About this file

Amend 008 Revised Schedule B

View the file

Other files

File Type Posted
Amend_011_Sf_30.pdf PDF
Schedule_B_052115.xls XLS spreadsheet
Amend__010_SF_30.pdf PDF
Questions-wkm-5-15-2015.docx DOCX document
Amend009.pdf PDF
NCAUR_Contract_Body_051815_Mod_008.docx DOCX document
NCAUR_Statement_of_Work_5-12_15.docx DOCX document
Amend_008.pdf PDF
051215_Questions.docx DOCX document
Amend_007.pdf PDF
Amend_006_SF_30_NCAUR.pdf PDF
05-2174.txt TXT text file
IL3_04032015.txt TXT text file
Amend_005_sf30.pdf PDF
NCAUR_Statement_of_Work_4_9_15.docx DOCX document
Revised_Schedule_B_040215.xls XLS spreadsheet
NCAUR_041015_Requests_for_Clarifications_and_Questions.pdf PDF
Amend004.pdf PDF
IL3_04022015.txt TXT text file
Attendee_Roster.pdf PDF
05-2174_0315.txt TXT text file
032305_NCAUR_SF_30.pdf PDF
Prebid_Meeting_Agenda_March_2015.doc DOC document
NCAUR_Contract_Body_03052015_Mod_002_(3)JJ.docx DOCX document
Revised_bid_Form_MOD_002.pdf PDF
NCAUR_Requests_for_Clarifications_and_Questions_-_J.docx DOCX document
Mod_002.pdf PDF
05-2173_12222014.txt TXT text file
IL3_03022015.txt TXT text file
E.5_SCA_WD_05-2174.txt TXT text file
ATT_026a_AW_Summary.xlsx XLSX spreadsheet
ATT_009a_Task_Report.pdf PDF
ATT_028b.pdf PDF
ATT_030b_Seimens_Points.pdf PDF
ATT_017a_-_Pest_Treatment_Matrix_(Floorplans).pdf PDF
ATT_001b_Craft_Codes.pdf PDF
ATT_012a_INVENTORY_REPORT_FOR_O_ _M.pdf PDF
ATT_014b-Contractor_Space_02272015.pdf PDF
ATT_004_Documents_Incorporated_By_Reference.docx DOCX document
ATT_025_-_Historical_Pricing_data.docx DOCX document
ATT_013b_Space_Requirements_-_Temperature_and_Humdiity_02272015a.pdf PDF
ATT_005_Gov_Services_Furnished.xlsx XLSX spreadsheet
E.4_DBA_WD_IL3.txt TXT text file
ATT_002a_Work_Order_Types.pdf PDF
E.7_Exhibit-NCAUR_Bldg_Standards_02_09_2105.pdf PDF
NCAUR_Statement_of_Work_3-7-14.docx DOCX document
E.2_Quality_Assurance_Plan.pdf PDF
ATT_027b_-_Annual_Simplex_Inspection_and_Testing_Report_(2).pdf PDF
ATT_015_DESCRIPTION_OF_FLOORING_SURFACES.xlsx XLSX spreadsheet
ATT_008a_Task_Instruction_List.pdf PDF
Show 40 more

Latest 50 of 96 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Schedule B For NCAUR Operations and Maintenance Contract
Total Price – Transition Period$0.00
Total Price – Base Period$225,000.00
Total Price – Option Period I$225,000.00
Total Price – Option Period II$225,000.00
Total Price – Option Period III$225,000.00
Total Price – Option Period IV$225,000.00
Total Price$1,125,000.00
Total Firm Fixed Price for labor, material and equipment to perform all
routine work as specified in Section C, except for additional work
specifically identified as being included in the Indefinite
Delivery/Indefinate Quantity portions of the contract
Routine Price – Transition Period$0.00
Routine Price – Base Period
B.1Work Management$0.00
B.2Admin Services$0.00
B.3Safety$0.00
B.4Utilities Service$0.00
B.5Facility Services$0.00
Base Total$0.00
Routine Price – Option Period I
1.1Work Management$0.00
1.2Admin Services$0.00
1.3Safety$0.00
1.4Utilities Service$0.00
1.5Facility Services$0.00
OY 1 Total$0.00
Routine Price – Option Period II
2.1Work Management$0.00
2.2Admin Services$0.00
2.3Safety$0.00
2.4Utilities Service$0.00
2.5Facility Services$0.00
OY II Total$0.00
Routine Price – Option Period III
3.1Work Management$0.00
3.2Admin Services$0.00
3.3Safety$0.00
3.4Utilities Service$0.00
3.5Facility Services$0.00
OY III Total$0.00
Routine Price – Option Period V
5.1Work Management$0.00
5.2Admin Services$0.00
5.3Safety$0.00
5.4Utilities Service$0.00
5.5Facility Services$0.00
OY V Total$0.00
Total Routine Work$0.00
Additional Work
AW Price – Base Period$225,000.00
AW Price – Option Period I$225,000.00
AW Price – Option Period II$225,000.00
AW Price – Option Period III$225,000.00
AW Price – Option Period IV$225,000.00
Total Additional Work$1,125,000.00

&LAG-32SC-S-14-0010&CNCAUR PEORIA&RFAR FAC 78

&LMOD 009&C&P&R05/18/2015

DBA AW

Base Period – Additional Work (Davis Bacon Act (DBA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract.
Item No.Labor CategoryEstimated DBA HoursFully Burdened Hourly Rate DBATotal Price
B.6Electrician800$0.00$0.00
B.7Roofer100$0.00$0.00
B.8Building/Sheet Metal Worker100$0.00$0.00
B.9Carpenter100$0.00$0.00
B.10Painter100$0.00$0.00
B.11Plumber/Steamfitter600$0.00$0.00
B.12Boiler Maker100$0.00$0.00
B.13Elevator Mechanic100$0.00$0.00
B.14Heavy Equipment Operator Group I100$0.00$0.00
B.15Heavy Equipment Operator Group II75$0.00$0.00
B.16Heavy Equipment Operator Group III50$0.00$0.00
B.17Laborer – Group I100$0.00$0.00
B.18Laborer – Group II100$0.00$0.00
B.19Laborer – Group III100$0.00$0.00
B.20Cement Mason100$0.00$0.00
B.21Bricklayer100$0.00$0.00
B.22Teamster100$0.00$0.00
B.23DBA MaterialsLSUM$125,000.00
B.24Contractor Markup, OH&P and materials Handling for materials onlyLSUM0.00%$0.00
Total DBA Work B.6-B.24 Base Period$125,000.00
Option Period I - Additional Work (Davis Bacon Act (DBA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract.
Item No.Labor CategoryEstimated DBA HoursFully Burdened Hourly Rate DBATotal Price
1.6Electrician800$0.00$0.00
1.7Roofer100$0.00$0.00
1.8Building/Sheet Metal Worker100$0.00$0.00
1.9Carpenter100$0.00$0.00
1.1Painter100$0.00$0.00
1.11Plumber/Steamfitter600$0.00$0.00
1.12Boiler Maker100$0.00$0.00
1.13Elevator Mechanic100$0.00$0.00
1.14Heavy Equipment Operator Group I100$0.00$0.00
1.15Heavy Equipment Operator Group II75$0.00$0.00
1.16Heavy Equipment Operator Group III50$0.00$0.00
1.17Laborer – Group I100$0.00$0.00
1.18Laborer – Group II100$0.00$0.00
1.19Laborer – Group III100$0.00$0.00
1.2Cement Mason100$0.00$0.00
1.21Bricklayer100$0.00$0.00
1.22Teamster100$0.00$0.00
1.23DBA MaterialsLSUM$125,000.00
1.24Contractor Markup, OH&P and materials Handling for materials onlyLSUM0.00%$0.00
Total DBA Work 1.6-1.24 Option Period One$125,000.00
Option Period II - Additional Work (Davis Bacon Act (DBA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract.
Item No.Labor CategoryEstimated DBA HoursFully Burdened Hourly Rate DBATotal Price
2.6Electrician800$0.00$0.00
2.7Roofer100$0.00$0.00
2.8Building/Sheet Metal Worker100$0.00$0.00
2.9Carpenter100$0.00$0.00
2.1Painter100$0.00$0.00
2.11Plumber/Steamfitter600$0.00$0.00
2.12Boiler Maker100$0.00$0.00
2.13Elevator Mechanic100$0.00$0.00
2.14Heavy Equipment Operator Group I100$0.00$0.00
2.15Heavy Equipment Operator Group II75$0.00$0.00
2.16Heavy Equipment Operator Group III50$0.00$0.00
2.17Laborer – Group I100$0.00$0.00
2.18Laborer – Group II100$0.00$0.00
2.19Laborer – Group III100$0.00$0.00
2.2Cement Mason100$0.00$0.00
2.21Bricklayer100$0.00$0.00
2.22Teamster100$0.00$0.00
2.23DBA MaterialsLSUM$125,000.00
2.24Contractor Markup, OH&P and materials Handling for materials onlyLSUM0.00%$0.00
Total DBA Work 2.6-2.24 Option Period Two$125,000.00
Option Period III - Additional Work (Davis Bacon Act (DBA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract.
Item No.Labor CategoryEstimated DBA HoursFully Burdened Hourly Rate DBATotal Price
3.6Electrician800$0.00$0.00
3.7Roofer100$0.00$0.00
3.8Building/Sheet Metal Worker100$0.00$0.00
3.9Carpenter100$0.00$0.00
3.1Painter100$0.00$0.00
3.11Plumber/Steamfitter600$0.00$0.00
3.12Boiler Maker100$0.00$0.00
3.13Elevator Mechanic100$0.00$0.00
3.14Heavy Equipment Operator Group I100$0.00$0.00
3.15Heavy Equipment Operator Group II75$0.00$0.00
3.16Heavy Equipment Operator Group III50$0.00$0.00
3.17Laborer – Group I100$0.00$0.00
3.18Laborer – Group II100$0.00$0.00
3.19Laborer – Group III100$0.00$0.00
3.2Cement Mason100$0.00$0.00
3.21Bricklayer100$0.00$0.00
3.22Teamster100$0.00$0.00
3.23DBA MaterialsLSUM$125,000.00
3.24Contractor Markup, OH&P and materials Handling for materials onlyLSUM0.00%$0.00
Total DBA Work 3.6-3.24 Option Period Three$125,000.00
Option Period IV - Additional Work (Davis Bacon Act (DBA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract.
Item No.Labor CategoryEstimated DBA HoursFully Burdened Hourly Rate DBATotal Price
4.6Electrician800$0.00$0.00
4.7Roofer100$0.00$0.00
4.8Building/Sheet Metal Worker100$0.00$0.00
4.9Carpenter100$0.00$0.00
4.1Painter100$0.00$0.00
4.11Plumber/Steamfitter600$0.00$0.00
4.12Boiler Maker100$0.00$0.00
4.13Elevator Mechanic100$0.00$0.00
4.14Heavy Equipment Operator Group I100$0.00$0.00
4.15Heavy Equipment Operator Group II75$0.00$0.00
4.16Heavy Equipment Operator Group III50$0.00$0.00
4.17Laborer – Group I100$0.00$0.00
4.18Laborer – Group II100$0.00$0.00
4.19Laborer – Group III100$0.00$0.00
4.2Cement Mason100$0.00$0.00
4.21Bricklayer100$0.00$0.00
4.22Teamster100$0.00$0.00
4.23DBA MaterialsLSUM$125,000.00
4.24Contractor Markup, OH&P and materials Handling for materials onlyLSUM0.00%$0.00
Total DBA Work 4.6-4.24 Option Period Four$125,000.00
Total Additional work Base and Five options$625,000.00

&LAG-32SC-S-14-0010&CNCAUR PEORIA&RFARFAC 78

&LMOD 000&C7&R02/25/2015

SCA AW

Base Period – Additional Work (Service Contract Act (SCA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract.
Item No.Labor CategoryEstimated SCA HoursFully Burdened Hourly Rate SCATotal Price
B.25Housekeeping100$0.00$0.00
B.26General Clerk II75$0.00$0.00
B.27Security Guard100$0.00$0.00
B.28Laborer Grounds Maintenance100$0.00$0.00
B.29N/A0$0.00$0.00
B.30Shipping/Receiving Clerk75$0.00$0.00
B.31Electrician300$0.00$0.00
B.32General Maintenance300$0.00$0.00
B.33HVAC Research400$0.00$0.00
B.34Maintenance Trades Helper200$0.00$0.00
B.35Painter300$0.00$0.00
B.36Pipefitter200$0.00$0.00
B.37Plumber200$0.00$0.00
B.38Boiler Operator100$0.00$0.00
B.39N/A0$0.00$0.00
B.40SCA MaterialsLSUM$100,000.00
B.41Contractor Markup, OH&P and materials Handling for materials onlyLSUM0.00%$0.00
Total SCA Work B.25-B.41 Base Period$100,000.00
Option Period One
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract.
Item No.Labor CategoryEstimated SCA HoursFully Burdened Hourly Rate SCATotal Price
1.25Housekeeping100$0.00$0.00
1.26General Clerk II75$0.00$0.00
1.27Security Guard100$0.00$0.00
1.28Laborer Grounds Maintenance100$0.00$0.00
1.29N/A0$0.00$0.00
1.3Shipping/Receiving Clerk75$0.00$0.00
1.31Electrician300$0.00$0.00
1.34General Maintenance300$0.00$0.00
1.33HVAC Research400$0.00$0.00
1.34Maintenance Trades Helper200$0.00$0.00
1.35Painter300$0.00$0.00
1.36Pipefitter200$0.00$0.00
1.37Plumber200$0.00$0.00
1.38Boiler Operator100$0.00$0.00
1.39N/A0$0.00$0.00
1.4SCA MaterialsLSUM$100,000.00
1.41Contractor Markup, OH&P and materials Handling for materials onlyLSUM0.00%$0.00
Total SCA Work 1.25-1.41 Option Period One$100,000.00
Option Period Two – Additional Work (Service Contract Act (SCA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract.
Item No.Labor CategoryEstimated SCA HoursFully Burdened Hourly Rate SCATotal Price
2.25Housekeeping100$0.00$0.00
2.26General Clerk II75$0.00$0.00
2.27Security Guard100$0.00$0.00
2.28Laborer Grounds Maintenance100$0.00$0.00
2.29N/A0$0.00$0.00
2.3Shipping/Receiving Clerk75$0.00$0.00
2.31Electrician300$0.00$0.00
2.32General Maintenance300$0.00$0.00
2.33HVAC Research400$0.00$0.00
2.34Maintenance Trades Helper200$0.00$0.00
2.35Painter300$0.00$0.00
2.36Pipefitter200$0.00$0.00
2.37Plumber200$0.00$0.00
2.38Boiler Operator100$0.00$0.00
2.39N/A0$0.00$0.00
2.4SCA MaterialsLSUM$100,000.00
2.41Contractor Markup, OH&P and materials Handling for materials onlyLSUM0.00%$0.00
Total SCA Work 2.25-2.41 Option Period Two$100,000.00
Option Period Three – Additional Work (Service Contract Act (SCA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract.
Item No.Labor CategoryEstimated SCA HoursFully Burdened Hourly Rate SCATotal Price
3.25Housekeeping100$0.00$0.00
3.26General Clerk II75$0.00$0.00
3.27Security Guard100$0.00$0.00
3.28Laborer Grounds Maintenance100$0.00$0.00
3.29N/A0$0.00$0.00
3.3Shipping/Receiving Clerk75$0.00$0.00
3.31Electrician300$0.00$0.00
3.32General Maintenance300$0.00$0.00
3.33HVAC Research400$0.00$0.00
3.34Maintenance Trades Helper200$0.00$0.00
3.35Painter300$0.00$0.00
3.36Pipefitter200$0.00$0.00
3.37Plumber200$0.00$0.00
3.38Boiler Operator100$0.00$0.00
3.39N/A0$0.00$0.00
3.4SCA MaterialsLSUM$100,000.00
3.41Contractor Markup, OH&P and materials Handling for materials onlyLSUM0.00%$0.00
Total SCA Work 3.25-3.41 Option Period Three$100,000.00
Optio Period Four – Additional Work (Service Contract Act (SCA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract.
Item No.Labor CategoryEstimated SCA HoursFully Burdened Hourly Rate SCATotal Price
4.25Housekeeping100$0.00$0.00
4.26General Clerk II75$0.00$0.00
4.27Security Guard100$0.00$0.00
4.28Laborer Grounds Maintenance100$0.00$0.00
4.29N/A0$0.00$0.00
4.3Shipping/Receiving Clerk75$0.00$0.00
4.31Electrician300$0.00$0.00
4.32General Maintenance300$0.00$0.00
4.33HVAC Research400$0.00$0.00
4.34Maintenance Trades Helper200$0.00$0.00
4.35Painter300$0.00$0.00
4.36Pipefitter200$0.00$0.00
4.37Plumber200$0.00$0.00
4.38Boiler Operator100$0.00$0.00
4.39N/A0$0.00$0.00
4.4SCA MaterialsLSUM$100,000.00
4.41Contractor Markup, OH&P and materials Handling for materials onlyLSUM0.00%$0.00
Total SCA Work 4.25-4.41 Option Period Four$100,000.00
$500,000.00

&LAG-32SC-S-14-0010&CNCAUR PEORIA&RFAR FAC 78

&LMOD 000&R02/25/2015

File details come from the government source that posted it. Updated .