Zone 1 Schedule (revised)

View the file

Other files

File Type Posted
01200_LAG_02_27_09_amended 2-10-10.doc DOC document
SECTION M.docx DOCX document
01110_wt_06_06 amended 2-10-2010.doc DOC document
SF 30_amend02.pdf PDF
WNF Paving All Drawings.pdf PDF
01600_wt_06_06.doc DOC document
PAVING-Schedule_ZONE_2_edited.xlsx XLSX spreadsheet
01360_wt_06_06.doc DOC document
PAVING-Schedule_Items_ZONE_1_edited.xlsx XLSX spreadsheet
01430_wt_09_08.doc DOC document
01720_wt_10_06.doc DOC document
01560_wt_06_06.doc DOC document
01110_wt_06_06.doc DOC document
01270_wt_11_07.doc DOC document
01510_wt_06_06.doc DOC document
01330_CM16_02_23_07.DOC DOC document
01770_list_wt_09_06.doc DOC document
01420_wt_06_06.doc DOC document
01200_LAG_02_27_09.doc DOC document
Wayne NF Paving drawings.pdf PDF
01310_wt_10_06.doc DOC document
00-index_wt_06_06.doc DOC document
PAVING-Schedule_ZONE_3 Edited.xlsx XLSX spreadsheet
01570_wt_10_06.doc DOC document
01323_wt_10_06.doc DOC document
01571_wt_06_06.doc DOC document
01330_wt_sublist_09_06.doc DOC document
Solicitation_01.pdf PDF
SF 1442.pdf PDF
DBA_WD.pdf PDF
Experience_Capability Statement.doc DOC document
SF 1442 Cont_0338.pdf PDF
Drawings.pdf PDF
Schedule of Items.pdf PDF
Paving Project Specs.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule

U.S.F.S. WAYNE NATIONAL FOREST
ROAD IMPROVEMENT PROJECTS - CIM-0900-02R-458-0914-01
ATHENS,HOCKING,PERRY COUNTIES, OHIO
BID SCHEDULE - ZONE -1
Method of
ItemDescriptionMeasurementUnit PriceQuantityUnitItems Total
AREA 1
1ODOT 407 - TACK COAT (0.075 GAL/SQ. YD.)AQ561.00GALLON
2ODOT 448 - ASPHALT PAVEMENT ( 1 1/2 INCH THICK)AQ7474.00SQ. YD.
3REMOVE & REPLACE EXISTING PARKING BLOCKSLSQ1.00LUMP SUM
4INSTALL NONWOVEN GEOTEXTILE FABRIC US 100P OVER ENTIRE AREAAQ7474.00SQ. YD.
5ODOT 641 - PARKING MARKINGSAQ2080.00LIN. FT.
6ODOT 641 - TRAFFIC FLOW & TURN ARROWS & STOP LINEAQ7.00EACH
7ODOT 641 - HANDICAP DECALSAQ4.00EACH
8ODOT 641 - VAN ACCESS DECALSAQ1.00EACH
96" OF #499 (ODOT) CLASS C CONCRETE SLABAQ5.00CU. YD.
10ODOT 603 - 6" SCH 80 CONDUIT PVCLSQ1.00LUMP SUM
11ODOT 603 - 4" SCH 40 CONDUIT PVCLSQ2.00LUMP SUM
NOTE #1
12ODOT 203 - EXCAVATIONAQ40.00CU. YD.
136" OF #304 (ODOT) AGGREGATE COMPACTED AGGREGATEAQ26.00CU. YD.
142.5" OF #448 (ODOT) ASPHALT CONCRETE INTERMEDIATE COURSEAQ120.00SQ. YD.
151.5" OF #448 (ODOT) ASPHALT CONCRETE SURFACE COURSEAQ120.00SQ. YD.
NOTE #2
16ODOT 203 - EXCAVATIONAQ28.00CU. YD.
176" OF #304 (ODOT) AGGREGATE COMPACTED AGGREGATEAQ19.00CU. YD.
182.5" OF #448 (ODOT) ASPHALT CONCRETE INTERMEDIATE COURSEAQ85.00SQ. YD.
191.5" OF #448 (ODOT) ASPHALT CONCRETE SURFACE COURSEAQ85.00SQ. YD.
20ADJUST SLIDING GATE FOR NEW PAVEMENTLSQ1.00LUMP SUM
AREA #2
1ODOT 204 - GRADING & COMPACTIONAQ3112.00SQ. YD.
2ODOT 408 - PRIME COAT (0.4 GAL/SQ. YD.)AQ1245.00GALLON
32" OF #448 (ODOT) ASPHALT CONCRETE SURFACE COURSEAQ3112.00SQ. YD.
4ODOT 204 - GRADING & COMPACTIONAQ2356.00SQ. YD.
5ODOT 408 - PRIME COAT (0.4 GAL/SQ. YD.)AQ942.00GALLON
62" OF #448 (ODOT) ASPHALT CONCRETE SURFACE COURSEAQ2356.00SQ. YD.
AREA #3
1ODOT 204 - GRADING & COMPACTIONAQ6168.00SQ. YD.
2ODOT 408 - PRIME COAT (0.4 GAL/SQ. YD.)AQ2467.00GALLON
32" OF #448 (ODOT) ASPHALT CONCRETE SURFACE COURSEAQ6168.00SQ. YD.
AREA #5
1ODOT 204 - GRADING & COMPACTIONAQ1990.00SQ. YD.
2ODOT 408 - PRIME COAT (0.4 GAL/SQ. YD.)AQ796.00GALLON
32" OF #448 (ODOT) ASPHALT CONCRETE SURFACE COURSEAQ1990.00SQ. YD.
Mobilization for Zone 1***$ 4,800.00
Base Items Zone 1 Subtotal$
Profit, Overhead and Bonding Base Items$
Zone 1 Base Items TOTAL$

*** Mobilization is being set by the Government @ $4,800.00 for Zone 1, AND $2,400 FOR THE OPTIONAL Items in zone 1.

Zone 1 Optional Items
Method of
ItemDescriptionMeasurementUnit PriceQuantityUnitItems Total
AREA #2C
1ODOT 204 - GRADING & COMPACTIONAQ8943.00SQ. YD.
2ODOT 408 - PRIME COAT (0.4 GAL/SQ. YD.)AQ3577.00GALLON
32" OF #448 (ODOT) ASPHALT CONCRETE SURFACE COURSEAQ8943.00SQ. YD.
4ODOT 603-18 - INSTALL 18" CPVC PIPE CULVERTAQ40.00FOOT
5ODOT 603-24 - INSTALL 24" CPVC PIPE CULVERTAQ130.00FOOT
6ODOT 613 - LEAN CONRETE (FLOWABLE) BACKFILLAQ69.00CU. YD.
AREA #2D
1ODOT 202 - REMOVE PIPEAQ58.00FEET
2ODOT 204 - GRADING & COMPACTIONAQ4605.00SQ. YD.
3ODOT 408 - PRIME COAT (0.4 GAL/SQ. YD.)AQ1842.00GALLON
42" OF #448 (ODOT) ASPHALT CONCRETE SURFACE COURSEAQ4605.00SQ. YD.
5ODOT 603-24 - INSTALL 24" CPVC PIPE CULVERTAQ120.00FOOT
6ODOT 613 - LEAN CONRETE (FLOWABLE) BACKFILLAQ57.00CU. YD.
AREA #4
1ODOT 204 - GRADING & COMPACTIONAQ3630.00SQ. YD.
2ODOT 408 - PRIME COAT (0.4 GAL/SQ. YD.)AQ1452.00GALLON
32" OF #448 (ODOT) ASPHALT CONCRETE SURFACE COURSEAQ3630.00SQ. YD.
AREA #6
1ODOT 408 - PRIME COAT (0.4 GAL/SQ. YD.)AQ1622.00GALLON
21.5" OF #448 (ODOT) ASPHALT CONCRETE SURFACE COURSEAQ4056.00SQ. YD.
Mobilization for Zone 1 Optional Items Only$ 2,400.00
Optional Items Zone 1 Subtotal$
Profit, Overhead and Bonding Zone 1 Optional Items Only$
Zone 1 Optional Items TOTAL$
TOTAL FOR BASE AND OPTIONAL ITEMS ZONE 1