Rough Carpentry - Scott Tower Maintenance ITEM 2

View the file

Other files

File Type Posted
SF 30 AMEND 3.PDF PDF
Amend 3 Questions and Answers.pdf PDF
Seed and Mulch natick cg.doc DOC document
DefBidItemsScott Tower Maint.doc DOC document
Camping Spurs and Pads Bessey Complex RSI.doc DOC document
SummaryOfWorkBessey complex rsi.doc DOC document
CompositeRd Natick CG.doc DOC document
SteelScott Tower Maint.doc DOC document
Aggregate Natick CG.doc DOC document
Scope of Work Pool.doc DOC document
BidItems Pool.doc DOC document
Submittals Pool.doc DOC document
SF 30 AMEND 2.PDF PDF
submittalsScott Tower Maint.doc DOC document
Asphalt ShinglesScott Tower Maint.doc DOC document
bid items natick.doc DOC document
DefBidItemsBessey complex rsi.doc DOC document
ScopeOfWorkScott Tower Maint.doc DOC document
scopeOfWorkNatick campground.doc DOC document
EarthworkBessey Complex RSI.doc DOC document
DrawingsBessey Complex RSI.pdf PDF
PaintingScott Tower Maint.doc DOC document
Selective DemolitionScott Tower Maint.doc DOC document
defofbiditems natic cg.doc DOC document
HandrailsScott Tower Maint.doc DOC document
Submittals Natick CG.doc DOC document
AWellAbandonment Pool.doc DOC document
Drawings Scott Tower Maint.pdf PDF
Earthwork Pool.doc DOC document
GFMBessey Complex RSI.doc DOC document
PoolDrawings.pdf PDF
SubmittalsBessey complex rsi.doc DOC document
SF 30 AMEND 1.PDF PDF
PoolDrawings.pdf PDF
02822_02Sod.doc DOC document
01732Selective Demolition.doc DOC document
experience questionnaire.pdf PDF
01330_02Submittals.doc DOC document
submittal procedures.doc DOC document
02525_02AWellAbandonment.doc DOC document
02616_02Aggregate.doc DOC document
01550_02GFM.doc DOC document
AG-82B1-S-10-0244.pdf PDF
NatickDrawings.pdf PDF
summary of work.doc DOC document
06100Rough Carpentry.doc DOC document
02300_02Earthwork.doc DOC document
02106_02CompositeRd.doc DOC document
Drawings.pdf PDF
05120Steel.doc DOC document
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 06100

rough carpentry part 1 - GENERAL

1.1 SUMMARY

A. This Section includes new stair treads and decking as shown on the drawings.

B. This Section also includes replacement of rotted or damaged building components including fascia boards.

SPEC WRITER: ADJUST LIST BELOW TO SUIT PROJECT.

part 2 - PRODUCTS

1.2 lookout house A. Grade and species of lumber used to repair rotted roof members shall be of similar species and grade as the items being replaced. Size of replacement members shall be the same as those being replaced.

1.3 Stair treads and decking

A. Preservative Treatment by Pressure Process: AWPA C2

SPEC WRITER: REVISE BELOW IF OTHER TYPE PRESERVATIVES REQUIRED.

1. Treatment type and retention shall be as recommended by the manufacturer and approved by the EPA for the intended use.

B. Kiln-dry material after treatment to maximum moisture content of 19 percent.

C. Mark each treated item with treatment quality mark of an inspection agency approved by the American Lumber Standards Committee Board of Review.

D. Lumber: S4S. Construction or No. 2 Grade of the following species:

spec writer: Select one or more of four subparagraphs below to suit Project. Species groups listed do not have equal properties.

1. Douglas fir-larch, Douglas fir-larch (north), or Douglas fir-south; NLGA, WCLIB, or WWPA.

2. Hem-fir or Hem-fir (north); NLGA, WCLIB, or WWPA.

3. Southern pine; SPIB.

4. Spruce-pine-fir (south) or Spruce-pine-fir; NELMA, NLGA, WCLIB, or WWPA.

E. Field Treatment of cuts, drill holes, and other drill holes: copper naphthenate.

part 3 - EXECUTION

1.4 INSTALLATION

A. Set rough carpentry to existing building lines, with members plumb, true to line, cut, and fitted. Fit rough carpentry to other construction; scribe and cope as needed for accurate fit and to match existing members in appearance.

B. Securely attach rough carpentry work to substrate by anchoring and fastening as indicated.

C. Any pressure treated timber that is cut, drilled, sanded, notched, or otherwise abraded after initial pressure treatment shall have 3 brush coats of copper naphthenate applied to the affected areas.

1. Contractor shall have copper naphthenate and application equipment on site whenever work on timber components is being done.

2. When field applying copper naphthenate do so in a manner that the preservative is not allowed to drip or spill into the environment. Provide an approved method to retain/recover drips, spills, or overspray.

END OF SECTION 06100

06100 - 1

ROUGH CARPENTRY