About this file

ATT 026

View the file

Other files

File Type Posted
Amend_011_Sf_30.pdf PDF
Schedule_B_052115.xls XLS spreadsheet
Amend__010_SF_30.pdf PDF
Questions-wkm-5-15-2015.docx DOCX document
Amend009.pdf PDF
NCAUR_Contract_Body_051815_Mod_008.docx DOCX document
Schedule_B_051815.xls XLS spreadsheet
NCAUR_Statement_of_Work_5-12_15.docx DOCX document
Amend_008.pdf PDF
051215_Questions.docx DOCX document
Amend_007.pdf PDF
Amend_006_SF_30_NCAUR.pdf PDF
05-2174.txt TXT text file
IL3_04032015.txt TXT text file
Amend_005_sf30.pdf PDF
NCAUR_Statement_of_Work_4_9_15.docx DOCX document
Revised_Schedule_B_040215.xls XLS spreadsheet
NCAUR_041015_Requests_for_Clarifications_and_Questions.pdf PDF
Amend004.pdf PDF
IL3_04022015.txt TXT text file
Attendee_Roster.pdf PDF
05-2174_0315.txt TXT text file
032305_NCAUR_SF_30.pdf PDF
Prebid_Meeting_Agenda_March_2015.doc DOC document
NCAUR_Contract_Body_03052015_Mod_002_(3)JJ.docx DOCX document
Revised_bid_Form_MOD_002.pdf PDF
NCAUR_Requests_for_Clarifications_and_Questions_-_J.docx DOCX document
Mod_002.pdf PDF
05-2173_12222014.txt TXT text file
IL3_03022015.txt TXT text file
E.5_SCA_WD_05-2174.txt TXT text file
ATT_009a_Task_Report.pdf PDF
ATT_028b.pdf PDF
ATT_030b_Seimens_Points.pdf PDF
ATT_017a_-_Pest_Treatment_Matrix_(Floorplans).pdf PDF
ATT_001b_Craft_Codes.pdf PDF
ATT_012a_INVENTORY_REPORT_FOR_O_ _M.pdf PDF
ATT_014b-Contractor_Space_02272015.pdf PDF
ATT_004_Documents_Incorporated_By_Reference.docx DOCX document
ATT_025_-_Historical_Pricing_data.docx DOCX document
ATT_013b_Space_Requirements_-_Temperature_and_Humdiity_02272015a.pdf PDF
ATT_005_Gov_Services_Furnished.xlsx XLSX spreadsheet
E.4_DBA_WD_IL3.txt TXT text file
ATT_002a_Work_Order_Types.pdf PDF
E.7_Exhibit-NCAUR_Bldg_Standards_02_09_2105.pdf PDF
NCAUR_Statement_of_Work_3-7-14.docx DOCX document
E.2_Quality_Assurance_Plan.pdf PDF
ATT_027b_-_Annual_Simplex_Inspection_and_Testing_Report_(2).pdf PDF
ATT_015_DESCRIPTION_OF_FLOORING_SURFACES.xlsx XLSX spreadsheet
ATT_008a_Task_Instruction_List.pdf PDF
Show 40 more

Latest 50 of 96 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMER002

Contract No. AG-3K06-C-10-0009

Item MU # AD 700 WO # Date Paid Room # Description of Work DO#

1001362015100056200906566.07/Dec/09$473.002204Install Foot Pedal at sink in room 22041
2001362091000083201000208.06/Nov/09$82.96LobbyHang Posters1
3001362091000086201000224.010/Nov/09$243.961013Move TV from Lobby to 10131
4001362096600001201000225.028/Oct/09$238.502034Install Cabinets1
5001362096600053201000225.16/Nov/09$166.952034Install Cabinets1
6001362096600053201000225.21/Dec/09$283.052034Install Cabinets1
7001362091000082201000226.06/Nov/09$87.842042Hang Pictures1
8001362096600002201000227.028/Oct/09$2,797.003013Remodel Room 30131
9001362096600003201000229.02/Nov/09$400.003017Remodel Room 30171
10001362096600056201000230.01/Dec/09$1,454.733019Remodel Room 30191
11001362014500033201000238.010/Nov/09$734.00NAShip machine and crate1
12001362014500011201000529.028/Oct/09$546.251227Move Millipore System from 1101 to 12271
13001362018100030201001224.02/Nov/09$167.000216Repair Mixing Valve1
14001362019100131201001290.014/Jan/10$283.032309Move Incubator Lights2
15001362015100093201001478.010/Feb/10$362.17BORSharpen Blades on Wiley Mill2
16001362013500094201001479.09/Feb/10$169.452300Leak Test Incubator2
17001362013500093201001480.09/Feb/10$0.001317Leak Test Refrigerator2
18001362014500086201001730.013/Jan/10$65.882104Install Keyboard Tray1
19001362014500087201002130.013/Jan/10$482.59Crate and Ship Brabender2
20001362014500231201002130.127/Apr/10$190.80PPLAdditional Work On Brabender3
21001362017100214201002139.04/Mar/10$287.77Install Cord Cap on Freezer2
22001362096600173201002405.013/Jan/10$834.64LobbyPrepare Lobby for Remodel2
23001362013500176201002818.04/May/10$627.85119Hook up Incubators in Room 01193
24001362018100153201003053.011/Mar/10$41.81BORMachining Work2
25001362017100252201003146.028/Mar/10$52.553118Install Springs in Freezer2
26001362081000354201003409.016/Mar/10$1,824.68GHWhitewash Greenhouse2
27001362096600201201003548.028/Mar/10$5,400.00BoilerWeld Repair Tubes in Boiler #22
28001362016100411201003561.030/Apr/10$2,899.203309Hook Up Water Softener3
29001362096600198201003569.026/Apr/10$2,327.01AtticDI Water Tank Refills2
30001362014500173201003716.016/Mar/10$1,586.33PPLBrabender Electrical Hook-up2
31001362096600205201003720.06/Apr/10$196.562057Paint Room 20572
32001362091000243201003733.020/Apr/10$146.402046Hang Whiteboard and Maps2
33001362096600214201004009.020/Apr/10$551.632218Add Weatherstripping2
34001362096600219201004009.110/May/10$759.162218Additional Weatherstripping Material3
35001362014500247201005641.06/May/10$2,244.432301Install cabinet salvaged from room 21043
36001362017100408201005497.07/Jun/10$139.082057Hang Various items on the wall3
37001362096600233201002913.07/Jun/10$2,585.17GuardAdd Card Reader to guard office3
38001362096600228201005919.024/May/10$1,309.86BuildingPerform Safety Inspections3
39001362096600229201002705.01/Jun/10$1,347.70Dock ChillerRepair Outside Dock Chiller3
40001362019100322201003320.01/Jun/10$659.023327Add Two receptacles3
41001362096600225201002910.024/May/10$0.003205Repair Roof - Deleted - Modified3
42001362019100328201005476.010/Jun/10$117.123327Hang Drying Board3
43001362014500323201006030.023/Jun/10$899.452301Miscellaneaous Work Items3
44001362096600239201005630.024/Jun/10$5,427.11BHMove Existing fence3
45001362018100286201003708.014/Jun/10$1,006.62NCPModify Reactor3
46001362096600213201004745.020/Apr/10$1,792.36ServiceInstall metering pumps4
47001362096600221201004745.117/May/10$287.20ServiceInstall extra at Metering Pumps4
48001362017100368201005318.017/May/10$476.123116AInstall nanopure system4
49001362014500338201006031.020/Jul/10$335.843233Miscellaneous4
50001362096600261201006322.05/Aug/10$6,765.49329Replace Kaeser Air Dryer4
51001362015100355201006587.029/Jul/10$963.342220Install High Shear Pump4
52001362014500379201002936.829/Jul/10$2,936.822047Paint Office Room 20474
53001362014500359201004185.020/Jul/10$891.752200Replace Sink4
54001362014500367201006871.022/Jul/10$118.551318Troubleshoot Beercooler4
55001362019100383201006720.026/Jul/10$250.481057Hang Various Items4
56001362019100380201006994.026/Jul/10$333.33322Hang Various Items4
57001362096600254201006473.027/Jul/10$1,015.383019Install Wiremold4
58001362016100519201006599.029/Jun/10$261.393306Trouble Shoot Beer Cooler4
59001362096600262201002804.09/Aug/10$152.883305Certify Biohood4
60001362019100399201006722.011/Aug/10$692.79322Epoxy Paint two items4
61001362096600270201002910.017/Aug/10$7,180.223205Repair Roof above room 32054
62001362014500373201007227.011/Aug/10$9,287.462301Electrical Upgrade5
63001362081000735201006206.020/Aug/10$609.34GhseRemove whitewash5
64001362013500310201004175.020/Aug/10$2,043.272052Electrical additions5
65001362015100429201005910.01/Sep/10$951.511200Install Nederman Arms5
66001362096600273201006314.01/Sep/10$5,560.43SW AtticSafety Guards on Exhaust Fans5
67001362071000009201006490.01/Sep/10$1,463.72204Electrical Work5
68001360199900071201007775.01/Sep/10$1,201.002020Electrical Outlet5
69001362096600271201007738.01/Sep/10$2,449.003049Repair Ceiling Leak5
70001362014500458201007523.015/Sep/10$2,767.00232Install Rapid Cooling System6
71001362041500004201004194.022/Sep/10$9,968.362057Install Carpet and Paint Room 20576
72001362014500462201008088.017/Sep/10$2,644.96232Fabricate and Install Hood6
73001362041500003201006328.022/Sep/10$9,613.97ServiceInsulate Heat Exchanger Piping6
74001362096600283201008374.024/Sep/10$377.08FacilityREA adjustment for Work Previously performed7
75001362041500001201008215.022/Sep/10$8,397.48BHReplace Boilerhouse ATS7
76001362041500002201006324.024/Sep/10$15,483.33BHReplace Boilerhouse Water Softener7

77 0013620 966 00280 2010 06321.0 22/Sep/10 $4,100.77 Tunnel Replace Sump Pump in Service Building Tunnel 8

78101362015100122201007940.09/Dec/10$3,016.32222Install Electrical in room 22209
79101362015100174201101163.020/Jan/11$9,177.003317Install Orbitrap9
80101362096600185201100689.017/Feb/11$1,525.002303Electrical Work9
81101362096600186201101410.022/Feb/11$688.59Bldg 8Building 008 Filters9
82101362018100043201100122.01/Nov/10$660.211200Install Shelving9
83101362017100206201101772.017/Feb/11$189.531301Adapt Electrical @ Vacuum Pump9
84101362096600183201101399.015/Feb/11$206.062235Change Circuits9
85101362013500072201101155.015/Feb/11$891.742050Replace Door9
86101362019100085201005638.014/Dec/10$431.143318Remove and Install Cabinets9
87101362019100037201100098.01/Nov/10$283.923312Troubleshoot and Repair Beer Cooler9
88088362000200044201102752.010/Mar/11$269.763120Repair Vacuum Pumps9
89101362018100234201103334.017/Mar/11$580.00216Remove and Replace reactor lid9
90101362018100271201103029.025/Apr/11$2,520.00216Receptacles10
91101362096600204201102072.015/Apr/11$1,683.49N WingLocate and Identify VAV's10
92101362081000436201103159.025/Apr/11$1,082.96GrnhseApply Whitewash10
93101362018100351201005244.011/Jul/11$290.00Fabricate Paddle10
94101362096600244201004556.021/Jul/11$2,427.98LabsInstall Insulation10
95101362019100352201103659.026/Jul/11$4,818.362039Paint10
96101362017100487201105250.026/Jul/11$89.92Change Oil In vacuum Pumps10
97101362096600255201105619.08/Aug/11$4,289.88Dock ChillerInstall Electrical in room 222010
98101362014500327201002310.04/Aug/11$6,955.40232Paint floors and walls10
99101362096600263201106405.02/Sep/11$9,921.90LibraryRepalce Flooring11
100101362091000302201100485.01/Sep/11$3,396.93GhouseInstall Whitewash11
101101362019100428201103355.09/Aug/11$3,534.913327Wiremold Installation11
102101362019100464201103829.031/Aug/11$1,471.993323Install Receptacles11
103101362015100452201001788.017/Aug/11$1,659.932205Install Oven11
104101362081000707201005104.02/Sep/11$558.00GhouseRemove Whitewash11
105101362013500177201104685.022/Aug/11$348.00214Change Seal in Fermentor11
106101360191500175201101025.020/Sep/11$3,275.00ComputerAdd surge suppression11
107101362015100530201106785.020/Sep/11$909.562205Remove and Re-install sprinkler head12
108101362040800001201107071.016/Sep/11$23,542.91BoilerSteam metering @ Boiler House12
109101362014500397201100105.021/Sep/11$463.142301Raise Receptacles12
110101362096600214201106951.012/Sep/11$12,518.09BoilerAutomatic Blowdown for Boilers13
111101362016100642201104966.026/Sep/11$6,207.65207Hook-up Pervaporator13
112101360192500169201103834.026/Sep/11$3,332.06DockRepair Lift13
113101360192500170201107091.026/Sep/11$2,536.722043Paint Room13
11410136209660028020106342.R22/Sep/11$8,704.07BoilerAdditional Water Softner Work14
115101362096600642201107192.016/Sep/11$10,190.94BoilerGas Meters14
1161013601000000201100000.026/Sep/110014
117201362096600181201201398.022/Feb/12$24,137.69StreetEmergency Water Leak Repair15
118201362096600093201201209.015/Feb/12$828.44BoilerGas Meters15
119201362018100081201202014.022/Feb/12$960.37216Replace Mixing Valve on press16
120201362096600184201203016.022/Feb/12$1,920.360038Asbestos Reoval a steam line16
121201362014500093201201209.015/Feb/12$0.000225Deleted16
122201362096600186201200140.015/Feb/12$1,402.73ServiceInstall Combo shower eyewash16
123201362096600185201201562.015/Feb/12$1,186.03CommoditiesAsbestos Encapsulation16
124201362017100127201202042.014/Feb/12$200.151305Fridge Repair16
125201362016100121201202305.08/Feb/12$120.363308Incubator Repair16
126201362016100122201202307.08/Feb/12$100.303300Cooler Repair16
127201362096600180201106944.08/Feb/12$654.390216Install Grounding Reels16
128201362016100124201202046.08/Feb/12$172.150204Repair Air Dryer16
129201362096600159201107239.018/Jan/12$996.47ServiceLight Installation16
130201360192500010201200268R17/Oct/11$267.84AreaMove Area Offices around16
131201362096600212201201654.09/Apr/12$886.552328Repair Incubator Leak17
132201362015100175201202530.03/Apr/12$386.16NAMachine End Caps17
133201362096600210201203710.09/Apr/12$339.76OutsideMow Prairie17
134201362096600165201203729.09/Apr/12$2,097.16BHBoiler Safety Valves17
135201362096600213201202811.09/Apr/12$755.3617
136201362096600234201203856.04/Jun/12$515.50CWInstall Seat Cover Dispensers17
137201362096600211201203709.04/Apr/12$550.77CWCasework Revisions17
138201362096600229201204172.03/May/12$3,062.75CWInstall DI Faucet17
139201362014500180201204342.03/May/12$3,625.13GHNitrogen line17
140201362014500180201204203.03/May/12$1,265.82GHWhitewash Spring 201217
141201362017100311201204324.03/May/12$3,354.323110Install Argon Line17
142201362096600206201203396.029/Mar/12$2,087.34BHUpgrade Boiler Pressure Control17
143101362096600216201200677.09/Apr/12$497.49ATTICRemedy Fall hazard17
144201362096600215201203397.09/Apr/12$1,056.96Bldg 001Investigate Electriccal17
145201362096600214201202810.09/Apr/12$398.53ASU- N-1Upgrade Filters @ ASU n-117
146201362096600205201203440.029/Mar/12$6,230.8224Repair UPS18
147201362096600236201204862.05/Jun/12$3,494.40LawnBuy Lawnmower18
148201362096600242201203434.06/Jun/12$1,790.5838Plugged Steam Line18
149201362016100341201204875.014/Jun/12$1,257.082118ARemove/Install Autclaves18
150201362018100218201202927.028/Jun/12$868.002235Install Vent System18
151201362096600241201204041.06/Jun/12$294.44CWClean Laboratories18
152201362016100381201204196.028/Jun/12$376.26214Install Cord Reel18
153201362096600258201205185.02/Jul/12$1,856.83FACReplace Ice Machine18
154201362096600260201202298.02/Jul/12$3,855.3136Replace Inergen Hoses18
155201362096600262201205286.02/Jul/12$505.322302Replace Wiring for Vent18
156201362096600266201203406.02/Jul/12$511.46FACChiller #5 Repair18
157201362096600267201204733.02/Jul/12$440.00GrndsSewer Line Scoping18
158201362096600265201205312.02/Jul/12$742.38GrndsInstall Conduits in Trench Drain18
159201362096600268201205018.02/Jul/12$647.703112BChange Plug on shaker18
160201362096600261201205015.02/Jul/12$385.572115Relocate Ice Machine18
161201362096600264201205195.02/Jul/12$601.08CWInstall Sanitary Waste Receptacles18
162201362096600263201204874.02/Jul/12$182.342114Cap Lab Gas Ports18
163201362014500221201203541.02/Jul/12$359.30225Build Adapter for Feeder18
164201362017100439201205016.017/Aug/12$5,914.62NALyophil Tubes19
165201362014500268201204212.023/Jul/12$888.53232Electrical Upgrades19
166201362019100304201203540.023/Jul/12$123.63naRefrigeration check on Innova Shaker19
167201362013500230201203049.023/Jul/12$182.08naRemove and Re-install gas valve19
168201362096600259201205014.02/Jul/12$7,945.50CWFurnish and Install Ice Machines19
169201362017100400201205176.017/Jul/12$119.52NAAssemble bookcase19
170201362018100284201205835.016/Aug/12$263.742235Install new outlet19
171201362014500250201205705.09/Aug/12$144.812114Adjust House Air19
172201362014500291201203405.09/Aug/12$231.321204Install new outlet19
173201362019100312201205180.026/Jul/12$187.643323Install new outlet19
174201362096600278201203417.023/Jul/12$329.43214Cut acces panel into refiner19
175201362014500267201204193.023/Jul/12$253.16232Electrical Work19
176201362096600285201205015.121/Aug/12$418.35CWRelocate Ice Machine19
177201362017100473201204731.021/Aug/12$1,591.453110BExtend Gas Services19
178201362096600287201205827.022/Aug/12$327.60USTUST Training19
179201362096600288201206228.022/Aug/12$237.053120ARestore Electrical Circuits (Modernization)19
180201362096600279201205288.04/Sep/12$15,957.48BoilerRefractory Repair20
181201362096600293201206221.04/Sep/12$2,149.061301Lighting Improvements20
182201362096600291201206356.04/Sep/12$1,180.4713011301 Remove and Clean Biohood20
183201362014500310201204212.129/Aug/12$44.28232Add Work to Electrical Upgrades20
184201362096600294201206244.04/Sep/12$755.052100Install three Outlets20
185201362096600296201206977.012/Sep/12$3,887.632100Install Drain Pan20
186201362096600295201204196.112/Sep/12$59.01214Cord Reel Extra Material20
187201362081000509201206769.013/Sep/12$687.76GHRemove Whitewash20
188201362096600292201206245.04/Sep/12$14,040.141301Electrical Improvements21
189201362019100367201206506.014/Sep/12$182.482303Install Water Purifier21
190201362096600304201204180.019/Sep/12$3,724.391310Connect Dishwasher21
191201362096600305201204181.019/Sep/12$2,459.151316Connect Dishwasher21
19220136209660029920126661.b14/Sep/12$2,312.47CWModify lab sink drains21
19320136209660029820126661a14/Sep/12$2,155.00CWModify lab sink drains21
194201362096600303201202536.019/Sep/12$2,688.69CommodCover asbestos22
195201362096600311201203417.121/Sep/12$281.16Refineradd work at refiner22
196201362096600312201207137.021/Sep/12$395.51StairsHnag Ladders22
197201362096600301201207110.018/Sep/12$16,887.66ParkingReseal Parking Lot22
198201362096600299201204227.020/Sep/12$737.90Replace bearing on Fermentor22
199201362096600323201207272.026/Sep/12$2,952.00BASBAS Improvements22
200201362096600320201206660.026/Sep/12$336.78105Misc Installations22
201201362096600324201207249.026/Sep/12$617.511309Install Outlets22
202201362096600300201206981.018/Sep/12$13,195.89GHFlashing of Greenhouse roof vents23
203201362096600279201203043.021/Sep/12$10,704.243204Install Elephant Trunks23
204201362096600315201206976.025/Sep/12$4,022.91Chiller #3Chiller #3 Replacement24
205201362016100563201206523.026/Sep/12$1,544.473311Install Nano Pure24
206201362096600321201207270.026/Sep/12$5,750.29BASBAS Upgrade24
207201362096600322201207271.026/Sep/12$9,859.31BASBAS Intercept24
208201362096600319201207273.026/Sep/12$2,952.00BASTraining24
209201362096600327201206007.027/Sep/12$944.58BHUpgrade Faulty Meter25
210201362096600326201207141.027/Sep/12$3,559.0215 Year Sprinkler test25
211201362096600329201207278.027/Sep/12$3,904.88001Asbestos Repair25
212201362096600328201207243.027/Sep/12$2,437.22001Jockey Pump Revision25
213201362096600316201207248.027/Sep/12$11,872.471301Piping Improvements25
214201362096600325201206007.027/Sep/12$8,356.00001Fire Alarm Revisions26
215201362096600318201207267.026/Sep/12$8,696.841301Remove Fume Hood in 130126
216201362096600317201207244.025/Sep/12$7,276.34TowerCooling Tower #5 Repair replace26
217301362081000097201206007.026/Nov/12$371.45NMRReplace Dessicant Filters27
218301362014500038201204192.020/Nov/12$2,227.830225Electricla Hookup27
219301362018100027201206814.019/Nov/12$215.4322352235 Change Power Configuration27
220301362096600165201206990.017/Dec/12$3,183.361Fire Alarm repairs27
221088362000200093201300147.019/Nov/12$153.123118ARepair Refrigerator27
222301362014500039201300447.020/Nov/12$446.84309Move Laboratory Equipment27
223301362096600161201300889.017/Dec/12$633.840036Exercise Existing Valves27
224301362016100064201300982.017/Dec/12$163.312118bRepair Refrigerator27
225301362015100032201300992.017/Dec/12$124.922205Modify Centrifuge Connection27
226301362096600171201301120.014/Jan/13$2,640.00001Reprogram Radios and Repeater27
227301362096600176201302029.028/Jan/13$760.20BHAsbestos Clean-up27
228301362014500063201204215.017/Jan/13$281.340225Install Casters on Cart27
229301362018100043201300009.08/Jan/13$215.101321Install Airline27
230301362014500055201300997.019/Dec/12$469.063236Install Drying Rack27
231301362096600205201302688.01/Mar/13$3,457.14SemiReplace Cooling Tower Valves28
232301362096600201201302461.025/Feb/13$1,436.28CWProvide Lamp Safety Covers28
233301362017100201201302318.012/Feb/13$1,912.322329Provide Moving and Storage of Equipment28
234301362017100202201302031.012/Feb/13$14,823.492326Install Growth Chamber28
235301362096600178201302277.07/Feb/13$1,328.180108Install Equipment Pad28
236301362017100192201302133.07/Feb/13$1,797.722305Rennovations28
237301362096600196201302578.014/Feb/13$185.523123BClean and Repair Fire Damage28
238301362013500115201302034.014/Feb/13$176.16GHTest For Non FunctioningBallasts29
239301362018100068201302040.012/Mar/13$415.780309Install 220V Electrical Outlet29
240301362096600206201302687.01/Mar/13$984.602307Clean Ductwork29
241301362017100210201300555.025/Feb/13$247.000321Clean Ducts and Lights29
242301362081000282201302308.025/Feb/13$140.950314Repair Growth Chamber29
243301362096600202201302586.020/Feb/13$725.00SiteRemove Selected Trees29
244301362096600177201302324.07/Feb/13$145.291Assist in opening and closing valves29
245301362013500122201301910.07/Feb/13$476.410214Replace Water Pump29
246301362014500087201204214.05/Feb/13$896.833236Install Power Strip29
247301362014500086201301882.05/Feb/13$96.54225Smooth Aluminum Plate29
248301362015100163201300572.010/Apr/13$96.541311Work On Extruder29
249301362014500145201202720.010/Apr/13$6,365.071303Rennovate Office29
250301362096600216201303913.026/Mar/13$1,751.162328Replace Ice Machine29
251301362015100162201300986.010/Apr/13$193.082205Air Connection for Air Instrument29
252301362014500144201304199.010/Apr/13$132.60225Replace Extruder Plug29
253301362015100158201301883.026/Mar/13$220.202201Move Cubicle Electrical29
254301362096600222201303904.026/Mar/13$179.28BHRemove Scrap Metal29
255301362096602029201302029.012/Aug/13($625.47)29
256301362081000403201304655.09/May/13$991.06GHSEWhite wash Greenhouse 201330
257301362096600236201304815.029/Apr/13$130.423026Paint for room 302630
258301362014500205201305346.06/Jun/13$898.021229Repair Recirculating pump30
259301362096600255201305715.025/Jun/13$650.00GrndsRemove invasive Trees30
260301362096600249201305860.010/Jun/13$527.34PlumbInstall Eyewashes @ 4 Locations30
261301362096600241201304869.06/May/13$2,075.280215Chiller Bypass30
262301362096600263201306522.022/Jul/13$315.30NAAT Adjust for REA30
263301362096600245201302720.120/May/13$1,137.431303Extra Electrical Work30
264301362014500244201305818.022/Jul/13$2,423.480225Provide New Outlets30
265301362096600256201302031.125/Jun/13$461.052326Core Drill Floor30
266301362014500228201305546.025/Jun/13$4,484.040225Install Surge Suppression30
267301362096600257201206275.025/Jun/13$514.87Bldg 1Remove Floor Tiles for Core Drilling30
268301362014500213201305714.013/Jun/13$126.620309Replace Outlet30
269301362014500204201303739.06/Jun/13$618.662308Add Electrical Outlets30
270301362019100204201303739.06/Jun/13$618.662308Add Electrical Outlets30
271301362096600232201304381.029/Apr/13$314.29Bldg 1Purchase Freon30
272301362096600233201304868.029/Apr/13$571.00Bldg 1Change Seimens Control System30
273301362096600234201304959.029/Apr/13$3,004.00Bldg 1Purchase Additioanl move hours30
274301362096600235201304475.029/Apr/13$493.080036Provide Empty Conduit30
275301362014500142201307028.014/Aug/13$19,779.36225Remove Door31
276301362017100516201306917.014/Aug/13$263.18123Add Outlet31
277301362014500274201306925.014/Aug/13$164.27225Replace Outlet31
278301362096600278201306916.019/Aug/13$1,405.636Re-Route Steam Piping31
279301362096600279201306536.019/Aug/13$793.37BHAsbestos Removal Costs31
280301362019100216201307184.019/Aug/13$165.00324Clean Fume Hood Area31
281301362096600246201305363.019/Aug/13$330.751Operate valves31
282301362014500297201306285.021/Aug/13$145.29309Install Oil Filter31
283301362081000669201306862.029/Aug/13$753.00GHRemove Whitewash31
284301362096600282201307461.029/Aug/13$228.76CWPaint Center wing EM panels31
285301362081000653201307443.029/Aug/13$152.88OO1Freon R-40731
286301362096600283201207194.029/Aug/13$125.65OO1Freon R134a31
287301362019100215201307058.019/Aug/13$12,207.73324Replace Fume hood32
288301362096600284201306140.019/Aug/13$6,826.24DockRepair Dock Chiller32
289301362014500331201307023.030/Aug/13$5,451.37o101Install Humidityu Chamber32
290301362014500141201307029.021/Aug/13o232Remove Milacron Equipment33
291301362096600237201306650.019/Aug/12GHReplace Fin tube Radiation33
292301362016100395201307185.030/Aug/132100Install Outlets33
293301362096600285201307022.04/Sep/13o322Repair Biohood33
294301362096600286201305715.14/Sep/13GroundsRemove Invasive Trees33
295301362096600292201305997.016/Sep/132328Insulate Piping34
296301362096600287201307460.04/Sep/13ASUN5Upgrade Filters @ AHU34
297301362096600288201307024.04/Sep/13LotReseal Parking Lot34
298301362014500321201307880.017/Sep/13225Install Nederman Arms34
299301362014500367201307876.017/Sep/13232Install Electric Feeder34
300301362013500261201307059.017/Sep/132302Repair Incubator34
301301362096600297201307242.018/Sep/13NWReplace VFD35
302301362096600296201307450.018/Sep/133020Install Cable Tray35
303301362018100266201306985.021/Sep/131204Install New Outlet35
304301362096600294201307877.018/Sep/13SiteProvide Extra Duympster35
305301362096600295201307314.018/Sep/13CWRemove Ductwork tabs35
306301362015100374201307863.021/Sep/132205Modify Electrical Connection35
307301362014500368201308025.025/Sep/13225Install Nederman Arm35
308301362014500384201308023.025/Sep/131Move Equipment35
309301362018100259201308024.026/Sep/133204Installl Gas Line to Hood36
310301362096600259201308024.026/Sep/133204"36
311301362096600305201308017.026/Sep/13CWRepair Drain Pipe36
312301362096600301201306531.026/Sep/13OO1Additional Repairs to water heater36
313301362096600303201308010.026/Sep/13CWInstall Bird Screen36
314301362096600302201306140.126/Sep/13DockTroubleshoot Dock Chiller36
315301362096600304201308022.026/Sep/131207Install Outlets36

316 3013620 966 00307 2013 06140.2 27/Sep/13 1207 Install Outlets 37

Totals $664,064.76

AG-32SC-S-14-0010 AT History ATT 026

File details come from the government source that posted it. Updated .