Appendix 1 Equipment List Revised_06 Jul 2023.pdf
PDF 1 MB Posted
- Attached to
- Industrial Process Waste (IPW) Cleaning Federal contract opportunity
- Solicitation number
- FA8571-23-R-0004
About this file
This document outlines industrial process waste cleaning tasks required at various facilities on an Air Force base. It provides a list of over 200 equipment items requiring cleaning, such as paint booths, sanding booths, grit blast booths, tanks, and drains. The cleaning tasks include removing residue, debris, and hazardous materials from the interiors and exteriors of the listed equipment. Requirements include the frequency of cleaning for each item, estimated dimensions, known hazards present, estimated time to complete the work, and applicable environmental regulations and standards. The level of effort and risk involved in the industrial cleaning work is extensive, as is the need to comply with numerous safety and regulatory guidelines due to the hazardous nature of the materials present.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building # Task ID # Equipment # Equipment Name Category Group Shop Frequency Work Description Estimated Dimensions Known Hazards Est Time to Complete Standards/References 50 5001 East Vent Plenum Drain
Screens Drain Screens AMXG Corrosion Control 180 Days Remove grates from trench drains, remove filter screens, wash thoroughly, remove all loose debris, paint stripper sludge and residue from floor, reinstall filter screens, and replace over trenches.
12' x 12' x 16' Confined Space. Cadmium, chromium, lead and chemical depaint (wet).
Slip, trip and fall.
8 hours 42 USC 6901/40 CFR 260/40 CFR 263/29 CFR
1910.146/29 CFR 1910.1027/ 29 CFR 1910.1026/29
CFR 1910.1025/NFPA 30/AFI 32-7042/RAFB
ISWMP/RAFB HWMP/RAFB 01560/WR-ALC OI 91-25
50 5002 West Vent Plenum Drain Screens
Drain Screens AMXG Corrosion Control 180 Days Remove grates from trench drains, remove filter screens, wash thoroughly, remove all loose debris, and paint stripper sludge and residue from floor, reinstall filter screens, and replace over trenches.
12' x 12' x 16' Confined Space. Cadmium, chromium, lead and chemical depaint (wet).
Slip, trip and fall.
8 hours 42 USC 6901/40 CFR 260/40 CFR 263/29 CFR
1910.146/29 CFR 1910.1027/ 29 CFR 1910.1026/29
CFR 1910.1025/NFPA 30/AFI 32-7042/RAFB
ISWMP/RAFB HWMP/RAFB 01560/WR-ALC OI 91-25
50 5003 Air Flow Tunnels (Long tunnel under hangar estimated 175 ft long x 6 ft wide x 8 ft tall)
Air Flow Tunnel AMXG Corrosion Control 360 Days Remove all loose debris, paint stripper sludge and residue from floor of tunnels, remove residue from walls, ceiling, and floor of tunnels down to bare concrete, clean overhead pipe drain and clean drain sump rooms, clean crossover duct(s) between both tunnels, remove all debris and residue in filter rooms including cleaning of reusable filters, clean each exhaust fan and discharge ducts, remove grates from trench drains, remove filter screens from trench, wash thoroughly, and reinstall grates over trenches.
6 ft W x 8 ft H Approx 600 linear ft
Confined Space. Cadmium, chromium, lead and chemical depaint (wet).
Slip, trip and fall.
32 hours - Four (4) 8-hour days with 6 workers
42 USC 6901/40 CFR 260/40 CFR 263/29 CFR
1910.146/29 CFR 1910.1027/ 29 CFR 1910.1026/29
CFR 1910.1025/NFPA 30/AFI 32-7042/RAFB
ISWMP/RAFB HWMP/RAFB 01560/WR-ALC OI 91-25
54 5401 Paint Chip Trench Drain Trench Drain AMXG Corrosion Control 360 Days Remove grates from trench drains, remove paint stripper sludge, blast media, and all other residue, remove filter screens and/or drain baskets from trench, wash thoroughly, reinstall and replace grates over trenches.
162 ft L x 2 ft W 130 ft L x 2 ft W 186 ft L x 2 ft W
Cadmium, chromium, lead and chemical depaint (wet). Slip, trip and fall.
4 hours 42 USC 6901/40 CFR 260/40 CFR 263/29 CFR
1910.1027/29 CFR 1910.1026/29 CFR
1910.1025/NFPA 30/AFI 32-7042/RAFB ISWMP/RAFB
HWMP/RAFB 01560
54 5402 Lift Station Lift Station AMXG Corrosion Control 90 Days Remove debris from the water return area and place in appropriate containers. Remove debris and paint stripper sludge from main containment area so that it is not allowed to enter industrial waste drain. Replace and clean all pit covers.
16 ft x 20 ft x 20 ft Confined Space. Cadmium, chromium, lead and chemical depaint (wet).
Slip, trip and fall.
16 hours 42 USC 6901/40 CFR 260/40 CFR 263/29 CFR
1910.146/29 CFR 1910.1027/29 CFR 1910.1026/29
CFR 1910.1025/NFPA 30/AFI 32-7042/RAFB
ISWMP/RAFB HWMP/RAFB 01560/WR-ALC OI 91-25
59 Paint 5901 Floor Trenches and Drain Baskets
Trench Drain AMXG Corrosion Control 360 Days Remove grates from trench drains, remove screens, remove paint stripper sludge, and all other debris from trenches accumulated during paint/de-paint processes, remove drain baskets from trench, wash drain baskets and screens thoroughly, reinstal and replace grates over trenches.
200 ft x 2 ft (2 each) Cadmium, chromium, lead and chemical depaint. Slip, trip and fall.
4 hours 42 USC 6901/40 CFR 260/40 CFR 263/29 CFR
1910.1027/29 CFR 1910.1026/29 CFR
1910.1025/NFPA 30/AFI 32-7042/RAFB ISWMP/RAFB
HWMP/RAFB 01560
59P (Paint) 5904 Chem Strip Process in a facility designed for paint only
Paint Facility AMXG Corrosion Control On Request Remove paint stripper sludge, debris, sediment and residue from hangar floor so that it is not allowed to enter the industrial waste drains.
Cadmium, chromium, lead and chemical depaint (wet). Slip, trip, and fall
5 days (crew of 5) 42 USC 6901/40 CFR 260/40 CFR 263/29 CFR
1910.1027/ 29 CFR 1910.1026/NFPA 30/AFI 32-
7042/RAFB ISWMP/RAFB HWMP/RAFB 01560
59D (dry -depaint facility)
5905 Filter Walls Plastic media facility not designed for sanding process. We have to clean sanding media once a year to prevent potential exposure to known hazards.
AMXG Corrosion Control On Request 360 Days
Remove covers, vacuum out the bottom of all the filter banks, and replace covers. Prevent purging of dust that risks employee exposure to hazardous waste.
Cadmium, chromium, lead and chemical depaint (dry).
5 days (crew of 5) 42 USC 6901/42 USC 7401/40 CFR 260/40 CFR 263/29
CFR 1910.1027/ 29 CFR 1910.1026/29 CFR
1910.1025/NFPA 30/AFI 32-7042/RAFB ISWMP/RAFB
HWMP/RAFB 01560
59D (dry -depaint facility)
5906 Sanding Hangar Plastic media depaint facility not designed for sanding process.
We have to clean once a year to prevent potential exposure to known hazards.
AMXG Corrosion Control On Request 360 Days
Remove dust and debris from all the hangar walls and any attachments (wipe down walls up to 8 feet above the floor).
Remove all dust and debris from reachable surfaces of 2 metal staircases, filter access platform, and floor.
265'W x 181"L=47,965 sq.
ft + 112' x 104'=11,648 sq.
ft. = 59,613 sq. ft. total
Cadmium, chromium, lead and chemical depaint (dry).
6 days (crew of 7) 42 USC 6901/42 USC 7401/40 CFR 260/40 CFR 263/29
CFR 1910.1027/ 29 CFR 1910.1026/29 CFR
1910.1025/NFPA 30/AFI 32-7042/RAFB ISWMP/RAFB
HWMP/RAFB 01560
89 08902 Chemical Strip Process Paint Facility AMXG Corrosion Control On Request Remove paint stripper sludge, debris, sediment and residue from hangar floor so that it is not allowed to enter the industrial waste drains. Clean drain baskets and sump to prevent flooding of hangar during chemical depaint process.
Cadmium, chromium, lead and chemical depaint (wet). Slip. Trip and fall.
5 days (crew of 5) 42 USC 6901/40 CFR 260/40 CFR 263/29 CFR
1910.1027/ 29 CFR 1910.1026/NFPA 30/AFI 32-
7042/RAFB ISWMP/RAFB HWMP/RAFB 01560
125 12502-A Hydrotron Sanding Booth
Sanding Booth AMXG C-5 Sheet Metal 7 Days Remove all dust, particles, and residue from walls, and floor of booth.
12 ft x 12 ft x 10 ft Dust with cadmium, chromium and lead above OSHA limits.
2 hours 42 USC 6901/40 CFR 260/40 CFR 263/29 CFR
1910.1027/ 29 CFR 1910.1026/NFPA 30/AFI 32-
7042/RAFB ISWMP/RAFB HWMP/RAFB 01560
*Please Note:
On Request 365 - 1 time cleaning anytime within the calendar year when requested, but equipment has to be cleaned at least once a year.
On Request – Equipment such as Chemical Tanks that are not used very often (maybe 1 time in 3 years) are cleaned on request or maybe never if never used
Building # Task ID # Equipment # Equipment Name Category Group Shop Frequency Work Description Estimated Dimensions Known Hazards Est Time to Complete Standards/References 125 12502-B Hydrotron Sanding
Booth Sanding Booth AMXG C-5 Sheet Metal 60 Days Inspect the mist eliminators for buildup of solids. Remove solid buildup by soaking in soapy solution power wash to remove all traces of soap. Clean fitting where the tube from the differential switch connects to the body of the dust collector.
Clean float switch. Drain water from tank. Use supplied rake to pull sludge to the front of the unit and remove using wet-dry vacuum. Dispose of sludge properly (consult NFPA code).
Check seals on acrylic door/panel.
16 ft x 16 ft x 8 ft Dust with cadmium, chromium and lead above OSHA limits.
1 hour 42 USC 6901/40 CFR 260/40 CFR 263/29 CFR
1910.1027/ 29 CFR 1910.1026/NFPA 30/AFI 32-
7042/RAFB ISWMP/RAFB HWMP/RAFB 01560
137 13701 Trench Drain - Bay 2 Trench Drain AMXG Corrosion Control 30 Days Remove grates from trench drains, remove paint stripper sludge, blast media, and all other residue, remove filter screens and/or drain baskets from trench, wash thoroughly, and reinstall, wash grates and replace over trenches
52 ft x 2 ft 16 ft x 2 ft Paint waste and debris.
Chromated primer overspray.
5 hours 42 USC 6901/40 CFR 260/40 CFR 263/29 CFR
1910.124/ 29 CFR 1910.1027/ 29 CFR
1910.1026/NFPA 30/AFI 32-7042/RAFB ISWMP/RAFB
HWMP/RAFB 01560
137 13702 Trench Drain - Bay 1 Trench Drain AMXG Corrosion Control 30 Days Remove grates from trench drains, remove paint stripper sludge, blast media, and all other residue, remove filter screens and/or drain baskets from trench, wash thoroughly, and reinstall, wash grates and replace over trenches
52 ft x 2 ft 16 ft x 2 ft Paint waste and debris.
Chromated primer overspray.
4 hours 42 USC 6901/40 CFR 260/40 CFR 263/29 CFR
1910.124/ 29 CFR 1910.1027/ 29 CFR
1910.1026/NFPA 30/AFI 32-7042/RAFB ISWMP/RAFB
HWMP/RAFB 01560
137 13703 Light Panels - Bay 2 Paint Booth AMXG Corrosion Control 180 Days Remove all paint and residue from panels in booth through which light must pass, replace all covering over from panels in booth through which light must pass.
18 sidelights 2' x 4' 20 toplights 2' x 2'
Paint waste and debris.
Chromated primer overspray.
4 hours 42 USC 6901/40 CFR 260/40 CFR 263/29 CFR
1910.124/ 29 CFR 1910.1027/ 29 CFR
1910.1026/NFPA 30/AFI 32-7042/RAFB ISWMP/RAFB
HWMP/RAFB 01560
137 13704 Light Panels - Bay 3 Paint Booth AMXG Corrosion Control 180 Days Remove all paint and residue from panels in booth through which light must pass, replace all covering over from panels in booth through which light must pass.
16 sidelights globe 12 toplights 2' x 2'
Dust with cadmium, chromium and lead above OSHA limits.
4 hours 42 USC 6901/42 USC 7401/40 CFR 260/40 CFR 263/29
CFR 1910.124/ 29 CFR 1910.1027/ 29 CFR
1910.1026/29 CFR 1910.1025/NFPA 30/AFI 32-
7042/RAFB ISWMP/RAFB HWMP/RAFB 01560
137 13705 Light Panels - Bay 4 Paint Booth AMXG Corrosion Control 180 Days Remove all paint and residue from panels in booth through which light must pass, replace all covering over from panels in booth through which light must pass.
20 sidelights globe 16 toplights 2' x 2'
Paint waste and debris.
Chromated primer overspray.
4 hours 42 USC 6901/40 CFR 260/40 CFR 263/29 CFR
1910.124/ 29 CFR 1910.1027/ 29 CFR
1910.1026/NFPA 30/AFI 32-7042/RAFB ISWMP/RAFB
HWMP/RAFB 01560
137 13706 Light Panels - Bay 5 Paint Booth AMXG Corrosion Control 180 Days Remove all paint and residue from panels in booth through which light must pass, replace all covering over from panels in booth through which light must pass.
10 sidelights 2' x 4' 42 toplights 2' x 2'
Paint waste and debris.
Chromated primer overspray.
4 hours 42 USC 6901/40 CFR 260/40 CFR 263/29 CFR
1910.124/ 29 CFR 1910.1027/ 29 CFR
1910.1026/NFPA 30/AFI 32-7042/RAFB ISWMP/RAFB
HWMP/RAFB 01560
137 13707 Media Recovery - Bay 4 Recovery Trench AMXG Corrosion Control 360 Days Remove grates and filter screens from floor recovery system, remove blast media and all other residue from floor recovery system, replace grating
32 ft L x 60 ft W Dust with cadmium, chromium and lead above OSHA limits.
10 hours 4 personnel over 2 days
42 USC 6901/42 USC 7401/40 CFR 260/40 CFR 263/29
CFR 1910.124/ 29 CFR 1910.1027/ 29 CFR
1910.1026/29 CFR 1910.1025/NFPA 30/AFI 32-
7042/RAFB ISWMP/RAFB HWMP/RAFB 01560
364 36401-A Hydrotron Sanding Booth
Sanding Booth AMXG Consolidated Support Flight
7 Days Remove all dust, particles, and residue from walls, and floor of booth.
10 ft Wide x 8 ft Tall x 10 ft Deep
Dust with cadmium, chromium and lead above OSHA limits.
2 hours 42 USC 6901/42 USC 7401/40 CFR 260/40 CFR 263/29
CFR 1910.1027/ 29 CFR 1910.1026/29 CFR
1910.1025/NFPA 30/AFI 32-7042/RAFB ISWMP/RAFB
HWMP/RAFB 01560
364 36401-B Hydrotron Sanding Booth
Sanding Booth AMXG Consolidated Support Flight
60 Days Inspect the mist eliminators for buildup of solids. Remove solid buildup by soaking in soapy solution power wash to remove all traces of soap. Clean fitting where the tube from the differential switch connects to the body of the dust collector.
Clean float switch. Drain water from tank. Use supplied rake to pull sludge to the front of the unit and remove using wet-dry vacuum. Dispose of sludge properly (consult NFPA code).
Check seals on acrylic door/panel.
16 ft L x 16 ft W x 8 ft H
Dust with cadmium, chromium and lead above OSHA limits.
1 hour 42 USC 6901/42 USC 7401/40 CFR 260/40 CFR 263/29
CFR 1910.1027/ 29 CFR 1910.1026/29 CFR
1910.1025/NFPA 30/AFI 32-7042/RAFB ISWMP/RAFB
HWMP/RAFB 01560
2036 203601 Hangar Floor Paint Facility AMXG Corrosion Control On Request Remove paint stripper sludge, debris, sediment and residue from hangar floor so that it is not allowed to enter the industrial waste drains.
Cadmium, chromium, lead and chemical depaint (wet). Slip, trip and fall.
5 days (crew of 5) 42 USC 6901/40 CFR 260/40 CFR 263/29 CFR
1910.1027/ 29 CFR 1910.1026/NFPA 30/AFI 32-
7042/RAFB ISWMP/RAFB HWMP/RAFB 01560
140 14001 RP8721 Oil Tank Tank CMXG Prop Shop On Request Remove liquids from tank into appropriate receptacle. Remove all residue from walls and bottom of tank. Remove residue from parts table assembly including table frame, grates, and rails.
Rectangular tank holds 110 gallons of light weight oil & lift table
1.5 hours 42 USC 6901 (solid waste disposal), 40 CFR 260 (hazardous waste mgmt), 40 CFR 263 (hazardous waste transport), 29 CFR 1910.124, (OSHA/beryllium), 29 CFR 1910.1027 (OSHA/cadmium), 29 CFR 1910.1026 (OSHA/chromium), NFPA 30 (flammable/combustible liquids), AFI 32-7042 (AF waste mgmt), RAFB ISWMP (local solid waste mgmt), RAFB HWMP (local hazardous waste mgmt), RAFB 01560 (environmental)
140 14002 RP8723 Finger Print Remover Tank
Tank CMXG Prop Shop On Request Remove liquids from tank into appropriate receptacle. Remove all residue from walls and bottom of tank. Remove residue from parts table assembly including table frame, grates, and rails.
Rectangular tank holds 110 gallons of MIL-C-15074C corrosion preventive liquid & lift table
1.5 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.124, 29 CFR 1910.1027 , 29 CFR 1910.1026,
NFPA 30, AFI 32-7042, RAFB ISWMP, RAFB HWMP,
RAFB 01560
140 14003 WR000253 Water Wash Grinding Booth # 1
Dust Collector CMXG Prop Shop 7 Days Clean mist eliminators. Remove all dust, residue, and debris from unit. Drain tank.
20 Ft Wide x 6 ft Tall Aluminum dust 0.50 hour (30 minutes) 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
Building # Task ID # Equipment # Equipment Name Category Group Shop Frequency Work Description Estimated Dimensions Known Hazards Est Time to Complete Standards/References 140 14004 WR000254 Water Wash Grinding
Booth # 2 Dust Collector CMXG Prop Shop 7 Days Clean mist eliminators. Remove all dust, residue, and debris from unit. Drain tank.
20 Ft Wide x 6 ft Tall Aluminum dust 0.50 hour (30 minutes) 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
140 14005-A WR003106 Three Stage Paint Booth Paint Booth CMXG Prop Shop 7 Days Clean all lights and replace light diffuser covers. Remove all dust, residue, and debris from ceiling, walls, personnel doors, roll-up doors, and floor (including door thresholds). Inspect and re-cover fire sprinklers with new paper bags as required.
Remove all floor covering and tape from floor except under workbench and cabinet area. Replace floor covering and tape to cover all accessible floor space. Workbench and cabinets may remain in place during this cleaning.
20 ft Wide x 19 ft Tall Paint waste and debris.
Chromated primer overspray. Cadmium and Chromium.
2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.124, 29 CFR 1910.1027 , 29 CFR 1910.1026,
NFPA 30, AFI 32-7042, RAFB ISWMP, RAFB HWMP,
RAFB 01560
140 14005-B WR003106 Three Stage Paint Booth Paint Booth CMXG Prop Shop 90 Days Clean all lights and replace light diffuser covers. Remove all peel-coat from walls, ceiling and floor inside paint booth.
Apply white water-based polymer emulsion peel-coat on walls and ceiling. Replace all floor covering and tape. Re-cover all fire sprinklers with new paper bags. Remove and limit build-up of paint to ensure visibility for reading gauges. Replace stage- 1, stage-2, and stage-3 filters.
20 ft Wide x 19 ft Tall Paint waste and debris.
Chromated primer overspray. Cadmium and Chromium.
7 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.124, 29 CFR 1910.1027 , 29 CFR 1910.1026,
NFPA 30, AFI 32-7042, RAFB ISWMP, RAFB HWMP,
RAFB 01560
140 14005-C WR003106 Three Stage Paint Booth Paint Booth CMXG Prop Shop On Request Replace stage-1 filters. If requested while cleaning of that booth is underway, filters will be replaced at that time. If no cleaning is underway, filters will be replaced at the next cleaning time.
20 ft Wide x 19 ft Tall Paint waste and debris.
Chromated primer overspray. Cadmium and Chromium.
1 hour 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.124, 29 CFR 1910.1027 , 29 CFR 1910.1026,
NFPA 30, AFI 32-7042, RAFB ISWMP, RAFB HWMP,
RAFB 01560
140 14005-D WR003106 Three Stage Paint Booth Paint Booth CMXG Prop Shop On Request Replace stage-1 and stage-2 filters. If requested while cleaning of that booth is underway, filters will be replaced at that time. If no cleaning is underway, filters will be replaced at the next cleaning time.
20 ft Wide x 19 ft Tall Paint waste and debris.
Chromated primer overspray. Cadmium and Chromium.
2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.124, 29 CFR 1910.1027 , 29 CFR 1910.1026,
NFPA 30, AFI 32-7042, RAFB ISWMP, RAFB HWMP,
RAFB 01560
140 14005-E WR003106 Three Stage Paint Booth Paint Booth CMXG Prop Shop On Request Replace stage-1, stage-2, and stage-3 filters. Replace ceiling filters. If requested while cleaning of that booth is underway, filters will be replaced at that time. If no cleaning is underway, filters will be replaced at the next cleaning time.
20 ft Wide x 19 ft Tall Paint waste and debris.
Chromated primer overspray. Cadmium and Chromium.
4 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.124, 29 CFR 1910.1027 , 29 CFR 1910.1026,
NFPA 30, AFI 32-7042, RAFB ISWMP, RAFB HWMP,
RAFB 01560
140 14006-A WR003566 Robotic Blade Grinder Dust Collector
Dust Collector CMXG Prop Shop 2 Times Weekly Drain the system and clean water level control box and tank section in accordance with ProVent's Operation and Maintenance Manual. Wipe down exterior.
4'W x 5' Tall Aluminum dust 1 hour 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
140 14006-B WR003566 Robotic Blade Grinder Dust Collector
Dust Collector CMXG Prop Shop 30 Days Remove and clean target plate, clean scrub cone, clean mist eliminator, and clean exhaust fan blades in accordance with ProVent's Operation and Maintenance Manual.
4'W x 5' Tall Aluminum dust 3 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
140 14007-A RP10105 Manual Blade Edge Grinding Booth
Grinding Booth CMXG Prop Shop 2 Times weekly Drain the system and clean water level control box and tank section in accordance with ProVent's Operation and Maintenance Manual. Wipe down exterior.
7 ft wide Face Aluminum dust 1 hour 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
140 14007-B RP10105 Manual Blade Edge Grinding Booth
Grinding Booth CMXG Prop Shop 90 Days Clean target plates, clean scrub cones, clean mist eliminators, and clean exhaust fan blades in accordance with ProVent's Operation and Maintenance Manual.
14'L x 10'W x 8' H Aluminum dust 4 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
140 14008 Penetrant Tank Tank CMXG NDI Shop 180 Days Remove all liquids into appropriate receptacle and remove all residue from interior of tank including all installed features.
75 gallons 2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.124, 29 CFR 1910.1027 , 29 CFR 1910.1026,
NFPA 30, AFI 32-7042, RAFB ISWMP, RAFB HWMP,
RAFB 01560
140 14009 Emulsifier Tank Tank CMXG NDI Shop 180 Days Remove all liquids into appropriate receptacle and remove all residue from interior of tank including all installed features.
75 gallons 2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.124, 29 CFR 1910.1027 , 29 CFR 1910.1026,
NFPA 30, AFI 32-7042, RAFB ISWMP, RAFB HWMP,
RAFB 01560
140 14019 WR003566 Robotic Grinding Room and Equipment
Grinding Booth CMXG Prop Shop 60 Days Remove all metal dust, particles, and debris from all surfaces (equipment, cage, ceiling, walls, windows, floor, etc) within the room.
114" L x 30" W x 82" D Aluminum dust 4 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
140 14020-A WR002937 Sanding Booth Sanding Booth CMXG CNC Machine Shop 2 Times Weekly Remove all dust, particles, and residue from walls, and floor of booth. Empty and clean all trays.
1556" L x 55"W x 165"H Dust with cadmium, chromium and lead above OSHA limits.
1 hour 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.124, 29 CFR 1910.1027 , 29 CFR 1910.1026,
NFPA 30, AFI 32-7042, RAFB ISWMP, RAFB HWMP,
RAFB 01560
140 14020-B WR002937 Sanding Booth Sanding Booth CMXG CNC Machine Shop 30 Days Remove all dust, particles, and residue from ceiling (including all flat surface, conduit and light fixtures), and booth entrance facing.
30"L x 3"W x 43"H Dust with cadmium, chromium and lead above OSHA limits.
2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.124, 29 CFR 1910.1027 , 29 CFR 1910.1026,
NFPA 30, AFI 32-7042, RAFB ISWMP, RAFB HWMP,
RAFB 01560
140 14020-C WR002937 Sanding Booth Sanding Booth CMXG CNC Machine Shop 180 Days Remove all dust, particles, and residue from ceiling (including all flat surface, conduit and light fixtures), walls, and floor of booth. Empty and clean all trays. Remove all dust, particles, and residue from all exterior surfaces of the booth including walls, roof, filter housings, conduit, piping, catwalk, etc.
96"L x 30"W x 66"H Dust with cadmium, chromium and lead above OSHA limits.
4 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.124, 29 CFR 1910.1027 , 29 CFR 1910.1026,
NFPA 30, AFI 32-7042, RAFB ISWMP, RAFB HWMP,
RAFB 01560
Building # Task ID # Equipment # Equipment Name Category Group Shop Frequency Work Description Estimated Dimensions Known Hazards Est Time to Complete Standards/References 140 14022 WR006165 WaterJet Cutter Sheet Metal CMXG Sheat metal Shop 90 Days Remove all liquids, material, and excess garnet from tank into appropriate receptacle. Clean the interior and exterior of the overall machine and remove the dirty water, debris, and buildup from inside and around the WaterJet area, including the floor and accociated components.
6 hours 4 personnel
140 14023 WR006166 WaterUet Sheet Metal CM Sheet Metal Shop 90 Days Remove all liquids, material, and excess garnet from tank into appropriate receptacle. Clean the interior and exterior of the overall machine and remove the dirty water, debris, and buildup from inside and around the WaterJet area, including the floor and accociated components.
6 hours 4 personnel
142 14201-A Sealant Spray Booth Paint Booth CMXG Plating Shop On Request Remove floor covering and tape. Replace all paper and tape to cover all floor space. Remove and replace door filters.
101"L X 30"W x 48"H Paint waste and debris.
Chromated primer overspray.
5 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
142 14243 Alkaline Tank # 601 Tank CMXG Plating Shop On request Remove all liquids from tank into appropriate receptacle.
Clean interior of tank including all installed or removed features.
36"L x 30"W x 108"H Contains 1840 L (490 gallons) of Sodium Hydroxide
3 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
142 14244 Rinse Tank # 602 Tank CMXG Plating Shop On Request Remove all liquids from tank into appropriate receptacle.
Clean interior of tank including all installed or removed features.
40"L x 30"W x 108"H 3 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
142 14245 HN03 Tank # 603 Tank CMXG Plating Shop On Request Remove all liquids from tank into appropriate receptacle.
Clean interior of tank including all installed or removed features.
40"L x 30"W x 108"H Contains 1840 L (490 gallons) of Desmut (HNO3)
3 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
142 14246 Rinse Tank # 604 Tank CMXG Plating Shop On Request Remove all liquids from tank into appropriate receptacle.
Clean interior of tank including all installed or removed features.
40"L x 30"W x 108"H 3 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
142 14247 Chromate Acid Anodize Tank # 605
Tank CMXG Plating Shop On Request Remove all liquids from tank into appropriate receptacle.
Clean interior of tank including all installed or removed features.
96"L x 30"W x 108"H Contains 4920 L (1300 gallons) of Chromic Acid Anodize
3 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
142 14248 Chromate Acid Anodize Tank # 606
Tank CMXG Plating Shop Every 3 yrs On Request
Remove all liquids from tank into appropriate receptacle.
Clean interior of tank including all installed or removed features.
96"L x 30"W x 108"H Contains 4920 L (1300 gallons) of Chromic Acid Anodize
3 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
142 14249 Rinse Tank # 607 Tank CMXG Plating Shop On Request Remove all liquids from tank into appropriate receptacle.
Clean interior of tank including all installed or removed features.
40"L x 30"W x 108"H 3 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
142 14250 Rinse Tank # 608 Tank CMXG Plating Shop On Request Remove all liquids from tank into appropriate receptacle.
Clean interior of tank including all installed or removed features.
36"L x 30"W x 108"H 3 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
142 14295 WR000464
RP8979
RP8981
RP101099
Hand Blast Systems (4 each)
Blast Equipment CMXG Plating Shop 90 Days Remove dust, particles, and residue from all exterior surfaces of the main unit of all four systems.
various sizes of small equipment
Dust with cadmium, chromium and lead above OSHA limits.
2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
142 14296 WR000464
RP8979
RP8981
RP101099
Hand Blast Systems (4 each)
Blast Equipment CMXG Plating Shop 90 Days Remove dust, particles, and residue from all exterior surfaces of all components of all four systems.
various sizes of small equipment
Dust with cadmium, chromium and lead above OSHA limits.
2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
142 14297 142 South Dry Area Industrial Common Areas
CMXG 142S Dry Side 14 Days Remove dust, particles, and residue from common traffic walkways/floors throughout 142 dry-side areas (including floor areas around & behind blast booths) & replace tacky mats for 4EA walk-in blast booths
? 2 hours 4 personnel
142 14298 142 South Dry Area Industrial Blast Areas CMXG 142S Dry Side 30 Days Remove dust, particles, & residue from respirator cleaning rm, walk-in blast booth area floor, cabinets, tabletops, etc.
(including area behind blast booths)
? 2 hours 4 personnel
142 14299 WR000561
WR000562
WR000563
WR000564
142S Walk-In Blast Booths
Industrial Blast Areas CMXG 142S Blast 360 Days Remove dust, particles, & residue from exterior of walk-in blast booths, supporting reclaim equipment, and overhead ductwork
? 40 hours 6 personnel
Building # Task ID # Equipment # Equipment Name Category Group Shop Frequency Work Description Estimated Dimensions Known Hazards Est Time to Complete Standards/References
142 142100 WR000561
WR000562
WR000563
WR000564
142S Walk-In Blast Booths Dust Collector Area
Industrial Blast Areas CMXG 142S Exterior 360 Days Remove dust, particles, & residue from exterior dust collector equipment & surrounding floor area
? 40 hours 6 personnel
142/327 142101 WR003294
WR003970
WR00XXXX
WR00XXXX
HVOF Booths Surface Coating CMXG 142S Dry Side 90 Days Remove dust particles, and residue from HVOF booth interior (ceiling, floors, walls, fixtures).
? 20 hours 4 personnel
146 14601 Trench Drain Trench Drain CMXG F-15 Water Pick 7 Days Remove trench grates. Remove all sludge and debris from trench into proper container. Remove and clean all filter screens and baskets and reinstall. Rinse trench clean. Wash and reinstall grates.
2 Trenches - Each is XX Ft L x 12 In W x 18 In D
2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16901-B Airless Degreaser (tank 2)
Vapor Degreaser CMXG Composite Repair On Request 360 Days
Remove all liquids from main tank, two water separators, and associated plumbing into appropriate receptacle for turn-in.
Remove safety screens for access. Clean and passivate all interior features with Soda Ash alkali solution including cooling coils, all plumbing lines, brackets, safety screens, drain troughs, water separator interiors and lids, tank lid, walls, bottom, heating elements and manual parts sprayer. Assure alkali solution reaches all crevices and underside surfaces and plumbing lines. Lightly abrade all tank walls, drain troughs and flat surfaces using steel brush or abrasive Scotch-Brite or equivalent pads and alkali solution IAW tank manufacturer’s procedures. Once more, remove all liquids from main tank, two water separators, and associated plumbing into appropriate receptacle for turn-in. Thoroughly rinse with water to remove alkali solution from all interior features.
Dispose of water in industrial waste system.
3 Ft W x 12 Ft L x 11 Ft D Contains 220 gallons of 3M HFE7100 Vapor Degreaser
16 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16902 Alkaline Tank (tank 3) Tank CMXG Composite Repair On Request Remove all liquids into appropriate receptacle and clean interior of tank including all installed features.
16'L x 3'W x 7'H Contains 1850 gallons of Alkaline Cleaner
4 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16905 LNC Tank (tank 5) Tank CMXG Composite Repair On Request Remove all liquids into appropriate receptacle and clean interior of tank including all installed features.
16'L x 3'W x 7'H 1850 gallons tank with heating elements & cooling coils contains Oakie Deoxidizer
4 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16906 Phosphoric Tank (tank 8)
Tank CMXG Composite Repair On Request Remove all liquids into appropriate receptacle and clean interior of tank including all installed features.
16'L x 3'W x 7'H 1850 gallons tank with heating elements & cooling coils contains Phosphoric Acid
4 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16907 Spray Rinse Tank (tank 9)
Tank CMXG Composite Repair On Request 360 Days
Remove all liquids into appropriate receptacle and clean interior of tank including all installed features.
16'L x 3'W x 7'H 4 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16909-A WR003749 Dry Filter Paint Booth and Room
Paint Booth CMXG Composite Repair 7 Days Clean all paint from light diffusers. Replace light diffuser covers. Remove all dust, residue, and debris from ceiling, walls, doors, and floor (including door thresholds). Inspect and re-cover fire sprinklers with new paper bags as required.
Remove all floor covering and tape from floor. Replace floor covering and tape to cover all floor space.
20'L x 15'W x 8'H Paint waste and debris.
Chromated primer overspray. Cadmium and Chromium.
2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16909-B WR003749 Dry Filter Paint Booth and Room
Paint Booth CMXG Composite Repair 90 Days Remove all peel-coat from walls, ceiling and floor inside paint booth. Apply white water-based polymer emulsion peel-coat on walls and ceiling. Replace all floor covering and tape. Re-cover all fire sprinklers with new paper bags. Clean all lights and replace light diffuser covers. Remove and limit build-up of paint to ensure visibility for reading gauges. Replace filter stages 1, 2, and 3.
20'L x 15'W x 8'H Paint waste and debris.
Chromated primer overspray. Cadmium and Chromium.
12 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16909-C WR003749 Dry Filter Paint Booth and Room
Paint Booth CMXG Composite Repair On Request Replace Stage 1 filters. If requested while cleaning of that booth is underway, filters will be replaced at that time. If no cleaning is underway, filters will be replaced at the next cleaning time.
20'L x 15'W x 8'H Paint waste and debris.
Chromated primer overspray. Cadmium and Chromium.
1 hour 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16909-D WR003749 Dry Filter Paint Booth and Room
Paint Booth CMXG Composite Repair On Request Replace Stages 1 and 2 filters. If requested while cleaning of that booth is underway, filters will be replaced at that time. If no cleaning is underway, filters will be replaced at the next cleaning time.
20'L x 15'W x 8'H Paint waste and debris.
Chromated primer overspray. Cadmium and Chromium.
2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16909-E WR003749 Dry Filter Paint Booth and Room
Paint Booth CMXG Composite Repair On Request Replace Stages 1, 2, and 3 filters. Replace intake filters. If requested while cleaning of that booth is underway, filters will be replaced at that time. If no cleaning is underway, filters will be replaced at the next cleaning time.
20'L x 15'W x 8'H Paint waste and debris.
Chromated primer overspray. Cadmium and Chromium
3 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
Building # Task ID # Equipment # Equipment Name Category Group Shop Frequency Work Description Estimated Dimensions Known Hazards Est Time to Complete Standards/References 169 16910-A WR002635 Grit Blast Booth Doors Grit Blast Booth CMXG Composite Repair 2 Times Weekly Clean all dust, particles, and residue from outside and edges of all doors.
4'W x 8'H Paint waste and debris.
Chromated primer overspray. Cadmium and Chromium.
2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16910-B WR002635 Grit Blast Booth Grit Blast Booth CMXG Composite Repair 90 Days Remove all removable grates and screens from floor recovery system inside booth and behind booth. Remove all visible blast media and residue from floor recovery system. Replace grates. Clean all dust, particles, debris, and residue from the entire floor & recovery system equipment behind booth, especially around the hopper.
34'L x 15'W x 12'H Paint waste and debris.
Chromated primer overspray. Cadmium and Chromium.
6 hours 4 personnel 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16912-A WR003743 Sanding Booth East Sanding Booth CMXG Composite Repair Daily Remove all dust, particles, and residue from walls, and floor of booth. Empty and clean all trays.
33'L x 15'W x 11'H Dust with cadmium, chromium and lead above OSHA limits.
1 hour 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16912-B WR003743 Sanding Booth East Sanding Booth CMXG Composite Repair 7 Days Remove all dust, particles, and residue from ceiling (including all flat surface, conduit and light fixtures), and booth entrance facing.
33'L x 15'W x 11'H Dust with cadmium, chromium and lead above OSHA limits.
2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16912-C WR003743 Sanding Booth East Sanding Booth CMXG Composite Repair 90 Days Remove all dust, particles, and residue from ceiling (including all flat surface, conduit and light fixtures), walls, and floor of booth. Empty and clean all trays. Remove all dust, particles, and residue from all exterior surfaces of the booth including walls, roof, filter housings, conduit, piping, catwalk, etc.
33'L x 15'W x 11'H Dust with cadmium, chromium and lead above OSHA limits.
42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16912-D WR Central Vacuum System Vacuum Cleaner CMXG Composite Repair 7 Days Remove, empty, and reinstall canisters. Clean all dust, particles and residue from vacuum systems' areas.
4'W x 8'H Dust with cadmium, chromium and lead above OSHA limits.
.25 hour 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16913-A WR002935 Sanding Booth South #1 Sanding Booth CMXG Composite Repair Daily Remove all dust, particles, and residue from walls, and floor of booth. Empty and clean all trays.
34'L x 19'W x 8'H Dust with cadmium, chromium and lead above OSHA limits.
1 hour 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16913-B WR002935 Sanding Booth South #1 Sanding Booth CMXG Composite Repair 7 Days Remove all dust, particles, and residue from ceiling (including all flat surface, conduit and light fixtures), and booth entrance facing.
34'L x 19'W x 8'H Dust with cadmium, chromium and lead above OSHA limits.
2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16913-C WR002935 Sanding Booth South #1 Sanding Booth CMXG Composite Repair 90 days Remove all dust, particles, and residue from ceiling (including all flat surface, conduit and light fixtures), walls, and floor of booth. Empty and clean all trays. Remove all dust, particles, and residue from all exterior surfaces of the booth including walls, roof, filter housings, conduit, piping, catwalk, etc.
34'L x 19'W x 8'H Dust with cadmium, chromium and lead above OSHA limits.
1.75 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16913-D WR00369 Central Vacuum System Vacuum Cleaner CMXG Composite Repair 7 Days Remove, empty, and reinstall canisters. Clean all dust, particles and residue from vacuum systems' areas.
4'W x 8'H Dust with cadmium, chromium and lead above OSHA limits.
.25 hour 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16914-A WR002936 Sanding Booth South #2 Sanding Booth CMXG Composite Repair Daily Remove all dust, particles, and residue from walls, and floor of booth. Empty and clean all trays.
34'L x 19'W x 8'H Dust with cadmium, chromium and lead above OSHA limits.
1 hour 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16914-B WR002936 Sanding Booth South #2 Sanding Booth CMXG Composite Repair 7 Days Remove all dust, particles, and residue from ceiling (including all flat surface, conduit and light fixtures), and booth entrance facing.
34'L x 19'W x 8'H Dust with cadmium, chromium and lead above OSHA limits.
2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16914-C WR002936 Sanding Booth South #2 Sanding Booth CMXG Composite Repair 90 Days Remove all dust, particles, and residue from ceiling (including all flat surface, conduit and light fixtures), walls, and floor of booth. Empty and clean all trays. Remove all dust, particles, and residue from all exterior surfaces of the booth including walls, roof, filter housings, conduit, piping, catwalk, etc.
34'L x 19'W x 8'H Dust with cadmium, chromium and lead above OSHA limits.
1.75 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16914-D WR003670 Central Vacuum System Vacuum Cleaner CMXG Composite Repair 7 Days Remove, empty, and reinstall canisters. Clean all dust, particles and residue from vacuum systems' areas.
4'W x 8'H Dust with cadmium, chromium and lead above OSHA limits.
.25 hour 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16915-A WR003026 Sanding Booth West Sanding Booth CMXG Composite Repair Daily Remove all dust, particles, and residue from walls, and floor of booth. Empty and clean all trays.
34'L x 19'W x 8'H Dust with cadmium, chromium and lead above OSHA limits.
1 hour 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16915-B WR003026 Sanding Booth West Sanding Booth CMXG Composite Repair 7 Days Remove all dust, particles, and residue from ceiling (including all flat surface, conduit and light fixtures), and booth entrance facing.
34'L x 19'W x 8'H Dust with cadmium, chromium and lead above OSHA limits.
2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16915-C WR003026 Sanding Booth West Sanding Booth CMXG Composite Repair 90 Days Remove all dust, particles, and residue from ceiling (including all flat surface, conduit and light fixtures), walls, and floor of booth. Empty and clean all trays. Remove all dust, particles, and residue from all exterior surfaces of the booth including walls, roof, filter housings, conduit, piping, catwalk, etc.
34'L x 19'W x 8'H Dust with cadmium, chromium and lead above OSHA limits.
1.75 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
169 16915-D WR003668 Central Vacuum System Vacuum System CMXG Composite Repair 7 Days Remove, empty, and reinstall canisters. Clean all dust, particles and residue from vacuum systems' areas.
4'W x 8'H Dust with cadmium, chromium and lead above OSHA limits.
.25 hour 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
180 18005 Trench Drain Trench Drain CMXG Paint Shop 2 Times Weekly Remove grates,remove all paint stripper sludge and blast media into proper container, remove and clean filter screen or trench basket and reinstall,rinse trench clean,wash and reinstall grates.
2 each trenches approx 60 ft long
Paint sludge from chemical depainting process
2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
1.75 hours
Building # Task ID # Equipment # Equipment Name Category Group Shop Frequency Work Description Estimated Dimensions Known Hazards Est Time to Complete Standards/References
180 18006 Trench Drain Trench Drain CMXG Paint Shop 2 Times Weekly Remove grates,remove all paint stripper sludge and blast media into proper container, remove and clean filter screen or trench basket and reinstall,rinse trench clean,wash and reinstall grates.
2 each trenches approx 60 ft long
Paint sludge from chemical depainting process
2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
180 18007 Trench Drain Trench Drain CMXG Paint Shop 2 Times Weekly Remove grates,remove all paint stripper sludge and blast media into proper container, remove and clean filter screen or trench basket and reinstall,rinse trench clean,wash and reinstall grates.
50 ft long L-shaped trench Paint sludge from chemical depainting process
2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
180 18008 Trench Drain Trench Drain CMXG Paint Shop 2 Times Weekly Remove grates,remove all paint stripper sludge and blast media into proper container, remove and clean filter screen or trench basket and reinstall,rinse trench clean,wash and reinstall grates.
125 ft long rectangular-shaped trench
Paint sludge from chemical depainting process
2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
180 18009 Trench Drain Trench Drain CMXG Paint Shop 7 Days Remove grates,remove all paint stripper sludge and blast media into proper container, remove and clean filter screen or trench basket and reinstall,rinse trench clean,wash and reinstall grates.
Approx 64 ft long L-shaped trench, connected w/IWC 18007
Paint sludge from chemical depainting process
2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
180 18010 Paint Stripping Tank (Estimated 18 ft long x 3 ft wide x 4 ft deep)
Tank CMXG Paint Shop On Request Remove all liquids into appropriate receptacle and remove all residue from interior of tank including all installed features.
21'L x 5'W x 4'H Methylene Chloride, paint sludge
3 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
180 18011 Paint Stripping Tank (Small)
Tank CMXG Paint Shop On Request Remove all liquids into appropriate receptacle and remove all residue from interior of tank including all installed features.
Paint sludge from chemical depainting process
2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
180 18012-A Sanding Booth Sanding Booth CMXG Depaint Shop Daily Remove all dust, particles, and residue from walls, and floor of booth. Empty and clean all trays.
Dust with cadmium, chromium and lead above OSHA limits.
1 hour 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
180 18012-B Sanding Booth Sanding Booth CMXG Depaint Shop 7 Days Remove all dust, particles, and residue from ceiling, walls, 8 ft.
high and lower.
Dust with cadmium, chromium and lead above OSHA limits.
2 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
180 18012-C Sanding Booth Sanding Booth CMXG Depaint Shop 90 Days Remove all dust, particles, and residue from ceiling (including all flat surface, conduit and light fixtures), walls, floor of booth, and booth entance facing. Empty and clean all trays. Remove all dust, particles, and residue from all exterior surfaces of the booth including walls, roof, filter housings, conduit, piping, catwalk, etc.
Dust with cadmium, chromium and lead above OSHA limits.
1.75 hours 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
180 18013-A1 WR005131 Dry Filter Paint Booth Paint Booth CMXG Paint Shop 7 Days Clean all paint from light diffusers. Replace light diffuser covers. Remove all dust, residue, and debris from walls and floor. Inspect and re-cover fire sprinklers with new paper bags as required. Remove all floor covering and tape from floor.
Replace floor covering and tape to cover all floor space.
20 Ft W x 50 Ft D x 16 Ft H = 1,000 Sq Ft
Paint waste and debris.
Chromated primer overspray. Cadmium and Chromium.
2 hours per asset 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
180 18013-A2 WR005107 Dry Filter Paint Booth Paint Booth CMXG Paint Shop 7 Days Clean all paint from light diffusers. Replace light diffuser covers. Remove all dust, residue, and debris from walls and floor. Inspect and re-cover fire sprinklers with new paper bags as required. Remove all floor covering and tape from floor.
Replace floor covering and tape to cover all floor space.
20 Ft W x 50 Ft D x 16 Ft H = 1,000 Sq Ft
Paint waste and debris.
Chromated primer overspray. Cadmium and Chromium.
2 hours per asset 42 USC 6901, 40 CFR 260, 40 CFR 263, 29 CFR
1910.1027 , 29 CFR 1910.1026, NFPA 30, AFI 32-7042,
RAFB ISWMP, RAFB HWMP, RAFB 01560
180 18013-A3 WR005130 Dry Filter Paint Booth Paint Booth CMXG Paint Shop 7 Days Clean all paint from light diffusers. Replace light diffuser covers. Remove all dust, residue, and debris from walls and floor. Inspect and re-cover fire sprinklers with new paper bags as required. Remove all floor covering and tape from floor.
Replace floor covering and tape to cover all floor space.
20 Ft…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .