About this file

J.1 -1 WAGE RATE NO. NY80034 DATED 11/20/2009 (12 PAGES)

Text of this file

General Decision Number: NY080034 11/20/2009 NY34

Superseded General Decision Number: NY20070034

State: New York

Construction Types: Building, Heavy and Highway

County: Ontario County in New York.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories), HEAVY AND HIGHWAY CONSTRUCTION

PROJECTS

Modification Number Publication Date 0 02/08/2008 1 02/22/2008 2 04/11/2008 3 05/30/2008 4 07/04/2008 5 08/08/2008 6 09/19/2008 7 12/19/2008 8 03/06/2009 9 03/13/2009 10 03/27/2009 11 05/01/2009 12 06/05/2009 13 06/19/2009 14 06/26/2009 15 07/03/2009 16 07/10/2009 17 08/21/2009 18 09/18/2009 19 11/20/2009

CARP0085-003 05/01/2009

Rates Fringes

Carpenters (HEAVY & HIGHWAY CONSTRUCTION)....................$ 26.39 15.91+a Carpenters, including Drywall Hanging (BUILDING CONSTRUCTION

Entire County, excluding the Towns of Phelps, Seneca and Geneva)..........................$ 25.67 15.91+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.

CARP0085-007 05/01/2009

Rates Fringes

Carpenters (BUILDING

CONSTRUCTION

ONTARIO COUNTY (Towns of Phelps, Seneca and Geneva))......$ 25.67 15.91

ELEC0086-005 06/01/2009

REMAINDER OF COUNTY

Rates Fringes

ELECTRICIAN......................$ 29.60 16.94

ELEC0840-002 06/01/2009

TOWNSPHIP OF FARMINGTON, MANCHESTER, PHELPS, HOPEWELL, GENEVA,

GORHAM, SENECA AND CANANDAIGUA

Rates Fringes

ELECTRICIAN......................$ 28.50 15.83

ELEC1249-003 05/04/2009

Rates Fringes

LINE CONSTRUCTION: Lineman

(LIGHTING AND TRAFFIC SIGNAL

Including any and all Fiber Optic Cable necessary for Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems) Flagman.....................$ 22.25 13.50+6.5%+a Groundman Digging Machine Operator....................$ 32.74 11.75+6.5%+a Groundman Truck Driver (tractor trailer unit)......$ 31.52 13.50+6.5%+a Groundman Truck Driver......$ 29.66 13.50+6.5%+a Lineman & Technician........$ 37.08 13.50+6.5%+a Mechanic....................$ 29.66 13.50+6.5%+a

FOOTNOTE:

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.

ELEC1249-004 05/04/2009

Rates Fringes

Line Construction:

Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities (where no other trades are or have been involved):

Cable Splicer..............$ 44.67 13.50+7%+a Flagman....................$ 24.37 13.50+7%+a Groundman digging machine operator...................$ 36.55 13.50+7%+a Groundman truck driver (tractor trailer unit).....$ 34.52 13.50+7%+a Groundman Truck driver.....$ 32.49 13.50+7%+a Lineman and Technician.....$ 40.61 13.50+7%+a Mechanic...................$ 32.49 13.50+7%+a Overhead transmission line work (where 40.09other trades are or have been involved):

Cable Splicer..............$ 46.41 12.00+7%+a Overhead transmission line work (where other trades are or have been involved):

Cable Splicer..............$ 47.44 13.50+7%+a Flagman....................$ 25.88 13.50+7%+a Groundman digging machine operator...................$ 38.82 13.50+7%+a Groundman truck driver (tractor trailer unit).....$ 36.66 13.50+7%+a Groundman truck driver.....$ 34.50 13.50+7%+a Lineman and Technician.....$ 43.13 13.50+7%+a Mechanic...................$ 34.50 13.50+7%+a Substation:

Cable Splicer..............$ 44.67 13.50+7%+a Flagman....................$ 24.37 13.50+7%+a Ground man truck driver....$ 32.49 13.50+7%+a Groundman digging machine operator...................$ 36.55 13.50+7%+a Groundman truck driver (tractor trailer unit).....$ 34.52 13.50+7%+a Lineman & Technician.......$ 40.61 13.50+7%+a Mechanic...................$ 32.49 13.50+7%+a Switching structures;

railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 46.10 13.50+7%+a Flagman....................$ 25.15 13.50+7%+a Groundman Digging Machine Operator...................$ 37.72 13.50+7%+a Groundman Truck Driver (tractor-trailer unit).....$ 35.62 13.50+7%+a Groundman Truck Driver.....$ 33.53 13.50+7%+a Lineman & Technician.......$ 38.87 11.75+7%+a Mechanic...................$ 33.53 13.50+7%+a

TELEPHONE, CATV

FIBEROPTICS CABLE AND

EQUIPMENT

Cable splicer/Central Office Person..............$ 23.07 3.05+3% Groundman..................$ 11.61 3.05+3% Installer Repairman- Teledata Lineman/Tecnician- Equipment Operator.........$ 21.91 3.05+3% TREE TRIMMER................$ 18.92 4.05+3%+b

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.

b. New Years Day, Washington's Birthday, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving Day and Christmas Day.

ENGI0832-001 07/01/2009

Rates Fringes

Operating Engineer:

EXCAVATION AND PAVING:

GROUP 1....................$ 24.44 16.95+a GROUP 2....................$ 24.01 16.95+a GROUP 3....................$ 20.31 16.95+a GROUP 4....................$ 19.21 16.95+a Master Mechanic............$ 25.04 16.95+a

HEAVY AND HIGHWAY

CONSTRUCTION:

GROUP 1....................$ 31.86 19.15+a GROUP 2....................$ 31.15 19.15+a GROUP 3....................$ 28.29 19.15+a GROUP 4....................$ 33.12 19.15+a GROUP 5....................$ 33.86 19.15+a TUNNEL and SHAFT:

GROUP 1....................$ 34.23 19.25+b GROUP 2....................$ 33.01 19.25+b GROUP 3....................$ 30.22 19.25+a GROUP 4....................$ 27.21 19.25+b Master Mechanic & Chief Tunnel Engineer............$ 36.36 19.25+b

For EXCAVATION AND PAVING:

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Christmas Day, regardless of the day of the week on which the holiday may fall, provided the employee works either on the work day immediately preceding the holiday or on the scheduled work day immediately following the holiday.

EXCAVATION AND PAVING CLASSIFICATIONS

GROUP 1: Asphalt paver; automatic fine grader; backhoe (except tractor mounted, rubber tired); blacktop plant (automated); cableway; caisson auger; central mix concrete plant (automated); cherry picker- over 5 ton capacity;

crane; cranes and derricks (steel erection); dragline; dual drum paver; front end loader (4 cu. yd. and over);

hoist,(Tow or 3 drum); pile driver; power grader with elevation loader attachment; quarry master (or equivalent);

shovel; slip form paver; tractor drawn belt-type loader;

truck crane tunnel shovel; excavator, all purpose hydraulically operated

GROUP 2: Backhoe (tractor mounted, rubber tired); bituminous spreader and mixer; blacktop plant (non automated); boring machine; cage hoist; central mix plant (non automated) and all concrete batching plants; cherry picker, 5 tons and under; compressor (4 or less) exceeding 2000 CFM combined capacity; concrete paver over 16s; concrete pump; crusher;

drill rigs (tractor mounted); front end loader (under 4 cu.

yds); hi- pressure boiler (15 lbs and over); hoist (one drum); Kolman plant loader and similar type loaders;

maintenance engineer; maintenance grease man; mechanical slurry machine; mixer for stabilized base self propelled;

monorail machine; plant engineer; power broom; power grader; pump crete; ready mix concrete plant; road widener;

roller (all above sub-grade); side boom; tractor scraper;

tractor with dozer and or pusher; trencher; winch

GROUP 3: Compressors (4 not to exceed 2000 CFM combined capacity; or 3 or less with more than 1200 CFM but not to exceed 2000 CFM); compressors (any size but subject to other provisions for compressors); dust collectors;

generators; welding machines (4 of any type or combination); concrete pavement spreaders and finishers;

conveyor; drill (core); drill (well); electric pump used in conjunction with well point systems; farm tractor with accessories; fine grade machine; fork lift; gunite machine;

hammers-hydraulic-self propelled; locomotive; post hole digger and post driver; pumps (regardless of motive power, not more than 4 in number not to exceed 20" in total capacity); submersible electric pumps when used in lieu of well points, tractor with towed accessories; vibratory compactor; vibro tamp; well point

GROUP 4: Compressor (any size, but subject to other provisions for compressors); dust collectors; generators;

welding machines (3 or less of any type or combination);

concrete mixer (16s and under), concrete saw-self propelled; fireman; form tamper; mulching machine; power heaterman; pumps regardless of motive power no more than 3 in number not to exceed 12" in total capacity; revinius widener; steam cleaner; tractor

GROUP 5: Master Mechanic

For HEAVY AND HIGHWAY CONSTRUCTION:

FOOTNOTE:

b. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day provided the employee works the working day before and the working day after the holiday

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt paver; automated concrete spreader (CMI type); automatic fine grader; backhoe (except tractor mounted, rubber tired); belt placer (CMI type); blacktop plant (automated); cableway; caisson auger; central mix concrete plant (automated), cherry picker (over 5 tons capacity); concrete curb machine (self-propelled-slipform);

concrete pump (8" or over); crane; cranes and derricks (steel erection); dragline; dredge; dual drum paver;

excavator (all purpose-hydraulically operated gradall or similar); fork lift (factory rated 15 ft and over); front end loader (4 cy and over); head tower (sauerman or equal);

hoist (two or three drum); holland loader; hydro-blaster;

maintenance engineer; mine hoist; mucking machine or mole;

overhead crane (gentry or straddle type); pavement profiler (over 105 horsepower); pole driver; power grader; Quad 9;

quarry master (or equivalent); scraper; shovel; side boom;

slip form paver; tractor drawn belt-type loader; truck crane; truck or trailer mounted log chipper (self feeder);

tug operator (manned rented equipment excluded); tunnel shovel

GROUP 2: Backhoe (tractor mounted, rubber tired); bituminous spreader and mixer; blacktop plant (non automated); blast or rotary drill (truck or tractor mounted); boring machine;

cage hoist; central mix plant (non automated and all concrete batching plants); cherry picker (5 tons capacity and under); compressors (4 or less) exceeding 2,000 CFM combined capacity; concrete paver (over 16s); concrete pump (under 8"); core drill; crusher; diesel power unit; drill rigs, tractor mounted; fork lift (factory rated under 15 ft); front end loader (under 4 cu yd); hi pressure boiler (15 lbs and over); hoist (one drum); hydro-axe;

hydroblaster; kolman plant loader and similar type loaders;

LCM work boat operator; locomotive; log skidder;

lubrication engineer/greaseman; mixer (for stabilized base self-propelled); monorail machine; pavement breaker (self-propelled) wertgen; PB-4 and similar type; pavement profiler 105 horsepower and under; plant engineer; pump crete; ready mix concrete plant; refrigeration equipment (for soil stabilization); road widener; roller (all above sub-grade); sea mule; tractor with dozer and/or pusher;

trencher; tugger hoist; vermeer type saw; welder; winch;

winch cat

GROUP 3: "A" frame truck; aggregate plant; ballast regulator (ride-on); boiler (used in conjunction with production);

cement and bin operator; compressors (4 not to exceed 2,000 CFM combined capacity; or 3 or less with more than 1,200 CFM but not to exceed 2,000 cfm); compressors (any size but subject to other provisions for compressors); dust collectors; generators; pumps; welding machines; light plants (4 of any type or combination); concrete pavement spreader and finisher; concrete paver or mixer (16s and under); concrete saw (self-propelled); conveyor; electric pump used in conjunction with well-point system; farm tractor with accessories; fine grade machine; fireman; form tamper; grout pump; gunite machine; hammers (hydraulic self-propelled); hydra-spiker (ride on); hydraulic pump (jacking system); hydroblaster (low pressure cleaning);

light plants; mulching machine; oiler; parapet concrete or pavement grinder; post hole digger and post driver; power broom (towed); power heaterman; power sweeper; revinius widener; roller (grade and fill); scarifier (ride on);

shell winder; span-saw (ride on); steam cleaner;

submersible electric pump (when used in lieu of well-point system); tamper (ride on); tie extractor (ride-on); tie handler (ride-on); tie inserter (ride-on); tie spacer (ride on); track liner (ride on); tractor (with or without towed accessories); vibratory compactor; vibrotamp; well drill;

well point

GROUP 4: Master mechanic

GROUP 5: Crane, friction or lattice type with boom length 200 feet and over

For TUNNEL AND SHAFT:

FOOTNOTE:

b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, regardless of the day of the week on which the Holiday may fall, provided the employee works the working day before and the working day after the holiday

TUNNEL AND SHAFT CLASSIFICATIONS

GROUP 1: Automated concrete spreader (CMI or equivalent);

automated fine grade machine (cmi); backhoe; belt placer (cmi or similar); blacktop spreader (automated); cableway;

caisson auger; central mix plant (automated); cherry picker (5 tons); concrete curb machine (self-propelled slipform);

concrete pump; crane; crane shaft; crane underground;

cranes and derricks (steel erection); dragline; dredge;

dual drum paver; excavator (all purpose-hydraulicly operated gradall or similar); fork lift (factory rated 15' and over); front end loader (4cu yd and over); head tower (sauerman or equal); hoist; shaft; hoist (two or three drum); holland loader; maintenance engineer (shaft and tunnel); mine hoist; mining machine (mole and similar types); mucking machine or mose; overhead crane (gantry or straddle type); pile driver; power grader; Quad 9, quarry master (or equivalent); scraper; shovel; side boom; slip form paver; tripper/maintenance engineer (shaft and tunnel); tractor drawn belt-type loader; truck crane; truck or trailer mounted log chipper (self feeder); tug operator (manned rented equipment excluded); tunnel shovel

GROUP 2: Automated central mix concrete plant; backhoe (topside); backhoe (tractor mounted,rubber tired);

bituminous spreader and mixer; blacktop plant (non automated); blast or rotary drill (truck or tractor mounted); boring machine; cage hoist; central mix plant (non automated) and all concrete batching plants; cherry picker (5 tons capacity and under); compressors (4 or less exceeding 2000 CFM combined capacity); concrete paver (over 16s); concrete pump; crane (topside); crusher; diesel power unit; drill rigs, tractor mounted; front end loader (under 4 cu. yds); grayco epoxy machine; hi-pressure boiler (15 lbs and over); hoist (one drum); hoist (two or three drum) (topside); kolman plant loader and similar type loaders;

L.C.M. work boat operator; locomotive; maintenance engineer (topside); maintenance greaseman; mixer (for stabilized base self-propelled); monorial machine; plant engineer;

personnel hoist; pump crete; ready mix concrete plant;

refrigeration equipment (from soil stabilization); road widener; roller (all above sub-grade); sea mule; shotcrete machine; shovel (topside); tractor with dozer and/or pusher; trencher; tugger hoist; tunnel locomotive; welder;

winch; winch cat

GROUP 3: "A" frame truck; ballast regulator (ride on);

compressors (4 not to exceed 2000 cfm combined capacity; or 3 or less with more than 1200 cfm but not to exceed 2000 cfm); compressors (any size but subject to other provisions for compressors; dust collectors; generators; pumps;

welding machines; light plants (4 of any type or combination); concrete pavement spreaders and finishers;

conveyor; drill (core); drill (well); electric pump used in conjunction with well point system; farm tractor with accessories; fine grade machine; fork lift (under 15 ft);

ground pump over 5 cu. ft (manufacturers rating); gunite machine; hammers (hydraulic self propelled); hydra-spiker (ride on); hydra blaster (water); hydra blaster; motorized form carrier; post hole digger and post driver; power sweeper; roller (grade and fill); scarifer (ride on); span saw (ride on); submersible electric pump (when used in lieu of well points); tamper (ride on); tie extractor (ride on);

tie handler (ride on); tie inserter (rider on); tie spacer (ride on); track liner (ride on); tractor with towed accessories; vibratory compactor; vibro tamp; well point aggregate plant; boiler (used in conjunction with production); cement and bin operator; compressors (3 or less not to exceed 1200 cfm combined capacity); compressors (any size; but subject to other provisions for compressors); dust collectors; generators; pumps; welding machines; light plants (3 or less of any type or combination); concrete paver or mixer (16s and under);

concrete saw (self propelled); fireman; form tamper;

greaseman; hydraulic pump (jacking system); junior engineer; light plants; mulching machine; oiler; parapet concrete or pavement grinder; power broom (towed); power heaterman (when used for production); revinius widener;

shell winder; steam cleaner; tractor

GROUP 4: Crane, friction or lattice type with boom length 200 feet and over

ENGI0832-004 07/01/2008

Rates Fringes

Power equipment operators:

BUILDING CONSTRUCTION:

GROUP 1....................$ 28.41 17.60+a GROUP 2....................$ 27.17 17.60+a GROUP 3....................$ 27.17 17.60+a GROUP 4....................$ 26.45 17.60+a GROUP 5....................$ 26.45 17.60+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day, provided the employee works on the work day immediately preceding the holiday or on the scheduled work day immediately following the holiday.

BUILDING CONSTRUCTION CLASSIFICATIONS

GROUP 1: Master Mechanic

GROUP 2: Crane, Friction or Lattice type with boom length 200 feet and over

GROUP 3: Asphalt Paver, Automated Concrete Spreader (CMI Type), Automatic Fine Grader, Backhoe (Except Tractor-Mounted, Rubber Tired), Belt Placer (CMI Type), Blacktop Plant (Automated), Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Cherry Picker (over 5 tons capacity), Concrete Curb Machine, Self-Propelled, Slipform, Concrete Pump, Crane, Cranes and Derricks (Steel Erection), Dragline, Dredge, Dual Drum Paver, Excavator (All Purpose-Hydraulicly Operated), Gradall or Similar, Fork Lift (Factory Rated 15 feet and over), Front End Loader (4 cu. yd. and over), Head Tower, (Sauerman or Equal); Hoist (Two or Three Drum), Holland Loader, Horizontal Directional Drill and Power Ram type equipment, Maintenance Engineer, Mine Hoist, Mucking Machine or Mole, Overhead Crane (Gentry or Straddle Type), Pavement Breaker (self propelled) Wertgen; PB-4 and similar type, Pavement Profiler over 105 horsepower, Pavement Rubbleizer, Pile Driver, Power Grader, Quad 9, Quarry Master (or equivalent), Scraper, Shovel, Side Boom, Slip Form Paver (If a second man is needed, he shall be an Oiler), Tractor Drawn Belt-Type Loader, Truck Crane, Truck or Trailer Mounted Log Chipper (Self Feeder), Tug Operator (Manned Rented Equipment Excluded), Tunnel Shovel

GROUP 4: Backhoe (Tractor Mounted, Rubber Tired), Bituminous Spreader and Mixer, Blacktop Plant (Non-Automated), Blast or Rotary Drill (Truck or Tractor Mounted), Boring Machine, Cage Hoist, Central Mix Plant (Non-Automated) and All Concrete Batching Plants, Cherry Picker (5 tons capacity and under), Compressors (4 or less) exceeding 2,000 C.F.M.

combined capacity, Concrete Paver (Over 16S), Core Drill, Crusher, Diesel Power Unit, Drill Rigs, Hydraulic Krupp type, Drill Rigs, Tractor Mounted, Fork Lift (Factory rated under 15 feet), Front End Loader (Under 4 cu.yd), Hi-Pressure Boiler (15 lbs. and over), Hoist (One Drum), Horizontal Directional Drill Locator, Hydro-Axe, Hydro-Blaster, self-propelled, non-manually operated, Kolman Plant Loader and similar type Loaders (If employer requires another man to clean the screen or to maintain the equipment, he shall be an Oiler), L.C.M. Work Boat Operator, Locomotive, Log Skidder, Lubrication Engineer/Greaseman, Mixer (for stablized base self-propelled), Monorail Machine, Pavement Profiler 105 horsepower, and under, Plant Engineer, Pump Crete, Ready Mix Concrete Plant, Refrigeration Equipment (for soil stabilization), Road Widener, Roller (all above sub-grade), Sea Mule, Skid Steer Loader with attachments, Tractor with Dozer and/or Pusher, Trencher, Tugger Hoist, Vacuum Blasting Machine-self propelled, non-manually operated, Vermeer Type Saw, Winch, Winch Cat

GROUP 5: A-Frame Truck, Aggregate Plant, Ballast Regulator, Ride-on, Boiler (used in conjunction with production), Cement and Bin Operator, Compressors (4 not to exceed 2,000 c.f.m, combined capacity; or 3 or less with more than 1,200 c.f.m. but not to exceed 2,000 c.f.m.), Compressors (any size but subject to other provisions for compressors), Dust Collectors, Generators, Pumps, Welding Machines, Light Plants (4 of any type or combination), Concrete Pavement Spreader and Finisher, Concrete Paver or Mixer (16S and under), Concrete Saw (Self-propelled), Conveyor, Electric Pump used in conjunction with well-point system, Farm Tractor with accessories, Fine Grade Machine, Fireman, Form, Tamper, Grout Pump, Gunite Machine, Hammers (Hydraulic self- propelled), Hydra-Spiker, ride on, Hydraulic Pump (Jacking system), Hydroblaster (low pressure cleaning), Light Plants, Mulching Machine, Oiler, Parapet Concrete or Pavement Grinder, Post Hole Digger and Post Driver, Power Boom (Towed), Power Heaterman, Power Sweeper, Revinius Widener, Roller (Grade and Fill), Scarifier, ride-on, Shell Winder, Span-Saw, ride-on, Steam Cleaner, Submersible Electric Pump (When used in lieu of well-point system), Tamper, ride on, Tie Extractor, ride-on, Tie Handler, ride-on, Tie Inserter, ride-on, Tie Spacer, ride-on, Track Liner, ride-on, Tractor (with or without towed accessories), Vibratory Compactor, Vibro Tamp, Well Drill, Well Point

IRON0033-010 05/01/2009

Rates Fringes

Ironworkers:

Sheeter.....................$ 25.05 17.29 Structural, ornamental, rodman machinery mover rigger, fence erector, precast concrete erector, reinforcing, stone derrickman..................$ 24.80 17.29

* LABO0435-006 05/01/2009

Rates Fringes

Laborers:

BUILDING

Asbestos removal...........$ 23.90 10.78 Blaster....................$ 24.23 10.78 Chuck Tender...............$ 23.10 10.78 Concrete vibrators.........$ 23.34 10.78 Drillers and asphalt raker.$ 23.30 10.78 Jack Hammer, mortar mixe...$ 23.20 10.78 Pipe layers, burners and cutters....................$ 23.20 10.78 Powder Monkey..............$ 23.77 10.78 Unskilled laborer..........$ 22.90 10.78 Yardman, clean-up..........$ 20.05 10.78

HEAVY AND HIGHWAY

GROUP 1....................$ 24.87 13.00

GROUP 2....................$ 25.57 13.00

GROUP 3....................$ 25.77 13.00

GROUP 4....................$ 26.57 13.00

GROUP 5....................$ 27.07 13.00

HEAVY AND HIGHWAY LABORER CLASSIFICATIONS

GROUP 1: Flaggers GROUP 2: Laborers GROUP 3: Rakers, drillers, pipelayers and torch operators GROUP 4: Blasters GROUP 5: Hazardous waste removal

PAIN0004-028 05/01/2009

Rates Fringes

Painters:

BUILDING CONSTRUCTION

Brush & Roll...............$ 22.66 14.65 Drywall Taper..............$ 22.16 14.65 Sandblasting...............$ 23.06 14.65 Spray......................$ 22.91 14.65 Wallcovering...............$ 22.61 14.65

HEAVY & HIGHWAY

CONSTRUCTION:

Bridge Work................$ 31.00 16.00

PLUM0013-004 05/01/2009

Rates Fringes

Plumber and Steamfitter (Including HVAC Work)............$ 30.71 17.03

ROOF0022-001 06/05/2006

Rates Fringes

ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 23.70 11.12

SHEE0046-003 05/04/2009

Rates Fringes

Sheet Metal (Including HVAC Work)............................$ 27.18 18.58

SUNY1993-002 10/04/1993

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 15.75 .59

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .