01330_CM16_02_23_07.DOC

DOC document 128 KB Posted

Attached to
RECOVERY: Blacktop paving parking lots, Wayne NF
Solicitation number
AG-4419-S-10-0338
Issued by

About this file

Spec 8

View the file

Other files

File Type Posted
01200_LAG_02_27_09_amended 2-10-10.doc DOC document
SECTION M.docx DOCX document
01110_wt_06_06 amended 2-10-2010.doc DOC document
SF 30_amend02.pdf PDF
WNF Paving All Drawings.pdf PDF
Schedule ZONE_1_Amended 2-10-10.xlsx XLSX spreadsheet
01600_wt_06_06.doc DOC document
PAVING-Schedule_ZONE_2_edited.xlsx XLSX spreadsheet
01360_wt_06_06.doc DOC document
PAVING-Schedule_Items_ZONE_1_edited.xlsx XLSX spreadsheet
01430_wt_09_08.doc DOC document
01720_wt_10_06.doc DOC document
01560_wt_06_06.doc DOC document
01110_wt_06_06.doc DOC document
01270_wt_11_07.doc DOC document
01510_wt_06_06.doc DOC document
01770_list_wt_09_06.doc DOC document
01420_wt_06_06.doc DOC document
01200_LAG_02_27_09.doc DOC document
Wayne NF Paving drawings.pdf PDF
01310_wt_10_06.doc DOC document
00-index_wt_06_06.doc DOC document
PAVING-Schedule_ZONE_3 Edited.xlsx XLSX spreadsheet
01570_wt_10_06.doc DOC document
01323_wt_10_06.doc DOC document
01571_wt_06_06.doc DOC document
01330_wt_sublist_09_06.doc DOC document
Solicitation_01.pdf PDF
SF 1442.pdf PDF
DBA_WD.pdf PDF
Experience_Capability Statement.doc DOC document
SF 1442 Cont_0338.pdf PDF
Drawings.pdf PDF
Schedule of Items.pdf PDF
Paving Project Specs.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRANSMITTAL - NATIONAL PARK SERVICE

Transmittal No.:

Sheet: 1 of:

Park:

Project:

Contract No.:

PMIS No.:

Date:

Contractor:

Subcontractor/Supplier:

NPS ACTION

Specification

Section No.

Description of Item

(Size, Type, Name, Manufacturer, Use, Etc.)

Contractor Signature
Recommended by
Title, Date
Title
Date

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Review Comments
Action By
Date

Contracting Officer’s Representative

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the Government is not responsible for errors or omission.

SUBMITTAL LOG DATES: From contractor [__________], To reviewer [__________], From reviewer [__________], To Contractor [__________]

Distribution: ( ) Contractor ( ) DSC File ( ) COR ( ) A/E ( ) DSC Interim ( ) COR Interim ( ) Contractor Interim CM-16Rev. 4/00

TRANSMITTAL CONTINUATION - NATIONAL PARK SERVICE
Transmittal No.:

Sheet: 1 of:

Park:

Project:

Contract No.:

PMIS No.:

Date:

Contractor:

Subcontractor/Supplier:

NPS ACTION

Specification

Section No.

Description of Item

(Size, Type, Name, Manufacturer, Use, Etc.)

Review Comments

CM-16 Rev. 06/06

File details come from the government source that posted it. Updated .