Summary

This is a 50% Construction Documents Set for the Mabel Brown Room Theatrical & House Lighting Upgrades project at Keene State College in Keene, New Hampshire, prepared by RFS Engineering and Jones Architecture, Inc. The project encompasses comprehensive theatrical and house lighting upgrades across the second and third floors of the Mabel Brown Room within the Student Center. The scope includes demolition of existing ceiling-mounted lighting fixtures, acoustic tile, and theatrical equipment; installation of new theatrical dimmer panels (two IQ48 panels and one DdR6 panel); replacement of house lighting with LED equivalents; installation of new theatrical lighting fixtures including ColorSource units, Selador fixtures, and high-end portable lighting; and implementation of an advanced lighting control system with network capabilities. The construction documents are presented in 50% completion stage, dated June 19, 2026, with architectural and electrical coordination drawings showing both base and alternate design options. The project involves detailed demolition notes, electrical plans for both floors, lighting schedules with fixture specifications, and control system wiring diagrams.

The construction documents specify multiple lighting fixture types for theatrical applications ranging from 56.8 watts to 550 watts, with manufacturers including ETC and High End Systems. The project includes both base design options utilizing standard LED fixtures with 0-10V dimming and alternate designs featuring RGBW color-mixing capabilities with DMX control. Emergency lighting provisions are integrated throughout, with emergency relay systems and dual-circuit fixtures as required. The lighting control infrastructure includes an Ion Xe 20 control console, Response MK2 gateways, Paradigm touchscreen stations, and Ethernet-based network communications. All work must comply with applicable National Electrical Code standards, NFPA guidelines, and state electrical licensing requirements. The construction documents indicate coordination between electrical contractors, architectural teams, and the owner, with specific provisions for temporary wiring during phased construction and comprehensive testing protocols for systems placed back in service during construction phases.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

www.rfsengineering.com

Boston, MA | Laconia, NH | Portland, ME

Keene State College

Mabel Brown Room Theatrical & House Lighting Upgrades

229 Main Street Keene, NH 03431

RFS Project #: 10967.001

June 19, 2026

Copyright © 2026 RFS Engineering

Drawing No.Stamp

24 Federal Street, 3rd Floor, Boston, MA 02110, 617.494.1464 71 Water Street, Laconia, NH 03246, 603.524.4647 82 Hanover Street, Suite 2, Portland, ME 04101, 207.761.4647

Jones Architecture, Inc.

10 Derby Square Salem, MA 01970

978.744.5200 www.jonesarch.com

Architect:

50% Construction Documents

/1

/2

:3

:1

P

M TS

TITLE SHEET

TS TITLE SHEET

ARCHITECTURAL

AD111 DEMO RCPS

AD420 DEMO ELEVATIONS

A111 PROPOSED RCPS

A420 PROPOSED ELEVATIONS

ELECTRICAL

E0.1 ELECTRICAL LEGEND, NOTES & ABBREVIATIONS

E0.2 ELECTRICAL SECOND FLOOR REFERENCE PLAN

E0.3 ELECTRICAL THIRD FLOOR REFERENCE PLAN

ED1.1 ELECTRICAL SECOND FLOOR DEMOLITION PLAN

ED1.2 ELECTRICAL THIRD FLOOR DEMOLITION PLAN

E1.1 ELECTRICAL SECOND FLOOR NEW CONSTRUCTION PLAN - BASE

E1.2 ELECTRICAL THIRD FLOOR NEW CONSTRUCTION PLAN - BASE

E1.3 ELECTRICAL THIRD FLOOR NEW CONSTRUCTION THEATRICAL PLAN

E1.4 ELECTRICAL SECOND FLOOR NEW CONSTRUCTION PLAN - ALTERNATE

E1.5 ELECTRICAL THIRD FLOOR NEW CONSTRUCTION PLAN - ALTERNATE

E2.1 LIGHTING SCHEDULES - BASE

E2.2 LIGHTING SCHEDULES - ALTERNATE

E2.3 ELECTRICAL LIGHTING DETAILS & DIAGRAMS

AD420

7.1

D

7.8 8.5 9.6 106.1

C

B

A

24' - 0" 18' - 0" 18' - 0" 24' - 0" 6' - 0"

LIMIT OF WORK

9' - 6"

9' - 6"

9' - 6"

9' - 6"

9' - 6"

9' - 6"

2 4

OPEN TO ABOVE

SEE 2/AD111

OPEN TO ABOVE

OPEN TO ABOVE

REFLECTED CEILING PLAN DEMO LEGEND

KEY NUMBER

DEMO TAG - SEE KEYNOTE LEGEND

EXISTING LIGHT FIXTURE TO BE REMOVED

EXISTING ACT CEILING TO BE REMOVED.

EXISTING WALL/ COLUMN TO REMAIN

EXISTING EXIT SIGN TO BE REMOVED.

REFER TO ELECTRICAL PLANS

ALSO SEE SYMBOL LEGEND ON COVERSHEET/A000

EXISTING ACT CEILING TO REMAIN.

EXISTING GWB CEILING TO REMAIN.

SPRINKLER TO BE REMAIN

SURFACE MOUNTED FIXTURE TO BE REMOVED

AND SALVAGED FOR REINSTALLATION

AD420

7.1

D

7.8 8.5 9.6 106.1

C

B

A

24' - 0" 18' - 0" 18' - 0" 24' - 0" 6' - 0"

LIMIT OF WORK

9' - 0"

15' - 4"

16' - 0"

15' - 8"

8' - 6"

9' - 0"

15' - 4"

9' - 0"9' - 0"

9' - 0"

16' - 0" 16' - 0" 16' - 0" 16' - 0"

16' - 0"16' - 0"16' - 0"16' - 0"

9' - 0"

9' - 0"

9' - 0"

15' - 8"

15' - 8"

15' - 8"

1 1

1 1

1 1

1 1

MULTI PURPOSE

RM

STAGE

STAIR 3

STAIR 4

STORAGE

SERVICE

CTRL.ROOM

CORR.

BALCONY

MULTI PURPOSE

RM

STAGE

STAIR 3

STAIR 4

STORAGE

SOUND ROOM

PROJ. ROOM

CORR.

TRASH

JAN.

A. ALL KEY NOTES INDICATE PROMINENT FEATURES OF THE DEMOLITION

PLAN. DEMOLITION PLANS ARE NOT LIMITED TO KEY NOTES. DEMOLITION

ENTAILS REMOVAL OF ELEMENTS ABOVE AND BEYOND THOSE ITEMS

INDICATED IN KEY NOTES. DEMOLITION CONTRACTOR IS REQUIRED TO

VISIT SITE TO UNDERSTAND COMPLETE SCOPE OF DEMOLITION WORK.

B. SEE MEP FOR DEMOLITION EXISTING MECHANICAL / PLUMBING AND

ELECTRICAL PIPING, VENTS, LIGHTING OR OTHER COMPONENTS.

C. REFER TO SPECIFICATION FOR GENERAL REQUIREMENTS FOR

DEMOLITION AND RELATED WORK.

D. CONTRACTOR TO DO ALL DEMOLITION WORK REQUIRED TO ACCOMPLISH

NEW CONSTRUCTION AND WORK.

E. REMOVE MEANS THAT ITEMS SHALL BE DETACHED FROM EXISTING

CONSTRUCTION AND LEGALLY DISPOSED OF OFF-SITE, UNLESS

INDICATED TO BE REMOVED AND SALVAGED OR REMOVED AND

REINSTALLED.

F. EXISTING TO REMAIN INDICATES EXISTING ITEMS OF CONSTRUCTION

THAT ARE NOT TO BE REMOVED.

G. REMOVE AND SALVAGE MEANS THAT ITEMS SHALL BE DETACHED FROM

EXISTING CONSTRUCTION AND CLEANED MOVED TO STORAGE PLACE AS

DESIGNATED BY THE OWNER.

DEMOLITION GENERAL NOTES

Drawing No.

Drawing Title

Date:

Revisions

Drawn By

Project No.

Checked By

Project Mgr.

Copyright © 2026 RFS Engineering

10967.001

50% Construction Drawings

June 19, 2026

Mabel Brown Room Theatrical & House Lighting Upgrades

Keene State College

File Name

Key Plan

Stamp

Scale

229 Main Street Keene, NH 03431 www.rfsengineering.com

24 Federal Street, 3rd Floor, Boston, MA 02110, 617.494.1464 71 Water Street, Laconia, NH 03246, 603.524.4647 82 Hanover Street, Suite 2, Portland, ME 04101, 207.761.4647

Boston, MA | Laconia, NH | Portland, ME

Jones Architecture, Inc.

10 Derby Square Salem, MA 01970

978.744.5200 www.jonesarch.com

Architect:

2622_RFS-Keene St_R24.rvt

1/8" = 1'-0"

/1

/2

:3

:3

A

M AD111

DEMO RCPS

JB

CS

CS

RCP DEMOLITION NOTES

1 REMOVE ALL ACT AND GRIDS, AS WELL AS ALL CEILING MOUNTED LIGHT FIXTURES.

ALL EXISTING CEILING MOUNTED DEVICES, EQUIPMENT, SPRINKLER HEADS, AND

DIFFUSERS AND GRILLES ARE TO REMAIN. U.N.O. ITEMS DIRECTLY ATTACHED TO THE

CEILING GRID OR TILES SHALL BE TEMPORARILY SUPPORTED AS NEEDED AND

REINSTALLED IN THE NEW GRID OR TILE IN THE SAME LOCATIONS.

2 REMOVE THEATRICAL LIGHT FIXTURES, ALSO REFER TO ELECTRICAL DRAWINGS.

3 REMOVE AND SALVAGE CEILING MOUNTED PIPE GRID FOR REINSTALLATION.

4 EXISTING CONT. CEILING MOUNTED RACEWAY TO REMAIN.

5 REMOVE AND SALVAGE "QUARTER MOON" LIGHT FIXTURES AT HIGH CEILING FOR

REINSTALLATION. REFER TO ELECTRICAL DRAWINGS.

6 REMOVE PENDANT LIGHTS ABOVE STAGE, ALSO REFER TO ELECTRICAL DRAWINGS.

7 REMOVE AND SALVAGE STAGE CURTAINS FOR REINSTALLATION.

SCALE: 1/8" = 1'-0"AD111

1 LEVEL 2 - DEMO RCP

N

4'0 8' 16'

GRAPHIC SCALE

SCALE: 1/8" = 1'-0"AD111

2 LEVEL 3 - DEMO RCP

Rev. Issued Date

LEVEL 2

EL. +13'-4" (13.33)

7.1

LEVEL 3

EL. +26'-8" (26.67)

7.8 8.5

DEMO SECTIONS OF GWB

SOFFIT AS REQD. FOR

STRUCTURAL WORK

(APPROX 70 SQFT)

HIGH CEILING

EL. +42'-8"

REMOVE AND SALVAGE

LIGHTING GRID FOR

REINSTALLATION.

REMOVE THEATRICAL

LIGHT FIXTURES

LEVEL 2

EL. +13'-4" (13.33)

7.1

LEVEL 3

EL. +26'-8" (26.67)

7.88.5

DEMO SECTIONS OF GWB

SOFFIT AS REQD. FOR

STRUCTURAL WORK

(APPROX 70 SQFT)

HIGH CEILING

EL. +42'-8"

REMOVE AND SALVAGE

LIGHTING GRID FOR

REINSTALLATION.

REMOVE THEATRICAL

LIGHT FIXTURES

LEVEL 2

EL. +13'-4" (13.33)

D

LEVEL 3

EL. +26'-8" (26.67)

C B

DEMO SECTIONS OF GWB

SOFFIT AS REQD. FOR

STRUCTURAL WORK

(APPROX 70 SQFT)

HIGH CEILING

EL. +42'-8"

REMOVE AND SALVAGE

ACOUSTIC WALL PANELS

REMOVE AND SALVAGE

LIGHTING GRID FOR

REINSTALLATION.

REMOVE THEATRICAL

LIGHT FIXTURES

Drawing No.

Drawing Title

Date:

Revisions

Drawn By

Project No.

Checked By

Project Mgr.

Copyright © 2026 RFS Engineering

10967.001

50% Construction Drawings

June 19, 2026

Mabel Brown Room Theatrical & House Lighting Upgrades

Keene State College

File Name

Key Plan

Stamp

Scale

229 Main Street Keene, NH 03431 www.rfsengineering.com

24 Federal Street, 3rd Floor, Boston, MA 02110, 617.494.1464 71 Water Street, Laconia, NH 03246, 603.524.4647 82 Hanover Street, Suite 2, Portland, ME 04101, 207.761.4647

Boston, MA | Laconia, NH | Portland, ME

Jones Architecture, Inc.

10 Derby Square Salem, MA 01970

978.744.5200 www.jonesarch.com

Architect:

2622_RFS-Keene St_R24.rvt

1/8" = 1'-0"

/1

/2

:3

:5

A

M AD420

DEMO ELEVATIONS

JB

CS

CS

SCALE: 1/8" = 1'-0"AD420

1 DEMO ELEVATION NORTH

SCALE: 1/8" = 1'-0"AD420

2 DEMO ELEVATION SOUTH

SCALE: 1/8" = 1'-0"AD420

3 DEMO ELEVATION WEST

REFLECTED CEILING PLAN LEGEND

ACT

2'-0" x 2'-0"

CEILING TYPES

GYPSUM BOARD

EXIT SIGN

(FILL INDICATES FACE)

RECESSED CAN

2x2 RETURN GRILL

2x2 SUPPLY GRILL2'x2' TROFFER

2'x4' TROFFER

LIGHT FIXTURES MECHANICAL ITEMS

LINEAR PENDANT

RECESSED LINEAR

RECESSED CEILING

PROJECTOR SCREEN

RADIANT CEILING

PANELS

SURFACE MOUNTED

LINEAR SUPPLY GRILL

EXPOSED

CEILING

EXPOSED

SPRINKLER HEAD

7.1

D

7.8 8.5 9.6 106.1

C

B

A

A420

24' - 0" 18' - 0" 18' - 0" 24' - 0" 6' - 0"

LIMIT OF WORK

9' - 6"

9' - 6"

MULTI PURPOSE

RM

STAGE

9' - 6"

9' - 6"

OPEN TO ABOVE,

SEE 2/A111

OPEN TO ABOVE

OPEN TO ABOVE

1 1

CORR.

CTRL.ROOM

SERVICE

STORAGE

STAIR 4

STAIR 3

7.1

D

7.8 8.5 9.6 106.1

C

B

A

A420

24' - 0" 18' - 0" 18' - 0" 24' - 0" 6' - 0"

LIMIT OF WORK

8' - 6"15' - 4"

15' - 8"

15' - 4"

9' - 0"

9' - 0"

9' - 0"

16' - 0"

15' - 8"

9' - 0"9' - 0"

9' - 0"

16' - 0"

16' - 0"

16' - 0"

16' - 0"

16' - 0"16' - 0"16' - 0"16' - 0"

9' - 0"

10' - 0"

15' - 8" 15' - 8"

15' - 4"

15' - 4"

15' - 4"

8' - 6"

8' - 6"

8' - 6"

8' - 6"

8' - 6"

8' - 6"

BALCONY

MULTI PURPOSE

RM

STAGE

CORR.

JAN.

TRASH

PROJ. ROOM

SOUND ROOM

STORAGE

STAIR 4

STAIR 3

ACOUSTIC CEILING TILE

1. BASIS OF DESIGN: ARMSTRONG DUNE, TEGULAR, 24"X24", COLOR: WHITE.

9/16" GRID.

2. ALTERNATE: ARMSTRONG FINE FISSURED, TEGULAR 24"X24", COLOR:

LIGHT GRAY. 9/16" GRID

PAINTING

1. BASIS OF DESIGN: PATCH AND PAINT THE ENTIRETY OF THE BALCONY

WALL WHERE NEW LIGHTING BARS ARE INSTALLED. MATCH EXISTING

COLOR AND SHEEN. APPROX 410 SF.

2. ALTERNATE: PAINT ALL GWB WALLS, SOFFITS/CEILINGS, AND COLUMN

ENCLOSURES WITHIN THE SPACE, APPROX X,XXX SF. NEW PAINT COLORS

TBD.

FINISHES AND ALTERNATES

Drawing No.

Drawing Title

Date:

Revisions

Drawn By

Project No.

Checked By

Project Mgr.

Copyright © 2026 RFS Engineering

10967.001

50% Construction Drawings

June 19, 2026

Mabel Brown Room Theatrical & House Lighting Upgrades

Keene State College

File Name

Key Plan

Stamp

Scale

229 Main Street Keene, NH 03431 www.rfsengineering.com

24 Federal Street, 3rd Floor, Boston, MA 02110, 617.494.1464 71 Water Street, Laconia, NH 03246, 603.524.4647 82 Hanover Street, Suite 2, Portland, ME 04101, 207.761.4647

Boston, MA | Laconia, NH | Portland, ME

Jones Architecture, Inc.

10 Derby Square Salem, MA 01970

978.744.5200 www.jonesarch.com

Architect:

2622_RFS-Keene St_R24.rvt

As indicated

/1

/2

:3

:2

A

M A111

PROPOSED RCPS

JB

CS

CS

SCALE: 1/8" = 1'-0"A111

1 LEVEL 2 - RCP

N

4'0 8' 16'

GRAPHIC SCALE

SCALE: 1/8" = 1'-0"A111

2 LEVEL 3 - RCP

RCP NEW WORK KEY NOTES 01

1 PROVIDE NEW ACT AND CEILING GRID. NEW LIGHT FIXTURES PER ELECTRICAL

DRAWINGS. REINSTALL ALL SALVAGED CEILING MOUNTED DEVICES, EUIPMENT,

SPRINKLER HEADS AND DIFFUSERS AND GRI

2 INSTALL NEW THEATRICAL LIGHT FIXTURES PER ELECTRICAL PLANS

3 REINSTALL THE EXISTING PIPE GRIDS IN THEIR ORIGINAL LOCATIONS.

4 INSTALL NEW LIGHT BAR PER STRUCTURAL DRAWINGS.

LEVEL 2

EL. +13'-4" (13.33)

7.1

LEVEL 3

EL. +26'-8" (26.67)

7.8 8.5

HIGH CEILING

EL. +42'-8"

PATCH & PAINT GWB WALL +/- 410 SF

REINSTALL LIGHTING

GRID IN EXISTING

LOCATION

REFER TO EL DRAWINGS

FOR NEW LIGHTING

NEW LIGHT BAR, REFER TO

ELECT & STRUCT DRAWINGS

LEVEL 2

EL. +13'-4" (13.33)

7.1

LEVEL 3

EL. +26'-8" (26.67)

7.88.5

HIGH CEILING

EL. +42'-8"

PATCH & PAINT GWB WALL +/- 410 SF

REINSTALL LIGHTING GRID

IN EXISTING LOCATION

REFER TO EL DRAWINGS

FOR NEW LIGHTING

NEW LIGHT BAR, REFER TO

ELECT & STRUCT DRAWINGS

LEVEL 2

EL. +13'-4" (13.33)

D

LEVEL 3

EL. +26'-8" (26.67)

C B

HIGH CEILING

EL. +42'-8"

PATCH & PAINT GWB WALL +/- 410 SF

REINSTALL LIGHTING GRID IN

EXISTING LOCATION

REFER TO EL DRAWINGS

FOR NEW LIGHTING

NEW LIGHT BAR, REFER TO

ELECT & STRUCT DRAWINGS

REINSTALL ACOUSTIC WALL

PANELS

Drawing No.

Drawing Title

Date:

Revisions

Drawn By

Project No.

Checked By

Project Mgr.

Copyright © 2026 RFS Engineering

10967.001

50% Construction Drawings

June 19, 2026

Mabel Brown Room Theatrical & House Lighting Upgrades

Keene State College

File Name

Key Plan

Stamp

Scale

229 Main Street Keene, NH 03431 www.rfsengineering.com

24 Federal Street, 3rd Floor, Boston, MA 02110, 617.494.1464 71 Water Street, Laconia, NH 03246, 603.524.4647 82 Hanover Street, Suite 2, Portland, ME 04101, 207.761.4647

Boston, MA | Laconia, NH | Portland, ME

Jones Architecture, Inc.

10 Derby Square Salem, MA 01970

978.744.5200 www.jonesarch.com

Architect:

2622_RFS-Keene St_R24.rvt

1/8" = 1'-0"

/1

/2

:3

:4

A

M A420

PROPOSED

ELEVATIONS

JB

CS

CS

SCALE: 1/8" = 1'-0"A420

1 PROPOSED ELEVATION NORTH

SCALE: 1/8" = 1'-0"A420

2 PROPOSED ELEVATION SOUTH

SCALE: 1/8" = 1'-0"A420

3 PROPOSED ELEVATION WEST

SWITCHING & WIRING LEGEND

S

S S

{ E# }

LP1(#)

SINGLE POLE SWITCH, MH = 44"AFF, UON

3 = THREE-WAY

4 = FOUR-WAY

PL = PILOT LIGHT

D = DIMMER

VS = VARIABLE SPEED CONTROLLER

K = KEY OPERATED

O = OCCUPANCY SENSOR

OD = DUAL RELAY OCCUPANCY SENSOR

T = DIGITAL TIMER

LV = LOW VOLTAGE

DOUBLE SWITCHING, ONE SWITCH SHALL CONTROL

INBOARD LAMP, OTHER SWITCH SHALL CONTROL

OUTBOARD LAMP(S) OF CONTROLLED LIGHTING CIRCUIT

LIGHTING CONTROL PANEL CIRCUIT NUMBER

EMERGENCY LIGHTING CONTROL PANEL CIRCUIT NUMBER

HOMERUN TO DESIGNATED PANELBOARD, (#=QUANTITY

OF HOMERUNS IF MULTIPLE) (2#12&1#12G-3/4"C., UON)

X

X

DEMOLITION LEGEND

EXISTING EQUIPMENT OR DEVICE TO BE REMOVED

EXISTING EQUIPMENT OR DEVICE TO REMAIN

XRL = EXISTING RELOCATED

XRU = EXISTING BOX & CONDUIT REUSED

XTR = EXISTING TO REMAIN

XR = EXISTING TO BE REMOVED

ELECTRICAL WIRING CIRCUIT (IN WALLS AND CEILINGS)

ELECTRICAL WIRING CIRCUIT (BELOW FLOOR OR SLAB)

SWITCH OR CONTROL CIRCUIT

EMERGENCY LIGHTING AC CIRCUIT

DC CIRCUIT

CONNECTION AT EQUIPMENT

POWER LEGEND

NEW SURFACE MOUNTED PANELBOARD

NEW RECESSED MOUNTED PANELBOARD

EXISTING SURFACE MOUNTED PANELBOARD

EXISTING RECESSED MOUNTED PANELBOARD

DRY-TYPE TRANSFORMER

FUSED DISCONNECT SWITCH

JUNCTION BOX

ENCLOSED CIRCUIT BREAKER

J

CB

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

C COUNTER HEIGHT

CLG CEILING MOUNTED

DN DOWN

DWG DRAWING

EC ELECTRICAL CONTRACTOR

FIBO FURNISHED AND INSTALLED BY OWNER/OTHERS

HP HORSEPOWER

LOR LOCATED ON ROOF

MC MECHANICAL CONTRACTOR

MCB MAIN CIRCUIT BREAKER

MD MOTORIZED DOOR **

MH MOUNTING HEIGHT

NTS NOT TO SCALE

OFCI OWNER FURNISHED CONTRACTOR INSTALLED

PC PLUMBING CONTRACTOR

S/S START/STOP PUSH BUTTONS

S. STL STAINLESS STEEL

TYP TYPICAL

UON UNLESS OTHERWISE NOTED

VP VANDAL PROOF

WG WIRE GUARD

* EQUIPMENT PROVIDED BY MECHANICAL TRADE, WIRED BY

ELECTRICAL TRADE

** EQUIPMENT PROVIDED BY DOOR HARDWARE TRADE, WIRED

BY ELECTRICAL TRADE

ABBREVIATIONS

CIRCUIT BREAKER TYPES

AF

G H

L

S

AFCI CIRCUIT BREAKER

GFCI CIRCUIT BREAKER

HACR CIRCUIT BREAKER

LOCKED-ON CIRCUIT

SHUNT TRIP CIRCUIT BREAKER

ONE-LINE LEGEND

NEW WIRE OR DEVICE

EXISTING WIRE OR DEVICE TO REMAIN

EXISTING WIRE OR DEVICE TO BE REMOVED

CIRCUIT BREAKER, ET = ELECTRONIC TRIP

TRANSFORMER

IDENTIFICATION FOR WIRE SIZE &

QUANTITY (SEE FEEDER SCHEDULE)

SWITCH

GENERAL NOTES

THE FOLLOWING GENERAL NOTES APPLY TO ALL RIST-FROST-SHUMWAY ENGINEERING,

INC., DRAWINGS AND TRADES ASSOCIATED WITH THOSE DRAWINGS INVOLVED ON THIS

PROJECT:

RIST-FROST-SHUMWAY ENGINEERING, INC., WAIVES ANY AND ALL

RESPONSIBILITY AND LIABILITY FOR PROBLEMS WHICH ARISE FROM FAILURE TO

FOLLOW THESE PLANS, SPECIFICATIONS AND/OR THE DESIGN INTENT THEY

CONVEY, OR FOR PROBLEMS WHICH ARISE FROM OTHERS' FAILURE TO OBTAIN

AND/OR FOLLOW THE GUIDANCE OF RIST-FROST-SHUMWAY ENGINEERING, INC.,

WITH RESPECT TO ANY ERRORS, OMISSIONS, INCONSISTENCIES, AMBIGUITIES

OR CONFLICTS WHICH ARE IS COVERED OR ALLEGED.

ALL WORK SHALL CONFORM TO ALL FEDERAL, STATE, AND LOCAL CODES AND

STANDARDS INCLUDING, BUT NOT LIMITED TO: NFPA, IBC, UL, SMACNA, OSHA,

AND NEC.

THE CONTRACTOR AND ALL SUBCONTRACTORS SHALL PROTECT THE WORK

SITE, SURROUNDING AREAS AND OCCUPANTS FROM DAMAGE AND INJURY.

THE CONTRACTOR AND ALL SUBCONTRACTORS SHALL FAMILIARIZE

THEMSELVES WITH THE CONTRACT DOCUMENTS. ALL DRAWINGS OF ANY

PARTICULAR TRADE SHALL BE USED IN CONJUNCTION WITH DRAWINGS OF ALL

OTHER TRADES TO COORDINATE ALL CONSTRUCTION. ANY DISCREPANCIES

SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER BEFORE

PROCEEDING WITH THE AFFECTED WORK. ANY PROPOSED CHANGES,

VARIATIONS OR SUBSTITUTIONS MUST BE REVIEWED AND ACCEPTED BY THE

ENGINEER PRIOR TO IMPLEMENTATION.

ALL DRAWINGS ARE INTENDED TO SHOW THE GENERAL ARRANGEMENT, DESIGN

INTENT AND EXTENT OF THE WORK. THEY SHALL BE CONSIDERED PARTLY

DIAGRAMMATIC. THEY ARE NOT INTENDED TO BE SCALED FOR ROUGHING-IN

MEASUREMENTS OR TO SERVE AS SHOP DRAWINGS.

THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL DIMENSIONS (AS-BUILT

OR OTHERWISE) BEFORE COMMENCING FABRICATION, AND/OR ORDERING

MATERIALS.

DETAILS SHOWN ON ANY DRAWING ARE TO BE CONSIDERED TYPICAL FOR ALL

SIMILAR CONDITIONS, UNLESS OTHERWISE INDICATED.

INFORMATION ON THESE DRAWINGS PERTAINING TO AS-BUILT CONSTRUCTION

AND OTHER EXISTING CONDITIONS HAVE BEEN OBTAINED FROM OTHER

DOCUMENTATION OR BY FIELD INVESTIGATION. (SEE GENERAL AND

SUPPLEMENTAL CONDITIONS FOR LISTING). THIS INFORMATION IS PROVIDED

FOR THE CONTRACTOR'S BENEFIT IN PERFORMANCE OF THE WORK.

G-1

G-2

G-3

G-4

G-5

G-6

G-7

G-8

ELECTRICAL TRADE NOTES

ALL ELECTRICAL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE

NATIONAL, STATE AND LOCAL CODES AND THE CURRENT NATIONAL ELECTRICAL CODE

(NEC) BY ELECTRICIANS LICENSED BY THE STATE IN WHICH THE WORK IS PERFORMED.

THE ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATION AND ELECTRICAL

REQUIREMENTS OF ALL EQUIPMENT PRIOR TO INSTALLING ANY CONDUIT AND/OR CABLE. IF

ELECTRICAL REQUIREMENTS DIFFER FROM THOSE INDICATED, OR IF ADDITIONAL

EQUIPMENT IS REQUIRED BY CODE, INFORM THE ENGINEER.

WIRING FOR ALL SINGLE PHASE CIRCUITS, 20A OR SMALLER, SHALL BE A MINIMUM OF 2#12

&1#12G-3/4"C., FOR CIRCUIT LENGTHS UNDER 100FT AND 2#10&1#10G-3/4"C., FOR CIRCUIT

LENGTHS 100FT AND OVER , UNLESS OTHERWISE NOTED. CIRCUITS FOR ISOLATED

GROUND RECEPTACLES SHALL INCLUDE ADDITIONAL ISOLATED GROUND CONDUCTOR.

CIRCUITS FOR DOUBLE SWITCHED LIGHT FIXTURES SHALL INCLUDE ADDITIONAL SWITCHED

CONDUCTOR(S) AS REQUIRED. THE SHARING OF NEUTRAL CONDUCTORS IS NOT

ALLOWED.

MOUNTING HEIGHTS GIVEN FOR ALL WIRING DEVICES (WALL SWITCHES, RECEPTACLES,

ETC.), TELEPHONE EQUIPMENT, SPEAKERS AND LIGHT FIXTURES ARE TO THE CENTERLINE

OF THE JUNCTION BOX USED TO MOUNT THE DEVICE, UNLESS OTHERWISE NOTED.

REMOVE AND DISPOSE OF EXISTING ELECTRICAL EQUIPMENT AND ASSOCIATED BOXES,

CONDUIT AND WIRE WHERE INDICATED OR WHERE LOCATED ON OR WITHIN WALLS AND

CEILINGS BEING DEMOLISHED OR ALTERED AS A RESULT OF THIS CONTRACT, UNLESS

OTHERWISE INDICATED. IT IS NOT THE INTENT OF THESE DRAWINGS TO INDICATE ALL

ELECTRICAL ITEMS TO BE REMOVED.

CIRCUIT WIRING INDICATED ON DRAWINGS IS SCHEMATIC IN NATURE AND SHALL NOT BE

CONSIDERED TO BE POINT-TO-POINT, UNLESS OTHERWISE NOTED.

EXISTING ELECTRICALLY POWERED ITEMS THAT REMAIN SHALL BE RECIRCUITED, IF

NECESSARY, TO ENSURE CONTINUED OPERATION.

COORDINATE FINAL LOCATIONS OF CEILING LIGHT FIXTURES AND OTHER EQUIPMENT WITH

REFLECTED CEILING PLANS AND ALL OTHER TRADE DRAWINGS PRIOR TO INSTALLATION.

WHERE LONG CIRCUIT LENGTHS ARE REQUIRED, ENSURE LESS THAN

3% VOLTAGE DROP UNDER FULL LOAD. INCREASE WIRE SIZE ON CIRCUITS 100 FEET LONG

AND ABOVE.

PROVIDE AND ENSURE FIREPROOFING OF ALL CONDUIT, CABLING AND ANY OTHER

ELECTRICAL DEVICES THROUGH FIRE RATED ASSEMBLIES.

PROVIDE PULL STRINGS IN ALL CONDUIT SYSTEMS LEFT FOR USE BY OTHERS.

MOUNTING HEIGHT FOR ELECTRICAL DEVICES (RECEPTACLES, MULTICOMMUNICATIONS

OUTLETS, ETC) LOCATED ON WALLS ABOVE FINTUBE SHALL BE 4" FROM TOP OF FINTUBE

ENCLOSURE TO CENTERLINE OF ELECTRICAL DEVICE.

PROVIDE EXPANSION FITTINGS IN CONDUIT RISERS FROM ALL EXTERIOR UNDERGROUND

CONDUITS TO FIXED EQUIPMENT OR CONDUIT FITTINGS AND PROVIDE FLEXIBLE

CONNECTIONS TO ANY EQUIPMENT SUBJECT TO SETTLEMENT OR FROST HEAVES.

WHERE DOUBLE SWITCHES ARE INDICATED, FIXTURES SHALL BE PROVIDED WITH

MULTIPLE BALLASTS.

E-1

E-2

E-3

E-4

E-5

E-6

E-7

E-8

E-9

E-10

E-11

E-12

E-13

E-14

A1

A1

TH1TH1

TC

LC

D

E

LCRP#

C#

PC1

LCN#

EB1

LR1

LR3

a

PANEL-#

(E) a

PANEL-#

(E)

T1 a PANEL-#

PANEL-#

X1 X1

X1

OS1

a

PANEL-# a a

OS2

a

OS3

a

OS4

a

OS5

a

OS6

a

OS7

a

PANEL-#

a a

LR2

a

LIGHT FIXTURE

REFER TO LIGHTING FIXTURE SCHEDULE FOR ADDITIONAL INFORMATION.

A1 = FIXTURE TYPE

a = SWITCHING OR DIMMING ZONE

PANEL-# = PANEL AND CIRCUIT #

(E) = FIXTURE CONNECTED TO EMERGENCY CIRCUIT

(N/L) = NIGHT LIGHT, WIRED CONSTANT ON

(E/N) = DUAL CIRCUIT - FIXTURE CONNECTED TO EMERGENCY AND

NORMAL

TRACK LIGHTING FIXTURE(S)

REFER TO LIGHTING FIXTURE SCHEDULE FOR ADDITIONAL INFORMATION.

T1 = TRACK TYPE

TH1 = TRACK HEAD TYPE

a = SWITCHING OR DIMMING ZONE

PANEL-# = PANEL AND CIRCUIT #

WALL MOUNTED EMERGENCY BATTERY FIXTURE

REFER TO LIGHTING FIXTURE SCHEDULE FOR ADDITIONAL INFORMATION.

EB1 = FIXTURE TYPE

PANEL-# = PANEL AND CIRCUIT #

CEILING MOUNTED EMERGENCY BATTERY FIXTURE

REFER TO LIGHTING FIXTURE SCHEDULE FOR ADDITIONAL INFORMATION.

EB1 = FIXTURE TYPE

PANEL-# = PANEL AND CIRCUIT #

WALL MOUNTED EMERGENCY BATTERY PACK

EB1 = FIXTURE TYPE

a = SWITCHING ZONE CONTROLLED

PANEL-# = PANEL AND CIRCUIT #

WALL MOUNTED REMOTE EMERGENCY FIXTURE HEAD(S)

EB1 = FIXTURE TYPE

a = SWITCHING ZONE CONTROLLED

PANEL-# = PANEL AND CIRCUIT #

WALL MOUNTED EXIT LIGHT

FILLED AREA INDICATES FACE LOCATION. PROVIDE WITH ARROW

DIRECTION INDICATING CHEVRONS AS SHOWN ON PLANS. REFER TO

TYPICAL DEVICE LOCATIONS, UON. REFER TO LIGHTING FIXTURE SCHEDULE

FOR ADDITIONAL INFORMATION.

X1 = FIXTURE TYPE

PANEL-# = PANEL AND CIRCUIT #

• = INTERNATIONAL SYMBOL OF ACCESSIBILITY

CEILING/PENDANT MOUNTED EXIT LIGHT

FILLED AREA INDICATES FACE LOCATION. PROVIDE WITH ARROW

DIRECTION INDICATING CHEVRONS AS SHOWN ON PLANS. REFER TO

TYPICAL DEVICE LOCATIONS, UON. REFER TO LIGHTING FIXTURE SCHEDULE

FOR ADDITIONAL INFORMATION.

X1 = FIXTURE TYPE

PANEL-# = PANEL AND CIRCUIT #

• = INTERNATIONAL SYMBOL OF ACCESSIBILITY

LIGHTING CONTROL RELAY MODULE

20A DIMMING, WIRED, UNIVERSAL VOLTAGE, (0-10V)

DIMMING, SYSTEM CONNECTED, WIRED FOR DIMMING U.O.N. REFER TO

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

a = SWITCHING OR DIMMING ZONE CONTROLLED

PANEL-# = PANEL AND CIRCUIT #

LIGHTING CONTROL RELAY MODULE

20A SWITCHING, WIRED, UNIVERSAL VOLTAGE, ON/OFF, SYSTEM

CONNECTED. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

a = SWITCHING OR DIMMING ZONE CONTROLLED

PANEL-# = PANEL AND CIRCUIT #

LIGHTING CONTROL RELAY MODULE

PHASE CUT DIMMING, WIRED, UNIVERSAL VOLTAGE INPUT, FORWARD

PHASE & REVERSE PHASE DIMMING, SYSTEM CONNECTED. REFER TO

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

a = SWITCHING OR DIMMING ZONE CONTROLLED

PANEL-# = PANEL AND CIRCUIT #

PANEL-#

PANEL-#

PANEL-#

PANEL-#

PANEL-#

PANEL-#

a

EB1

PANEL-#

a

PANEL-#

a

PANEL-#

PANEL-#

a

X1

EB1

EB1

EB1

PC2

a

LIGHTING LEGEND

WHU

P

CPS

CEILING MOUNTED VACANCY SENSOR

WIRED, 360°, DUAL-TECHNOLOGY (INFRARED / ULTRASONIC),

SYSTEM CONNECTED.

a = SWITCHING OR DIMMING ZONE CONTROLLED

CEILING MOUNTED OCCUPANCY SENSOR

WIRED, 360°, ULTRASONIC, SYSTEM CONNECTED.

a = SWITCHING OR DIMMING ZONE CONTROLLED

CEILING MOUNTED OCCUPANCY SENSOR

WIRED, 360°, INFRARED, SYSTEM CONNECTED.

a = SWITCHING OR DIMMING ZONE CONTROLLED

WALL MOUNTED OCCUPANCY SENSOR

WIRED, DUAL-TECHNOLOGY (INFRARED / ULTRASONIC),

SYSTEM CONNECTED.

a = SWITCHING OR DIMMING ZONE CONTROLLED

WALL MOUNTED OCCUPANCY SENSOR

WIRED, ULTRASONIC, SYSTEM CONNECTED.

a = SWITCHING OR DIMMING ZONE CONTROLLED

WALL MOUNTED OCCUPANCY SENSOR

WIRED, INFRARED, SYSTEM CONNECTED.

a = SWITCHING OR DIMMING ZONE CONTROLLED

CEILING MOUNTED OCCUPANCY SENSOR

HIGH BAY, WIRED, 360°, INFRARED, SYSTEM CONNECTED.

a = SWITCHING OR DIMMING ZONE CONTROLLED

LOW VOLTAGE LIGHTING CONTROL STATION

SYSTEM CONNECTED

# = STATION NUMBER. REFER TO CONTROL STATION ELEVATIONS

AND DETAILS.

a = SWITCHING OR DIMMING ZONE CONTROLLED

DAYLIGHTING CONTROL PHOTOCELL SENSOR

WIRED, SYSTEM CONNECTED, MOUNT PER MANUFACTURER'S

SPECIFICATIONS.

a = SWITCHING OR DIMMING ZONE CONTROLLED

EXTERIOR DAYLIGHTING CONTROL PHOTOCELL SENSOR

WEATHPROOF, WIRED, SYSTEM CONNECTED, MOUNT PER

MANUFACTURER'S SPECIFICATIONS.

a = SWITCHING OR DIMMING ZONE CONTROLLED

REMOTE DRIVER OR POWER SUPPLY

EMERGENCY LIGHTING TRANSFER DEVICE WITH TEST SWITCH, UL924

LISTED.

a = SWITCHING OR DIMMING ZONE CONTROLLED

PANEL-# = PANEL AND CIRCUIT #

LIGHTING CONTROL RELAY PANEL

REFER TO LIGHTING CONTROL WIRING DIAGRAMS.

# = STATION NUMBER.

DIGITAL TIMECLOCK

LIGHTING CONTACTOR WITH CONTACTS RATED AS REQUIRED

LIGHTING CONTROL NETWORK EQUIPMENT

# = STATION NUMBER.

EMERGENCY PULL ROPE CORRIDOR DOME LIGHT

CEILING MOUNTED PARTITION SENSOR

CEILING MOUNTED WIRELESS HUB UNIT

NO SCALE

Drawing No.

Drawing Title

Date:

Revisions

Drawn By

Project No.

Checked By

Project Mgr.

Copyright © 2026 RFS Engineering

10967.001

50% Construction Documents

June 19, 2026

Mabel Brown Room Theatrical & House Lighting Upgrades

Keene State College

File Name

Key Plan

Stamp

Scale

229 Main Street Keene, NH 03431 www.rfsengineering.com

24 Federal Street, 3rd Floor, Boston, MA 02110, 617.494.1464 71 Water Street, Laconia, NH 03246, 603.524.4647 82 Hanover Street, Suite 2, Portland, ME 04101, 207.761.4647

Boston, MA | Laconia, NH | Portland, ME

10967 Central Elect 2024.rvt

Jones Architecture, Inc.

10 Derby Square Salem, MA 01970

978.744.5200 www.jonesarch.com

Architect:

/1

/2

:2

:2

P

M E0.1

ELECTRICAL LEGEND,

NOTES &

ABBREVIATIONS

CEG

AMS

PGW

MAIN SWITCHBOARD

350A /3P

225kVA

480V-120/208V

150A /3P

600A /3P

SR24

DIMMER

PANEL

SR48

DIMMER

PANEL

MAIN SWITCHBOARD

350A /3P

225kVA

480V-120/208V

150A /3P

400A /3P

DdR6

DIMMER

PANEL

IQ48

DIMMER

PANEL

IQ48

DIMMER

PANEL

EMERGENCY RELAY

EMERGENCY RELAY

SPLICE 200A WIRING TO

400A WIRING TO SPLIT

FEEDER

ONE-LINE DEMOLITION NOTES

1. DISCONNECT EXISTING SR24 DIMER PANEL AND REMOVE.

MAINTAIN EXISTING FEEDER AND CIRCUIT BREAKER COMPLETE.

2. DISCONNECT EXISTING AR48 DIMER PANEL AND REMOVE.

REMOVE EXISTING FEEDR COMPLETE. MAINTAIN EXISTING

CIRCUIT BREAKER FOR REUSE.

3. REMOVE EXISTING EMERGENCY LIGHTING RELAY FOR

REPLACEMENT. MAINTAIN EXISTING DISCONNECT AND BRANCH

CIRCUIT COMPLETE.

ONE-LINE NEW WORK NOTES

1. INSTALL NEW DdR6 DIMMER PANEL TO REPLACE EXISTING SR24

HOUSE DIMEMR PANEL. CONNECT TO EXISTING FEEDER

MAINTAINED. RECONNECT EXISTING CIRCUITS MAINTAINED TO

NEW DIMMER PANEL. ANY NEW CONDUIT AND WIRING SHALL

MATCH EXISTING IN ALL RESPECTS.

2. ADJUST EXISTING 600A BREAKER DOWN TO 400A FOR NEW

FEED. WITHIN EXISTING TROUGH, SPLICE NEW 400A FEEDER TO

(2) 200A FEEDERS FOR NEW LOADS TO IQ48 DIMMER PANELS.

3. CONNECT NEW EMERGENCY RELAY TO EXISTING BRANCH

CIRCUIT MAINTAINED. ANY NEW CONDUIT AND WIRING SHALL

MATCH EXISTING IN ALL RESPECTS.

EXISTING WIRE-TROUGH

EXISTING WIRE-TROUGH

PARTIAL ONE-LINE DIAGRAM - DEMOLITION

SCALE: N.T.S.

PARTIAL ONE-LINE DIAGRAM - DEMOLITION

SCALE: N.T.S.

400F

400F

200F

1 2

7.1

D

7.8 8.5 9.6 106.15.14.12.91.91

C

B

A

E

F

G

AREA OF WORK

AS NOTED

Drawing No.

Drawing Title

Date:

Revisions

Drawn By

Project No.

Checked By

Project Mgr.

Copyright © 2026 RFS Engineering

10967.001

50% Construction Documents

June 19, 2026

Mabel Brown Room Theatrical & House Lighting Upgrades

Keene State College

File Name

Key Plan

Stamp

Scale

229 Main Street Keene, NH 03431 www.rfsengineering.com

24 Federal Street, 3rd Floor, Boston, MA 02110, 617.494.1464 71 Water Street, Laconia, NH 03246, 603.524.4647 82 Hanover Street, Suite 2, Portland, ME 04101, 207.761.4647

Boston, MA | Laconia, NH | Portland, ME

10967 Central Elect 2024.rvt

Jones Architecture, Inc.

10 Derby Square Salem, MA 01970

978.744.5200 www.jonesarch.com

Architect:

/1

/2

:2

:2

P

M E0.2

ELECTRICAL SECOND

FLOOR REFERENCE

PLAN

CEG

AMS

PGW

7.8 8.5 9.6 106.15.14.12.91.91

C

B

A

E

F

G

AREA OF WORK

AS NOTED

Drawing No.

Drawing Title

Date:

Revisions

Drawn By

Project No.

Checked By

Project Mgr.

Copyright © 2026 RFS Engineering

10967.001

50% Construction Documents

June 19, 2026

Mabel Brown Room Theatrical & House Lighting Upgrades

Keene State College

File Name

Key Plan

Stamp

Scale

229 Main Street Keene, NH 03431 www.rfsengineering.com

24 Federal Street, 3rd Floor, Boston, MA 02110, 617.494.1464 71 Water Street, Laconia, NH 03246, 603.524.4647 82 Hanover Street, Suite 2, Portland, ME 04101, 207.761.4647

Boston, MA | Laconia, NH | Portland, ME

10967 Central Elect 2024.rvt

Jones Architecture, Inc.

10 Derby Square Salem, MA 01970

978.744.5200 www.jonesarch.com

Architect:

/1

/2

:2

:2

P

M E0.3

ELECTRICAL THIRD

FLOOR REFERENCE

PLAN

CEG

AMS

CB

CBCB

7.1

D

7.8 8.5 9.6 106.15.1

C

B

A

E

XR

XR

XR

XR

XRXR

XRXR

XR XR XR XR XR XR

XR XR XR XR XR XR

XR XR

XR

XRXR

XRXR

XRXR

XRXRXRXRXR

XR XR XR XR

XR XR XR XR

XRXRXRXR

XR

XR XR XR XR

XR XR XR XR

XR

XR XR XR XR

XRXRXRXR

XR

XR XR XR

XRXRXR

XR XR XR XR

XR

XR

XR

XR

XR

XR

XR

XR

OPEN TO

ABOVE

XTR

XTR

XTR XTR

XTR

XTR

XTR

XTR

XR

XR

XR

XR

NIC

NIC

NIC

LL6

LL5

LH3

XR

XTRXTR

XR

XR

EXISTING WIRE

TROUGH

XTR

STAGE

DIMMER FEED

HOUSE

DIMMER FEED

AS NOTED

Drawing No.

Drawing Title

Date:

Revisions

Drawn By

Project No.

Checked By

Project Mgr.

Copyright © 2026 RFS Engineering

10967.001

50% Construction Documents

June 19, 2026

Mabel Brown Room Theatrical & House Lighting Upgrades

Keene State College

File Name

Key Plan

Stamp

Scale

229 Main Street Keene, NH 03431 www.rfsengineering.com

24 Federal Street, 3rd Floor, Boston, MA 02110, 617.494.1464 71 Water Street, Laconia, NH 03246, 603.524.4647 82 Hanover Street, Suite 2, Portland, ME 04101, 207.761.4647

Boston, MA | Laconia, NH | Portland, ME

10967 Central Elect 2024.rvt

Jones Architecture, Inc.

10 Derby Square Salem, MA 01970

978.744.5200 www.jonesarch.com

Architect:

/1

/2

:2

:2

P

M ED1.1

ELECTRICAL SECOND

FLOOR DEMOLITION

PLAN

CEG

AMS

PGW

KEYED NOTES :

1. EXISTING SR48 DIMMER TO BE REMOVED

AND REPLACED WITH (2) IQ48 DIMMER

RACKS. REMOVE EXISTING FEEDER

COMPLETE. REMOVE EXISTING

DISCONNECT SWITCH COMPLETE.

2. EXISTING SR24 DIMMER TO BE REMOVED

AND REPLACED WITH (1) DrD6 DIMMER.

MAINTAIN EXISTING ENCLOSED CIRCUIT

BREAKER AND FEEDER COMPLETE FOR

REUSE.

3. REMOVE EXISTING EMERGENCY LIGHTING

RELAY BETWEEN DIMMING PANELS.

MAINTAIN EXISTING CIRCUITRY FOR

REUSE.

DRAWING NOTES:

A. REFER TO ARCHITECTURAL DRAWINGS, DETAILS AND ELEVATIONS FOR

COORDINATION OF ALL DEMOLITION WORK

B. EXISTING BRANCH CIRCUITS SHALL BE MAINTAINED AND UTILIZED FOR NEW LIGHTING

FIXTURES. EC SHALL INSPECT INTEGRITY OF WIRING AND REPLACE IF ANY FOUND

DAMAGED, FREYED, OR DETERIORATING DUE TO AGE.

ELECTRICAL DEMOLITION NOTES

AS DIRECTED BY THE OWNER, ALL EXISTING ELECTRICAL SYSTEMS, EQUIPMENT AND

APPURTENANCES LOCATED IN THE EXISTING FACILITY ARE TO BE CAREFULLY

DISASSEMBLED AND REMOVED, SALVAGED, AND TURNED OVER TO THE OWNER,

UNLESS INDICATED TO BE REUSED ON THE ARCHITECTURAL AND/OR ELECTRICAL

PLANS AND SPECIFICATIONS.

NO EXISTING ELECTRICAL EQUIPMENT, SYSTEMS, OR APPURTENANCES SHALL BE

ABANDONED IN PLACE. (NOTE: CONDUIT LOCATED IN EXISTING WALLS TO REMAIN

AND FLOOR SLABS MAY BE ABANDONED IN PLACE OR REUSED.

WHERE EQUIPMENT OR APPURTENANCES ARE REMOVED WHICH WERE BUILT-IN TO

EXISTING CONSTRUCTION, COORDINATE WITH THE CONSTRUCTION

MANAGER/GENERAL CONTRACTOR TO PATCH AND/OR REPAIR ALL SUCH AREAS IN

ACCORDANCE WITH APPROVED CONSTRUCTION METHODS AND FINISHES, AS

DIRECTED BY THE CONTRACT DRAWINGS, SPECIFICATIONS, AND/OR THE

ARCHITECT/ENGINEER.

COORDINATE WITH THE CONSTRUCTION MANAGER/GENERAL CONTRACTOR AND ALL

OTHER SUB-CONTRACTORS IN ORDER TO DETERMINE OVERALL PROJECT PHASING

AND DEMOLITION WORK SEQUENCING. COORDINATE REQUIRED DEMOLITION BY

OTHER TRADES RESULTING FROM ELECTRICAL SYSTEMS DEMOLITION.

PROTECT ALL EXISTING FINISHES WHICH ARE TO REMAIN.

REFER TO THE ARCHITECTS DEMOLITION NOTES AND PROJECT SPECIFICATIONS

FOR ADDITIONAL DEMOLITION INFORMATION AND REQUIREMENTS.

ALL PCB TYPE LIGHTING FIXTURE BALLASTS TO BE REMOVED SHALL BE TURNED

OVER TO THE ABATEMENT CONTRACTOR FOR FURTHER DISPOSITION.

REMOVE AND DISPOSE OF EXISTING ELECTRICAL EQUIPMENT AND ASSOCIATED

BOXES, CONDUIT AND WIRE WHERE INDICATED OR WHERE LOCATED ON OR WITHIN

WALLS AND CEILINGS BEING DEMOLISHED OR ALTERED AS A RESULT OF THIS

CONTRACT, UNLESS OTHERWISE INDICATED. IT IS NOT THE INTENT OF THESE

DRAWINGS TO INDICATE ALL ELECTRICAL ITEMS TO BE REMOVED.

EXISTING ELECTRICALLY POWERED ITEMS THAT REMAIN SHALL BE RECIRCUITED, IF

NECESSARY, TO ENSURE CONTINUED OPERATION.

WORK FOR THIS PROJECT WILL BE PHASED, AS DIRECTED BY THE OWNER. WHEN A

PARTIAL SYSTEM IS PLACED BACK IN SERVICE DURING CONSTRUCTION. THE SYSTEM

SHALL BE TESTED TO ENSURE IT IS FULLY OPERATIONAL. THIS SHALL INCLUDE, BUT

NOT BE LIMITED TO POWER, FIRE ALARM, LIGHTING, EMERGENCY LIGHTING, EXIT

SIGNAGE, DATA, TELEPHONE, AND P/A SYSTEMS.

REMOVE OR MODIFY THE PART OF EACH ELECTRICAL SYSTEM CORRESPONDING TO

THE PHASING PLANS FOR THE PROJECT. PROVIDE TEMPORARY WIRING FOR EACH

SYSTEM TO REMAIN OPERATIONAL DURING CONSTRUCTION.

FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. NO ALLOWANCE WILL BE

MADE FOR ADDITIONAL COSTS DUE TO THE CONTRACTOR'S FAILURE TO FIELD

VERIFY EXISTING CONDITIONS AND DIMENSIONS.

D-1

D-2

D-3

D-4

D-5

D-6

D-7

D-8

D-9

D-10

D-11

D-12

7.8 8.5 9.6 106.15.1

C

B

A

E

XR XR XR XR XR XR

XR XR XR XR XR XR

XR XR

XR

XRXR

XRXR

XR

XR

XRXRXRXR

XR

XR

XRXR

XR

XR

XRXR

XR XR XR

XR

XR XR

XR

XR

XR

XRXR

XR

XR

XR

XR

XR

XR

XR XR

XR XR XR

XRXRXRXR

XR XR

XR

XR

XR XR

XR

XR

XR

XR

XR

XRXRXR

XR XR XR XR

XR XR

XR XR

XR XR

XR

XR XR XR

XR

XR

XR

XRXR

XR

XR XR

XRXR

XR

XR

XR

XR

XR

XR

XR XR

XTR

XTR

XTRXTR

XTRXTR

XTR

XTRXTRXTR

XTR

XTR

XTR XTR XTR XTR

XR XR

XR XR

XR XR

XR XR

XR XR

XR XR

XR XR

XR XR

XR XR

XR XR

XR XR

XR XR XR XR

XRXR

XR XR

XRXR

XR XR

XRXRXRXR

XR XR XR XR

XRXR

XR XR

XRXR

XR XR

XRXR

XTR

XTR

XTR

XTR

XR

NIC

XR

XR

XR

XR

(TYP.)

(TYP.)

(TYP.)

XR

NIC

NIC

XTR

(TYP.)

(TYP.)

AS NOTED

Drawing No.

Drawing Title

Date:

Revisions

Drawn By

Project No.

Checked By

Project Mgr.

Copyright © 2026 RFS Engineering

10967.001

50% Construction Documents

June 19, 2026

Mabel Brown Room Theatrical & House Lighting Upgrades

Keene State College

File Name

Key Plan

Stamp

Scale

229 Main Street Keene, NH 03431 www.rfsengineering.com

24 Federal Street, 3rd Floor, Boston, MA 02110, 617.494.1464 71 Water Street, Laconia, NH 03246, 603.524.4647 82 Hanover Street, Suite 2, Portland, ME 04101, 207.761.4647

Boston, MA | Laconia, NH | Portland, ME

10967 Central Elect 2024.rvt

Jones Architecture, Inc.

10 Derby Square Salem, MA 01970

978.744.5200 www.jonesarch.com

Architect:

/1

/2

:2

:4

P

M ED1.2

ELECTRICAL THIRD

FLOOR DEMOLITION

PLAN

CEG

AMS

PGW

DRAWING NOTES: KEYED NOTES :

1. REPLACE EXISTING LAMPS WITH LED

EQUIVALENTS. FINAL LAMP TYPE (STATIC

WHITE OR RGBW) TO BE CONFIRMED

WITH ARCHITECT/OWNER.

2. ALL EXISTING TRACK HEADS SHALL BE

REMOVED.

3. EXISTING THEATRICAL PIPE GRID TO

REMAIN.

A. REFER TO ARCHITECTURAL DRAWINGS, DETAILS AND ELEVATIONS FOR

COORDINATION OF ALL DEMOLITION WORK

B. EXISTING BRANCH CIRCUITS SHALL BE MAINTAINED AND UTILIZED FOR NEW LIGHTING

FIXTURES. EC SHALL INSPECT INTEGRITY OF WIRING AND REPLACE IF ANY FOUND

DAMAGED, FREYED, OR DETERIORATING DUE TO AGE.

ELECTRICAL DEMOLITION NOTES

AS DIRECTED BY THE OWNER, ALL EXISTING ELECTRICAL SYSTEMS, EQUIPMENT AND

APPURTENANCES LOCATED IN THE EXISTING FACILITY ARE TO BE CAREFULLY

DISASSEMBLED AND REMOVED, SALVAGED, AND TURNED OVER TO THE OWNER,

UNLESS INDICATED TO BE REUSED ON THE ARCHITECTURAL AND/OR ELECTRICAL

PLANS AND SPECIFICATIONS.

NO EXISTING ELECTRICAL EQUIPMENT, SYSTEMS, OR APPURTENANCES SHALL BE

ABANDONED IN PLACE. (NOTE: CONDUIT LOCATED IN EXISTING WALLS TO REMAIN

AND FLOOR SLABS MAY BE ABANDONED IN PLACE OR REUSED.

WHERE EQUIPMENT OR APPURTENANCES ARE REMOVED WHICH WERE BUILT-IN TO

EXISTING CONSTRUCTION, COORDINATE WITH THE CONSTRUCTION

MANAGER/GENERAL CONTRACTOR TO PATCH AND/OR REPAIR ALL SUCH AREAS IN

ACCORDANCE WITH APPROVED CONSTRUCTION METHODS AND FINISHES, AS

DIRECTED BY THE CONTRACT DRAWINGS, SPECIFICATIONS, AND/OR THE

ARCHITECT/ENGINEER.

COORDINATE WITH THE CONSTRUCTION MANAGER/GENERAL CONTRACTOR AND ALL

OTHER SUB-CONTRACTORS IN ORDER TO DETERMINE OVERALL PROJECT PHASING

AND DEMOLITION WORK SEQUENCING. COORDINATE REQUIRED DEMOLITION BY

OTHER TRADES RESULTING FROM ELECTRICAL SYSTEMS DEMOLITION.

PROTECT ALL EXISTING FINISHES WHICH ARE TO REMAIN.

REFER TO THE ARCHITECTS DEMOLITION NOTES AND PROJECT SPECIFICATIONS

FOR ADDITIONAL DEMOLITION INFORMATION AND REQUIREMENTS.

ALL PCB TYPE LIGHTING FIXTURE BALLASTS TO BE REMOVED SHALL BE TURNED

OVER TO THE ABATEMENT CONTRACTOR FOR FURTHER DISPOSITION.

REMOVE AND DISPOSE OF EXISTING ELECTRICAL EQUIPMENT AND ASSOCIATED

BOXES, CONDUIT AND WIRE WHERE INDICATED OR WHERE LOCATED ON OR WITHIN

WALLS AND CEILINGS BEING DEMOLISHED OR ALTERED AS A RESULT OF THIS

CONTRACT, UNLESS OTHERWISE INDICATED. IT IS NOT THE INTENT OF THESE

DRAWINGS TO INDICATE ALL ELECTRICAL ITEMS TO BE REMOVED.

EXISTING ELECTRICALLY POWERED ITEMS THAT REMAIN SHALL BE RECIRCUITED, IF

NECESSARY, TO ENSURE CONTINUED OPERATION.

WORK FOR THIS PROJECT WILL BE PHASED, AS DIRECTED BY THE OWNER. WHEN A

PARTIAL SYSTEM IS PLACED BACK IN SERVICE DURING CONSTRUCTION. THE SYSTEM

SHALL BE TESTED TO ENSURE IT IS FULLY OPERATIONAL. THIS SHALL INCLUDE, BUT

NOT BE LIMITED TO POWER, FIRE ALARM, LIGHTING, EMERGENCY LIGHTING, EXIT

SIGNAGE, DATA, TELEPHONE, AND P/A SYSTEMS.

REMOVE OR MODIFY THE PART OF EACH ELECTRICAL SYSTEM CORRESPONDING TO

THE PHASING PLANS FOR THE PROJECT. PROVIDE TEMPORARY WIRING FOR EACH

SYSTEM TO REMAIN OPERATIONAL DURING CONSTRUCTION.

FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. NO ALLOWANCE WILL BE

MADE FOR ADDITIONAL COSTS DUE TO THE CONTRACTOR'S FAILURE TO FIELD

VERIFY EXISTING CONDITIONS AND DIMENSIONS.

D-1

D-2

D-3

D-4

D-5

D-6

D-7

D-8

D-9

D-10

D-11

D-12

CB CB

CBCB

C

C

C1

C1

C1

C

C

C

C

C3

OS1 OS1

OS1 OS1

OS1

C3

C3

C3

7.1

D

7.8 8.5 9.6 106.15.1

C

B

A

E

XTR

XTR

XTR

XTR

XTR

XTR

XTR XTR

NIC

NIC

NIC

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

TL4 TL4 TL4

TL4 TL4 TL4

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k k k k k k k

TL5

(E) (E) (E)

(E)

(E)

(E)

(E)

(E)

(E)

(E) (E) (E)

(E)

TL2 TL2 TL2

TL2 TL2 TL2

IQ48(2)

IQ48(1)

DdR6

EDBK

XTR XTR

XTR

STAGE

DIMMER FEED

HOUSE

DIMMER FEED

EXISTING WIRE

TROUGH

MINI DIN RAIL ENCLOSURE

DMX EMERGENCY BYPASS (ABOVE)

EQUIPMENT RACK

LL6

LL5

LH3

LLA

LL7

MULTI PURPOSE

RM

STAGE

C1

C1 m m m m

(E)

(E) n n n

OPEN TO

ABOVE

C1 m

(E)

AS NOTED

Drawing No.

Drawing Title

Date:

Revisions

Drawn By

Project No.

Checked By

Project Mgr.

Copyright © 2026 RFS Engineering

10967.001

50% Construction Documents

June 19, 2026

Mabel Brown Room Theatrical & House Lighting Upgrades

Keene State College

File Name

Key Plan

Stamp

Scale

229 Main Street Keene, NH 03431 www.rfsengineering.com

24 Federal Street, 3rd Floor, Boston, MA 02110, 617.494.1464 71 Water Street, Laconia, NH 03246, 603.524.4647 82 Hanover Street, Suite 2, Portland, ME 04101, 207.761.4647

Boston, MA | Laconia, NH | Portland, ME

10967 Central Elect 2024.rvt

Jones Architecture, Inc.

10 Derby Square Salem, MA 01970

978.744.5200 www.jonesarch.com

Architect:

/1

/2

:2

:4

P

M E1.1

ELECTRICAL SECOND

FLOOR NEW

CONSTRUCTION PLAN

- BASE

CEG

AMS

PGW

KEYED NOTES :

1. MOUNT THEATRICAL LIGHT BAR ON FACE

OF BALCONY AT WOOD TRIM.

THEATRICAL LUMINAIRES SHALL BE

MOUNTED AT MINIMUM 13'- 0" AFF.

2. NEW IQ48 THEATRICAL DIMMER PANELS.

PROVIDE NEW FEEDERS. UTILIZE

EXISTING BREAKER. REFER TO ONE-LINE

DIAGRAMS ON DRAWING E0.1 FOR

ADDITIONAL INFORMATION.

3. ADJUST EXISITING BREAKER TO 400A FOR

NEW LOAD. REFER TO ONE-LINE

DIAGRAMS ON DRAWING E0.1 FOR

ADDITIONAL INFORMATION.

4. NEW DdR6 HOUSE DIMMER PANEL.

CONNECT TO EXISTING FEEDER

MAINTAINED. ANY NEW CONDUIT AND

WIRING TO MATCH EXISTING IN ALL

RESPECTS.

5. NEW EMERGENCY LIGHTING RELAY.

CONNECT TO EXISTING FEEDER

MAINTAINED. ANY NEW CONDUIT AND

WIRING TO MATCH EXISTING IN ALL

RESPECTS.

6. UTILIZE EXISTING SPARE BREAKERS

WITHIN EXISTING PANELS FOR NEW

LOADS INDICATED BY HOMERUNS.

CONTRACTOR TO VERIFY EXISTING

CIRCUITS TO BE UTILIZED. IF NO SPARE

BREAKERS EXIST, PROVIDE NEW 20A/1P

BREAKERS AS REQUIRED TO SUPPORT

ADDITIONAL LOADS.

7. DMX BYPASS AND DIN RAIL PART OF

LIGHTING ALTERNATE. CIRCUITS

REQUIRED ONLY IF ALTERNATE IS

ACCEPTED.

C

C

C1

C1

OS1 OS1

OS1

OS1 OS1

OS1

OS1

OS1

OS1

OS1

7.1

D

7.8 8.5 9.6 106.15.1

C

B

A

E

XTR

XTR

XTR

XTR

XTR

f

XTR

XTR XTR

XTR

f

XTRXTR

ff

XTR XTR

NIC

NIC

NIC

F1 c

F1 c

F1 c

F1 c

F1 c

F1 c

F1 c

F1 c

F1 c

F1 c

F1 c

F1 c

F1 c

F1 c

F1 c

F1 c

F1 c

F1 c

F1 d

F1 d

F1 d

F1 d

F1 d

F1 d

F1 d

F1 d

F1 d

F1 d

F1 d

F1 d

F1 d

F1 d

F1 d

F2 a

F2 a

F2 a

F2 a

F2 a

F3 b

F3 b

F3 b

F3 b

F3 b

F3 b

F1 a

F1 a

F1 a

F1 a

F1 a

F1 a

F1 a

F1 a

F1 a

F1 a

F1 a

F1 a

F1 a

F1 a

F1 a

F1 a

F1 a

F1 a

F1 a

F1 a

F1 a

F1 a a,b,c,d a,b,c,d a,b,c,d a,b,c,d

F4 h

F4 h

F4 F4 F4

F4

F4 i i h i h

F5 j

F5 j

(TYP.)

XTR

XTRXTR

XTR

F4F4

F4F4

F4

F4 F4

F4 F4

F5 F5 j j hh ii i h h i i

F5 j

F5 j

F5

F5 j j

F6 n

F6 n

(E)

(E)

(E)

(E) (E) (E) (E) (E)

(E) (E) (E) (E)(E)

(E)

(E)

(E)

(E)

(E) (E)

(E)(E) f f ff g gg g

XTR XTRXTRXTR

g ggg

MULTI PURPOSE

RM

STAGE

BALCONY

n n

AS NOTED

Drawing No.

Drawing Title

Date:

Revisions

Drawn By

Project No.

Checked By

Project Mgr.

Copyright © 2026 RFS Engineering

10967.001

50% Construction Documents

June 19, 2026

Mabel Brown Room Theatrical & House Lighting Upgrades

Keene State College

File Name

Key Plan

Stamp

Scale

229 Main Street Keene, NH 03431 www.rfsengineering.com

24 Federal Street, 3rd Floor, Boston, MA 02110, 617.494.1464 71 Water Street, Laconia, NH 03246, 603.524.4647 82 Hanover Street, Suite 2, Portland, ME 04101, 207.761.4647

Boston, MA | Laconia, NH | Portland, ME

10967 Central Elect 2024.rvt

Jones Architecture, Inc.

10 Derby Square Salem, MA 01970

978.744.5200 www.jonesarch.com

Architect:

/1

/2

:2

:4

P

M E1.2

ELECTRICAL THIRD

FLOOR NEW

CONSTRUCTION PLAN

- BASE

CEG

AMS

PGW

KEYED NOTES :

1. REPLACE EXISTING LAMPING WITH LED

EQUIVALENTS. FINAL LAMP TYPE (STATIC

WHITE OR RGBW) TO BE CONFIRMED

WITH ARCHITECT/OWNER.

7.8 8.5 9.6 106.15.1

C

B

A

E

TL3 TL3

TL3 TL3

TL3

TL3

TL3

TL3

TL3

TL3

TL3

TL3

TL3

TL3

TL3

TL3

TL3

TL3

TL3

TL3

TL3

TL3

TL6 TL6

TL6 TL6

TL2

TL2

TL2

TL2

TL2

TL2

TL2

TL2

TL2

TL2

TL1

TL1

TL1

TL1

TL1

TL1

TL1

TL2

TL2

TL2

TL2

TL2

TL2

TL2

TL2

TL2

TL2

TL2TL2TL2

TL2TL2TL2

TL6

TL6

TL6

TL9

TL9

TL9 TL9

TL9

TL9

TL9

TL9

TL8

TL8

TL8

TL8

TL7

TL7

TL7NIC

NIC

NIC

XTR

MIRROR BALL

AS NOTED

Drawing No.

Drawing Title

Date:

Revisions

Drawn By

Project No.

Checked By

Project Mgr.

Copyright © 2026 RFS Engineering

10967.001

50% Construction Documents

June 19, 2026

Mabel Brown Room Theatrical & House Lighting Upgrades

Keene State College

File Name

Key Plan

Stamp

Scale

229 Main Street Keene, NH 03431 www.rfsengineering.com

24 Federal Street, 3rd Floor, Boston, MA 02110, 617.494.1464 71 Water Street, Laconia, NH 03246, 603.524.4647 82 Hanover Street, Suite 2, Portland, ME 04101, 207.761.4647

Boston, MA | Laconia, NH | Portland, ME

10967 Central Elect 2024.rvt

Jones Architecture, Inc.

10 Derby Square Salem, MA 01970

978.744.5200 www.jonesarch.com

Architect:

/1

/2

:2

:4

P

M E1.3

ELECTRICAL THIRD

FLOOR NEW

CONSTRUCTION

THEATRICAL PLAN

CEG

AMS

PGW

DRAWING NOTES:

A. PROVIDE ONE (1) ETC NET PORT AT EACH

EXISTING CIRCUIT DISTRIBUTION

POSITION. FIELD VERIFY QUANTITY.

B. PROVIDE ALL THEATRICAL FIXTURES

WITH POWER INPUT, CLAMP, SAFETY,

AND 10' DMX CABLE.

CBCB

CB CB

C

C

C

C1

C1

C1

C

C1

C

C

C

C3

OS1 OS1

OS1 OS1

OS1

C3

C3

C3

7.1

D

7.8 8.5 9.6 106.15.1

C

B

A

E

LL6

LL5

LH3

IQ48(2)

IQ48(1)

DdR6

EDBK

XTR XTR

XTR

STAGE

DIMMER FEED

HOUSE

DIMMER FEED

EXISTING WIRE

TROUGH

MINI DIN RAIL ENCLOSURE

DMX EMERGENCY BYPASS (ABOVE)

EQUIPMENT RACK

NIC

NIC

NIC

XTR

XTR

XTR

XTR

XTR XTR

XTR

XTR

LLA

LL7

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

TL4 TL4 TL4

TL4 TL4 TL4

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k

F1 k k k k k k k k k

TL5

(E) (E) (E)

(E)

(E)

(E)

(E)

(E)

(E)

(E) (E) (E)

(E)

TL2 TL2 TL2

TL2 TL2 TL2

MULTI PURPOSE

RM

STAGE

C1 m m

C1 m m

(E)

(E) n n n

AS NOTED

Drawing No.

Drawing Title

Date:

Revisions

Drawn By

Project No.

Checked By

Project Mgr.

Copyright © 2026 RFS Engineering

10967.001

50% Construction Documents

June 19, 2026

Mabel Brown Room Theatrical & House Lighting Upgrades

Keene State College

File Name

Key Plan

Stamp

Scale

229 Main Street Keene, NH 03431 www.rfsengineering.com

24 Federal Street, 3rd Floor, Boston, MA 02110, 617.494.1464 71 Water Street, Laconia, NH 03246, 603.524.4647 82 Hanover Street, Suite 2, Portland, ME 04101, 207.761.4647

Boston, MA | Laconia, NH | Portland, ME

10967 Central Elect 2024.rvt

Jones Architecture, Inc.

10 Derby Square Salem, MA 01970

978.744.5200 www.jonesarch.com

Architect:

/1

/2

:2

:4

P

M E1.4

ELECTRICAL SECOND

FLOOR NEW

CONSTRUCTION PLAN

- ALTERNATE

CEG

AMS

PGW

KEYED NOTES :

1. MOUNT THEATRICAL LIGHT BAR ON FACE

OF BALCONY AT WOOD TRIM.

THEATRICAL LUMINAIRES SHALL BE

MOUNTED AT MINIMUM 13'- 0" AFF.

2. NEW IQ48 THEATRICAL DIMMER PANELS.

PROVIDE NEW FEEDERS. UTILIZE

EXISTING BREAKER. REFER TO ONE-LINE

DIAGRAMS ON DRAWING E0.1 FOR

ADDITIONAL INFORMATION.

3. ADJUST EXISITING BREAKER TO 400A FOR

NEW LOAD. REFER TO ONE-LINE

DIAGRAMS ON DRAWING E0.1 FOR

ADDITIONAL INFORMATION.

4. NEW DdR6 HOUSE DIMMER PANEL.

CONNECT TO EXISTING FEEDER

MAINTAINED. ANY NEW CONDUIT AND

WIRING TO MATCH EXISTING IN ALL

RESPECTS.

5. NEW EMERGENCY LIGHTING RELAY.

CONNECT TO EXISTING FEEDER

MAINTAINED. ANY NEW CONDUIT AND

WIRING TO MATCH EXISTING IN ALL

RESPECTS.

6. UTILIZE EXISTING SPARE BREAKERS

WITHIN EXISTING PANELS FOR NEW

LOADS INDICATED BY HOMERUNS.

CONTRACTOR TO VERIFY EXISTING

CIRCUITS TO BE UTILIZED. IF NO SPARE

BREAKERS EXIST, PROVIDE NEW 20A/1P

BREAKERS AS REQUIRED TO SUPPORT

ADDITIONAL LOADS.

7. DMX BYPASS AND DIN RAIL PART OF

LIGHTING ALTERNATE. CIRCUITS

REQUIRED ONLY IF ALTERNATE IS

ACCEPTED.

C

C

C1

C1

OS1 OS1

OS1

OS1 OS1

OS1

OS1

OS1

OS1

OS1

7.1

D

7.8 8.5 9.6 106.15.1

C

B

A

E

XTR

XTR

XTR

XTR

XTR

XTR XTR XTR XTR

XTRXTRXTRXTR

XTR XTR XTR XTR

XTRXTRXTRXTR

NIC

NIC

NIC

F1 F1 F1 F1 F1 F1 F1 F1 F1

F1 F1 F1 F1 F1 F1 F1 F1 F1

F1 F1 F1 F1 F1 F1 F1 F1 F1

F1 F1 F1 F1 F1 F1

F2

F2

F2

F2

F2

F3

F3

F3

F3

F3

F3F1F1

F1F1

F1F1

F1F1

F1F1

F1F1

F1F1

F1F1

F1F1

F1F1

F1F1

F4

F4

F4 F4 F4

F4

F4

F5

F5

F4F4

F4F4

F4

F4 F4

F4 F4

F5 F5

F5 F5

F5

F5

F6

F6

(E)

(E)

(E)

(E) (E) (E) (E) (E)

(E) (E) (E) (E)(E)

(E)

(E)

(E)

(E)

(E) (E)

(E)(E)

STAGE

BALCONY

(TYP.)

MULTI PURPOSE

RM

f fff c c c c c c c c c c c c c c c c c c d d d d d d d d d d d d d d d a a a a a b b b b b baa aa aa aa aa aa aa aa aa aa aa h h i i h i h j j j j hh ii i h h i i j j j j n n ff ff g gg g g ggg n n a,b,c,d a,b,c,d a,b,c,d a,b,c,d

AS NOTED

Drawing No.

Drawing Title

Date:

Revisions

Drawn By

Project No.

Checked By

Project Mgr.

Copyright © 2026 RFS Engineering

10967.001

50% Construction Documents

June 19, 2026

Mabel Brown Room Theatrical & House Lighting Upgrades

Keene State College

File Name

Key Plan

Stamp

Scale

229 Main Street Keene, NH 03431 www.rfsengineering.com

24 Federal Street, 3rd Floor, Boston, MA 02110, 617.494.1464 71 Water Street, Laconia, NH 03246, 603.524.4647 82 Hanover Street, Suite 2, Portland, ME 04101, 207.761.4647

Boston, MA | Laconia, NH | Portland, ME

10967 Central Elect 2024.rvt

Jones Architecture, Inc.

10 Derby Square Salem, MA 01970

978.744.5200 www.jonesarch.com

Architect:

/1

/2

:2

:4

P

M E1.5

ELECTRICAL THIRD

FLOOR NEW

CONSTRUCTION PLAN

- ALTERNATE

CEG

AMS

PGW

KEYED NOTES :

1. REPLACE EXISTING LAMPING WITH LED

EQUIVALENTS. FINAL LAMP TYPE (STATIC

WHITE OR RGBW) TO BE CONFIRMED

WITH ARCHITECT/OWNER.

THEATRICAL LIGHTING FIXTURE SCHEDULE

TYPE

TL1

TL2

TL3

TL4

TL5

TL6

TL7

TL8

TL9

NOTES:

1. PROVIDE 1 EDSION TO TRU1 AND/OR POWERCON FEED CABLE FOR EACH LIGHITNG DISTRIBUTION LOCATION BASED ON THE FIXTURE TYPE BEING FED FROM THAT LOCATION.

DESCRIPTION

COLORSOURCE CYC

COLORSOURCE FRESNEL V MAX

COLORSOURCE SPOT V

19 DEGREE

COLORSOURCE SPOT V

36 DEGREE

COLORSOURCE SPOT V

15 DEGREE-30 DEGREE ZOOM

COLORSOURCE SPOT JR DEEP BLUE

SELADOR D22 SELL20 LUSTER PORTABLE

HIGH END MEGAPIX

LONESTAR

MANUFACTURER

[ETC]

#CSCYC-400SC-400CC-DPJ-10/CD10-DMX

[ETC]

#CSFRESVMAXMV-400CC-400SC-T1J-10-CD10-DMX

[ETC]

#CSSPOTVMVS-419EDLT-400CC-400SC-T1J-10-CD10-DMX

[ETC]

#CSSPOTVMVS-436EDLT-400CC-400SC-T1J-10-CD10-DMX

[ETC]

#CSSPOTVMVS-41530LT-400CC-400SC-T1J-10-CD10-DMX

[ETC]

#CSSPOTJRDB2550-400SC-400CC-DPJ-10-CD10-DMX

[ETC]

#SELD22L-400CC-400SC

[ETC]

#MP-MI-MP-TH-T1J-10-MEGA-CLW-400SC-CD10-DMX

[ETC]

#LS-P-T1PA-A-MEGA-CLW-400SC-CD10-DMX

LAMP TYPE

133 W IN WHITE

COLOR MIXING

4117 LUMENS

208 W IN WHITE

COLOR MIXING

9,293 LUMENS

197 W IN WHITE

COLOR MIXING

8,308 LUMENS

197 W IN WHITE

COLOR MIXING

8,308 LUMENS

197 W IN WHITE

COLOR MIXING

8,308 LUMENS

147 W IN WHITE

COLOR MIXING

5,426 LUMENS

56.8W IN WHITE

COLOR MIXING

1,479 LUMENS

450W IN WHITE

COLOR MIXING

10,000 LUMENS

550W

6500K

17,000 LUMENS

CONTROL

DMX

DMX

DMX

DMX

DMX

DMX

DMX

DMX

DMX

VOLTAGE

100-23VAC

100-240VAC

100-240VAC

100-240VAC

100-240VAC

100-240VAC

100-240VAC

100-240V

100-240V

FIXTURE

WATTAGE

133 W

208 W

197 W

197 W

197 W

147 W

57W

450W

550W

REMARKS

PROVIDE WITH CLAMP, SAFETY CABLE, 10' DMX CABLE,

10' PWRCON TO PWRCON JUMPER

PROVIDE WITH CLAMP, SAFETY CABLE, 10' DMX CABLE,

10' TRU1 TO TRU1 JUMPER

PROVIDE WITH CLAMP, SAFETY CABLE, 10' DMX CABLE,

10' TRU1 TO TRU1 JUMPER

PROVIDE WITH CLAMP, SAFETY CABLE, 10' DMX CABLE,

10' TRU1 TO TRU1 JUMPER

PROVIDE WITH CLAMP, SAFETY CABLE, 10' DMX CABLE,

10' TRU1 TO TRU1 JUMPER

PROVIDE WITH CLAMP, SAFETY CABLE, 10' DMX CABLE,

10' PWRCON TO PWRCON JUMPER

PROVIDE WITH CLAMP, SAFETY CABLE, YOKE MOUNT,

AND EDISON MOLDED PLUG

PROVIDE WITH MEGACLAW CLAMP, SAFTEY CABLE,

10' DMX CABLE, 10' TRU1 TO TRU1 JUMPER

PROVIDE WITH MEGACLAW CLAMP, SAFTEY CABLE,

10' DMX CABLE, 10' TRU1 TO TRU1 JUMPER

BASE LIGHTING FIXTURE SCHEDULE

TYPE

F1

F2

F3

F4

F5

F6

C1

NOTES:

1. ALL 0-10VOLT LED DIMMING DRIVERS SHALL MEET THE REQUIREMENTS OF IEC 60929 AND SHALL HAVE AN ISOLATED 0-10VDC CONTROL CIRCUIT.

2. WHERE N/E IS NOTED, PROVIDE FIXTURE WITH TWO (2) DRIVERS. ONE DRIVER SHALL BE POWERED FROM THE NORMAL CIRCUIT AND ONE SHALL BE POWERED FROM THE EMERGENCY CIRCUIT.

3. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REMOTE DRIVER LOCATIONS. COORDINATE DRIVER LOCATIONS WITH THE ARCHITECT. PROVIDE WIRE SIZE IN ACCORDANCE

WITH MANUFACTURER’S RECOMMENDATIONS. DO NOT EXCEED MANUFACTURER’S RECOMMENDATIONS FOR DISTANCE.

DESCRIPTION

4" RECESSED LED ROUND DOWNLIGHT, 20 GAUGE GALVANIZED STEEL,

WITH SHALLOW HOUSING, 1500 LUMENS, MEDIUM BATWING 60° LIGHT DISTRIBUTION,

AND WHITE TRIM FINISH

4" RECESSED LED ROUND DOWNLIGHT, 20 GAUGE GALVANIZED STEEL,

WITH SHALLOW HOUSING, 1000 LUMENS, MEDIUM BATWING 60° LIGHT DISTRIBUTION,

AND WHITE TRIM FINISH

4" RECESSED LED ROUND DOWNLIGHT, 20 GAUGE GALVANIZED STEEL,

WITH SHALLOW HOUSING, 2000 LUMENS, MEDIUM BATWING 60° LIGHT DISTRIBUTION,

AND WHITE TRIM FINISH

6" RECESSED LED DOWNLIGHT, 20 GAUGE MINIMUM COLD-ROLLED STEEL, GALVANIZED STEEL,

AND ALUMINUM HOUSING, 4000 LUMENS, 40° LIGHT DISTRIBUTION,

AND WHITE TRIM FINISH

6" RECESSED LED DOWNLIGHT, 20 GAUGE MINIMUM COLD-ROLLED STEEL, GALVANIZED STEEL,

AND ALUMINUM HOUSING, 3000 LUMENS, 40° LIGHT DISTRIBUTION,

AND WHITE TRIM FINISH

4" RECESSED LED LINEAR SLOT, EXTRUDED ALUMINUM HOUSING,

STANDARD SNAP IN FLUSH LENS, LAMBERTIAN LOW GLARE LIGHT DISTRIBUTION,

AND WHITE POWDER COAT FINISH

4' SUSPENDED LED LINEAR STRIP, CODE-GUAGE COLD-ROLLED STEEL HOUSING,

STANDARD EFFICIENCY, FLAT DIFFUSED ACRYLIC LENS, LAMBERTIAN LIGHT DISTRIBUTION,

AND BAKED WHITE POLYESTER FINISH

MANUFACTURER

[GOTHAM LIGHTING]

#IVO4S-D-15LM-35K-90CRI-MD-DARK-MVOLT-ZT-NCH-P-

WMR-F

[GOTHAM LIGHTING]

#IVO4S-D-10LM-35K-90CRI-MD-DARK-MVOLT-ZT-NCH-P-

WMR-F

[GOTHAM LIGHTING]

#IVO4S-D-20LM-35K-90CRI-MD-DARK-MVOLT-ZT-NCH-P-

WMR-F

[GOTHAM]

#IVO6-D-40LM-35K-90CRI-40D-DARK-MVOLT-ZT-NCH-P-

WMR-F

[GOTHAM]

#IVO6-D-30LM-35K-90CRI-40D-DARK-MVOLT-ZT-NCH-P-

WMR-F

[ALW]

#LPX-4-R-G9-FN-S[LENGTH]-12-35-90-LG-

V00-N-N-N-N-N-N-N-SW-N-UNV-N-N-DC

[LITHONIA LIGHTING]

#CLX-L48-3000LM-SEF-FDL-MVOLT-GZ1-35K-90CRI-WH

LAMP TYPE

15.7W

3500K, 90CRI

1,475 LUMENS

10.5W

3500K, 90CRI

1,060 LUMENS

22.4W

3500K, 90CRI

1,929 LUMENS

42.8W

3500K, 90CRI

3,889 LUMENS

25.2W

3500K, 90CRI

2,949 LUMENS

10.97W/LF

3500K, 90CRI

1,533 LM/LF

18.5W

3500K, 90CRI

2,531 LUMENS

CONTROL

0.1% DIMMING (0-10V)

0.1% DIMMING (0-10V)

0.1% DIMMING (0-10V)

0.1% DIMMING (0-10V)

0.1% DIMMING (0-10V)

1% DIMMING (0-10V)

1% DIMMING (0-10V)

VOLTAGE

UNV

UNV

UNV

UNV

UNV

UNV

UNV

FIXTURE

WATTAGE

16W

11W

22W

43W

25W

11W/LF

19W

REMARKS

CONTRACTOR TO COORDINATE MOUNTING PRIOR TO INSTALLATION.

CONTRACTOR TO COORDINATE MOUNTING PRIOR TO INSTALLATION.

CONTRACTOR TO COORDINATE MOUNTING PRIOR TO INSTALLATION.

CONTRACTOR TO COORDINATE MOUNTING PRIOR TO INSTALLATION.

CONTRACTOR TO COORDINATE MOUNTING PRIOR TO INSTALLATION.

CONTRACTOR TO COORDINATE MOUNTING PRIOR TO INSTALLATION.

CONTRACTOR TO COORDINATE MOUNTING PRIOR TO INSTALLATION.

CONTRACTOR SHALL COORDINATE ALL REQUIRED MOUNTING ACCESSORIES.

BOTTOM OF FIXTURE TO BE MOUNTED 8'-0" AFF.

NO SCALE

Drawing No.

Drawing Title

Date:

Revisions

Drawn By

Project No.

Checked By

Project Mgr.

Copyright © 2026 RFS Engineering

10967.001

50% Construction Documents

June 19, 2026

Mabel Brown Room Theatrical & House Lighting Upgrades

Keene State College

File Name

Key Plan

Stamp

Scale

229 Main Street Keene, NH 03431 www.rfsengineering.com

24 Federal Street, 3rd Floor, Boston, MA 02110, 617.494.1464 71 Water Street, Laconia, NH 03246, 603.524.4647 82 Hanover Street, Suite 2, Portland, ME 04101, 207.761.4647

Boston, MA | Laconia, NH | Portland, ME

10967 Central Elect 2024.rvt

Jones Architecture, Inc.

10 Derby Square Salem, MA 01970

978.744.5200 www.jonesarch.com

Architect:

/1

/2

:2

:4

P

M E2.1

LIGHTING SCHEDULES

- BASE

CEG

AMS

THEATRICAL LIGHTING FIXTURE SCHEDULE

TYPE

TL1

TL2

TL3

TL4

TL5

TL6

TL7

TL8

TL9

NOTES:

1. PROVIDE 1 EDSION TO TRU1 AND/OR POWERCON FEED CABLE FOR EACH LIGHITNG DISTRIBUTION LOCATION BASED ON THE FIXTURE TYPE BEING FED FROM THAT LOCATION.

DESCRIPTION

COLORSOURCE CYC

COLORSOURCE FRESNEL V MAX

COLORSOURCE SPOT V

19 DEGREE

COLORSOURCE SPOT V

36 DEGREE

COLORSOURCE SPOT V

15 DEGREE-30 DEGREE ZOOM

COLORSOURCE SPOT JR DEEP BLUE

SELADOR D22 SELL20 LUSTER PORTABLE

HIGH END MEGAPIX

LONESTAR

MANUFACTURER

[ETC]

#CSCYC-400SC-400CC-DPJ-10/CD10-DMX

[ETC]

#CSFRESVMAXMV-400CC-400SC-T1J-10-CD10-DMX

[ETC]

#CSSPOTVMVS-419EDLT-400CC-400SC-T1J-10-CD10-DMX

[ETC]

#CSSPOTVMVS-436EDLT-400CC-400SC-T1J-10-CD10-DMX

[ETC]

#CSSPOT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .