About this file

GFM BESSEY COMPLEX RSI ITEM 1

View the file

Other files

File Type Posted
SF 30 AMEND 3.PDF PDF
Amend 3 Questions and Answers.pdf PDF
Seed and Mulch natick cg.doc DOC document
DefBidItemsScott Tower Maint.doc DOC document
Camping Spurs and Pads Bessey Complex RSI.doc DOC document
SummaryOfWorkBessey complex rsi.doc DOC document
CompositeRd Natick CG.doc DOC document
SteelScott Tower Maint.doc DOC document
Aggregate Natick CG.doc DOC document
Scope of Work Pool.doc DOC document
BidItems Pool.doc DOC document
Submittals Pool.doc DOC document
SF 30 AMEND 2.PDF PDF
submittalsScott Tower Maint.doc DOC document
Asphalt ShinglesScott Tower Maint.doc DOC document
bid items natick.doc DOC document
DefBidItemsBessey complex rsi.doc DOC document
ScopeOfWorkScott Tower Maint.doc DOC document
scopeOfWorkNatick campground.doc DOC document
EarthworkBessey Complex RSI.doc DOC document
DrawingsBessey Complex RSI.pdf PDF
Rough CarpentryScott Tower Maint.doc DOC document
PaintingScott Tower Maint.doc DOC document
Selective DemolitionScott Tower Maint.doc DOC document
defofbiditems natic cg.doc DOC document
HandrailsScott Tower Maint.doc DOC document
Submittals Natick CG.doc DOC document
AWellAbandonment Pool.doc DOC document
Drawings Scott Tower Maint.pdf PDF
Earthwork Pool.doc DOC document
PoolDrawings.pdf PDF
SubmittalsBessey complex rsi.doc DOC document
SF 30 AMEND 1.PDF PDF
PoolDrawings.pdf PDF
02822_02Sod.doc DOC document
01732Selective Demolition.doc DOC document
experience questionnaire.pdf PDF
01330_02Submittals.doc DOC document
submittal procedures.doc DOC document
02525_02AWellAbandonment.doc DOC document
02616_02Aggregate.doc DOC document
01550_02GFM.doc DOC document
AG-82B1-S-10-0244.pdf PDF
NatickDrawings.pdf PDF
summary of work.doc DOC document
06100Rough Carpentry.doc DOC document
02300_02Earthwork.doc DOC document
02106_02CompositeRd.doc DOC document
Drawings.pdf PDF
05120Steel.doc DOC document
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01550

GOVERNMENT FURNISHED MATERIALS (GFM)

PART 1 - GENERAL

1.1 1.1

SUMMARY

A. Applies to materials that shall be provided by the Government and installed by the Contractor.

1.2 INSPECTION

A. The Contractor shall notify the Contracting Officer (CO) at least 5 calendar days prior to picking up or returning Government-furnished materials.

1. The Contractor and the CO shall jointly inspect all materials during the Contractor loading operation at the storage area.

1.3 LIABILITY

A. The Contractor's liability for Government-furnished material shall start at the time he accepts the materials at the storage area, and shall terminate upon completion and final acceptance of the work.

1. It shall be implied that the Contractor has accepted Government-furnished material when he/she transports the material from the storage area to the worksite.

1.4 REPLACEMENT AND/OR SUPPLEMENTAL MATERIALS

A. Any defective materials discovered prior to the Contractor's acceptance of the materials shall be replaced by the Government.

B. If the quantity of Government-furnished material accepted by the Contractor is insufficient to complete the specified work, supplemental materials complying with these specifications shall be provided by the Government at no expense to the Contractor.

C. The Government shall not replace any materials that, in the opinion of the CO, are damaged or lost due to the Contractor's negligence after the Contractor accepts the materials. Such materials shall be replaced at the Contractor's expense.

1.5 SURPLUS MATERIAL

A. After completion and final acceptance of the work, surplus Government-furnished materials shall be returned to the specified storage area in the same mechanical and physical condition as originally accepted.

B. Damaged surplus materials shall be replaced at the Contractor's expense.

C. The Contractor's liability for surplus materials shall terminate upon unloading and storage at the storage area.

PART 2 – PRODUCTS

1.6 GOVERNMENT-FURNISHED MATERIALS

A. Government-furnished materials shall be limited to:

SPEC WRITER: SUBPARAGRAPHS BELOW ARE EXAMPLES – REVISE TO SUIT PROJECT

1. Fire Rings

PART 3 – EXECUTION

1.7 GENERAL

A. Installation and testing of Government-furnished materials shall comply with the applicable contract specifications and drawings covering work requiring the use of such materials.

END OF SECTION 01550

01550 - 1

GOVERNMENT FURNISHED MATERIALS (GFM)