
| Cost of WorkPest Control: |
| Provide Total Dollar Amount for General ConditionsPest Control: |
| CommentsPest Control: |
| General ConditionsHoisting Rigging and Cranes: |
| CM FeeHoisting Rigging and Cranes: |
| Pre Con FeeHoisting Rigging and Cranes: |
| Owner SuppliedHoisting Rigging and Cranes: |
| Cost of WorkHoisting Rigging and Cranes: |
| Provide Total Dollar Amount for General ConditionsHoisting Rigging and Cranes: |
| CommentsHoisting Rigging and Cranes: |
| General ConditionsOther_7: |
| CM FeeOther_7: |
| Pre Con FeeOther_7: |
| Owner SuppliedOther_4: |
| Cost of WorkOther_7: |
| Provide Total Dollar Amount for General ConditionsOther_7: |
| CommentsOther_7: |
| General ConditionsOther_8: |
| CM FeeOther_8: |
| Pre Con FeeOther_8: |
| Owner SuppliedOther_5: |
| Cost of WorkOther_8: |
| Provide Total Dollar Amount for General ConditionsOther_8: |
| CommentsOther_8: |
| General ConditionsOther_9: |
| CM FeeOther_9: |
| Pre Con FeeOther_9: |
| Owner SuppliedOther_6: |
| Cost of WorkOther_9: |
| Provide Total Dollar Amount for General ConditionsOther_9: |
| CommentsOther_9: |
| General ConditionsTemporary Protection: |
| CM FeeTemporary Protection: |
| Pre Con FeeTemporary Protection: |
| Owner SuppliedTemporary Protection: |
| Cost of WorkTemporary Protection: |
| Provide Total Dollar Amount for General ConditionsTemporary Protection: |
| CommentsTemporary Protection: |
| General ConditionsGeneral Protection Safety Materials: |
| CM FeeGeneral Protection Safety Materials: |
| Pre Con FeeGeneral Protection Safety Materials: |
| Owner SuppliedGeneral Protection Safety Materials: |
| Cost of WorkGeneral Protection Safety Materials: |
| Provide Total Dollar Amount for General ConditionsGeneral Protection Safety Materials: |
| CommentsGeneral Protection Safety Materials: |
| General ConditionsProtect Finish Work: |
| CM FeeProtect Finish Work: |
| Pre Con FeeProtect Finish Work: |
| Owner SuppliedProtect Finish Work: |
| Cost of WorkProtect Finish Work: |
| Provide Total Dollar Amount for General ConditionsProtect Finish Work: |
| CommentsProtect Finish Work: |
| General ConditionsFirst Aid: |
| CM FeeFirst Aid: |
| Pre Con FeeFirst Aid: |
| Owner SuppliedFirst Aid: |
| Cost of WorkFirst Aid: |
| Provide Total Dollar Amount for General ConditionsFirst Aid: |
| CommentsFirst Aid: |
| General ConditionsFire Extinguishers: |
| CM FeeFire Extinguishers: |
| Pre Con FeeFire Extinguishers: |
| Owner SuppliedFire Extinguishers: |
| Cost of WorkFire Extinguishers: |
| Provide Total Dollar Amount for General ConditionsFire Extinguishers: |
| CommentsFire Extinguishers: |
| General ConditionsOther_10: |
| CM FeeOther_10: |
| Pre Con FeeOther_10: |
| Owner SuppliedOther_7: |
| Cost of WorkOther_10: |
| Provide Total Dollar Amount for General ConditionsOther_10: |
| CommentsOther_10: |
| General ConditionsOther_11: |
| CM FeeOther_11: |
| Pre Con FeeOther_11: |
| Owner SuppliedOther_8: |
| Cost of WorkOther_11: |
| Provide Total Dollar Amount for General ConditionsOther_11: |
| CommentsOther_11: |
| General ConditionsOther_12: |
| CM FeeOther_12: |
| Pre Con FeeOther_12: |
| Owner SuppliedOther_9: |
| Cost of WorkOther_12: |
| Provide Total Dollar Amount for General ConditionsOther_12: |
| CommentsOther_12: |
| General ConditionsRubbish Recycling Cleanup: |
| CM FeeRubbish Recycling Cleanup: |
| Pre Con FeeRubbish Recycling Cleanup: |
| Owner SuppliedRubbish Recycling Cleanup: |
| Cost of WorkRubbish Recycling Cleanup: |
| Provide Total Dollar Amount for General ConditionsRubbish Recycling Cleanup: |
| CommentsRubbish Recycling Cleanup: |
| General ConditionsTrash Chutes: |
| CM FeeTrash Chutes: |
| Pre Con FeeTrash Chutes: |
| Owner SuppliedTrash Chutes: |
| Cost of WorkTrash Chutes: |
| Provide Total Dollar Amount for General ConditionsTrash Chutes: |
| CommentsTrash Chutes: |
| General ConditionsDumpsters Tipping Fees: |
| CM FeeDumpsters Tipping Fees: |
| Pre Con FeeDumpsters Tipping Fees: |
| Owner SuppliedDumpsters Tipping Fees: |
| Cost of WorkDumpsters Tipping Fees: |
| Provide Total Dollar Amount for General ConditionsDumpsters Tipping Fees: |
| CommentsDumpsters Tipping Fees: |
| General ConditionsRecycling Containers: |
| CM FeeRecycling Containers: |
| Pre Con FeeRecycling Containers: |
| Owner SuppliedRecycling Containers: |
| Cost of WorkRecycling Containers: |
| Provide Total Dollar Amount for General ConditionsRecycling Containers: |
| CommentsRecycling Containers: |
| General ConditionsStreet Cleaning: |
| CM FeeStreet Cleaning: |
| Pre Con FeeStreet Cleaning: |
| Owner SuppliedStreet Cleaning: |
| Cost of WorkStreet Cleaning: |
| Provide Total Dollar Amount for General ConditionsStreet Cleaning: |
| CommentsStreet Cleaning: |
| General ConditionsStorm Drain Cleaning: |
| CM FeeStorm Drain Cleaning: |
| Pre Con FeeStorm Drain Cleaning: |
| Owner SuppliedStorm Drain Cleaning: |
| Cost of WorkStorm Drain Cleaning: |
| Provide Total Dollar Amount for General ConditionsStorm Drain Cleaning: |
| CommentsStorm Drain Cleaning: |
| DESCRIPTION Insert an X under the appropriate category for each item below_4: |
| General ConditionsGeneral Cleaning: |
| CM FeeGeneral Cleaning: |
| Pre Con FeeGeneral Cleaning: |
| Owner SuppliedGeneral Cleaning: |
| Cost of WorkGeneral Cleaning: |
| Provide Total Dollar Amount for General ConditionsGeneral Cleaning: |
| CommentsGeneral Cleaning: |
| General ConditionsFinal Cleaning: |
| CM FeeFinal Cleaning: |
| Pre Con FeeFinal Cleaning: |
| Owner SuppliedFinal Cleaning: |
| Cost of WorkFinal Cleaning: |
| Provide Total Dollar Amount for General ConditionsFinal Cleaning: |
| CommentsFinal Cleaning: |
| General ConditionsExterior Window Cleaning: |
| CM FeeExterior Window Cleaning: |
| Pre Con FeeExterior Window Cleaning: |
| Owner SuppliedExterior Window Cleaning: |
| Cost of WorkExterior Window Cleaning: |
| Provide Total Dollar Amount for General ConditionsExterior Window Cleaning: |
| CommentsExterior Window Cleaning: |
| General ConditionsOther_13: |
| CM FeeOther_13: |
| Pre Con FeeOther_13: |
| Owner SuppliedOther_10: |
| Cost of WorkOther_13: |
| Provide Total Dollar Amount for General ConditionsOther_13: |
| CommentsOther_13: |
| General ConditionsOther_14: |
| CM FeeOther_14: |
| Pre Con FeeOther_14: |
| Owner SuppliedOther_11: |
| Cost of WorkOther_14: |
| Provide Total Dollar Amount for General ConditionsOther_14: |
| CommentsOther_14: |
| General ConditionsField Office Expenses: |
| CM FeeField Office Expenses: |
| Pre Con FeeField Office Expenses: |
| Owner SuppliedField Office Expenses: |
| Cost of WorkField Office Expenses: |
| Provide Total Dollar Amount for General ConditionsField Office Expenses: |
| CommentsField Office Expenses: |
| General ConditionsField Office Rental: |
| CM FeeField Office Rental: |
| Pre Con FeeField Office Rental: |
| Owner SuppliedField Office Rental: |
| Cost of WorkField Office Rental: |
| Provide Total Dollar Amount for General ConditionsField Office Rental: |
| CommentsField Office Rental: |
| General ConditionsOffice Computers: |
| CM FeeOffice Computers: |
| Pre Con FeeOffice Computers: |
| Owner SuppliedOffice Computers: |
| Cost of WorkOffice Computers: |
| Provide Total Dollar Amount for General ConditionsOffice Computers: |
| CommentsOffice Computers: |
| General ConditionsOffice Furniture: |
| CM FeeOffice Furniture: |
| Pre Con FeeOffice Furniture: |
| Owner SuppliedOffice Furniture: |
| Cost of WorkOffice Furniture: |
| Provide Total Dollar Amount for General ConditionsOffice Furniture: |
| CommentsOffice Furniture: |
| General ConditionsOffice Equip: |
| CM FeeOffice Equip: |
| Pre Con FeeOffice Equip: |
| Owner SuppliedOffice Equip: |
| Cost of WorkOffice Equip: |
| Provide Total Dollar Amount for General ConditionsOffice Equip: |
| CommentsOffice Equip: |
| General ConditionsSupplies: |
| CM FeeSupplies: |
| Pre Con FeeSupplies: |
| Owner SuppliedSupplies: |
| Cost of WorkSupplies: |
| Provide Total Dollar Amount for General ConditionsSupplies: |
| CommentsSupplies: |
| General ConditionsProject Sign: |
| CM FeeProject Sign: |
| Pre Con FeeProject Sign: |
| Owner SuppliedProject Sign: |
| Cost of WorkProject Sign: |
| Provide Total Dollar Amount for General ConditionsProject Sign: |
| CommentsProject Sign: |
| General ConditionsTemp Signage: |
| CM FeeTemp Signage: |
| Pre Con FeeTemp Signage: |
| Owner SuppliedTemp Signage: |
| Cost of WorkTemp Signage: |
| Provide Total Dollar Amount for General ConditionsTemp Signage: |
| CommentsTemp Signage: |
| General ConditionsTelephoneFacsimile: |
| CM FeeTelephoneFacsimile: |
| Pre Con FeeTelephoneFacsimile: |
| Owner SuppliedTelephoneFacsimile: |
| Cost of WorkTelephoneFacsimile: |
| Provide Total Dollar Amount for General ConditionsTelephoneFacsimile: |
| CommentsTelephoneFacsimile: |
| General ConditionsPostage Messengers: |
| CM FeePostage Messengers: |
| Pre Con FeePostage Messengers: |
| Owner SuppliedPostage Messengers: |
| Cost of WorkPostage Messengers: |
| Provide Total Dollar Amount for General ConditionsPostage Messengers: |
| CommentsPostage Messengers: |
| General ConditionsReproductionPrinting: |
| CM FeeReproductionPrinting: |
| Pre Con FeeReproductionPrinting: |
| Owner SuppliedReproductionPrinting: |
| Cost of WorkReproductionPrinting: |
| Provide Total Dollar Amount for General ConditionsReproductionPrinting: |
| CommentsReproductionPrinting: |
| General Conditions2Way Radios: |
| CM Fee2Way Radios: |
| Pre Con Fee2Way Radios: |
| Owner Supplied2Way Radios: |
| Cost of Work2Way Radios: |
| Provide Total Dollar Amount for General Conditions2Way Radios: |
| Comments2Way Radios: |
| General ConditionsCellular Phones: |
| CM FeeCellular Phones: |
| Pre Con FeeCellular Phones: |
| Owner SuppliedCellular Phones: |
| Cost of WorkCellular Phones: |
| Provide Total Dollar Amount for General ConditionsCellular Phones: |
| CommentsCellular Phones: |
| General ConditionsTravel: |
| CM FeeTravel: |
| Pre Con FeeTravel: |
| Owner SuppliedTravel: |
| Cost of WorkTravel: |
| Provide Total Dollar Amount for General ConditionsTravel: |
| CommentsTravel: |
| General ConditionsProgress Photos: |
| CM FeeProgress Photos: |
| Pre Con FeeProgress Photos: |
| Owner SuppliedProgress Photos: |
| Cost of WorkProgress Photos: |
| Provide Total Dollar Amount for General ConditionsProgress Photos: |
| CommentsProgress Photos: |
| General ConditionsMisc General Expenses: |
| CM FeeMisc General Expenses: |
| Pre Con FeeMisc General Expenses: |
| Owner SuppliedMisc General Expenses: |
| Cost of WorkMisc General Expenses: |
| Provide Total Dollar Amount for General ConditionsMisc General Expenses: |
| CommentsMisc General Expenses: |
| General ConditionsSanitary Facilities: |
| CM FeeSanitary Facilities: |
| Pre Con FeeSanitary Facilities: |
| Owner SuppliedSanitary Facilities: |
| Cost of WorkSanitary Facilities: |
| Provide Total Dollar Amount for General ConditionsSanitary Facilities: |
| CommentsSanitary Facilities: |
| General ConditionsSmall Tools: |
| CM FeeSmall Tools: |
| Pre Con FeeSmall Tools: |
| Owner SuppliedSmall Tools: |
| Cost of WorkSmall Tools: |
| Provide Total Dollar Amount for General ConditionsSmall Tools: |
| CommentsSmall Tools: |
| General ConditionsTools Consumables: |
| CM FeeTools Consumables: |
| Pre Con FeeTools Consumables: |
| Owner SuppliedTools Consumables: |
| Cost of WorkTools Consumables: |
| Provide Total Dollar Amount for General ConditionsTools Consumables: |
| CommentsTools Consumables: |
| General ConditionsEngineer s Layout Supplies: |
| CM FeeEngineer s Layout Supplies: |
| Pre Con FeeEngineer s Layout Supplies: |
| Owner SuppliedEngineer s Layout Supplies: |
| Cost of WorkEngineer s Layout Supplies: |
| Provide Total Dollar Amount for General ConditionsEngineer s Layout Supplies: |
| CommentsEngineer s Layout Supplies: |
| General ConditionsWeather Gear for Staff: |
| CM FeeWeather Gear for Staff: |
| Pre Con FeeWeather Gear for Staff: |
| Owner SuppliedWeather Gear for Staff: |
| Cost of WorkWeather Gear for Staff: |
| Provide Total Dollar Amount for General ConditionsWeather Gear for Staff: |
| CommentsWeather Gear for Staff: |
| General ConditionsPlan and Spec Reproduction for GMP Bid: |
| CM FeePlan and Spec Reproduction for GMP Bid: |
| Pre Con FeePlan and Spec Reproduction for GMP Bid: |
| Owner SuppliedPlan and Spec Reproduction for GMP Bid: |
| Cost of WorkPlan and Spec Reproduction for GMP Bid: |
| Provide Total Dollar Amount for General ConditionsPlan and Spec Reproduction for GMP Bid: |
| CommentsPlan and Spec Reproduction for GMP Bid: |
| General ConditionsOther_15: |
| CM FeeOther_15: |
| Pre Con FeeOther_15: |
| Owner SuppliedOther_12: |
| Cost of WorkOther_15: |
| Provide Total Dollar Amount for General ConditionsOther_15: |
| CommentsOther_15: |
| General ConditionsOther_16: |
| CM FeeOther_16: |
| Pre Con FeeOther_16: |
| Owner SuppliedOther_13: |
| Cost of WorkOther_16: |
| Provide Total Dollar Amount for General ConditionsOther_16: |
| CommentsOther_16: |
| General ConditionsOther_17: |
| CM FeeOther_17: |
| Pre Con FeeOther_17: |
| Owner SuppliedOther_14: |
| Cost of WorkOther_17: |
| Provide Total Dollar Amount for General ConditionsOther_17: |
| CommentsOther_17: |
| General ConditionsOther_18: |
| CM FeeOther_18: |
| Pre Con FeeOther_18: |
| Owner SuppliedOther_15: |
| Cost of WorkOther_18: |
| Provide Total Dollar Amount for General ConditionsOther_18: |
| CommentsOther_18: |
| General ConditionsOther_19: |
| CM FeeOther_19: |
| Pre Con FeeOther_19: |
| Owner SuppliedOther_16: |
| Cost of WorkOther_19: |
| Provide Total Dollar Amount for General ConditionsOther_19: |
| CommentsOther_19: |
| General ConditionsBuilding Commissioning: |
| undefined: |
| X: |
| Provide Total Dollar Amount for General ConditionsX_3: |
| DESCRIPTION Insert an X under the appropriate category for each item below_5: |
| General ConditionsHaz Mat Abatement: |
| CM FeeHaz Mat Abatement: |
| Pre Con FeeHaz Mat Abatement: |
| Cost of WorkX_3: |
| Provide Total Dollar Amount for General ConditionsX_4: |
| CommentsX_3: |
| General ConditionsHaz Mat Disposal: |
| CM FeeHaz Mat Disposal: |
| Pre Con FeeHaz Mat Disposal: |
| Cost of WorkX_4: |
| Provide Total Dollar Amount for General ConditionsX_5: |
| CommentsX_4: |
| Punchlist: |
| X_2: |
| Cost of WorkX_5: |
| Provide Total Dollar Amount for General ConditionsX_6: |
| XHVAC Commissioning: |
| CM FeeHVAC Commissioning: |
| Pre Con FeeHVAC Commissioning: |
| Cost of WorkX_6: |
| Provide Total Dollar Amount for General ConditionsX_7: |
| Keene State College will develop a Punchlist to supplement CM s PunchlistX: |
| XDemonstration Training: |
| CM FeeDemonstration Training: |
| Pre Con FeeDemonstration Training: |
| XDemonstration Training_2: |
| Cost of WorkDemonstration Training: |
| Provide Total Dollar Amount for General ConditionsDemonstration Training: |
| Keene State College will develop a Punchlist to supplement CM s PunchlistDemonstration Training: |
File details come from the government source that posted it. Updated .