Annex K Heating and Cooling Services - 18 May 22.pdf

PDF 128 KB Posted

Attached to
Base Operations Support Services, Ft. Wainwright, AK Federal contract opportunity
Solicitation number
W912CN22R0013
Issued by
Department of the Army Materiel Command Army Contracting Command

About this file

This performance work statement and related solicitation provide details on base operations support services requirements at Fort Wainwright, Alaska. The performance work statement outlines the scope of heating and cooling services to be provided, including operating mechanical rooms and systems for steam, hot water, and chilled water production. It also covers inspection and maintenance requirements for boilers, furnaces, and air handling units. The related solicitation is a 100% small business set-aside seeking proposals for an IDIQ contract to provide base operations support services at Fort Wainwright and its area of responsibility, which includes facilities maintenance, fire protection, solid waste management, grounds maintenance, and other services. The solicitation notes a closing date for proposals and states the requirement is assigned NAICS code 561210 with a small business size standard of $41.5 million. The Department of the Army is listed as the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations Support Services, Ft. Wainwright, AK, newest first.
File Type Posted
W912CN-22-R-0013-0002.pdf PDF
Attachment 03 - Personnel Qualifications.pdf PDF
Attachment 04 - Exhibit Line Item Number Sheet 7-26-2022.xlsx XLSX spreadsheet
Attachment 05 - Question Submission Form Responses - 7-26-22.XLSX XLSX spreadsheet
TE 53 - PMO - WORKLOAD_DATA 07252022 - Final.pdf PDF
TE 94 Lightning Protection.pdf PDF
Attachment 02 - Subcontractor Teaming Partner Consent Letter.docx DOCX document
Attachment 04 - Exhibit Line Item Number Sheet.xlsx XLSX spreadsheet
Annex B- Facilities Maintenance Instruction -13 May 2022 - F.pdf PDF
Annex D - RESERVED.pdf PDF
Annex M Pest Management - 13 May 22.pdf PDF
TE 01 - Lists of Facilities and Roads.pdf PDF
TE 17 - Fire Roll Up Doors.pdf PDF
TE 28 - HVAC.pdf PDF
TE 31 - Overhead Doors.pdf PDF
TE 32 - Contractor Space.pdf PDF
TE 49 - Crosswalks.pdf PDF
TE 50 - Ammunition Bunkers.pdf PDF
TE 55 - Tip Sheets.pdf PDF
TE 58 - Fort Wainwright List of Possible DMOs 26 April 2022.pdf PDF
TE 74 - Cranes and Hoists.pdf PDF
TE 78 - Generator PM Schedule.pdf PDF
TE 79 - Snow Event Gravel Route - 11 APR 22.pdf PDF
TE 14 - Dumpster Tips Workload.pdf PDF
W912CN-22-R-0013.pdf PDF
Attachment 06 - Wage Determination 2015-5683.pdf PDF
Attachment 08 - DBA Wage Determination 15 April 2022.pdf PDF
Annex C - RESERVED.pdf PDF
Annex F Maintenance-Grounds - 26 Apr 22.pdf PDF
Annex H Facility Maintenance - 18 May 22.pdf PDF
Annex J Maintenance - Surfaced and Unsurfaced Areas -13 May 22.pdf PDF
TE 02 - Area Maps - 31 Mar 22.pdf PDF
TE 03 - FWA Real Property Facilities.pdf PDF
TE 05 - Monthly Materials List - 30 Mar 22.pdf PDF
TE 08 - Interior and Exterior Lighting Systems and Controls.pdf PDF
TE 13 - Scheduled Pest Control Services - 15 Mar 22.pdf PDF
TE 15 - TM 5-624 Maintenance and Repair of Surface Areas.pdf PDF
TE 16 - Eyewash Stations.pdf PDF
TE 19 - Cooling Systems.pdf PDF
TE 20 - Boilers and Furnances.pdf PDF
TE 22 - Playgrounds - 13 APR 22.pdf PDF
TE 25 - Emergency Exit Lights.pdf PDF
TE 30 - Gates.pdf PDF
TE 34 - Generators - 13 Apr 22.pdf PDF
TE 35 - Fuel Powered Pumps.pdf PDF
TE 37 - Traffic Lights.pdf PDF
TE 38 - UPS.docx.pdf PDF
TE 41 - Geographical History.pdf PDF
TE 43 - Spill Prevention Control and Countermeasure Plan.pdf PDF
TE 48 - Preventative Maintenance Inventory of Installed Equipment.pdf PDF
Show all 50

Base Operations Support Services, Ft. Wainwright, AK has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Annex K (CLS 501 Heating/Cooling Services) FRAGO 1 to OPORD 18-011: IMCOM Enterprise Base Operations (BASOPS) Performance Work Statement (PWS) Templates (U)

Annex K

Heating/Services

18 May 2022

Table of Contents

1.0 GENERAL INFORMATION

1.1 Overview

1.2 Air Pollution Regulations

2.0 DESCRIPTION OF SERVICES

2.1 Scope

2.2 Heating and Boiler Plant Staffing

2.3 Operation of Mechanical rooms

2.3.1 Unattended Mechanical rooms

2.4 Central Boiler Plants

2.5 Summer Overhaul

2.6 Idle Standby Boilers

2.7 Monthly Inspections

2.8 Boiler/Heat Plant Shutdowns

2.9 Boiler Water Treatment Chemicals

2.10 Boiler Water Test Samples

2.11 Prepare Boilers and Coordinate Boiler Inspections

2.12 Boiler Plant Calibration

2.13 Emergencies

2.14 Operational Considerations

3.0 PURCHASE OF FUELS

3.1 Fuel Oil

3.2 Natural Gas Distribution System

3.3 Other Fuels

4.0 Air Handling Units and Ventilation Systems

4.1 Scope

4.2 Repair of Air Conditioning Systems

1.0 General Information.

1.1 Overview. Heating and Cooling Services provide steam, hot water, chilled water for heating, cooling, domestic hot water, and facility processes using Government-owned central heating and cooling plants, and distribution systems. The Fort Wainwright Heating Plant is operated through a privatized company and the contractor will have no responsibility for the heating plant.

1.2 Air Pollution Regulations. The Contractor shall operate all mechanical rooms in compliance with all Federal, State, and local air pollution regulations. The Contractor shall address all non-compliance issues immediately to the Contracting Officer’s Representative (COR) or Alternate Contracting Officer’s Representative (ACOR).

2.0 Description of Services.

2.1 Scope. The Contractor shall operate all mechanical rooms and systems (steam meters, automatic tank monitoring system, boilers, and furnaces) used in the production of domestic heat (including the provision of unscheduled services) as directed by the

COR/ACOR.

2.2 Heating and Boiler Plant Staffing. N/A

2.3 Operation of Mechanical rooms. The Contractor shall operate the steam/hot water mechanical rooms listed in TE 57. Operation of these plants includes start-up and shutdown of heating equipment; operator maintenance and inspection (maintenance required to operate mechanical rooms on a daily basis; e.g., during operational visits ensure the plant is operating properly). Operation also includes keeping required logs, correction of improper operating conditions, and making minor adjustments to the plant and equipment and keeping mechanical rooms clean.

2.3.1 Unattended Mechanical rooms. The Contractor shall operate all unattended mechanical rooms listed in TE 57. Operation of these plants shall include seasonal start-up and shut down of heating equipment.

2.4 Central Boiler Plants. N / A

2.5 Summer Overhaul. N / A

2.6 Idle Standby Boilers. N/A

2.7 Inspections. See TE 54.

2.8 Boiler/Furnaces/Water heaters. Boiler/Furnaces/Water heaters provide hot water and heat to the facilities. The contractor shall provide PM to this equipment IAW TE 54.

Corrective maintenance beyond minor corrective repairs conducted during PM will be conducted by DMOs.

2.9 Boiler Water Treatment Chemicals. N / A

2.10 Boiler Water Test Samples. N / A

2.11 Prepare Boilers and Coordinate Boiler Inspections. N/A

2.12 Boiler Plant Calibration. N/A

2.13 Emergencies. The Contractor shall inform the COR/ACOR within thirty (30) minutes of shutting down any boiler or furnace for repairs. The Contractor shall provide 72 hour advance notice of planned repairs that require the shutdown of any boiler or furnace. If permanent repairs cannot be completed within 24 hours, the Contractor shall analyze the occupancy, use of facility and provide temporary hot water, when needed and directed by the COR. Contractor shall provide the COR with daily updates on the status of water heater, furnace, or boiler failures until temporary hot water has been provided or the system is fully operational again.

2.14 Operational Considerations. N/A

3.0 Purchase of Fuels.

3.1 Fuel Oil. N/A

3.2 Natural Gas Distribution System. N/A

3.3 Other Fuels. N/A

4.0 Air Handling Units and Ventilation Systems. See Annex H Facility Maintenance, paragraph 2.3 and subparagraphs.

4.1 Scope.

4.2 Repair of Air Conditioning Systems. See Annex H Facility Maintenance, paragraph

2.3 and subparagraphs.

2.3.1 Unattended Mechanical rooms 1

File details come from the government source that posted it. Updated .