SECTION 01570
TEMPORARY CONTROLS
PART 1
GENERAL
1 .1 DESCRIPTION
A. The work of this section consists of providing temporary controls.
1 .2 SUBMITTALS
A. The following general management and recycling procedures shall be adhered to:
1. Waste products and materials that are recycled shall be separated from trash and sorted into appropriately marked separate containers and then transported to the respective recycling facility for further processing;
2. Remove recycled waste materials from project site on a regular basis. Do not allow recycled materials to accumulate on site.
3.
Transport recycled material off of USDA Forest Service property and legally dispose off site.
PART 2
PRODUCTS
Not used.
PART 3
EXECUTION
3.1
HOUSEKEEPING
A.
Keep project neat, orderly, and in a safe condition at all times.
B. Provide enough containers for collecting construction debris and construction materials to be recycled.
C. Provide individually marked containers for recycling personal items, such as aluminum cans, newspapers, glass, plastic, corrugated cardboard. These items shall be recycled by the Contractor.
D. Wet down dry materials and rubbish to prevent blowing dust.
E. Keep volatile wastes in covered containers.
F. Utilize excavated material as soon as possible.
3.2
DISPOSAL
A.
Dispose of excess excavated material (including rocks and boulders) that cannot be used in construction off site at location as shown on map in solicitation or other non USDA Forest Service site if Contractor so chooses and complies with all laws.
B.
Unless otherwise specified, all removed material becomes the property of the Contractor and shall be disposed of outside the project site in legal manner.
C.
Immediately remove hazardous rubbish from project site. Place other construction debris in refuse containers at least daily. Dispose of refuse at least weekly, in a legal manner, at public or private dumping areas outside the project site off federal land. Burning or burying refuse inside of the project site is not permitted.
3.3
AIR AND WATER POLLUTION CONTROL
A.
Take all necessary reasonable measures to reduce air and water pollution by any material or equipment used during construction.
B.
Do not dispose of volatile wastes or oils on site.
C.
Do not allow waste materials to be washed into streams or bodies of water.
D.
Seed slopes, as specified in the State of Ohio Department of Transportation, Construction and Material Specifications, Item 207 Temporary Sediment and Erosion Control, and Item 659 Seeding and Mulching, as soon as possible to prevent erosion. If it is impossible to prevent erosion, the Contracting Officer may require construction of sedimentation basins to prevent water pollution.
E.
All seed mixes must be approved by the C.O.R. before any seed is applied. All seed must not be considered a Non-Native Invasive Species (NNIS) by the USDA Forest Service. All seed must be considered native.
END OF SECTION
WAYNE NATIONAL FOREST,
01570-1
ROAD IMPROVEMENT PROJECTS, PROJECT NO.
TEMPORARY CONTROLS