About this file

Meeting Agenda Amend 003

View the file

Other files

File Type Posted
Amend_011_Sf_30.pdf PDF
Schedule_B_052115.xls XLS spreadsheet
Amend__010_SF_30.pdf PDF
Questions-wkm-5-15-2015.docx DOCX document
Amend009.pdf PDF
NCAUR_Contract_Body_051815_Mod_008.docx DOCX document
Schedule_B_051815.xls XLS spreadsheet
NCAUR_Statement_of_Work_5-12_15.docx DOCX document
Amend_008.pdf PDF
051215_Questions.docx DOCX document
Amend_007.pdf PDF
Amend_006_SF_30_NCAUR.pdf PDF
05-2174.txt TXT text file
IL3_04032015.txt TXT text file
Amend_005_sf30.pdf PDF
NCAUR_Statement_of_Work_4_9_15.docx DOCX document
Revised_Schedule_B_040215.xls XLS spreadsheet
NCAUR_041015_Requests_for_Clarifications_and_Questions.pdf PDF
Amend004.pdf PDF
IL3_04022015.txt TXT text file
Attendee_Roster.pdf PDF
05-2174_0315.txt TXT text file
032305_NCAUR_SF_30.pdf PDF
NCAUR_Contract_Body_03052015_Mod_002_(3)JJ.docx DOCX document
Revised_bid_Form_MOD_002.pdf PDF
NCAUR_Requests_for_Clarifications_and_Questions_-_J.docx DOCX document
Mod_002.pdf PDF
05-2173_12222014.txt TXT text file
IL3_03022015.txt TXT text file
E.5_SCA_WD_05-2174.txt TXT text file
ATT_026a_AW_Summary.xlsx XLSX spreadsheet
ATT_009a_Task_Report.pdf PDF
ATT_028b.pdf PDF
ATT_030b_Seimens_Points.pdf PDF
ATT_017a_-_Pest_Treatment_Matrix_(Floorplans).pdf PDF
ATT_001b_Craft_Codes.pdf PDF
ATT_012a_INVENTORY_REPORT_FOR_O_ _M.pdf PDF
ATT_014b-Contractor_Space_02272015.pdf PDF
ATT_004_Documents_Incorporated_By_Reference.docx DOCX document
ATT_025_-_Historical_Pricing_data.docx DOCX document
ATT_013b_Space_Requirements_-_Temperature_and_Humdiity_02272015a.pdf PDF
ATT_005_Gov_Services_Furnished.xlsx XLSX spreadsheet
E.4_DBA_WD_IL3.txt TXT text file
ATT_002a_Work_Order_Types.pdf PDF
E.7_Exhibit-NCAUR_Bldg_Standards_02_09_2105.pdf PDF
NCAUR_Statement_of_Work_3-7-14.docx DOCX document
E.2_Quality_Assurance_Plan.pdf PDF
ATT_027b_-_Annual_Simplex_Inspection_and_Testing_Report_(2).pdf PDF
ATT_015_DESCRIPTION_OF_FLOORING_SURFACES.xlsx XLSX spreadsheet
ATT_008a_Task_Instruction_List.pdf PDF
Show 40 more

Latest 50 of 96 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-32SC-S-14-0010

Pre-Bid Meeting Agenda Project Name: NCAUR O&M Date:

Thursday, March 19, 2015

Time:

10:00 AM CDT

Location:

USDA, ARS, NCAUR

A. INTRODUCTIONS

Location:

1. Paul Sebesta - Center Director

2. Bob Caywood - CenterAdministrative Officer

3. Wayne Myers - Center Engineer

4. Al Probyn - Center QA

5. Christine Guntermann - Center Purchasing Agent

EBSC:

6. Jeffrey Neill - Contracting Officer (Team Lead)(Telecon)

7. Mark Volk - Admin Contracting Officer

8. Kristen Turner - Team two observer

B. SIGN-IN SHEET

C. PROJECT DESCRIPTION & SCOPE OF WORK

B.1

SCOPE OF THE CONTRACT

The Contractor shall furnish all necessary personnel, materials, supplies, services, and equipment to include rental equipment to operate and perform Operations and Maintenance support at the U.S. Department of Agriculture, Agricultural Research Service, National Center for Agricultural Utilization Research Center Peoria, IL in accordance with the terms and conditions and the Performance Work Statement. The Performance Work Statement (PWS) describes the services expected to provide the full range of operational and maintenance support. The PWS is intended to describe the minimum level of facility services and preventative and predictive maintenance required to create a clean, functional, healthy, safe, comfortable, and aesthetically pleasing physical environment for staff and visitors.

D. Few Words by CD

E. DELIVERY METHOD

B.1.1 ROUTINE WORK (FIRM-FIXED PRICE)

Routine work is all work that is defined in the Performance Work Statement (PWS).

B.1.2 ADDITIONAL WORK (Indefinite Quantity Contract IQC)

Additional work is defined as work within the general scope, but not specifically described in the PWS. Additional work may also include labor hours above the workload data.

F. ALTERNATES, ALLOWANCES AND UNIT PRICES

B.2

PRICE SCHEDULE

The hours reflected in the Additional Work IQC portion are estimated quantities and will serve as the Contract maximum for the IQC.

The Government will pay the Contractor in accordance with the following: See attached Schedule B

G. QUESTIONS DURING BID

Submit questions in written format via email to Mark Volk at Mark.Volk@ARS.USDA.GOV Questions and responses will be provided to all offerors in an amendment(s) to the solicitation.

H. BID ADDENDUM

1. Acknowledge receipt on Bid Form

2. Sign each SF30 and submit with Bid

I. BID OPENING

01 April 2015

J. COMPLETION TIME & PROJECT SCHEDULE

F.2

AGAR 452.211-74 PERIOD OF PERFORMANCE (FEB 1998)

Transition Period: May 1, 2015 through May 31, 2015

Base Period:

June 1, 2015 through September 30, 2015

Option Period 1:

October 1, 2015 through September 30, 2016

Option Period 2:

October 1, 2016 through September 30, 2017

Option Period 3:

October 1, 2017 through September 30, 2018

Option Period 4:

October 1, 2018 through September 30, 2019

Option Period 5:

October 1, 2019 through April 30, 2020

K. OBTAINING PLANS AND SPECIFICATIONS

Download @ FBO

L. REQUIRED BID SUBMITTALS

1. L.5 AGAR 452.215-71 INSTRUCTIONS FOR PREPARATION OF TECHNICAL AND BUSINESS PROPOSALS (SEP 1999)

2. L.6 AGAR 452.215-72 AMENDMENTS TO PROPOSALS (FEB 1988)

M. SAFETY

The Contractor must develop and implement an environmental, health and safety program for their employees. This program must include, but is not limited to, the following topics: accident prevention, affirmative procurement, asbestos awareness, asbestos site supervisor, powered industrial trucks, blood-borne pathogens, compressed gasses and compressed gas cylinders, confined spaces, electrical hazards/Arc flash, emergency eyewashes and safety showers, environmental management system, fall protection, fire extinguisher (hands-on), hazard communication, hazardous conditions, hazardous spill response and clean-up, hot work, high risk activities, job hazard analysis, lead awareness, lockout/tagout, machine guarding, materials handling (certification), obstructions, personal protective equipment, ozone depleting substances, scaffolding, storage, temporary construction barriers, and welding/cutting/burning & Proper Attire

N. DRUG FREE – SAFETY PROGRAM

Drug-Free Safety Program

O. SPECIAL CONSIDERATIONS

1. BioBased Products

a) 52.223-1

BIOBASED PRODUCT CERTIFICATION

MAY 2012

b) 52.223-2

AFFIRMATIVE PROCUREMENT OF BIOBASED

PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS SEP 2013

2. GFE

a) Attachment

3. Work Management System

a) MP2

4. Buy American

a) I.11 FAR 52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (MAY 2014)

b) FAR 52.225-10 NOTICE OF BUY AMERICAN ACT REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)

5. Recycling – 50-60% Recycled materials

P. INSURANCE

1. Contractors are to provide and maintain Liability and Builders Risk coverage per H.5

AGAR 452.228-71 INSURANCE COVERAGE (NOV 1996)

Q. PREVAILING WAGE

1. This is a prevailing wage project with Contractor/Subcontractor compliance and reporting requirements.

2. 52.222-6 DAVIS-BACON ACT MAY 2014

3. 52.222-41 SERVICE CONTRACT ACT OF 1965

MAY 2014

R. SUPPLEMENTARY CONDITIONS & SUPPLEMENTARY INSTRUCTIONS

1. 52.222-99 - ESTABLISHING A MINIMUM WAGE FOR CONTRACTORS (DEVIATION 2014-O0017) (JUNE 2014)

S. GENERAL CONDITIONS & AGREEMENT FORM

1. SF 33

T. QUESTIONS

1. No Answers U. SITE TOUR Introduce Wayne Myers as Tour Director

1. Bump caps/Hard Hats

2. Safety Glasses

3. Route NCAUR O&M Pre-Bid Meeting Agenda

March 19 2015