This project manual contains the 100% construction documents for the Maryland State Police Barrack J Annapolis Communication Room and Garage, a state construction project administered by the Department of General Services (DGS) in Anne Arundel County, Maryland. The project involves the phased renovation of an existing duty office (approximately 5,288 gross square feet, single-story Type VB construction to be fully sprinklered) and the demolition and reconstruction of a maintenance garage at the Maryland State Police Annapolis facility located at 610 Taylor Avenue. The project is classified as a F-level project with an estimated budget of $5,000,000 to $10,000,000. Construction is expected to be completed within 420 calendar days from notice to proceed, with liquidated damages assessed at $1,500 per day for any extension beyond this period. The project manual includes comprehensive specifications divided into 49 divisions covering general requirements, existing conditions, concrete, masonry, metals, wood, thermal protection, openings, finishes, specialties, equipment, furnishings, plumbing, HVAC, electrical, communications, and electronic safety and security systems.

The contractor's bid must include a cash allowance of $1,200,000 for the provision and installation of permanent communication technology and equipment for radio operations in the remodeled spaces, to be performed by Motorola Inc. or their subcontractors under Maryland's State-Wide Contract. The project includes eight unit price line items for soil-related work with bid quantities ranging from 100 to 2,000 cubic yards, covering removal of unsatisfactory soil, contaminated soil, and rock, along with placement of engineered fill and drainage stone. All work is subject to prevailing wage requirements as determined by the Maryland Department of Labor, with wage rates established for Anne Arundel County covering various classifications including laborers, equipment operators, skilled trades, and apprentices. The contractor must submit the Schedule of Values within 15 days of contract award and shall warrant all work for two years. Minority Business Enterprises are encouraged to respond, and the project is subject to Maryland's procurement procedures accessible through the eMaryland Marketplace Advantage portal.

View the file

Other files

File Type Posted
Addendum #1 - eMMA Issue.pdf PDF
Attachment E-1, E-1A, E-1B VSBE 9.1.22.pdf PDF
Exhibit 2 - Sample Contract.pdf PDF
Attachment E - VSBE Forms.pdf PDF
Addendum #3 Bid Extension.pdf PDF
Addendum #4 Q&A.pdf PDF
Appendix 7 - Bonds.pdf PDF
Appendix 10 - General Conditions for Construction Contracts July 1, 2022.pdf PDF
IFB - MSP Barrack J PJ-610-230-001.pdf PDF
Construction Supplemental.pdf PDF
Appendix 5 - VSBE Participation Goal.pdf PDF
Attachment 1 - No Bid Proposal Notice, Vendor Feedback Form.pdf PDF
Appendix 4 - MBE Participation Goal.pdf PDF
Addendum #4 - Specifications.pdf PDF
Appendix 9.1 - MSP Barrack J PJ-610-230-001 As-Built Drawings.pdf PDF
Attachment C - Bid Bond - Limited Liability Company.pdf PDF
Attachment C - Bid Bond.pdf PDF
Attachment D - MBE Forms.pdf PDF
Attachment AB - Certification of American-Manufactured Goods.pdf PDF
Exhibit 3 - Prevailing Wage Determination PJ-610-230-001.pdf PDF
Attachment D-1A MBE Affidavit & Schedule.pdf PDF
Attachment AA - Contractor Questionnaire.pdf PDF
Addendum #4 - Drawings.pdf PDF
Exhibit 1 - MBE, VSBE, and SBR Research Factors.pdf PDF
Addendum #2.pdf PDF
Appendix 1 - Abbreviations and Definitions.pdf PDF
Appendix 12 - Electronic Transaction Fee.pdf PDF
Appendix 11 - Instructions to Bidders for Construction Projects October 1, 2025.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL FOR CONSTRUCTION OF

BARRACK J ANNAPOLIS COMMUNICATION ROOM AND GARAGE

AT THE

MARYLAND STATE POLICE

ANNAPOLIS, ANNE ARUNDEL COUNTY, MARYLAND

FOR THE DEPARTMENT OF GENERAL SERVICES

DGS PROJECT NO.: PJ-610-230-001 PROJECT CLASSIFICATION: F - $5,000,000 - $10,000,000

MARCH 5, 2026

DEPARTMENT OF GENERAL SERVICES - STATE OF MARYLAND

DEPARTMENT OF GENERAL SERVICES BOARD OF PUBLIC WORKS

ATIF T. CHAUNDHRY, SECRETARY WES MOORE, GOVENOR

301 WEST PRESTON STREET BROOKE LIERMAN, COMPTROLLER

BALTIMORE, MD 21201 DERECK DAVIS, TREASURER

MINORITY BUSINESS ENTERPRISES ARE ENCOURAGED TO RESPOND TO THIS SOLICITATION

ARCHITECT

MANNS WOODWARD STUDIOS

8098 SANDPIPER CIRCLE, SUITE H

NOTTINGHAM, MD 21236

410-410-344-1460

MECHANICAL/ELECTRICAL ENGINEER

BKM INC.

6300 BLAIR HILL LANE

BALTIMORE, MD 21209

410-323-0600

TELECOM CONSULTANT

WRIGHT ENGINEERING, LLC

853 RIPPLE STREAM COURT

JOPPA, MD 21085

410-877-6297

CIVIL/STRUCTURAL ENGINEER

CARROLL ENGINEERING, INC.

215 SCHILLING CIRCLE, #120

HUNT VALLEY, MD 21031

410-785-7423

GEOTECHNICAL ENGINEER

KIM ENGINEERING

1390 PICCARD DRIVE, SUITE 340

ROCKVILLE, MD 20850

240-614-7678

COST ESTIMATOR

FORELLA

34 ATHERTON ROAD

LUTHERVILLE, MD 21093

410-941-9020

BID SET

This page intentionally left blank

Maryland State Police MW Studios Barrack J Annapolis Communication Room and Garage 100% Construction Documents DGS Project No.: PJ-610-230-001 March 5, 2026

Seals Page 00 0007 - 1

SECTION 00 0007 - SEALS PAGE

1.1 PROJECT INFORMATION

A. Project Name: Barrack J Annapolis Communication Room and Garage

B. DGS Project No.: PJ-610-230-001

1.2 DESIGN PROFESSIONAL OF RECORD

A. Architect:

1. Manns Woodward Studios, Inc.

2. Responsible for portions of Divisions 01, 02, 04, 05, 06, 07, 08, 09, 10, 11, and 12.

B. Civil Engineer and Landscape Architect

1. Carroll Engineering, Inc. .

2. Responsible for portions of Divisions 02, 31, 32, and 33 .

C. Structural Engineer

1. Carroll Engineering, Inc. .

2. Responsible for portions of Divisions 03 and 05 .

D. Mechanical Engineer

1. Burdette, Koehler, Murphy and Associates .

2. Responsible for portions of Divisions 01 and 23 .

E. Plumbing Engineer Engineer

1. Burdette, Koehler, Murphy and Associates.

2. Responsible for portions of Divisions 21 and 22.

F. Electrical Engineer

1. Burdette, Koehler, Murphy and Associates.

2. Responsible for portions of Divisions 26 and 27.

G. Telecommunications Engineer

1. Wright Engineering, LLC.

2. Responsible for portions of Divisions 28 .

END OF SECTION 00 0007

DGS Project No.: PJ-610-230-001 March 5, 2026

Seals Page 00 0007 - 2

Seals and Signatures 00 0008 - 1

SECTION 00 0008 - SEALS AND SIGNATURES

ARCHITECTS CERTIFICATION

The Contract Documents for the public improvement identified as the Maryland State Police Barrack J Annapolis Communication Room and Garage, DGS Project Number PJ-610-230-001, were prepared under my supervision, and to the best of my knowledge, information, and belief, they comply with the relevant building codes of the State of Maryland.

Architect David A. Woodward License No.: 15505 Expiration: 08/18/2026 Manns Woodward Studios, Inc.

8098 Sandpiper Circle, Suite H Nottingham, Maryland 21236

ENGINEER'S CERTIFICATION

I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the state of Maryland.

Civil Engineer Judith A. Carroll License No.: 14446 Expiration: 05/25/2027 Carroll Engineering, Inc.

215 Schilling Circle, #102 Hunt Valley, MD 21031

Landscape Architect Claire Morgan Fishman License No.: 3621 Expiration: 03/20/2027 Carroll Engineering, Inc.

215 Schilling Circle, #102 Hunt Valley, MD 21031

Structural Engineer Scott Bradley License No.: 29269 Expiration: 06/16/2027 Carroll Engineering, Inc.

215 Schilling Circle, #102 Hunt Valley, MD 21031

Seals and Signatures 00 0008 - 2

Mechanical & Plumbing Engineer William Joseph Collins Jr.

License No.: 17117 Expiration: 10/25/2026 Burdette, Koehler, Murphy & Associates, Inc.

6300 Blair Hill Lane Baltimore, MD 21029

Electrical Engineer Anthony Raymond Page License No.: 29743 Expiration: 01/15/2027 Burdette, Koehler, Murphy & Associates, Inc.

6300 Blair Hill Lane Baltimore, MD 21029

Telecommunication Engineer James Wright License No.: 22868 Expiration: 10/14/2026 Wright Engineering, LLC 853 Ripple Stream Court Joppa, MD 21085

END OF SECTION 00 0008

DGS Project No.: PJ-610-230-001 March 5, 2026

Table of Contents 00 0010 - 1

SECTION 00 0010 - TABLE OF CONTENTS

DIVISION 00 -- PROJECT INFORMATION

00 0007 - Seals Page 00 0008 - Seals and Signatures 00 0010 - Table of Contents 00 0011 - Maryland Department of General Services Procurement Documents A. Version: Dated 4.28.23 B. State of Maryland Procurement and Contracting documents shall be obtained by each Contractor bidding on this Project through eMaryland Marketplace Advantage; https://procurement.maryland.gov/ C. Division 00 - Procurement and Contracting Documents located on the eMaryland Marketplace Advantage website for this Project are hereby incorporated by reference into these Bid Documents. Procurement and Contracting Documents may include, but are not limited to, the following:

1. Notice to Bidders - Solicitation Fact Sheet (eMaryland Marketplace Advantage attachment)

2. Instructions to Bidders For Construction Projects (July 1, 2022) (eMaryland Marketplace Advantage attachment)

3. General Conditions For Construction Contracts (July 1, 2022) (eMaryland Marketplace Advantage attachment)

4. Bid/Proposal Affidavit (eMaryland Marketplace Advantage attachment)

5. Payment of Employee Healthcare Expenses Certification (eMaryland Marketplace Advantage attachment)

6. Contractor Questionnaire

7. Bid Bond (eMaryland Marketplace Advantage attachment)

8. Minority Business Enterprise Forms Attachment D (February 5, 2021) (eMaryland Marketplace

Advantage attachment)

9. Veteran-owned Small Business Enterprise (VSBE) Forms Attachment E (September 1, 2022) (eMaryland

Marketplace Advantage attachment)

10. List of Prevailing Wage Rates (eMaryland Marketplace Advantage attachment)

11. Corporate Diversity Addendum (eMaryland Marketplace Advantage attachment)

12. Addenda (eMaryland Marketplace Advantage attachment)

13. List of Drawings (eMaryland Marketplace Advantage attachment)

14. Attachment A - Contract (eMaryland Marketplace attachment)

15. Pre-Bid Conference / Site Visit Information: Refer to: State Finance and Procurement Article Section

14-302(a)(7)(v) and COMAR 21.11.03.09.C.(2)(e).

00 0115 - List of Drawing Sheets 00 3100 - Available Project Information 00 6000 - Forms 00 7346 - Wage Determination Sche

TECHNICAL SPECIFICATIONS

DIVISION 01 -- GENERAL REQUIREMENTS

01 1000 - Summary

DGS Project No.: PJ-610-230-001 March 5, 2026

Table of Contents 00 0010 - 2

01 2000 - Price and Payment Procedures 01 2100 - Allowances 01 2200 - Unit Prices 01 2500 - Substitution Procedures 01 2501 - Substitution Request Form 01 3000 - Administrative Requirements 01 3001 - Submittal Review and Transmittal 01 3216 - Construction Progress Schedule 01 4000 - Quality Requirements 01 4216 - Definitions 01 4219 - Reference Standards 01 5000 - Temporary Facilities and Controls 01 5213 - Field Offices and Sheds 01 6000 - Product Requirements 01 7000 - Execution and Closeout Requirements 01 7123 - Field Engineering 01 7419 - Construction Waste Management and Disposal 01 7610 - Temporary Protective Coverings 01 7800 - Closeout Submittals 01 7801 - Operation and Maintenance Manual Template 01 7900 - Demonstration and Training

DIVISION 02 -- EXISTING CONDITIONS

02 4100 - Building Demolition

DIVISION 03 -- CONCRETE

03 3000 - Cast-in-Place Concrete

DIVISION 04 -- MASONRY

04 0511 - Masonry Mortaring and Grouting 04 2000 - Unit Masonry

DIVISION 05 -- METALS

05 1200 - Structural Steel 05 2100 - Steel Joists 05 3100 - Steel Deck 05 4000 - Cold-Formed Metal Framing 05 5000 - Metal Fabrications

DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES

06 1053 - Miscellaneous Rough Carpentry 06 4116 - Plastic-Laminate-Clad Architectural Cabinets 06 6400 - Plastic Paneling

DGS Project No.: PJ-610-230-001 March 5, 2026

Table of Contents 00 0010 - 3

DIVISION 07 -- THERMAL AND MOISTURE PROTECTION

07 1113 - Bituminous Dampproofing 07 1326 - Self-Adhering Sheet Waterproofing 07 2100 - Thermal Insulation 07 2726 - Fluid-Applied Membrane Air-Barriers 07 5423 - Thermoplastic-Polyolefin Roofing (TPO) 07 6200 - Sheet Metal Flashing and Trim 07 7100 - Roof Specialties 07 7200 - Roof Accessories 07 8413 - Penetration Firestopping 07 9200 - Joint Sealants

DIVISION 08 -- OPENINGS

08 1113 - Hollow Metal Doors and Frames 08 3113 - Access Doors And Frames 08 3113.53 - Security Access Doors And Frames 08 3323 - Overhead Coiling Doors 08 3613 - Sectional Doors 08 4113 - Aluminum-Framed Entrances and Storefronts 08 5113 - Aluminum Windows 08 5653 - Security Windows 08 7111 - Door Hardware 08 8000 - Glazing 08 8853 - Security Glazing 08 9119 - Fixed Louvers 08 9200 - Louvered Equipment Enclosures

DIVISION 09 -- FINISHES

09 2216 - Non-Structural Metal Framing 09 2900 - Gypsum Board 09 5113 - Acoustical Panel Ceilings 09 5133 - Acoustical Metal Pan Ceilings 09 6513 - Resilient Base and Accessories 09 6519 - Resilient Tile Flooring 09 6536 - Static-Control Resilient Flooring 09 6723 - Resinous Flooring and Wall Covering 09 8430 - Sound-Absorbing Wall and Ceiling Units 09 9123 - Interior Painting 09 9600 - High-Performance Coatings

DIVISION 10 -- SPECIALTIES

10 1423.13 - Room-Identification Panel Signage

DGS Project No.: PJ-610-230-001 March 5, 2026

Table of Contents 00 0010 - 4

10 2213 - Wire Mesh Partitions 10 2800 - Toilet, Bath, and Laundry Accessories 10 4416 - Fire Extinguishers 10 5613 - Metal Storage Shelving

DIVISION 11 -- EQUIPMENT

11 1916 - Detention Gun Lockers 11 3013 - Residential Appliances 11 9400 - Dog Run Equipment

DIVISION 12 -- FURNISHINGS

12 3661.19 - Quartz Agglomerate Countertops

DIVISION 13 -- SPECIAL CONSTRUCTION (NOT USED)

DIVISION 14 -- CONVEYING EQUIPMENT (NOT USED)

14 4500 - Heavy Duty Vehicle Lifts

DIVISION 15 -- RESERVED (NOT USED) (FOR MECHANICAL, SEE DIVISIONS 21, 22, AND 23)

DIVISION 16 -- RESERVED (NOT USED) (FOR ELECTRICAL, SEE DIVISIONS 25, 26, 27, 28, AND 29)

DIVISION 17 -- RESERVED (NOT USED)

DIVISION 18 -- RESERVED (NOT USED)

DIVISION 19 -- RESERVED (NOT USED)

DIVISION 20 -- RESERVED (NOT USED)

DIVISION 21 -- FIRE SUPPRESSION

DIVISION 22 -- PLUMBING

22 0100 - Basic Plumbing Requirements 22 0200 - Project Closeout Plumbing 22 0500 - Basic Plumbing Materials and Methods 22 0510 - Plumbing Related Work 22 0513 - Electrical Provisions for Plumbing Equipment 22 0514 - Pipe, Tube and Fittings for Plumbing Equipment 22 0515 - Piping Specialties for Plumbing Systems 22 0519 - Meters and Gauges for Plumbing Piping 22 0523 - Valves for Plumbing Piping 22 0529 - Hangers and Supports for Plumbing Piping and Equipment 22 0548 - Vibration Isolation for Plumbing Piping and Equipment 22 0553 - Identification for Plumbing Piping and Equipment 22 0700 - Plumbing Insulation

DGS Project No.: PJ-610-230-001 March 5, 2026

Table of Contents 00 0010 - 5

22 1116 - Domestic Water Piping 22 1316 - Soil, Waste and Vent Piping 22 1413 - Storm Water Piping 22 3000 - Plumbing Equipment 22 4000 - Plumbing Fixtures 22 6300 - Natural Gas Systems

DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

23 0100 - Basic HVAC Requirements 23 0200 - Project Closeout HVAC 23 0500 - Basic HVAC Materials and Methods 23 0510 - HVAC Related Work 23 0513 - Electrical Provisions for HVAC Equipment 23 0529 - Hangers and Supports for HVAC Piping and Equipment 23 0548 - Vibration Isolation for HVAC Piping and Equipment 23 0553 - Identification for HVAC Piping and Equipment 23 0593 - Testing, Adjusting, and Balancing for HVAC 23 0700 - HVAC Insulation 23 0800 - Commissioning of HVAC Systems 23 0900 - Automatic Control Systems (Electric-Electronic) 23 2300 - Refrigerant Piping 23 3113 - Low Pressure Ductwork 23 3300 - Duct Accessories 23 3400 - Fans 23 3700 - Air Outlets and Inlets 23 7413 - Packaged Rooftop Air Handling Units 23 8119 - Split Systems Air Conditioning Units 23 8120 - Variable Refrigerant Flow Systems 23 8200 - Heating and Cooling Terminal Units

DIVISION 24 -- RESERVED (NOT USED)

DIVISION 25 -- INTEGRATED AUTOMATION (NOT USED)

DIVISION 26 -- ELECTRICAL

26 0100 - Basic Electrical Materials and Methods 26 0200 - Project Closeout Electrical 26 0501 - Inspections, Testing and Start-up 26 0519 - Wires and Cables 26 0526 - Grounding 26 0529 - Supporting Devices 26 0533 - Raceways 26 0534 - Boxes, Fittings and Cabinets 26 0543 - Underground Electrical Structures

DGS Project No.: PJ-610-230-001 March 5, 2026

Table of Contents 00 0010 - 6

26 0573 - Coordination Study 26 0943 - Lighting Control Systems 26 2416 - Panelboards 26 2726 - Wiring Devices 26 2736 - Electrical Connections 26 2816 - Disconnect, Switches and Contactors 26 2913 - Motor Controllers

26 3353 - UPS

26 4314 - External SPD 26 5100 - Lighting Fixtures 26 5720 - Telephone and Data Systems Support

DIVISION 27 -- COMMUNICATIONS

27 0000 - General Communications Provisions 27 0100 - Common Work Results for Communications 27 0200 - Communications Equipment Room Fittings 27 0536 - Cable Trays for Communications Systems 27 4100 - AudioVisual Systems 27 5000 - Data, Voice and Video Systems 27 5200 - Grounding and Bonding for Communications 27 5800 - Conduit and Backboxes for Communications Systems 27 6000 - Telephone and CATV Utility Service Provisions

DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY

28 0500 - Common Work Results for Electronic Safety and Security Systems 28 2300 - Security Camera Systems 28 3111 - Fire Dertection and Alarm System 28 4000 - Access Control and Alarm System 28 5200 - Grounding and Bonding for Electronic Safety and Security Systems 28 5800 - Conduit and Backboxes for Electronic Safety and Security Systems

DIVISION 29 -- RESERVED (NOT USED)

DIVISION 30 -- RESERVED (NOT USED)

DIVISION 31 -- EARTHWORK (NOT USED)

31 1000 - Site Clearing 31 2000 - Earth Moving 31 5000 - Excavation Support and Protection

DIVISION 32 -- EXTERIOR IMPROVEMENTS (NOT USED)

32 1216 - Asphalt Paving 32 1313 - Concrete Paving 32 1373 - Concrete Paving Joint Sealants

DGS Project No.: PJ-610-230-001 March 5, 2026

Table of Contents 00 0010 - 7

32 3113 - Chain Link Fences and Gates 32 9200 - Turf and Grasses 32 9300 - Plants

DIVISION 33 -- UTILITIES (NOT USED)

33 0500 - Common Work Results for Utilities 33 1415 - Site Water Distribution Piping 33 4200 - Stormwater Conveyance

DIVISION 34 -- TRANSPORTATION (NOT USED)

DIVISION 35 -- WATERWAY AND MARINE CONSTRUCTION (NOT USED)

DIVISION 36 -- RESERVED (NOT USED)

DIVISION 37 -- RESERVED (NOT USED)

DIVISION 38 -- RESERVED (NOT USED)

DIVISION 39 -- RESERVED (NOT USED)

DIVISION 40 -- PROCESS INTEGRATION (NOT USED)

DIVISION 41 -- MATERIAL PROCESSING AND HANDLING EQUIPMENT (NOT USED)

DIVISION 42 -- PROCESS HEATING, COOLING, AND DRYING EQUIPMENT (NOT USED)

DIVISION 43 -- PROCESS GAS AND LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT (NOT

USED)

DIVISION 44 -- POLLUTION CONTROL EQUIPMENT (NOT USED)

DIVISION 45 -- INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT (NOT USED)

DIVISION 46 -- WATER AND WASTEWATER EQUIPMENT (NOT USED)

DIVISION 47 -- RESERVED (NOT USED)

DIVISION 48 -- ELECTRICAL POWER GENERATION (NOT USED)

DIVISION 49 -- RESERVED (NOT USED)

END OF SECTION 00 0010

Table of Contents 00 0010 - 8

DGS Project No.: PJ-610-230-001 March 5, 2026

Maryland Department of General Services Procurement Documents 00 0011 - 1

SECTION 00 0011 - MARYLAND DEPARTMENT OF GENERAL SERVICES PROCUREMENT

DOCUMENTS

PART 1 - GENERAL

1.1 DIVISION 00 - PROCURMENT AND CONTRACTING REQUIREMENTS

A. State of Maryland Procurement and Contracting documents shall be obtained by each Contractor bidding on this Project through eMaryland Marketplace Advantage; https://procurement.maryland.gov/

B. Division 00 - Procurement and Contracting Documents located on the eMaryland Marketplace Advantage website for this Project are hereby incorporated by reference into these Bid Documents. Procurement and Contracting Documents may include, but are not limited to, the following:

1. Notice to Bidders - Solicitation Fact Sheet (eMaryland Marketplace Advantage attachment)

2. Instructions to Bidders For Construction Projects (July 1, 2022) (eMaryland Marketplace Advantage attachment)

3. General Conditions For Construction Contracts (July 1, 2022) (eMaryland Marketplace Advantage attachment)

4. Bid/Proposal Affidavit (eMaryland Marketplace Advantage attachment)

5. Payment of Employee Healthcare Expenses Certification (eMaryland Marketplace Advantage attachment)

6. Contractor Questionnaire (eMaryland Marketplace Advantage attachment)

7. Bid Bond (eMaryland Marketplace Advantage attachment)

8. Minority Business Enterprise Forms Attachment D (February 5, 2021) (eMaryland Marketplace

Advantage attachment)

9. Veteran-owned Small Business Enterprise (VSBE) Forms Attachment E (September 1, 2022)

(eMaryland Marketplace Advantage attachment)

10. List of Prevailing Wage Rates (eMaryland Marketplace Advantage attachment)

11. Corporate Diversity Addendum (eMaryland Marketplace Advantage attachment)

12. Addenda (eMaryland Marketplace Advantage attachment)

13. List of Drawings (eMaryland Marketplace Advantage attachment)

14. Attachment A - Contract (eMaryland Marketplace attachment)

15. Pre-Bid Conference / Site Visit Information: Refer to: State Finance and Procurement Article

Section 14-302(a)(7)(v) and COMAR 21.11.03.09.C.(2)(e).

DGS Project No.: PJ-610-230-001 March 5, 2026

Maryland Department of General Services Procurement Documents 00 0011 - 2

PART - 2 PRODUCTS (NOT USED)

PART - 3 EXECUTION (NOT USED)

END OF SECTION 00 0011

DGS Project No.: PJ-610-230-001 March 5, 2026

Maryland Department of General Services Procurement Documents 00 0011 - 3

List of Drawing Sheets 00 0115 - 1

SECTION 00 0115 - LIST OF DRAWING SHEETS

SHEET NUMBER

SHEET NAME

GENERAL/CODE

G000

G001

G002

G003

G004

G005

G006

G007

G008

G009

COVER SHEEET

ABBREVIATIONS, LEGENDS & GENERAL NOTES

DRAWINGS INDEX

CODE ANALYSIS

CODE PLANS - BARRACK

CODE PLANS - GARAGE

PROGRAM VALIDATION

WORK AREAS

ADA PLANS

TYPICAL ACCESSIBILITY GUIDLIENS

CIVIL

C100

C110

C200

C300

C301

C302

C400

C500

C501

C502

C503

C504

C600

C601

C602

C603

C604

C605

C606

C607

C608

C609

C610

C611

C700

EXISTING CONDITIONS PLAN

BORING PLAN

SITE DEMOLITION PLAN

PROPOSED SITE PLAN

SITE DETAILS

SITE DETAILS

PROPOSED GRADING PLAN

PROPOSED UTILITY PLAN

STORM DRAIN PROFILES

SANITARY AND WATER PROFILES

UTILITY DETAILS

UTILITY DETAILS

EROSION & SEDIMENT CONTROL COVER SHEET

EROSION & SEDIMENT CONTROL PLAN - PHASE 1

EROSION & SEDIMENT CONTROL PLAN - PHASE 2

EROSION & SEDIMENT CONTROL PLAN - PHASE 3

EROSION & SEDIMENT CONTROL DETAILS

EROSION & SEDIMENT CONTROL DETAILS

EROSION & SEDIMENT CONTROL NOTES

EROSION & SEDIMENT CONTROL NOTES

EROSION & SEDIMENT CONTROL NOTES

DRAINAGE AREA MAP - INITIAL CONDITIONS

DRAINAGE AREA MAP - INTERIM CONDITIONS

DRAINAGE AREA MAP - FINAL CONDITIONS

PROPOSED STORMWATER MANAGEMENT PLAN

List of Drawing Sheets 00 0115 - 2

C701

L100

L101

L110

STORMWATER MANAGEMENT DETAILS

PROPOSED LANDSCAPING PLAN

PROPOSED CBCA LANDSCAPE PLAN

PROPOSED LANDSCAPING NOTES AND DETAILS

ARCHITECTURAL

A001

A002

A003

A004

A005

AD100

AD101

A100

A101

A102

A111

A112

A113

A121

A122

A123

A200

A300

A301

A400

A401

A500

A600

A601

A602

A603

A604

A605

A700

A701

A702

A703

A704

A705

A801

ARCHITECTURAL SITE DIAGRAM

SITE LOGISTICS

PHASING PLANS - BARRACK

PHASING PLANS - BARRACK

PHASING PLANS - BARRACK

DEMO PLANS - BARRACK

DEMO PLANS - GARAGE

ASSEMBLY TYPES & NOTES

REFERENCE & DIMENSION PLAN - BARRACK

REFERENCE & DIMENSION PLAN - GARAGE

EQUIPMENT, FFE & FINISH PLANS - BARRACK

EQUIPMENT, FFE & FINISH PLANS - GARAGE

FINISH SCEHDULES, NOTES & DETAILS

ROOF PLAN

ROOF DETAILS

ROOF DETAILS

BUILDING ELEVATIONS

BUILDING SECTIONS

BUILDING SECTIONS

WALL SECTIONS

WALL SECTION DETAILS

PLAN DETAILS

DOOR SCHEDULE & DETAILS

DOOR DETAILS

WINDOW SCHEDULE & DETAILS

SPECIALTY DOOR DETAILS

STOREFRONT ELEVATIONS & DETAILS

DOOR HARDWARE SETS

ENLARGED PLANS & INT. ELEVATIONS - BARRACK

ENLARGED PLANS & INT. ELEVATIONS - GARAGE

ENLARGED PLANS & INT. ELEVATIONS - GARAGE

CASEWORK SECTIONS

CASEWORK SECTIONS

CASEWORK SECTIONS

REFLECTED CEILING PLAN - BARRACK

List of Drawing Sheets 00 0115 - 3

A802

A900

REFLECTED CEILING PLAN - GARAGE

TYPICAL ADA SIGNAGE DETAILS

STRUCTURAL

S001

S002

S101

S102

S301

S302

S303

S401

S402

GENERAL NOTES

GENERAL NOTES & SCHEDULES

GARAGE FOUNDATION/ROOF FRAMING PLAN

BARRACK J FIRST FLOOR FRAMING PLAN

TYPICAL DETAILS - FOUNDATIONS

TYPICAL DETAILS - MASONRY & CONCRETE

TYPICAL DETAILS - STEEL & MISC.

SECTIONS

SECTIONS

MECHANICAL

M001

MD101

M101

M102

M103

M201

M301

M401

M501

MECHANICAL LEGEND, ABBREVIATIONS & GENERAL NOTES

FIRST FLOOR PLAN HVAC DEMOLITION

FIRST FLOOR PLAN HVAC NEW WORK

GARAGE FLOOR PLAN DUCTWORK NEW WORK

GARAGE FLOOR PLAN HVAC NEW WORK

GARAGE FLOOR PLAN HVAC PIPING NEW WORK

MECHANICAL DETAILS

MECHANICAL CONTROLS

MECHANICAL SCHEDULES

PLUMBING

P001

PD101

P100

P101

P102

P103

P201

P301

P401

P402

P403

P404

P405

P501

PLUMBING LEGEND, ABBREVIATIONS & GENERAL NOTES

FIRST FLOOR PLAN PLUMBING DEMOLITION

GARAGE FOUNDATION PLAN - PLUMBING NEW WORK

GARAGE FLOOR PLAN PLUMBING NEW WORK

GARAGE ROOF PLAN PLUMBING NEW WORK

FIRST FLOOR PLAN PLUMBING NEW WORK

GARAGE FIRST FLOOR PART PLAN - PLUMBING NEW WORK

RISER DIAGRAM

PLUMBING DETAILS

PLUMBING DETAILS

PLUMBING DETAILS

PLUMBING DETAILS

PLUMBING DETAILS

PLUMBING SCHEDULES

List of Drawing Sheets 00 0115 - 4

ELECTRICAL

E001

E002

E003

ED101

ED102

ED103

E101

E102

E103

E104

E201

E202

E401

E501

E601

E602

E603

ELECTRICAL LEGEND, ABBREVIATIONS, AND GENERAL NOTES

ELECTRICAL GENERAL NOTES

ELECTRICAL SITE PLAN

GARAGE FLOOR PLAN ELECTRICAL DEMOLITION

BARRACK BASEMENT FLOOR PLAN ELECTRICAL DEMOLITION

BARRACK FIRST FLOOR PLAN ELECTRICAL DEMOLITION

GARAGE FLOOR PLAN POWER NEW WORK

GARAGE ROOF PLAN POWER NEW WORK

BARRACK BASEMENT FLOOR PLAN ELECTRICAL NEW WORK

BARRACK FIRST FLOOR PLAN POWER NEW WORK

GARAGE FLOOR PLAN LIGHTING NEW WORK

BARRACK FIRST FLOOR PLAN LIGHTING NEW WORK

ELECTRICAL DETAILS

RISER DIAGRAM DEMOLITION AND NEW WORK

PANEL SCHEDULES

PANEL SCHEDULES

PANEL SCHEDULES

FIRE PROTECTION

FA001

FD101

FA101

ELECTRICAL LEGEND AND ABBREVIATIONS

GARAGE FLOOR PLAN FIRE ALARM DEMOLITION

GARAGE FLOOR PLAN FIRE ALARM NEW WORK

TELECOM

T001

T101

T102

T103

T104

T105

T106

T107

T501

T502

T503

T504

T505

T506

T507

T508

T509

SYMBOLS & LEGENDS

TELECOM & SECURITY SITE PLAN

GARAGE PLAN - TELECOM

BARRACK BASEMENT FLOOR PLAN - TELECOM

BARRACK FIRST FLOOR PLAN - TELECOM

GARAGE PLAN - SECURITY

BARRACK BASEMENT FLOOR PLAN - SECURITY

BARRACK FIRST FLOOR PLAN - SECURITY

RISER DIAGRAM

TELECOM DETAILS

TELECOM DETAILS

TELECOM DETAILS

TELECOM DETAILS

TELECOM DETAILS

SECURITY DETAILS

SECURITY DETAILS

GROUNDING DETAILS

List of Drawing Sheets 00 0115 - 5

END OF SECTION 00 0115

DGS Project No.: PJ-610-230-001 March 5, 2026

Available Project Information 00 3100 - 1

SECTION 00 3100 - AVAILABLE PROJECT INFORMATION

PART 1 GENERAL

1.1 INFORMATION AVAILABLE TO BIDDERS

A. Certain information relating to existing surface and subsurface conditions and structures is available to Bidders for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. The information available shall not be a warranty or guarantee of existing conditions. The information available will not be part of the Contract Documents.

1.2 EXISTING CONDITIONS

A. Geotechnical Report: Entitled BARACK J MARYLAND STATE POLICE 610 TAYLOR AVE. ANNAPOLIS, MD 21401 KIM PROJECT NO. G24012, dated May 9, 2024 prepared by Kim Engineering, Inc. 3916 Vero Road, Suite K, Baltimore, MD 21127 .

1. A copy of the original report is available for viewing upon request.

2. The opinions expressed in this report are those of a geotechnical engineer and represent interpretations of subsoil conditions, tests, and results of analyses conducted by a geotechnical engineer. Owner is not responsible for interpretations or conclusions drawn from the data.

3. Any party using information described in the geotechnical report shall make additional test borings and conduct other exploratory operations that may be required to determine the character of subsurface materials that may be encountered.

4. The recommendations described shall not be construed as a requirement of this Contract, unless specifically referenced in Contract Documents.

5. Because subsurface conditions indicated by the soil borings are a sampling in relation to the entire construction area, and for other reasons, the Owner, the Architect, the Architect's consultants, and the firm reporting the subsurface conditions do not warranty the conditions below the depths of the borings or that the strata logged from the borings are necessarily typical of the entire site. Any party using the information described in the soil borings and geotechnical report shall accept full responsibility for its use.

1.3 PERMITS

A. General Contractor shall be responsible for tracking the expiration of all permits during the course of construction up to project closeout unless otherwise indicated. General Contractor shall notify in writing the Architect and the Owner a minimum of 60 calendar days prior to the expiration of any permit. The General Contractor shall be responsible for any/all costs incurred as a result of failing to notify the Architect and the Owner prior to the 60 calendar day deadline for notification.

B. The Architect/Owner has applied for the following permits:

1. Site work and GradingPermit.

a. Status: Approved

2. General Building Permit.

a. Status: Approved

DGS Project No.: PJ-610-230-001 March 5, 2026

Available Project Information 00 3100 - 2

C. The General Contractor shall be responsible for obtaining and paying for all other required permits including but not limited to all trade permits. Obtainment of permits includes but is not limited to gathering, producing, and submitting all documentation and information required by the AHJ for any/all permits.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

END OF SECTION 00 3100

DGS Project No.: PJ-610-230-001 March 5, 2026

Forms 00 6000 - 1

SECTION 00 6000 - FORMS

PART 1 GENERAL

1.1 FORM OF AGREEMENT AND GENERAL CONDITIONS

A. The following form of Owner/Contractor Agreement and form of the General Conditions shall be used for Project:

1. Owner's procurement and contracting documents are available for download on the eMaryland

Marketplace Advantage website: http://procurement.maryland.gov/

1.2 ADMINISTRATIVE FORMS

A. Administrative Forms: Additional administrative forms are specified in Division 01 General Requirements.

B. Copies of AIA standard forms may be obtained from the American Institute of Architects.

1. Website: https://www.aia.org/contractsdocs/purchase/index.htm

2. docspurchase@aia.org; (800) 942-7732

C. Information and Modification Forms: Where other forms are not indicated within the Owner's Procurement and Contracting Documents or within the Technical Specification Division 01 sections, utilize the following forms:

1. Form for Request for Information (RFI's): AIA

2. Form for Requests for Information (RFIs): AIA Document G716, "Request for Information (RFI)."

3. Form of Request for Proposal: AIA Document G709, "Work Changes Proposal Request."

4. Change Order Form: As indicated in the Owner's "The Department of General Services Change

Order Guidelines," issued April 2017.

5. Form of Architect's Memorandum for Minor Changes in the Work: "Architect's Supplemental

Instructions."

6. Form of Change Directive: AIA Document G714, "Construction Change Directive."

D. Payment Forms: Where other forms are not indicated within the Owner's Procurement and Contracting Documents or within the Technical Specification Division 01 sections, utilize the following forms:

1. Schedule of Values Form: AIA Document G703, "Continuation Sheet."

2. Payment Application: AIA Document G702/703, "Application and Certificate for Payment and

Continuation Sheet."

3. Form of Contractor's Affidavit: AIA Document G706, "Contractor's Affidavit of Payment of Debts and

Claims."

4. Form of Affidavit of Release of Liens: AIA Document G706A, "Contractor's Affidavit of Payment of

Release of Liens."

5. Form of Consent of Surety: AIA Document G707, "Consent of Surety to Final Payment."

DGS Project No.: PJ-610-230-001 March 5, 2026

Forms 00 6000 - 2

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

END OF SECTION 00 6000

DGS Project No.: PJ-610-230-001 March 5, 2026

Wage Determination Schedule 00 7346 - 1

SECTION 00 7346 - WAGE DETERMINATION SCHEDULE

PART 1 GENERAL

1.1 WAGE DETERMINATION SCHEDULE

A. See Wage Determination Schedule appended to this specification following this Section.

PART 2 PRODUCTS - NOT USED

END OF SECTION 00 7346

Re: BARRACK J Annapolis Communication Room and Garage

Project No: PJ-610-230-001

Enclosed please find the Prevailing Wage Determination and Instructions for Contractors for the project referenced above.

Upon advertisement for bid or proposal of this project, you are requested to submit to this office the date and name of publication in which such advertisement appeared.

Once awarded, you are further directed to submit to this office, the NOTICE TO PROCEED for the project, complete with the date of notice, the name of the general contractor, and the dollar amount of the project. In addition, we ask that a representative of the prevailing wage Unit be invited to attend the Pre-Construction Conference.

Any questions concerning this matter may be referred to PrevailingWage@dllr.state.md.us

Sincerely, Enclosures

Wage Determination

Instruction for the Contractor Prevailing Wage Unit

Oz Ozturk - Procurement Officer

301 W Preston St., Room 1405

Baltimore, MD 21201

MDGS

REQUEST FOR ADVERTISEMENT AND NOTICE TO PROCEED

12/10/2025

DEPARTMENT OF LABOR

DIVISION OF LABOR AND INDUSTRY

PREVAILING WAGE SECTION

10946 Golden West Drive, Suite 160

Hunt Valley, MD 21031

(410) 767-2342

STATE OF MARYLAND

12/10/2025 1:22 PM Page 1 of 7Page 28 of 1537

PREVAILING WAGE INSTRUCTIONS FOR THE CONTRACTOR & SUBCONTRACTOR

The contractor shall electronically submit completed copies of certified payroll records to the Commissioner of Labor & Industry, Prevailing Wage Unit by going on-line to https://www.dllr.state.md.us/prevwage and following the instructions for submitting payroll information (NOTE: A contractor must register prior to submitting on-line certified payroll information).

If you have technical questions regarding electronic submittal, contact the Department at dldliprevailingwage-dllr@maryland.gov.

All certified payroll records shall have an accurate week beginning and ending date. The contractor shall be responsible for certifying and submitting to the Commissioner of Labor and Industry, Prevailing Wage Unit all of their subcontractors' payroll records covering work performed directly at the work site. By certifying the payroll records, the contractor is attesting to the fact that the wage rates contained in the payroll records are not less than those established by the Commissioner as set forth in the contract, the classification set forth for each worker or apprentice conforms with the work performed, and the contractor or subcontractor has complied with the provisions of the law.

A contractor or subcontractor may make deductions that are (1) required by law; (2) required by a collective bargaining agreement between a bona fide labor organization and the contractor or subcontractor; or (3) contained in a written agreement between an employee and an employer undertaken at the beginning of employment, if the agreement is submitted by the employer to the public body awarding the public work and is approved by the public body as fair and reasonable.

A contractor or subcontractor is required to submit information on-line on their fringe benefit packages including a list of fringe benefits for each craft employed by the contractor or subcontractor, by benefit and hourly amount. Where fringe benefits are paid in cash to the employee or to an approved plan, fund, or program, the contribution is required to be indicated.

Payroll records must be electronically submitted and received within 14 calendar days after the end of each payroll period. If the contractor is delinquent in submitting payroll records, processing of partial payment estimates may be held in abeyance pending receipt of the records. In addition, if the contractor is delinquent in submitting the payroll records, the contractor shall be liable to the contracting public body for liquidated damages. The liquidated damages are $10.00 for each calendar day the records are late.

Only apprentices registered with the Maryland Apprenticeship and Training Council shall be employed on prevailing wage projects. Apprentices shall be paid a percentage of the determined journey person 's wage for the specific craft.

Overtime rates shall be paid by the contractor and any subcontractors under its contracts and agreements with their employees which in no event shall be less than time and one-half the prevailing hourly rate of wages for all hours worked in excess of ten (10) hours in any one calendar day; in excess of forty (40) hours per workweek; and work performed on Sundays and legal holidays.

Contractors and subcontractors employing a classification of worker for which a wage rate was not issued SHALL notify the Commissioner of Labor & Industry, Prevailing Wage Unit, for the purpose of obtaining the wage rate for said classification PRIOR TO BEING EMPLOYED on the project. To obtain a prevailing wage rate which was NOT listed on the Wage Determination, a contractor or subcontractor can look on the LABOR webpage under prevailing wage.

Contractors and subcontractors shall maintain a valid copy of proper State and county licenses that permit the contractor and a subcontractor to perform construction work in the State of Maryland. These licenses must be retained at the worksite and available for review upon request by the Commissioner of Labor and Industry’s designee.

**Each contractor under a public work contract subject to Section 17-219 shall:

1. Post a clearly legible statement of each prevailing wage rate to be paid under the public work contract; and

2. Keep the statement posted during the full time that any employee is employed on the public work contract.

3. The statement of prevailing wage rates shall be posted in a prominent and easily accessible place at the site of the public work.

12/10/2025 1:22 PM Page 2 of 7Page 29 of 1537 https://www.dllr.state.md.us/prevwage

**Penalty - Subject to Section 10-1001 of the State Goverment Article, the Commissioner may impose on a person that violates this section a civil penalty of up to $50.00 per violation.

Under the Maryland Apprenticeship and Training Council requirements, consistent with proper supervision, training and continuity of employment and applicable provisions in collective bargaining agreements, a ratio of one journey person regularly employed to one apprentice shall be allowed. No deviation from this ratio shall be permitted without prior written approval from the Maryland Apprenticeship and Training Council.

Laborers may NOT assist mechanics in the performance of the mechanic's work, NOR USE TOOLS peculiar to established trades.

ALL contractors and subcontractors shall employ only competent workers and apprentices and may NOT employ any individual classified as a HELPER or TRAINEE on a prevailing wage project.

The State Apprenticeship and Training Fund (Fund) law provides that contractors and certain subcontractors performing work on certain public work contracts are required to make contributions toward apprenticeship. See §17- 601 through 17-606, State Finance and Procurement, Annotated Code of Maryland. Contractors and subcontractors have three options where they can choose to make their contributions: (1) participate in a registered apprenticeship training program; (2) contribute to an organization that has a registered apprenticeship training program; or (3) contribute to the State Apprenticeship and Training Fund.

The Department of Labor (LABOR) is moving forward with final adoption of regulations. The regulations were published in the December 14, 2012 edition of the Maryland Register.

IMPORTANT: Please note that the obligations under this law will become effective on JULY 1, 2013. This law will require that contractors and certain subcontractors make contributions toward apprenticeship and report those contributions on their certified payroll records that they submit pursuant to the prevailing wage law.

The Department is offering outreach seminars to any interested parties including contractors, trade associations, and any other stakeholders. Please contact the Department at dldliprevailingwage-dllr@maryland.gov or (410) 767-2968 for seminar times and locations. In addition, information regarding this law will be provided at pre-construction meetings for projects covered by the Prevailing Wage law.

For additional information, contact:

Division of Labor and Industry

Maryland Apprenticeship and Traning 1100 North Eutaw Street, Room 606

Baltimore, Maryland 21201

(410) 767-2246

E-Mail Address: matp@dllr.state.md.us.

12/10/2025 1:22 PM Page 3 of 7Page 30 of 1537 mailto:matp@dllr.state.md.us

STATE OF MARYLAND

DEPARTMENT OF LABOR

DIVISION OF LABOR AND INDUSTRY

PREVAILING WAGE SECTION

10946 Golden West Drive, Suite 160

Hunt Valley, MD 21031

(410) 767-2342

CLASSIFICATION MODIFICATION

REASON

BORROWED

FROM

FRINGE

BENEFIT

PAYMENT

BASIC

HOURLY

RATE

AD $50.92 $24.61 BALANCING TECHNICIAN

AD $38.80 $15.57 BRICKLAYER

AD $35.89 $14.60 CARPENTER

AD $35.89 $14.60 CARPENTER - SHORING SCAFFOLD BUILDER

AD $35.10 $15.33 CARPET LAYER

AD $32.40 $17.34 COMMUNICATION INSTALLER TECHNICIAN

AD $35.89 $14.60 DRYWALL - SPACKLING, TAPING, & FINISHING

AD $49.50 $21.14 ELECTRICIAN

AD $48.99 $18.89 ELEVATOR MECHANIC

The wage rates to be paid laborers and mechanics for the locality described below is announced by order of Commissioner of Labor and Industry.

It is mandatory upon the successful bidder and any subcontractor under him, to pay not less than the specific rates to all workers employed by them in executing contracts in this locality. Reference: Annotated Code of Maryland State Finance and Procurement, Section 17-201 thru 17-226.

These wage rates were taken from the locality survey of 2025 for Anne Arundel County, issued pursuant to the Commissioner's authority under State Finance and Procurement Article Section 17-209, Annotated Code of Maryland or subsequent modification.

**Note: If additional Prevailing Wage Rates are needed for this project beyond those listed below, contact the Prevailing Wage Unit. Phone: (410) 767-2342, email: prevailingwage@dllr.state.md.us.

Name and Title of Requesting Officer:

Department, Agency or Bureau:

Project Number

PJ-610-230-001

Oz Ozturk - Procurement Officer

MDGS

301 W Preston St., Room 1405 Baltimore, MD 21201

Location and Description of work:

Anne Arundel County: The Project generally consists of the phased renovation of the existing duty office, the demolition of the existing Garage building, and the construction of a new Maintenance Garage at Barrack J of the Maryland State Police and other Work as indicated within the Contract Documents. The renovation work area is approximately 5,288 gross square feet and is a single-story structure.

Determination Number

64252

Date of Issue: Dec 10, 2025

BUILDING CONSTRUCTION

6/2/2026 3:20 PM Page 1 of 4

AD $17.00 510 $2.24 FIREPROOFER - BY HAND

AD $27.00 510 $5.22 FIREPROOFER - SPRAYER

AD $30.21 $10.68 FIRESTOPPER

AD $36.65 $14.61 GLAZIER

AD $40.77 $20.42 INSULATION WORKER

AD $48.25 $21.11 IRONWORKER - FENCE ERECTOR

AD $27.99 $4.58 IRONWORKER - ORNAMENTAL

CR $30.18 $24.09 IRONWORKER - REINFORCING

AD $37.86 $26.22 IRONWORKER - STRUCTURAL

AD $39.50 $17.52 MILLWRIGHT

AD $29.16 $12.01 PAINTER

AD $36.37 $16.21 PAINTER-INDUSTRIAL

AD $37.74 $17.64 PILEDRIVER

AD $20.00 510 $2.24 PLASTERER - MIXER

AD $47.78 $25.93 PLUMBER

AD $35.18 $15.12 POWER EQUIPMENT OPERATOR - BACKHOE

AD $33.23 $15.12 POWER EQUIPMENT OPERATOR - BROOM / SWEEPER

AD $35.18 005 $15.12 POWER EQUIPMENT OPERATOR - BULLDOZER

AD $35.18 $15.12 POWER EQUIPMENT OPERATOR - CONCRETE PUMP

AD $42.00 $19.10 POWER EQUIPMENT OPERATOR - CRANE

AD $42.00 510 $19.10 POWER EQUIPMENT OPERATOR - CRANE - TOWER

AD $35.18 $15.12 POWER EQUIPMENT OPERATOR - DRILL - RIG

AD $35.18 $15.12 POWER EQUIPMENT OPERATOR - EXCAVATOR

AD $35.18 $15.12 POWER EQUIPMENT OPERATOR - FORKLIFT

AD $35.18 $15.12 POWER EQUIPMENT OPERATOR - LOADER

AD $37.24 510 $15.12 POWER EQUIPMENT OPERATOR - MECHANIC

AD $22.00 005 $3.58 POWER EQUIPMENT OPERATOR - ROLLER - ASPHALT

AD $29.60 $15.12 POWER EQUIPMENT OPERATOR - ROLLER - EARTH

AD $33.23 $15.12 POWER EQUIPMENT OPERATOR - SKID STEER (BOBCAT)

AD $38.60 510 $15.75 POWER EQUIPMENT OPERATOR-VACUUM TRUCK

AD $35.10 $15.33 RESILIENT FLOOR

AD $52.71 $14.06 ROOFER/WATERPROOFER

AD $50.92 $24.61 SHEETMETAL WORKER (INCLUDING METAL ROOFING)

AD $45.22 $26.64 SPRINKLERFITTER

AD $47.78 $25.93 STEAMFITTER/PIPEFITTER

AD $45.65 $21.51 STONE MASON

AD $28.85 $12.85 TILE & TERRAZZO FINISHER

AD $34.34 $14.50 TILE & TERRAZZO MECHANIC

AD $26.73 005 $7.65 TRUCK DRIVER - DUMP

AD $26.25 025 $7.60 TRUCK DRIVER - FLATBED

AD $31.50 027 $9.19 TRUCK DRIVER - LOWBOY

LABORER GROUP II

AD $21.34 $6.90 LABORER - ASPHALT RAKER

AD $21.34 $6.90 LABORER - COMMON

6/2/2026 3:20 PM Page 2 of 4

These Informational Prevailing Wage Rates may not be substituted for the requirements of pre-advertisement or onsite job posting for a public work contract that exceeds $250,000 in value and either of the following criteria are met: (1) the contracting body is a unit of State government or an instrumentality of the State and there is any State funding for the project; or (2) the contracting body is a political subdivision, agency, person or entity (such as a county) and the

State funds 25% or more of the project.

Modification Codes:

(AD) 17-209 Annual Determination from Survey Wage Data Received (CH) 17-211 Commissioners’ Hearing (CR) 17-208 Commissioners’ Review (SR) 17-208 Survey Review by Staff

Each "Borrowed From" county is identified with the FIPS 3-digit county code unique for the specific jurisdiction in Maryland.

For additional information on the FIPS (Federal Information Processing Standard) code, see http://www.census.gov/datamap/fipslist/AllSt.txt

AD $21.34 $6.90 LABORER - CONCRETE PUDDLER

AD $21.34 $6.90 LABORER - CONCRETE TENDER

AD $21.34 $6.90 LABORER - CONCRETE VIBRATOR

AD $21.34 $6.90 LABORER - DENSITY GAUGE

AD $21.34 $6.90 LABORER - FIREPROOFER - MIXER

AD $21.34 $6.90 LABORER - FLAGGER

AD $21.34 $6.90 LABORER - GRADE CHECKER

AD $21.34 $6.90 LABORER - HAND ROLLER

AD $21.34 $6.90 LABORER - JACKHAMMER

AD $21.34 $6.90 LABORER - LANDSCAPING

AD $21.34 $6.90 LABORER - LAYOUT

AD $21.34 $6.90 LABORER - LUTEMAN

AD $21.34 $6.90 LABORER - MORTAR MIXER

AD $21.34 $6.90 LABORER - PLASTERER - HANDLER

AD $21.34 $6.90 LABORER - TAMPER

LABORERS GROUP I

AD $27.68 $6.78 LABORER - AIR TOOL OPERATOR

AD $27.68 $6.78 LABORER - ASPHALT PAVER

AD $27.68 $6.78 LABORER - BLASTER - DYNAMITE

AD $27.68 $6.78 LABORER - BURNER

AD $27.68 $6.78 LABORER - CONCRETE SURFACER

AD $27.68 $6.78 LABORER - HAZARDOUS MATERIAL HANDLER

AD $27.68 $6.78 LABORER - MASON TENDER

AD $27.68 $6.78 LABORER - PIPELAYER

AD $27.68 $6.78 LABORER - SCAFFOLD BUILDER

Incidental Craft Data: Caulker, Man Lift Operator, Rigger, Scaffold Builder, and Welder receive the wage and fringe rates prescribed for the craft performing the operation to which welding, scaffold building, rigging, operating a Man Lift, or caulking is incidental.

6/2/2026 3:20 PM Page 3 of 4

The Prevailing Wage rates appearing on this form were originally derived from Maryland’s annual Wage Survey. The Commissioner of Labor & Industry encourages all contractors and interested groups to participate in the voluntary Wage Survey, detailing wage rates paid to workers on various types of construction throughout Maryland.

A mail list of both street and email addresses is maintained by the Prevailing Wage Unit to enable up-to-date prevailing wage information, including Wage Survey notices to be sent to contractors and other interested parties. If you would like to be included in the mailing list, please forward (1) your Name, (2) the name of your company (if applicable), (3) your complete postal mailing address, (4) your email address and (5) your telephone number to PWMAILINGLIST@dllr.state.md.us. Requests for inclusion can also be mailed to: Prevailing Wage, 1100 N. Eutaw Street - Room 607, Baltimore MD 21201-2201.

6/2/2026 3:20 PM Page 4 of 4

DGS Project No.: PJ-610-230-001 March 5, 2026

Summary 01 1000 - 1

SECTION 01 1000 - SUMMARY

PART 1 GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, Including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Project Information

2. Contract Description

3. Bidder/General Contractor Qualifications

4. Work by Owner

5. Owner Furnished/Contractor Installed (OFCI) Products

6. Owner Occupancy

7. Contractors Use of Site

8. Work Restrictions

9. Specifications and Drawing Conventions

10. Miscellaneous Provisions

1.3 PROJECT INFORMATION

A. Project Name: Maryland State Police Barrack J Annapolis Communication Room and Garage.

B. Project Location: 610 Taylor Avenue, Annapolis, Maryland21401.

C. Owner's Name: State of Maryland Department of General Services .

D. Owner's Location: 301 West Preston Street, Baltimore, Maryland21201.

E. Architect's Name: MW Studios.

F. Architect's Location: 8098 Sandpiper Circle, Suite H, Nottingham, Maryland 21236.

G. Additional Project contact information is specified in Section 00 0103 - Project Directory.

H. Project Duration: All Work of the Project shall be completed within 420 calendar days unless modified as indicated within the State of Maryland - Department of General Services General Conditions for Construction Contracts (latest version at time of award of the project) Section 7 - Changes In The Work.

I. Liquidated Damages: The Work is subject to liquidated damages. Liquidated damages shall be assessed at 1,500 dollars for each day extending beyond the Project Duration. See State of Maryland - Department of General Services General Conditions for Construction Contracts (latest version at time of award of the project.)

DGS Project No.: PJ-610-230-001 March 5, 2026

Summary 01 1000 - 2

J. Contractor's Warranty Period: The Contractor shall warrant all Work of the project for a period of Two

(2) years per State of Maryland - Department of General Services General Conditions for Construction Contracts (latest version at time of award of the project.)

K. The Work of the Project is defined by the Contract Documents and generally includes, but is not limited to, the following:

1. The Project generally consists of the phased renovation of the existing duty office, the demolition of the existing Garage building, and the construction of a new Maintenance Garage at Barrack J of the Maryland State Police and other Work as indicated within the Contract Documents. The renovation work area is approximately 5,288 gross square feet and is a single story structure of type VB construction that will be fully sprinklered.

2. Phased Construction

a. The project will be constructed in multiple phases as outlined within the drawings. Construct each phase of the project to be substantially complete before proceeding to the next phase of work.

1) Before commencing the work of each phase, submit an updated copy of the Contractor's construction schedule, showing the sequence, commencement and completion dates and move-out and -in dates of Owner's personnel where applicable for all phases of the Work.

L. Web-Based Project Software: Project software will be used for purposes of managing communication and documents during the construction stage of this Project.

1. See Section 01 3000 - Administrative Requirements for requirements for obtaining and utilizing web-based Project Software.

1.4 CONTRACT DESCRIPTION

A. Contract Type: As indicated within the Owners Procurement and Contracting Documents; documents shall be obtained from the eMaryland Marketplace Advantage website; https://procurement.maryland.gov/

1.5 WORK BY OWNER

A. Cooperate fully with Owner/Owners Contractors, so work may be carried out smoothly, without interference with or delaying Work under this Contract or work by Owner/Owners Contractors. Coordinate the Work of this Contract with work performed by Owner/Owners Contractors.

1.6 OWNER FURNISHED/CONTRACTOR INSTALLED (OFCI) PRODUCTS

A. Owner's Responsibilities: Owner will furnish products indicated and perform the following, as applicable:

1. Provide to Contractor Owner reviewed Product Data, Shop Drawings, and Samples.

2. Provide for delivery of Owner furnished products to Project Site.

3. Upon delivery, the Owner will inspect, with the Contractor present, the delivered item(s).

a. If Owner furnished products are damaged, defective, or missing, the Owner will arrange for replacement.

4. Owner will obtain manufacturer's inspections, service, and warranties.

5. Owner will inform the Contractor of earliest available delivery date for Owner furnished products.

B. Contractors Responsibilities: The Work includes the following, as applicable:

DGS Project No.: PJ-610-230-001 March 5, 2026

Summary 01 1000 - 3

1. Identify delivery dates of Owner furnished products in Contractors construction schedule, utilizing Owner furnished earliest available delivery dates.

2. Review Owner reviewed Product Data, Shop Drawings, and Samples noting discrepancies and other issues in providing for Owner furnished products in the Work.

3. Receive, unload, handle, store, protect, and install Owner furnished products.

4. Make building services connections for Owner furnished pro

5. Protect Owner furnished products from damage during storage, handling, and installation and prior to

Substantial Completion.

6. Repair or replace Owner furnished products damaged following receipt and prior to Substantial

Completion.

C. Owner Furnished Contractor Installed (OFCI) Products:

1. Items shall be as indicated on drawings.

1.7 OWNER OCCUPANCY

A. Full Owner Occupancy: Owner will occupy Project site and existing and adjacent building(s) during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Schedule/Perform the Work so as not to interfere with Owners day-to-day operations.

1. Maintain existing exits unless otherwise indicated.

2. Maintain access to walkways, corridors, or other occupied or used facilities. Do not close or obstruct walkways, corridors, other other occupied or used facilities without written permission from Owner and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .