About this file

This statement of work outlines requirements for replacing broken utility light poles and LED lights at the Vehicle Assembly Building West Parking Lot at Kennedy Space Center. The scope of work involves installing two new 40-foot and one new 30-foot coated aluminum light poles with LED lighting fixtures equivalent to 700-750 watts. The contractor must validate existing power panels and circuits with the local facility manager, submit material lists and safety plans for approval, and comply with base contract standards for low voltage electrical work. The period of performance is 90 calendar days from award. Inspections will be conducted by the government.

This statement of work is in reference to solicitation number 80KSC024R0005 for Kennedy Space Center Electrical BPA Construction Services, a blanket purchase agreement for on-call construction services issued by the National Aeronautics and Space Administration.

View the file

Other files for this federal contract opportunity

Other files attached to KSC Electrical BPA Construction Services, newest first.
File Type Posted
80KSC024R0005 Amnd 06.pdf PDF
Apd 6 - SOW PCN 99777 - v4.pdf PDF
Apdx 6 - SOW PCN 99777 - v3.pdf PDF
80KSC024R0005 Amnd 05.pdf PDF
80KSC024R0005 Amend 004.pdf PDF
80KSC024R0005 Amnd 03.pdf PDF
Apdx 5 - SOW PCN 99776 - v2 Redlined.pdf PDF
Apdx 6 - PCN 99777 - v2 Clean.pdf PDF
Amnd 02 80KSC024R0005.pdf PDF
Apdx 5 - SOW PCN 99776 - v2 Clean.pdf PDF
Apdx 6 - SOW PCN 99777 - v2 Redlined.pdf PDF
Amnd 01 80KSC024R0005.pdf PDF
Attch J-6 Control Log.pdf PDF
Attch J-7 KSC and CCAFS Map.pdf PDF
Apdx 9 - Site Visit Locations.pdf PDF
Attch J-1 Project Deliverables.pdf PDF
Attch J-2 KSC Project Specific Requirements.pdf PDF
Attch J-4 SSSP Template.docx DOCX document
Attch J-8 ASB Badge Request Form.docx DOCX document
Apdx 6 - SOW PCN 99777.pdf PDF
Apdx 1 - Site Visit Badge Request Form.docx DOCX document
Apdx 2 - Acceptable Identity Guide.docx DOCX document
Apdx 4 - Pre-Proposal Inquiry Form PCN 99777.xlsx XLSX spreadsheet
Apdx 7 - Technical Experience Summary.pdf PDF
Apdx 8 - Past Performance Questionnaire.pdf PDF
Solicitation 80KSC024R0005 eBPA.pdf PDF
Attch J-5 Lockout -Tagout.pdf PDF
Attch J-3 Wage Determination10-20- 2023.pdf PDF
Apdx 3 - Pre-Proposal Inquiry Form PCN 99776.xlsx XLSX spreadsheet
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

PCN99776: Replace Broken Lights and Poles VAB West Parking Lot (K6-0848)

Reference: EWR163381

11/17/2023

SCOPE

Summary: This project will replace broken utility light poles and LED lights at VAB West Parking Lot (K6- 0848). The poles were previously broken from 2022 Hurricane Ian.

VAB West Parking Lot (K6-0848):

• Install (2) new coated aluminum light poles 40’ in length, typical round pedestal mounted.

• Install (1) new coated aluminum light poles 30’ in length, typical round pedestal mounted.

• All poles shall be mounted to approx. 20”H x 16”W square standoff to allow for bolting down pole to concrete pedestal and terminating wires. Materials shall be made for sea-coast environment. New poles shall be mounted to existing concrete light pedestal.

• Install new LED light fixture, which includes conduit and conductors mounted to pole.

• Enviorlux L70 - 293W;277V Amber LED Light will be provided by the Government (GFE) for only light poles LGHT01752 & LGHT01753.

• Contractor shall replace lighting fixture and lamps with LED on the 40’ pole, LGHT01751. Existing lights are dual fixture swivel 20”W x 20”W 1000W HPS. New fixture shall be 700-750W equivalent Amber LED (sea-turtle safe spectrum).

o Hardware submittal required for review.

• Power panel feeding lights to be validated by VAB FM, local outage.

• Existing pedestals shall be re-conditioned on surface, which includes leveling surface and new mounting hardware.

• There is existing power fed through the concrete pedestal. Power terminations shall be made at this junction.

• Pole is to be re-labeled, per SME label data or government provided property/ID tag.

Important: Clarifying site walk comments noted below include technical suggestions (per SME and COR).

Please follow these notations closely. Contractor has discretion on means-and-methods to achieve functional system that is code compliant.

Site-Walk Clarification Notes:

• eBPA Contractor Attendees: TBD

• Date of Site Walk: TBD

ENGINEERING

• No special engineering required for this project. This is like-for-like replacement.

• This work maintains existing power sources (no upgrades needed) and repairs existing configurations.

• Field verify with local Facility Manager and COR the applicable power panels and circuits prior to commencement of field work and LOTO.

IMPLEMENTATION

• Work to be performed during standard hours of Operations, M-F 1st Shift.

• Daily coordination required with Facility Manager.

SUBMITTALS

Preconstruction:

• Standard Lockout-Tagout scheduling/coordination.

• Contractor will submit adequate material list for PM/SME approval prior to project start.

• Provide Site Specific Safety & Health Plan for review and approval prior to commencement of services.

Closeout:

• As-built/redline drawings as required.

• Final punch list with all required signatures.

STANDARDS

• Work shall comply with standards provided in “Requirements for Low Voltage Electrical Work at KSC” located in base contract.

BADGING

• TAA is required to access VAB.

o VAB Perimeter access is required to access the light poles. All work outside of facility, but within perimeter fence.

INSPECTION

• Inspections shall be provided by the Government, in accordance with the Special Conditions of this contract. The Site Inspector may at any time review current work conditions and must approve of progress, milestones, daily logs, etc. The Contractor is to participate in the final acceptance walk down and complete any punch list items as required, to ensure a fully operational system.

PROJECT CLOSEOUT

• To be conducted per the Project closeout section of the base contract

PROPOSAL/BID DEVELOPMENT

• To be submitted per the Bid Submission Guidelines found in section of the base contract.

PERIOD OF PERFORMANCE: 90 calendar days from award date (includes time for lead-time hardware).

Attachment 01: Pictures, Drawings, and Sketches

VAB Exterior Lighting NW Side, Near High Bay 2&4 Roll Up Doors:

Light Pole 1753 – North of HB-4 Door

Light Pole 1752 & Light Pole 1751 – Between HB-2 & HB-4 doors.

Note: Long pole is eastern pedestal LGHT01751, short pole is western pedestal LGHT01752.