Appendix 8 - MSP Barrack J PJ-610-230-001 Project Manual.pdf
PDF 23 MB Posted
- Solicitation number
- BPM057381
- Issued by
- Maryland
About this file
This project manual contains the 100% construction documents for the Maryland State Police Barrack J Annapolis Communication Room and Garage, a state construction project administered by the Department of General Services (DGS) in Anne Arundel County, Maryland. The project involves the phased renovation of an existing duty office (approximately 5,288 gross square feet, single-story Type VB construction to be fully sprinklered) and the demolition and reconstruction of a maintenance garage at the Maryland State Police Annapolis facility located at 610 Taylor Avenue. The project is classified as a F-level project with an estimated budget of $5,000,000 to $10,000,000. Construction is expected to be completed within 420 calendar days from notice to proceed, with liquidated damages assessed at $1,500 per day for any extension beyond this period. The project manual includes comprehensive specifications divided into 49 divisions covering general requirements, existing conditions, concrete, masonry, metals, wood, thermal protection, openings, finishes, specialties, equipment, furnishings, plumbing, HVAC, electrical, communications, and electronic safety and security systems.
The contractor's bid must include a cash allowance of $1,200,000 for the provision and installation of permanent communication technology and equipment for radio operations in the remodeled spaces, to be performed by Motorola Inc. or their subcontractors under Maryland's State-Wide Contract. The project includes eight unit price line items for soil-related work with bid quantities ranging from 100 to 2,000 cubic yards, covering removal of unsatisfactory soil, contaminated soil, and rock, along with placement of engineered fill and drainage stone. All work is subject to prevailing wage requirements as determined by the Maryland Department of Labor, with wage rates established for Anne Arundel County covering various classifications including laborers, equipment operators, skilled trades, and apprentices. The contractor must submit the Schedule of Values within 15 days of contract award and shall warrant all work for two years. Minority Business Enterprises are encouraged to respond, and the project is subject to Maryland's procurement procedures accessible through the eMaryland Marketplace Advantage portal.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL FOR CONSTRUCTION OF
BARRACK J ANNAPOLIS COMMUNICATION ROOM AND GARAGE
AT THE
MARYLAND STATE POLICE
ANNAPOLIS, ANNE ARUNDEL COUNTY, MARYLAND
FOR THE DEPARTMENT OF GENERAL SERVICES
DGS PROJECT NO.: PJ-610-230-001 PROJECT CLASSIFICATION: F - $5,000,000 - $10,000,000
MARCH 5, 2026
DEPARTMENT OF GENERAL SERVICES - STATE OF MARYLAND
DEPARTMENT OF GENERAL SERVICES BOARD OF PUBLIC WORKS
ATIF T. CHAUNDHRY, SECRETARY WES MOORE, GOVENOR
301 WEST PRESTON STREET BROOKE LIERMAN, COMPTROLLER
BALTIMORE, MD 21201 DERECK DAVIS, TREASURER
MINORITY BUSINESS ENTERPRISES ARE ENCOURAGED TO RESPOND TO THIS SOLICITATION
ARCHITECT
MANNS WOODWARD STUDIOS
8098 SANDPIPER CIRCLE, SUITE H
NOTTINGHAM, MD 21236
410-410-344-1460
MECHANICAL/ELECTRICAL ENGINEER
BKM INC.
6300 BLAIR HILL LANE
BALTIMORE, MD 21209
410-323-0600
TELECOM CONSULTANT
WRIGHT ENGINEERING, LLC
853 RIPPLE STREAM COURT
JOPPA, MD 21085
410-877-6297
CIVIL/STRUCTURAL ENGINEER
CARROLL ENGINEERING, INC.
215 SCHILLING CIRCLE, #120
HUNT VALLEY, MD 21031
410-785-7423
GEOTECHNICAL ENGINEER
KIM ENGINEERING
1390 PICCARD DRIVE, SUITE 340
ROCKVILLE, MD 20850
240-614-7678
COST ESTIMATOR
FORELLA
34 ATHERTON ROAD
LUTHERVILLE, MD 21093
410-941-9020
BID SET
This page intentionally left blank
Maryland State Police MW Studios Barrack J Annapolis Communication Room and Garage 100% Construction Documents DGS Project No.: PJ-610-230-001 March 5, 2026
Seals Page 00 0007 - 1
SECTION 00 0007 - SEALS PAGE
1.1 PROJECT INFORMATION
A. Project Name: Barrack J Annapolis Communication Room and Garage
B. DGS Project No.: PJ-610-230-001
1.2 DESIGN PROFESSIONAL OF RECORD
A. Architect:
1. Manns Woodward Studios, Inc.
2. Responsible for portions of Divisions 01, 02, 04, 05, 06, 07, 08, 09, 10, 11, and 12.
B. Civil Engineer and Landscape Architect
1. Carroll Engineering, Inc. .
2. Responsible for portions of Divisions 02, 31, 32, and 33 .
C. Structural Engineer
1. Carroll Engineering, Inc. .
2. Responsible for portions of Divisions 03 and 05 .
D. Mechanical Engineer
1. Burdette, Koehler, Murphy and Associates .
2. Responsible for portions of Divisions 01 and 23 .
E. Plumbing Engineer Engineer
1. Burdette, Koehler, Murphy and Associates.
2. Responsible for portions of Divisions 21 and 22.
F. Electrical Engineer
1. Burdette, Koehler, Murphy and Associates.
2. Responsible for portions of Divisions 26 and 27.
G. Telecommunications Engineer
1. Wright Engineering, LLC.
2. Responsible for portions of Divisions 28 .
END OF SECTION 00 0007
DGS Project No.: PJ-610-230-001 March 5, 2026
Seals Page 00 0007 - 2
Seals and Signatures 00 0008 - 1
SECTION 00 0008 - SEALS AND SIGNATURES
ARCHITECTS CERTIFICATION
The Contract Documents for the public improvement identified as the Maryland State Police Barrack J Annapolis Communication Room and Garage, DGS Project Number PJ-610-230-001, were prepared under my supervision, and to the best of my knowledge, information, and belief, they comply with the relevant building codes of the State of Maryland.
Architect David A. Woodward License No.: 15505 Expiration: 08/18/2026 Manns Woodward Studios, Inc.
8098 Sandpiper Circle, Suite H Nottingham, Maryland 21236
ENGINEER'S CERTIFICATION
I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the state of Maryland.
Civil Engineer Judith A. Carroll License No.: 14446 Expiration: 05/25/2027 Carroll Engineering, Inc.
215 Schilling Circle, #102 Hunt Valley, MD 21031
Landscape Architect Claire Morgan Fishman License No.: 3621 Expiration: 03/20/2027 Carroll Engineering, Inc.
215 Schilling Circle, #102 Hunt Valley, MD 21031
Structural Engineer Scott Bradley License No.: 29269 Expiration: 06/16/2027 Carroll Engineering, Inc.
215 Schilling Circle, #102 Hunt Valley, MD 21031
Seals and Signatures 00 0008 - 2
Mechanical & Plumbing Engineer William Joseph Collins Jr.
License No.: 17117 Expiration: 10/25/2026 Burdette, Koehler, Murphy & Associates, Inc.
6300 Blair Hill Lane Baltimore, MD 21029
Electrical Engineer Anthony Raymond Page License No.: 29743 Expiration: 01/15/2027 Burdette, Koehler, Murphy & Associates, Inc.
6300 Blair Hill Lane Baltimore, MD 21029
Telecommunication Engineer James Wright License No.: 22868 Expiration: 10/14/2026 Wright Engineering, LLC 853 Ripple Stream Court Joppa, MD 21085
END OF SECTION 00 0008
DGS Project No.: PJ-610-230-001 March 5, 2026
Table of Contents 00 0010 - 1
SECTION 00 0010 - TABLE OF CONTENTS
DIVISION 00 -- PROJECT INFORMATION
00 0007 - Seals Page 00 0008 - Seals and Signatures 00 0010 - Table of Contents 00 0011 - Maryland Department of General Services Procurement Documents A. Version: Dated 4.28.23 B. State of Maryland Procurement and Contracting documents shall be obtained by each Contractor bidding on this Project through eMaryland Marketplace Advantage; https://procurement.maryland.gov/ C. Division 00 - Procurement and Contracting Documents located on the eMaryland Marketplace Advantage website for this Project are hereby incorporated by reference into these Bid Documents. Procurement and Contracting Documents may include, but are not limited to, the following:
1. Notice to Bidders - Solicitation Fact Sheet (eMaryland Marketplace Advantage attachment)
2. Instructions to Bidders For Construction Projects (July 1, 2022) (eMaryland Marketplace Advantage attachment)
3. General Conditions For Construction Contracts (July 1, 2022) (eMaryland Marketplace Advantage attachment)
4. Bid/Proposal Affidavit (eMaryland Marketplace Advantage attachment)
5. Payment of Employee Healthcare Expenses Certification (eMaryland Marketplace Advantage attachment)
6. Contractor Questionnaire
7. Bid Bond (eMaryland Marketplace Advantage attachment)
8. Minority Business Enterprise Forms Attachment D (February 5, 2021) (eMaryland Marketplace
Advantage attachment)
9. Veteran-owned Small Business Enterprise (VSBE) Forms Attachment E (September 1, 2022) (eMaryland
Marketplace Advantage attachment)
10. List of Prevailing Wage Rates (eMaryland Marketplace Advantage attachment)
11. Corporate Diversity Addendum (eMaryland Marketplace Advantage attachment)
12. Addenda (eMaryland Marketplace Advantage attachment)
13. List of Drawings (eMaryland Marketplace Advantage attachment)
14. Attachment A - Contract (eMaryland Marketplace attachment)
15. Pre-Bid Conference / Site Visit Information: Refer to: State Finance and Procurement Article Section
14-302(a)(7)(v) and COMAR 21.11.03.09.C.(2)(e).
00 0115 - List of Drawing Sheets 00 3100 - Available Project Information 00 6000 - Forms 00 7346 - Wage Determination Sche
TECHNICAL SPECIFICATIONS
DIVISION 01 -- GENERAL REQUIREMENTS
01 1000 - Summary
DGS Project No.: PJ-610-230-001 March 5, 2026
Table of Contents 00 0010 - 2
01 2000 - Price and Payment Procedures 01 2100 - Allowances 01 2200 - Unit Prices 01 2500 - Substitution Procedures 01 2501 - Substitution Request Form 01 3000 - Administrative Requirements 01 3001 - Submittal Review and Transmittal 01 3216 - Construction Progress Schedule 01 4000 - Quality Requirements 01 4216 - Definitions 01 4219 - Reference Standards 01 5000 - Temporary Facilities and Controls 01 5213 - Field Offices and Sheds 01 6000 - Product Requirements 01 7000 - Execution and Closeout Requirements 01 7123 - Field Engineering 01 7419 - Construction Waste Management and Disposal 01 7610 - Temporary Protective Coverings 01 7800 - Closeout Submittals 01 7801 - Operation and Maintenance Manual Template 01 7900 - Demonstration and Training
DIVISION 02 -- EXISTING CONDITIONS
02 4100 - Building Demolition
DIVISION 03 -- CONCRETE
03 3000 - Cast-in-Place Concrete
DIVISION 04 -- MASONRY
04 0511 - Masonry Mortaring and Grouting 04 2000 - Unit Masonry
DIVISION 05 -- METALS
05 1200 - Structural Steel 05 2100 - Steel Joists 05 3100 - Steel Deck 05 4000 - Cold-Formed Metal Framing 05 5000 - Metal Fabrications
DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
06 1053 - Miscellaneous Rough Carpentry 06 4116 - Plastic-Laminate-Clad Architectural Cabinets 06 6400 - Plastic Paneling
DGS Project No.: PJ-610-230-001 March 5, 2026
Table of Contents 00 0010 - 3
DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
07 1113 - Bituminous Dampproofing 07 1326 - Self-Adhering Sheet Waterproofing 07 2100 - Thermal Insulation 07 2726 - Fluid-Applied Membrane Air-Barriers 07 5423 - Thermoplastic-Polyolefin Roofing (TPO) 07 6200 - Sheet Metal Flashing and Trim 07 7100 - Roof Specialties 07 7200 - Roof Accessories 07 8413 - Penetration Firestopping 07 9200 - Joint Sealants
DIVISION 08 -- OPENINGS
08 1113 - Hollow Metal Doors and Frames 08 3113 - Access Doors And Frames 08 3113.53 - Security Access Doors And Frames 08 3323 - Overhead Coiling Doors 08 3613 - Sectional Doors 08 4113 - Aluminum-Framed Entrances and Storefronts 08 5113 - Aluminum Windows 08 5653 - Security Windows 08 7111 - Door Hardware 08 8000 - Glazing 08 8853 - Security Glazing 08 9119 - Fixed Louvers 08 9200 - Louvered Equipment Enclosures
DIVISION 09 -- FINISHES
09 2216 - Non-Structural Metal Framing 09 2900 - Gypsum Board 09 5113 - Acoustical Panel Ceilings 09 5133 - Acoustical Metal Pan Ceilings 09 6513 - Resilient Base and Accessories 09 6519 - Resilient Tile Flooring 09 6536 - Static-Control Resilient Flooring 09 6723 - Resinous Flooring and Wall Covering 09 8430 - Sound-Absorbing Wall and Ceiling Units 09 9123 - Interior Painting 09 9600 - High-Performance Coatings
DIVISION 10 -- SPECIALTIES
10 1423.13 - Room-Identification Panel Signage
DGS Project No.: PJ-610-230-001 March 5, 2026
Table of Contents 00 0010 - 4
10 2213 - Wire Mesh Partitions 10 2800 - Toilet, Bath, and Laundry Accessories 10 4416 - Fire Extinguishers 10 5613 - Metal Storage Shelving
DIVISION 11 -- EQUIPMENT
11 1916 - Detention Gun Lockers 11 3013 - Residential Appliances 11 9400 - Dog Run Equipment
DIVISION 12 -- FURNISHINGS
12 3661.19 - Quartz Agglomerate Countertops
DIVISION 13 -- SPECIAL CONSTRUCTION (NOT USED)
DIVISION 14 -- CONVEYING EQUIPMENT (NOT USED)
14 4500 - Heavy Duty Vehicle Lifts
DIVISION 15 -- RESERVED (NOT USED) (FOR MECHANICAL, SEE DIVISIONS 21, 22, AND 23)
DIVISION 16 -- RESERVED (NOT USED) (FOR ELECTRICAL, SEE DIVISIONS 25, 26, 27, 28, AND 29)
DIVISION 17 -- RESERVED (NOT USED)
DIVISION 18 -- RESERVED (NOT USED)
DIVISION 19 -- RESERVED (NOT USED)
DIVISION 20 -- RESERVED (NOT USED)
DIVISION 21 -- FIRE SUPPRESSION
DIVISION 22 -- PLUMBING
22 0100 - Basic Plumbing Requirements 22 0200 - Project Closeout Plumbing 22 0500 - Basic Plumbing Materials and Methods 22 0510 - Plumbing Related Work 22 0513 - Electrical Provisions for Plumbing Equipment 22 0514 - Pipe, Tube and Fittings for Plumbing Equipment 22 0515 - Piping Specialties for Plumbing Systems 22 0519 - Meters and Gauges for Plumbing Piping 22 0523 - Valves for Plumbing Piping 22 0529 - Hangers and Supports for Plumbing Piping and Equipment 22 0548 - Vibration Isolation for Plumbing Piping and Equipment 22 0553 - Identification for Plumbing Piping and Equipment 22 0700 - Plumbing Insulation
DGS Project No.: PJ-610-230-001 March 5, 2026
Table of Contents 00 0010 - 5
22 1116 - Domestic Water Piping 22 1316 - Soil, Waste and Vent Piping 22 1413 - Storm Water Piping 22 3000 - Plumbing Equipment 22 4000 - Plumbing Fixtures 22 6300 - Natural Gas Systems
DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 0100 - Basic HVAC Requirements 23 0200 - Project Closeout HVAC 23 0500 - Basic HVAC Materials and Methods 23 0510 - HVAC Related Work 23 0513 - Electrical Provisions for HVAC Equipment 23 0529 - Hangers and Supports for HVAC Piping and Equipment 23 0548 - Vibration Isolation for HVAC Piping and Equipment 23 0553 - Identification for HVAC Piping and Equipment 23 0593 - Testing, Adjusting, and Balancing for HVAC 23 0700 - HVAC Insulation 23 0800 - Commissioning of HVAC Systems 23 0900 - Automatic Control Systems (Electric-Electronic) 23 2300 - Refrigerant Piping 23 3113 - Low Pressure Ductwork 23 3300 - Duct Accessories 23 3400 - Fans 23 3700 - Air Outlets and Inlets 23 7413 - Packaged Rooftop Air Handling Units 23 8119 - Split Systems Air Conditioning Units 23 8120 - Variable Refrigerant Flow Systems 23 8200 - Heating and Cooling Terminal Units
DIVISION 24 -- RESERVED (NOT USED)
DIVISION 25 -- INTEGRATED AUTOMATION (NOT USED)
DIVISION 26 -- ELECTRICAL
26 0100 - Basic Electrical Materials and Methods 26 0200 - Project Closeout Electrical 26 0501 - Inspections, Testing and Start-up 26 0519 - Wires and Cables 26 0526 - Grounding 26 0529 - Supporting Devices 26 0533 - Raceways 26 0534 - Boxes, Fittings and Cabinets 26 0543 - Underground Electrical Structures
DGS Project No.: PJ-610-230-001 March 5, 2026
Table of Contents 00 0010 - 6
26 0573 - Coordination Study 26 0943 - Lighting Control Systems 26 2416 - Panelboards 26 2726 - Wiring Devices 26 2736 - Electrical Connections 26 2816 - Disconnect, Switches and Contactors 26 2913 - Motor Controllers
26 3353 - UPS
26 4314 - External SPD 26 5100 - Lighting Fixtures 26 5720 - Telephone and Data Systems Support
DIVISION 27 -- COMMUNICATIONS
27 0000 - General Communications Provisions 27 0100 - Common Work Results for Communications 27 0200 - Communications Equipment Room Fittings 27 0536 - Cable Trays for Communications Systems 27 4100 - AudioVisual Systems 27 5000 - Data, Voice and Video Systems 27 5200 - Grounding and Bonding for Communications 27 5800 - Conduit and Backboxes for Communications Systems 27 6000 - Telephone and CATV Utility Service Provisions
DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY
28 0500 - Common Work Results for Electronic Safety and Security Systems 28 2300 - Security Camera Systems 28 3111 - Fire Dertection and Alarm System 28 4000 - Access Control and Alarm System 28 5200 - Grounding and Bonding for Electronic Safety and Security Systems 28 5800 - Conduit and Backboxes for Electronic Safety and Security Systems
DIVISION 29 -- RESERVED (NOT USED)
DIVISION 30 -- RESERVED (NOT USED)
DIVISION 31 -- EARTHWORK (NOT USED)
31 1000 - Site Clearing 31 2000 - Earth Moving 31 5000 - Excavation Support and Protection
DIVISION 32 -- EXTERIOR IMPROVEMENTS (NOT USED)
32 1216 - Asphalt Paving 32 1313 - Concrete Paving 32 1373 - Concrete Paving Joint Sealants
DGS Project No.: PJ-610-230-001 March 5, 2026
Table of Contents 00 0010 - 7
32 3113 - Chain Link Fences and Gates 32 9200 - Turf and Grasses 32 9300 - Plants
DIVISION 33 -- UTILITIES (NOT USED)
33 0500 - Common Work Results for Utilities 33 1415 - Site Water Distribution Piping 33 4200 - Stormwater Conveyance
DIVISION 34 -- TRANSPORTATION (NOT USED)
DIVISION 35 -- WATERWAY AND MARINE CONSTRUCTION (NOT USED)
DIVISION 36 -- RESERVED (NOT USED)
DIVISION 37 -- RESERVED (NOT USED)
DIVISION 38 -- RESERVED (NOT USED)
DIVISION 39 -- RESERVED (NOT USED)
DIVISION 40 -- PROCESS INTEGRATION (NOT USED)
DIVISION 41 -- MATERIAL PROCESSING AND HANDLING EQUIPMENT (NOT USED)
DIVISION 42 -- PROCESS HEATING, COOLING, AND DRYING EQUIPMENT (NOT USED)
DIVISION 43 -- PROCESS GAS AND LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT (NOT
USED)
DIVISION 44 -- POLLUTION CONTROL EQUIPMENT (NOT USED)
DIVISION 45 -- INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT (NOT USED)
DIVISION 46 -- WATER AND WASTEWATER EQUIPMENT (NOT USED)
DIVISION 47 -- RESERVED (NOT USED)
DIVISION 48 -- ELECTRICAL POWER GENERATION (NOT USED)
DIVISION 49 -- RESERVED (NOT USED)
END OF SECTION 00 0010
Table of Contents 00 0010 - 8
DGS Project No.: PJ-610-230-001 March 5, 2026
Maryland Department of General Services Procurement Documents 00 0011 - 1
SECTION 00 0011 - MARYLAND DEPARTMENT OF GENERAL SERVICES PROCUREMENT
DOCUMENTS
PART 1 - GENERAL
1.1 DIVISION 00 - PROCURMENT AND CONTRACTING REQUIREMENTS
A. State of Maryland Procurement and Contracting documents shall be obtained by each Contractor bidding on this Project through eMaryland Marketplace Advantage; https://procurement.maryland.gov/
B. Division 00 - Procurement and Contracting Documents located on the eMaryland Marketplace Advantage website for this Project are hereby incorporated by reference into these Bid Documents. Procurement and Contracting Documents may include, but are not limited to, the following:
1. Notice to Bidders - Solicitation Fact Sheet (eMaryland Marketplace Advantage attachment)
2. Instructions to Bidders For Construction Projects (July 1, 2022) (eMaryland Marketplace Advantage attachment)
3. General Conditions For Construction Contracts (July 1, 2022) (eMaryland Marketplace Advantage attachment)
4. Bid/Proposal Affidavit (eMaryland Marketplace Advantage attachment)
5. Payment of Employee Healthcare Expenses Certification (eMaryland Marketplace Advantage attachment)
6. Contractor Questionnaire (eMaryland Marketplace Advantage attachment)
7. Bid Bond (eMaryland Marketplace Advantage attachment)
8. Minority Business Enterprise Forms Attachment D (February 5, 2021) (eMaryland Marketplace
Advantage attachment)
9. Veteran-owned Small Business Enterprise (VSBE) Forms Attachment E (September 1, 2022)
(eMaryland Marketplace Advantage attachment)
10. List of Prevailing Wage Rates (eMaryland Marketplace Advantage attachment)
11. Corporate Diversity Addendum (eMaryland Marketplace Advantage attachment)
12. Addenda (eMaryland Marketplace Advantage attachment)
13. List of Drawings (eMaryland Marketplace Advantage attachment)
14. Attachment A - Contract (eMaryland Marketplace attachment)
15. Pre-Bid Conference / Site Visit Information: Refer to: State Finance and Procurement Article
Section 14-302(a)(7)(v) and COMAR 21.11.03.09.C.(2)(e).
DGS Project No.: PJ-610-230-001 March 5, 2026
Maryland Department of General Services Procurement Documents 00 0011 - 2
PART - 2 PRODUCTS (NOT USED)
PART - 3 EXECUTION (NOT USED)
END OF SECTION 00 0011
DGS Project No.: PJ-610-230-001 March 5, 2026
Maryland Department of General Services Procurement Documents 00 0011 - 3
List of Drawing Sheets 00 0115 - 1
SECTION 00 0115 - LIST OF DRAWING SHEETS
SHEET NUMBER
SHEET NAME
GENERAL/CODE
G000
G001
G002
G003
G004
G005
G006
G007
G008
G009
COVER SHEEET
ABBREVIATIONS, LEGENDS & GENERAL NOTES
DRAWINGS INDEX
CODE ANALYSIS
CODE PLANS - BARRACK
CODE PLANS - GARAGE
PROGRAM VALIDATION
WORK AREAS
ADA PLANS
TYPICAL ACCESSIBILITY GUIDLIENS
CIVIL
C100
C110
C200
C300
C301
C302
C400
C500
C501
C502
C503
C504
C600
C601
C602
C603
C604
C605
C606
C607
C608
C609
C610
C611
C700
EXISTING CONDITIONS PLAN
BORING PLAN
SITE DEMOLITION PLAN
PROPOSED SITE PLAN
SITE DETAILS
SITE DETAILS
PROPOSED GRADING PLAN
PROPOSED UTILITY PLAN
STORM DRAIN PROFILES
SANITARY AND WATER PROFILES
UTILITY DETAILS
UTILITY DETAILS
EROSION & SEDIMENT CONTROL COVER SHEET
EROSION & SEDIMENT CONTROL PLAN - PHASE 1
EROSION & SEDIMENT CONTROL PLAN - PHASE 2
EROSION & SEDIMENT CONTROL PLAN - PHASE 3
EROSION & SEDIMENT CONTROL DETAILS
EROSION & SEDIMENT CONTROL DETAILS
EROSION & SEDIMENT CONTROL NOTES
EROSION & SEDIMENT CONTROL NOTES
EROSION & SEDIMENT CONTROL NOTES
DRAINAGE AREA MAP - INITIAL CONDITIONS
DRAINAGE AREA MAP - INTERIM CONDITIONS
DRAINAGE AREA MAP - FINAL CONDITIONS
PROPOSED STORMWATER MANAGEMENT PLAN
List of Drawing Sheets 00 0115 - 2
C701
L100
L101
L110
STORMWATER MANAGEMENT DETAILS
PROPOSED LANDSCAPING PLAN
PROPOSED CBCA LANDSCAPE PLAN
PROPOSED LANDSCAPING NOTES AND DETAILS
ARCHITECTURAL
A001
A002
A003
A004
A005
AD100
AD101
A100
A101
A102
A111
A112
A113
A121
A122
A123
A200
A300
A301
A400
A401
A500
A600
A601
A602
A603
A604
A605
A700
A701
A702
A703
A704
A705
A801
ARCHITECTURAL SITE DIAGRAM
SITE LOGISTICS
PHASING PLANS - BARRACK
PHASING PLANS - BARRACK
PHASING PLANS - BARRACK
DEMO PLANS - BARRACK
DEMO PLANS - GARAGE
ASSEMBLY TYPES & NOTES
REFERENCE & DIMENSION PLAN - BARRACK
REFERENCE & DIMENSION PLAN - GARAGE
EQUIPMENT, FFE & FINISH PLANS - BARRACK
EQUIPMENT, FFE & FINISH PLANS - GARAGE
FINISH SCEHDULES, NOTES & DETAILS
ROOF PLAN
ROOF DETAILS
ROOF DETAILS
BUILDING ELEVATIONS
BUILDING SECTIONS
BUILDING SECTIONS
WALL SECTIONS
WALL SECTION DETAILS
PLAN DETAILS
DOOR SCHEDULE & DETAILS
DOOR DETAILS
WINDOW SCHEDULE & DETAILS
SPECIALTY DOOR DETAILS
STOREFRONT ELEVATIONS & DETAILS
DOOR HARDWARE SETS
ENLARGED PLANS & INT. ELEVATIONS - BARRACK
ENLARGED PLANS & INT. ELEVATIONS - GARAGE
ENLARGED PLANS & INT. ELEVATIONS - GARAGE
CASEWORK SECTIONS
CASEWORK SECTIONS
CASEWORK SECTIONS
REFLECTED CEILING PLAN - BARRACK
List of Drawing Sheets 00 0115 - 3
A802
A900
REFLECTED CEILING PLAN - GARAGE
TYPICAL ADA SIGNAGE DETAILS
STRUCTURAL
S001
S002
S101
S102
S301
S302
S303
S401
S402
GENERAL NOTES
GENERAL NOTES & SCHEDULES
GARAGE FOUNDATION/ROOF FRAMING PLAN
BARRACK J FIRST FLOOR FRAMING PLAN
TYPICAL DETAILS - FOUNDATIONS
TYPICAL DETAILS - MASONRY & CONCRETE
TYPICAL DETAILS - STEEL & MISC.
SECTIONS
SECTIONS
MECHANICAL
M001
MD101
M101
M102
M103
M201
M301
M401
M501
MECHANICAL LEGEND, ABBREVIATIONS & GENERAL NOTES
FIRST FLOOR PLAN HVAC DEMOLITION
FIRST FLOOR PLAN HVAC NEW WORK
GARAGE FLOOR PLAN DUCTWORK NEW WORK
GARAGE FLOOR PLAN HVAC NEW WORK
GARAGE FLOOR PLAN HVAC PIPING NEW WORK
MECHANICAL DETAILS
MECHANICAL CONTROLS
MECHANICAL SCHEDULES
PLUMBING
P001
PD101
P100
P101
P102
P103
P201
P301
P401
P402
P403
P404
P405
P501
PLUMBING LEGEND, ABBREVIATIONS & GENERAL NOTES
FIRST FLOOR PLAN PLUMBING DEMOLITION
GARAGE FOUNDATION PLAN - PLUMBING NEW WORK
GARAGE FLOOR PLAN PLUMBING NEW WORK
GARAGE ROOF PLAN PLUMBING NEW WORK
FIRST FLOOR PLAN PLUMBING NEW WORK
GARAGE FIRST FLOOR PART PLAN - PLUMBING NEW WORK
RISER DIAGRAM
PLUMBING DETAILS
PLUMBING DETAILS
PLUMBING DETAILS
PLUMBING DETAILS
PLUMBING DETAILS
PLUMBING SCHEDULES
List of Drawing Sheets 00 0115 - 4
ELECTRICAL
E001
E002
E003
ED101
ED102
ED103
E101
E102
E103
E104
E201
E202
E401
E501
E601
E602
E603
ELECTRICAL LEGEND, ABBREVIATIONS, AND GENERAL NOTES
ELECTRICAL GENERAL NOTES
ELECTRICAL SITE PLAN
GARAGE FLOOR PLAN ELECTRICAL DEMOLITION
BARRACK BASEMENT FLOOR PLAN ELECTRICAL DEMOLITION
BARRACK FIRST FLOOR PLAN ELECTRICAL DEMOLITION
GARAGE FLOOR PLAN POWER NEW WORK
GARAGE ROOF PLAN POWER NEW WORK
BARRACK BASEMENT FLOOR PLAN ELECTRICAL NEW WORK
BARRACK FIRST FLOOR PLAN POWER NEW WORK
GARAGE FLOOR PLAN LIGHTING NEW WORK
BARRACK FIRST FLOOR PLAN LIGHTING NEW WORK
ELECTRICAL DETAILS
RISER DIAGRAM DEMOLITION AND NEW WORK
PANEL SCHEDULES
PANEL SCHEDULES
PANEL SCHEDULES
FIRE PROTECTION
FA001
FD101
FA101
ELECTRICAL LEGEND AND ABBREVIATIONS
GARAGE FLOOR PLAN FIRE ALARM DEMOLITION
GARAGE FLOOR PLAN FIRE ALARM NEW WORK
TELECOM
T001
T101
T102
T103
T104
T105
T106
T107
T501
T502
T503
T504
T505
T506
T507
T508
T509
SYMBOLS & LEGENDS
TELECOM & SECURITY SITE PLAN
GARAGE PLAN - TELECOM
BARRACK BASEMENT FLOOR PLAN - TELECOM
BARRACK FIRST FLOOR PLAN - TELECOM
GARAGE PLAN - SECURITY
BARRACK BASEMENT FLOOR PLAN - SECURITY
BARRACK FIRST FLOOR PLAN - SECURITY
RISER DIAGRAM
TELECOM DETAILS
TELECOM DETAILS
TELECOM DETAILS
TELECOM DETAILS
TELECOM DETAILS
SECURITY DETAILS
SECURITY DETAILS
GROUNDING DETAILS
List of Drawing Sheets 00 0115 - 5
END OF SECTION 00 0115
DGS Project No.: PJ-610-230-001 March 5, 2026
Available Project Information 00 3100 - 1
SECTION 00 3100 - AVAILABLE PROJECT INFORMATION
PART 1 GENERAL
1.1 INFORMATION AVAILABLE TO BIDDERS
A. Certain information relating to existing surface and subsurface conditions and structures is available to Bidders for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. The information available shall not be a warranty or guarantee of existing conditions. The information available will not be part of the Contract Documents.
1.2 EXISTING CONDITIONS
A. Geotechnical Report: Entitled BARACK J MARYLAND STATE POLICE 610 TAYLOR AVE. ANNAPOLIS, MD 21401 KIM PROJECT NO. G24012, dated May 9, 2024 prepared by Kim Engineering, Inc. 3916 Vero Road, Suite K, Baltimore, MD 21127 .
1. A copy of the original report is available for viewing upon request.
2. The opinions expressed in this report are those of a geotechnical engineer and represent interpretations of subsoil conditions, tests, and results of analyses conducted by a geotechnical engineer. Owner is not responsible for interpretations or conclusions drawn from the data.
3. Any party using information described in the geotechnical report shall make additional test borings and conduct other exploratory operations that may be required to determine the character of subsurface materials that may be encountered.
4. The recommendations described shall not be construed as a requirement of this Contract, unless specifically referenced in Contract Documents.
5. Because subsurface conditions indicated by the soil borings are a sampling in relation to the entire construction area, and for other reasons, the Owner, the Architect, the Architect's consultants, and the firm reporting the subsurface conditions do not warranty the conditions below the depths of the borings or that the strata logged from the borings are necessarily typical of the entire site. Any party using the information described in the soil borings and geotechnical report shall accept full responsibility for its use.
1.3 PERMITS
A. General Contractor shall be responsible for tracking the expiration of all permits during the course of construction up to project closeout unless otherwise indicated. General Contractor shall notify in writing the Architect and the Owner a minimum of 60 calendar days prior to the expiration of any permit. The General Contractor shall be responsible for any/all costs incurred as a result of failing to notify the Architect and the Owner prior to the 60 calendar day deadline for notification.
B. The Architect/Owner has applied for the following permits:
1. Site work and GradingPermit.
a. Status: Approved
2. General Building Permit.
a. Status: Approved
DGS Project No.: PJ-610-230-001 March 5, 2026
Available Project Information 00 3100 - 2
C. The General Contractor shall be responsible for obtaining and paying for all other required permits including but not limited to all trade permits. Obtainment of permits includes but is not limited to gathering, producing, and submitting all documentation and information required by the AHJ for any/all permits.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
END OF SECTION 00 3100
DGS Project No.: PJ-610-230-001 March 5, 2026
Forms 00 6000 - 1
SECTION 00 6000 - FORMS
PART 1 GENERAL
1.1 FORM OF AGREEMENT AND GENERAL CONDITIONS
A. The following form of Owner/Contractor Agreement and form of the General Conditions shall be used for Project:
1. Owner's procurement and contracting documents are available for download on the eMaryland
Marketplace Advantage website: http://procurement.maryland.gov/
1.2 ADMINISTRATIVE FORMS
A. Administrative Forms: Additional administrative forms are specified in Division 01 General Requirements.
B. Copies of AIA standard forms may be obtained from the American Institute of Architects.
1. Website: https://www.aia.org/contractsdocs/purchase/index.htm
2. docspurchase@aia.org; (800) 942-7732
C. Information and Modification Forms: Where other forms are not indicated within the Owner's Procurement and Contracting Documents or within the Technical Specification Division 01 sections, utilize the following forms:
1. Form for Request for Information (RFI's): AIA
2. Form for Requests for Information (RFIs): AIA Document G716, "Request for Information (RFI)."
3. Form of Request for Proposal: AIA Document G709, "Work Changes Proposal Request."
4. Change Order Form: As indicated in the Owner's "The Department of General Services Change
Order Guidelines," issued April 2017.
5. Form of Architect's Memorandum for Minor Changes in the Work: "Architect's Supplemental
Instructions."
6. Form of Change Directive: AIA Document G714, "Construction Change Directive."
D. Payment Forms: Where other forms are not indicated within the Owner's Procurement and Contracting Documents or within the Technical Specification Division 01 sections, utilize the following forms:
1. Schedule of Values Form: AIA Document G703, "Continuation Sheet."
2. Payment Application: AIA Document G702/703, "Application and Certificate for Payment and
Continuation Sheet."
3. Form of Contractor's Affidavit: AIA Document G706, "Contractor's Affidavit of Payment of Debts and
Claims."
4. Form of Affidavit of Release of Liens: AIA Document G706A, "Contractor's Affidavit of Payment of
Release of Liens."
5. Form of Consent of Surety: AIA Document G707, "Consent of Surety to Final Payment."
DGS Project No.: PJ-610-230-001 March 5, 2026
Forms 00 6000 - 2
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION 00 6000
DGS Project No.: PJ-610-230-001 March 5, 2026
Wage Determination Schedule 00 7346 - 1
SECTION 00 7346 - WAGE DETERMINATION SCHEDULE
PART 1 GENERAL
1.1 WAGE DETERMINATION SCHEDULE
A. See Wage Determination Schedule appended to this specification following this Section.
PART 2 PRODUCTS - NOT USED
END OF SECTION 00 7346
Re: BARRACK J Annapolis Communication Room and Garage
Project No: PJ-610-230-001
Enclosed please find the Prevailing Wage Determination and Instructions for Contractors for the project referenced above.
Upon advertisement for bid or proposal of this project, you are requested to submit to this office the date and name of publication in which such advertisement appeared.
Once awarded, you are further directed to submit to this office, the NOTICE TO PROCEED for the project, complete with the date of notice, the name of the general contractor, and the dollar amount of the project. In addition, we ask that a representative of the prevailing wage Unit be invited to attend the Pre-Construction Conference.
Any questions concerning this matter may be referred to PrevailingWage@dllr.state.md.us
Sincerely, Enclosures
Wage Determination
Instruction for the Contractor Prevailing Wage Unit
Oz Ozturk - Procurement Officer
301 W Preston St., Room 1405
Baltimore, MD 21201
MDGS
REQUEST FOR ADVERTISEMENT AND NOTICE TO PROCEED
12/10/2025
DEPARTMENT OF LABOR
DIVISION OF LABOR AND INDUSTRY
PREVAILING WAGE SECTION
10946 Golden West Drive, Suite 160
Hunt Valley, MD 21031
(410) 767-2342
STATE OF MARYLAND
12/10/2025 1:22 PM Page 1 of 7Page 28 of 1537
PREVAILING WAGE INSTRUCTIONS FOR THE CONTRACTOR & SUBCONTRACTOR
The contractor shall electronically submit completed copies of certified payroll records to the Commissioner of Labor & Industry, Prevailing Wage Unit by going on-line to https://www.dllr.state.md.us/prevwage and following the instructions for submitting payroll information (NOTE: A contractor must register prior to submitting on-line certified payroll information).
If you have technical questions regarding electronic submittal, contact the Department at dldliprevailingwage-dllr@maryland.gov.
All certified payroll records shall have an accurate week beginning and ending date. The contractor shall be responsible for certifying and submitting to the Commissioner of Labor and Industry, Prevailing Wage Unit all of their subcontractors' payroll records covering work performed directly at the work site. By certifying the payroll records, the contractor is attesting to the fact that the wage rates contained in the payroll records are not less than those established by the Commissioner as set forth in the contract, the classification set forth for each worker or apprentice conforms with the work performed, and the contractor or subcontractor has complied with the provisions of the law.
A contractor or subcontractor may make deductions that are (1) required by law; (2) required by a collective bargaining agreement between a bona fide labor organization and the contractor or subcontractor; or (3) contained in a written agreement between an employee and an employer undertaken at the beginning of employment, if the agreement is submitted by the employer to the public body awarding the public work and is approved by the public body as fair and reasonable.
A contractor or subcontractor is required to submit information on-line on their fringe benefit packages including a list of fringe benefits for each craft employed by the contractor or subcontractor, by benefit and hourly amount. Where fringe benefits are paid in cash to the employee or to an approved plan, fund, or program, the contribution is required to be indicated.
Payroll records must be electronically submitted and received within 14 calendar days after the end of each payroll period. If the contractor is delinquent in submitting payroll records, processing of partial payment estimates may be held in abeyance pending receipt of the records. In addition, if the contractor is delinquent in submitting the payroll records, the contractor shall be liable to the contracting public body for liquidated damages. The liquidated damages are $10.00 for each calendar day the records are late.
Only apprentices registered with the Maryland Apprenticeship and Training Council shall be employed on prevailing wage projects. Apprentices shall be paid a percentage of the determined journey person 's wage for the specific craft.
Overtime rates shall be paid by the contractor and any subcontractors under its contracts and agreements with their employees which in no event shall be less than time and one-half the prevailing hourly rate of wages for all hours worked in excess of ten (10) hours in any one calendar day; in excess of forty (40) hours per workweek; and work performed on Sundays and legal holidays.
Contractors and subcontractors employing a classification of worker for which a wage rate was not issued SHALL notify the Commissioner of Labor & Industry, Prevailing Wage Unit, for the purpose of obtaining the wage rate for said classification PRIOR TO BEING EMPLOYED on the project. To obtain a prevailing wage rate which was NOT listed on the Wage Determination, a contractor or subcontractor can look on the LABOR webpage under prevailing wage.
Contractors and subcontractors shall maintain a valid copy of proper State and county licenses that permit the contractor and a subcontractor to perform construction work in the State of Maryland. These licenses must be retained at the worksite and available for review upon request by the Commissioner of Labor and Industry’s designee.
**Each contractor under a public work contract subject to Section 17-219 shall:
1. Post a clearly legible statement of each prevailing wage rate to be paid under the public work contract; and
2. Keep the statement posted during the full time that any employee is employed on the public work contract.
3. The statement of prevailing wage rates shall be posted in a prominent and easily accessible place at the site of the public work.
12/10/2025 1:22 PM Page 2 of 7Page 29 of 1537 https://www.dllr.state.md.us/prevwage
**Penalty - Subject to Section 10-1001 of the State Goverment Article, the Commissioner may impose on a person that violates this section a civil penalty of up to $50.00 per violation.
Under the Maryland Apprenticeship and Training Council requirements, consistent with proper supervision, training and continuity of employment and applicable provisions in collective bargaining agreements, a ratio of one journey person regularly employed to one apprentice shall be allowed. No deviation from this ratio shall be permitted without prior written approval from the Maryland Apprenticeship and Training Council.
Laborers may NOT assist mechanics in the performance of the mechanic's work, NOR USE TOOLS peculiar to established trades.
ALL contractors and subcontractors shall employ only competent workers and apprentices and may NOT employ any individual classified as a HELPER or TRAINEE on a prevailing wage project.
The State Apprenticeship and Training Fund (Fund) law provides that contractors and certain subcontractors performing work on certain public work contracts are required to make contributions toward apprenticeship. See §17- 601 through 17-606, State Finance and Procurement, Annotated Code of Maryland. Contractors and subcontractors have three options where they can choose to make their contributions: (1) participate in a registered apprenticeship training program; (2) contribute to an organization that has a registered apprenticeship training program; or (3) contribute to the State Apprenticeship and Training Fund.
The Department of Labor (LABOR) is moving forward with final adoption of regulations. The regulations were published in the December 14, 2012 edition of the Maryland Register.
IMPORTANT: Please note that the obligations under this law will become effective on JULY 1, 2013. This law will require that contractors and certain subcontractors make contributions toward apprenticeship and report those contributions on their certified payroll records that they submit pursuant to the prevailing wage law.
The Department is offering outreach seminars to any interested parties including contractors, trade associations, and any other stakeholders. Please contact the Department at dldliprevailingwage-dllr@maryland.gov or (410) 767-2968 for seminar times and locations. In addition, information regarding this law will be provided at pre-construction meetings for projects covered by the Prevailing Wage law.
For additional information, contact:
Division of Labor and Industry
Maryland Apprenticeship and Traning 1100 North Eutaw Street, Room 606
Baltimore, Maryland 21201
(410) 767-2246
E-Mail Address: matp@dllr.state.md.us.
12/10/2025 1:22 PM Page 3 of 7Page 30 of 1537 mailto:matp@dllr.state.md.us
STATE OF MARYLAND
DEPARTMENT OF LABOR
DIVISION OF LABOR AND INDUSTRY
PREVAILING WAGE SECTION
10946 Golden West Drive, Suite 160
Hunt Valley, MD 21031
(410) 767-2342
CLASSIFICATION MODIFICATION
REASON
BORROWED
FROM
FRINGE
BENEFIT
PAYMENT
BASIC
HOURLY
RATE
AD $50.92 $24.61 BALANCING TECHNICIAN
AD $38.80 $15.57 BRICKLAYER
AD $35.89 $14.60 CARPENTER
AD $35.89 $14.60 CARPENTER - SHORING SCAFFOLD BUILDER
AD $35.10 $15.33 CARPET LAYER
AD $32.40 $17.34 COMMUNICATION INSTALLER TECHNICIAN
AD $35.89 $14.60 DRYWALL - SPACKLING, TAPING, & FINISHING
AD $49.50 $21.14 ELECTRICIAN
AD $48.99 $18.89 ELEVATOR MECHANIC
The wage rates to be paid laborers and mechanics for the locality described below is announced by order of Commissioner of Labor and Industry.
It is mandatory upon the successful bidder and any subcontractor under him, to pay not less than the specific rates to all workers employed by them in executing contracts in this locality. Reference: Annotated Code of Maryland State Finance and Procurement, Section 17-201 thru 17-226.
These wage rates were taken from the locality survey of 2025 for Anne Arundel County, issued pursuant to the Commissioner's authority under State Finance and Procurement Article Section 17-209, Annotated Code of Maryland or subsequent modification.
**Note: If additional Prevailing Wage Rates are needed for this project beyond those listed below, contact the Prevailing Wage Unit. Phone: (410) 767-2342, email: prevailingwage@dllr.state.md.us.
Name and Title of Requesting Officer:
Department, Agency or Bureau:
Project Number
PJ-610-230-001
Oz Ozturk - Procurement Officer
MDGS
301 W Preston St., Room 1405 Baltimore, MD 21201
Location and Description of work:
Anne Arundel County: The Project generally consists of the phased renovation of the existing duty office, the demolition of the existing Garage building, and the construction of a new Maintenance Garage at Barrack J of the Maryland State Police and other Work as indicated within the Contract Documents. The renovation work area is approximately 5,288 gross square feet and is a single-story structure.
Determination Number
64252
Date of Issue: Dec 10, 2025
BUILDING CONSTRUCTION
6/2/2026 3:20 PM Page 1 of 4
AD $17.00 510 $2.24 FIREPROOFER - BY HAND
AD $27.00 510 $5.22 FIREPROOFER - SPRAYER
AD $30.21 $10.68 FIRESTOPPER
AD $36.65 $14.61 GLAZIER
AD $40.77 $20.42 INSULATION WORKER
AD $48.25 $21.11 IRONWORKER - FENCE ERECTOR
AD $27.99 $4.58 IRONWORKER - ORNAMENTAL
CR $30.18 $24.09 IRONWORKER - REINFORCING
AD $37.86 $26.22 IRONWORKER - STRUCTURAL
AD $39.50 $17.52 MILLWRIGHT
AD $29.16 $12.01 PAINTER
AD $36.37 $16.21 PAINTER-INDUSTRIAL
AD $37.74 $17.64 PILEDRIVER
AD $20.00 510 $2.24 PLASTERER - MIXER
AD $47.78 $25.93 PLUMBER
AD $35.18 $15.12 POWER EQUIPMENT OPERATOR - BACKHOE
AD $33.23 $15.12 POWER EQUIPMENT OPERATOR - BROOM / SWEEPER
AD $35.18 005 $15.12 POWER EQUIPMENT OPERATOR - BULLDOZER
AD $35.18 $15.12 POWER EQUIPMENT OPERATOR - CONCRETE PUMP
AD $42.00 $19.10 POWER EQUIPMENT OPERATOR - CRANE
AD $42.00 510 $19.10 POWER EQUIPMENT OPERATOR - CRANE - TOWER
AD $35.18 $15.12 POWER EQUIPMENT OPERATOR - DRILL - RIG
AD $35.18 $15.12 POWER EQUIPMENT OPERATOR - EXCAVATOR
AD $35.18 $15.12 POWER EQUIPMENT OPERATOR - FORKLIFT
AD $35.18 $15.12 POWER EQUIPMENT OPERATOR - LOADER
AD $37.24 510 $15.12 POWER EQUIPMENT OPERATOR - MECHANIC
AD $22.00 005 $3.58 POWER EQUIPMENT OPERATOR - ROLLER - ASPHALT
AD $29.60 $15.12 POWER EQUIPMENT OPERATOR - ROLLER - EARTH
AD $33.23 $15.12 POWER EQUIPMENT OPERATOR - SKID STEER (BOBCAT)
AD $38.60 510 $15.75 POWER EQUIPMENT OPERATOR-VACUUM TRUCK
AD $35.10 $15.33 RESILIENT FLOOR
AD $52.71 $14.06 ROOFER/WATERPROOFER
AD $50.92 $24.61 SHEETMETAL WORKER (INCLUDING METAL ROOFING)
AD $45.22 $26.64 SPRINKLERFITTER
AD $47.78 $25.93 STEAMFITTER/PIPEFITTER
AD $45.65 $21.51 STONE MASON
AD $28.85 $12.85 TILE & TERRAZZO FINISHER
AD $34.34 $14.50 TILE & TERRAZZO MECHANIC
AD $26.73 005 $7.65 TRUCK DRIVER - DUMP
AD $26.25 025 $7.60 TRUCK DRIVER - FLATBED
AD $31.50 027 $9.19 TRUCK DRIVER - LOWBOY
LABORER GROUP II
AD $21.34 $6.90 LABORER - ASPHALT RAKER
AD $21.34 $6.90 LABORER - COMMON
6/2/2026 3:20 PM Page 2 of 4
These Informational Prevailing Wage Rates may not be substituted for the requirements of pre-advertisement or onsite job posting for a public work contract that exceeds $250,000 in value and either of the following criteria are met: (1) the contracting body is a unit of State government or an instrumentality of the State and there is any State funding for the project; or (2) the contracting body is a political subdivision, agency, person or entity (such as a county) and the
State funds 25% or more of the project.
Modification Codes:
(AD) 17-209 Annual Determination from Survey Wage Data Received (CH) 17-211 Commissioners’ Hearing (CR) 17-208 Commissioners’ Review (SR) 17-208 Survey Review by Staff
Each "Borrowed From" county is identified with the FIPS 3-digit county code unique for the specific jurisdiction in Maryland.
For additional information on the FIPS (Federal Information Processing Standard) code, see http://www.census.gov/datamap/fipslist/AllSt.txt
AD $21.34 $6.90 LABORER - CONCRETE PUDDLER
AD $21.34 $6.90 LABORER - CONCRETE TENDER
AD $21.34 $6.90 LABORER - CONCRETE VIBRATOR
AD $21.34 $6.90 LABORER - DENSITY GAUGE
AD $21.34 $6.90 LABORER - FIREPROOFER - MIXER
AD $21.34 $6.90 LABORER - FLAGGER
AD $21.34 $6.90 LABORER - GRADE CHECKER
AD $21.34 $6.90 LABORER - HAND ROLLER
AD $21.34 $6.90 LABORER - JACKHAMMER
AD $21.34 $6.90 LABORER - LANDSCAPING
AD $21.34 $6.90 LABORER - LAYOUT
AD $21.34 $6.90 LABORER - LUTEMAN
AD $21.34 $6.90 LABORER - MORTAR MIXER
AD $21.34 $6.90 LABORER - PLASTERER - HANDLER
AD $21.34 $6.90 LABORER - TAMPER
LABORERS GROUP I
AD $27.68 $6.78 LABORER - AIR TOOL OPERATOR
AD $27.68 $6.78 LABORER - ASPHALT PAVER
AD $27.68 $6.78 LABORER - BLASTER - DYNAMITE
AD $27.68 $6.78 LABORER - BURNER
AD $27.68 $6.78 LABORER - CONCRETE SURFACER
AD $27.68 $6.78 LABORER - HAZARDOUS MATERIAL HANDLER
AD $27.68 $6.78 LABORER - MASON TENDER
AD $27.68 $6.78 LABORER - PIPELAYER
AD $27.68 $6.78 LABORER - SCAFFOLD BUILDER
Incidental Craft Data: Caulker, Man Lift Operator, Rigger, Scaffold Builder, and Welder receive the wage and fringe rates prescribed for the craft performing the operation to which welding, scaffold building, rigging, operating a Man Lift, or caulking is incidental.
6/2/2026 3:20 PM Page 3 of 4
The Prevailing Wage rates appearing on this form were originally derived from Maryland’s annual Wage Survey. The Commissioner of Labor & Industry encourages all contractors and interested groups to participate in the voluntary Wage Survey, detailing wage rates paid to workers on various types of construction throughout Maryland.
A mail list of both street and email addresses is maintained by the Prevailing Wage Unit to enable up-to-date prevailing wage information, including Wage Survey notices to be sent to contractors and other interested parties. If you would like to be included in the mailing list, please forward (1) your Name, (2) the name of your company (if applicable), (3) your complete postal mailing address, (4) your email address and (5) your telephone number to PWMAILINGLIST@dllr.state.md.us. Requests for inclusion can also be mailed to: Prevailing Wage, 1100 N. Eutaw Street - Room 607, Baltimore MD 21201-2201.
6/2/2026 3:20 PM Page 4 of 4
DGS Project No.: PJ-610-230-001 March 5, 2026
Summary 01 1000 - 1
SECTION 01 1000 - SUMMARY
PART 1 GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, Including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Project Information
2. Contract Description
3. Bidder/General Contractor Qualifications
4. Work by Owner
5. Owner Furnished/Contractor Installed (OFCI) Products
6. Owner Occupancy
7. Contractors Use of Site
8. Work Restrictions
9. Specifications and Drawing Conventions
10. Miscellaneous Provisions
1.3 PROJECT INFORMATION
A. Project Name: Maryland State Police Barrack J Annapolis Communication Room and Garage.
B. Project Location: 610 Taylor Avenue, Annapolis, Maryland21401.
C. Owner's Name: State of Maryland Department of General Services .
D. Owner's Location: 301 West Preston Street, Baltimore, Maryland21201.
E. Architect's Name: MW Studios.
F. Architect's Location: 8098 Sandpiper Circle, Suite H, Nottingham, Maryland 21236.
G. Additional Project contact information is specified in Section 00 0103 - Project Directory.
H. Project Duration: All Work of the Project shall be completed within 420 calendar days unless modified as indicated within the State of Maryland - Department of General Services General Conditions for Construction Contracts (latest version at time of award of the project) Section 7 - Changes In The Work.
I. Liquidated Damages: The Work is subject to liquidated damages. Liquidated damages shall be assessed at 1,500 dollars for each day extending beyond the Project Duration. See State of Maryland - Department of General Services General Conditions for Construction Contracts (latest version at time of award of the project.)
DGS Project No.: PJ-610-230-001 March 5, 2026
Summary 01 1000 - 2
J. Contractor's Warranty Period: The Contractor shall warrant all Work of the project for a period of Two
(2) years per State of Maryland - Department of General Services General Conditions for Construction Contracts (latest version at time of award of the project.)
K. The Work of the Project is defined by the Contract Documents and generally includes, but is not limited to, the following:
1. The Project generally consists of the phased renovation of the existing duty office, the demolition of the existing Garage building, and the construction of a new Maintenance Garage at Barrack J of the Maryland State Police and other Work as indicated within the Contract Documents. The renovation work area is approximately 5,288 gross square feet and is a single story structure of type VB construction that will be fully sprinklered.
2. Phased Construction
a. The project will be constructed in multiple phases as outlined within the drawings. Construct each phase of the project to be substantially complete before proceeding to the next phase of work.
1) Before commencing the work of each phase, submit an updated copy of the Contractor's construction schedule, showing the sequence, commencement and completion dates and move-out and -in dates of Owner's personnel where applicable for all phases of the Work.
L. Web-Based Project Software: Project software will be used for purposes of managing communication and documents during the construction stage of this Project.
1. See Section 01 3000 - Administrative Requirements for requirements for obtaining and utilizing web-based Project Software.
1.4 CONTRACT DESCRIPTION
A. Contract Type: As indicated within the Owners Procurement and Contracting Documents; documents shall be obtained from the eMaryland Marketplace Advantage website; https://procurement.maryland.gov/
1.5 WORK BY OWNER
A. Cooperate fully with Owner/Owners Contractors, so work may be carried out smoothly, without interference with or delaying Work under this Contract or work by Owner/Owners Contractors. Coordinate the Work of this Contract with work performed by Owner/Owners Contractors.
1.6 OWNER FURNISHED/CONTRACTOR INSTALLED (OFCI) PRODUCTS
A. Owner's Responsibilities: Owner will furnish products indicated and perform the following, as applicable:
1. Provide to Contractor Owner reviewed Product Data, Shop Drawings, and Samples.
2. Provide for delivery of Owner furnished products to Project Site.
3. Upon delivery, the Owner will inspect, with the Contractor present, the delivered item(s).
a. If Owner furnished products are damaged, defective, or missing, the Owner will arrange for replacement.
4. Owner will obtain manufacturer's inspections, service, and warranties.
5. Owner will inform the Contractor of earliest available delivery date for Owner furnished products.
B. Contractors Responsibilities: The Work includes the following, as applicable:
DGS Project No.: PJ-610-230-001 March 5, 2026
Summary 01 1000 - 3
1. Identify delivery dates of Owner furnished products in Contractors construction schedule, utilizing Owner furnished earliest available delivery dates.
2. Review Owner reviewed Product Data, Shop Drawings, and Samples noting discrepancies and other issues in providing for Owner furnished products in the Work.
3. Receive, unload, handle, store, protect, and install Owner furnished products.
4. Make building services connections for Owner furnished pro
5. Protect Owner furnished products from damage during storage, handling, and installation and prior to
Substantial Completion.
6. Repair or replace Owner furnished products damaged following receipt and prior to Substantial
Completion.
C. Owner Furnished Contractor Installed (OFCI) Products:
1. Items shall be as indicated on drawings.
1.7 OWNER OCCUPANCY
A. Full Owner Occupancy: Owner will occupy Project site and existing and adjacent building(s) during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Schedule/Perform the Work so as not to interfere with Owners day-to-day operations.
1. Maintain existing exits unless otherwise indicated.
2. Maintain access to walkways, corridors, or other occupied or used facilities. Do not close or obstruct walkways, corridors, other other occupied or used facilities without written permission from Owner and…