SECTION 01200
SPECIAL PROVISIONS
PART 1
GENERAL
1 .1 DESCRIPTION
A. The work of this contract consists of the general grading of existing aggregate road surfaces, compaction of graded surface, pavement replacement, asphalt pavement, surface treatment of existing pavement surface; asphalt sealing/chipping, traffic control marking and associated work.
B. The work shall conform to the drawings and specifications entitled “Road Improvement Projects”.
C.
The State of Ohio Department of Transportation Construction and Material Specifications dated January 1, 2008, shall govern this project and shall be referred to throughout these specifications as ODOT. When ODOT or ‘The Department’ is mentioned, it will refer to the Wayne National Forest, not ODOT for administrative duties.
D.
Whenever reference is made to the State of Ohio Department of Transportation (ODOT) Construction and Material Specifications, the section or item number will be referred to and such reference shall govern the conduct of the work herein, and have the same force and effect as though transcribed into these detailed specifications.
E.
The following specifications shall govern the conduct of the work herein:
USDA Forest Service Specification Sections 101, 102, 103, 106, 160, and 161; Administration Guide for Construction of Roads & Bridges, EM 7720-100 (8-96);
ODOT CONSTRUCTION & MATERIAL SPECIFICATIONS
DIVISION 200: EARTHWORK
| GOVERNING SPECIFICATION |
| ITEM DESCRIPTION |
ODOT ITEM 203
EXCAVATION
| ODOT ITEM 203 |
| EMBANKMENT |
ODOT ITEM 204
SUBGRADE COMPACTION
ODOT ITEM 207
PERIMETER FILTER FABRIC FENCE
DIVISION 300: BASES
| GOVERNING SPECIFICATION |
| ITEM DESCRIPTION |
ODOT ITEM 304
AGGREGATE BASE
ODOT ITEM 308
PRIME COAT
DIVISION 400: FLEXIBLE PAVEMENTS
| GOVERNING SPECIFICATION |
| ITEM DESCRIPTION |
ODOT ITEM 401
ASPHALT CONCRETE PAVEMENTS - GENERAL
ODOT ITEM 402
ASPHALT CONCRETE MIXING PLANTS
ODOT ITEM 403
ASPHALT CONCRETE QUALITY CONTROL AND ACCEPTANCE
ODOT ITEM 408
BITUMINOUS PRIME COAT
| ODOT ITEM 410 |
| TRAFFIC COMPACTED SURFACE |
| ODOT ITEM 448 |
| ASPHALT CONCRETE, SURFACE COURSE, TYPE 1, PG 64-22 |
| ODOT ITEM 448 |
| ASPHALT CONCRETE, INTERMEDIATE COURSE, TYPE 2 PG 64-22 |
| ODOT ITEM 422 |
| CHIP AND SEAL |
DIVISION 640: PAVEMENT MARKING
| GOVERNING SPECIFICATION |
| ITEM DESCRIPTION |
ODOT ITEM 641
PAVEMENT MARKING - GENERAL
ODOT ITEM 646
EPOXY PAVEMENT MARKING, AS PER PLAN
F.
In the case of conflict between ODOT Construction & Material Specifications and the USDA Forest Service, the USDA Forest Service specifications shall take precedent.
1.2 SEQUENCE OF WORK/COMPLETION REQUIREMENT/BONUS
A. The Contractor shall submit a written copy of his intended sequence of work to the USDA Forest Service for review and approval prior to beginning work.
B. The Contractor shall complete all work and it is accepted by the government on or before June 30, 2010.
C.
The Contractor shall be responsible for any permits required to complete the work.
1.3 LIMITATIONS OF OPERATIONS
A.
The Contractor shall limit his operations so as to cause as little disturbance as possible to areas outside the limits of work.
B.
The Contractor shall contact the proper local authorities concerning load limits, road crossing on public streets, etc., and shall be responsible for any approval, permits, or bonds required.
C.
The Contractor shall be solely responsible for all damages arising from failure to install or maintain adequate safeguards.
PART 2
PRODUCTS
Not used.
PART 3
EXECUTION
Not used.
END OF SECTION
WAYNE NATIONAL FOREST,
01200-2
ROAD IMPROVEMENT PROJECTS, PROJECT NO.
SPECIAL PROVISIONS
File details come from the government source that posted it. Updated .