About this file

ATT 009

View the file

Other files

File Type Posted
Amend_011_Sf_30.pdf PDF
Schedule_B_052115.xls XLS spreadsheet
Amend__010_SF_30.pdf PDF
Questions-wkm-5-15-2015.docx DOCX document
Amend009.pdf PDF
NCAUR_Contract_Body_051815_Mod_008.docx DOCX document
Schedule_B_051815.xls XLS spreadsheet
NCAUR_Statement_of_Work_5-12_15.docx DOCX document
Amend_008.pdf PDF
051215_Questions.docx DOCX document
Amend_007.pdf PDF
Amend_006_SF_30_NCAUR.pdf PDF
05-2174.txt TXT text file
IL3_04032015.txt TXT text file
Amend_005_sf30.pdf PDF
NCAUR_Statement_of_Work_4_9_15.docx DOCX document
Revised_Schedule_B_040215.xls XLS spreadsheet
NCAUR_041015_Requests_for_Clarifications_and_Questions.pdf PDF
Amend004.pdf PDF
IL3_04022015.txt TXT text file
Attendee_Roster.pdf PDF
05-2174_0315.txt TXT text file
032305_NCAUR_SF_30.pdf PDF
Prebid_Meeting_Agenda_March_2015.doc DOC document
NCAUR_Contract_Body_03052015_Mod_002_(3)JJ.docx DOCX document
Revised_bid_Form_MOD_002.pdf PDF
NCAUR_Requests_for_Clarifications_and_Questions_-_J.docx DOCX document
Mod_002.pdf PDF
05-2173_12222014.txt TXT text file
IL3_03022015.txt TXT text file
E.5_SCA_WD_05-2174.txt TXT text file
ATT_026a_AW_Summary.xlsx XLSX spreadsheet
ATT_028b.pdf PDF
ATT_030b_Seimens_Points.pdf PDF
ATT_017a_-_Pest_Treatment_Matrix_(Floorplans).pdf PDF
ATT_001b_Craft_Codes.pdf PDF
ATT_012a_INVENTORY_REPORT_FOR_O_ _M.pdf PDF
ATT_014b-Contractor_Space_02272015.pdf PDF
ATT_004_Documents_Incorporated_By_Reference.docx DOCX document
ATT_025_-_Historical_Pricing_data.docx DOCX document
ATT_013b_Space_Requirements_-_Temperature_and_Humdiity_02272015a.pdf PDF
ATT_005_Gov_Services_Furnished.xlsx XLSX spreadsheet
E.4_DBA_WD_IL3.txt TXT text file
ATT_002a_Work_Order_Types.pdf PDF
E.7_Exhibit-NCAUR_Bldg_Standards_02_09_2105.pdf PDF
NCAUR_Statement_of_Work_3-7-14.docx DOCX document
E.2_Quality_Assurance_Plan.pdf PDF
ATT_027b_-_Annual_Simplex_Inspection_and_Testing_Report_(2).pdf PDF
ATT_015_DESCRIPTION_OF_FLOORING_SURFACES.xlsx XLSX spreadsheet
ATT_008a_Task_Instruction_List.pdf PDF
Show 40 more

Latest 50 of 96 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1Page

Task Report (Full List)

National Center Agricultural Utilization Research1/21/2014

Task No. 5 YR INSPECTION/TEST

5 YR INSPECTION/TEST ITEMS

Assigned To WO Type

Expense Class

Priority Multitask

In-service Task

PM

3.00 No Yes

Description

Site NCAUR

Craft Estimated Labor HoursCrew Size

ELEC 1.00 12.00

PIPE 2.00 12.00

SUB 32.00

INTERMAL INSPECTION OF SYSTEM CHECK VALVE

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

Perform Every 5.00 Year(s)

Date Last Performed Next Due Date 9/20/2017

Schedule Type Duplicates Task Duration

No. of Times Completed Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. FIRE-SPRINK-CHECK VALVE

INTERNAL INSPECTION OF FIRE SPRINKLER SYSTEMS PIPI

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

Perform Every 5.00 Year(s)

Date Last Performed Next Due Date

Schedule Type Duplicates Task Duration

No. of Times Completed Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. FIRE-SPRINK-SPRINKLER PIPING

STANDPIPE TEST ON INSTALLED WET STANDPIPES

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

Perform Every 5.00 Year(s)

Date Last Performed Next Due Date

Schedule Type Duplicates Task Duration

No. of Times Completed Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. FIRE-SPRINK-STANDPIPE

SYSTEM GAUGE(S) REPLACEMENT

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

Perform Every 5.00 Year(s)

Date Last Performed Next Due Date

Schedule Type Duplicates Task Duration

No. of Times Completed Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. FIRE-SPRINK-SYS GAUGE

Meter Name Last Performed At

Task Instructions

CHECK THE DATE ON GAUGE AND REPLACE EVERY 5 YEARS AS REQUIRED PER NFPA 25 SEC. 5.3.2 Instruction Code 5 YR 3/11/2013Date Last Edited

Task No. AC-COMP-BLD10-Q QUARTERLY ON CONDENSING UNIT IN BUILDING 10Description

Site NCAUR

AG-32SC-S-14-0010 ATT 009

2Page

National Center Agricultural Utilization Research1/21/2014

Assigned To WO Type

Expense Class

Priority Multitask

In-service Task

PM

3.00 Yes Yes

Craft Estimated Labor HoursCrew Size

HVAC 1.00 2.00

AC COMPRESSOR CONDENSING UNIT & BLOWER

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 10

C

Perform Every 3.00 Month(s)

Date Last Performed 1/17/2014 Next Due Date 4/18/2014

Schedule Type Duplicates Task Duration 14.00

No. of Times Completed 41.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. AC-COMP-BLD10

Meter Name Last Performed At

Task Instructions

A. INSPECT UNIT FOR LOOSE COMPONENTS, CORROSION, ETC.

B. CHECK ELECTRICAL CONNECTIONS FOR TIGHTNESS

C. CLEAN DRAINS

D. CHANGE THE REFRIDGERANT DRIER CORE AS REQUIRED

Instruction Code 069 7/26/2011Date Last Edited

WARNING -

FIRE DETECTORS MUST BE DISABLED BEFORE ANY FLAME OR ARC WELDING WORK

Instruction Code BLDG 10 3/30/2010Date Last Edited

CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT

[ ] ASBESTOS [ ] PERMIT-REQUIRED

[ ] CARCINOGEN [ ] SINGLE-SOURCE

[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"

[ ] INCOMPATIBLE CHEMICALS

[ ] LEAD EYE/FACE PROTECTION

[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES

[ ] CHEMICAL GOOGLES

PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)

[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)

[ ] CONFINED SPACE [ ] UV/WELDER SHIELD

[ ] MANUAL LIFTING

[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION

[ ] NOISE [ ] EARPLUGS

[ ] HAZARDOUS ENERGY: [ ] EARMUFFS

___ ELECTRICAL [ ] BOTH

___ HYDRAULIC

___ PNEUMATIC HAND PROTECTION

___ STEAM [ ] CHEMICAL GLOVES

___ OTHER: [ ] STANDARD WORK GLOVES

[ ] OVERHEAD HAZARDS [ ] GAUNTLETS

[ ] WELDING/BURNING/HOT WORK [ ] OTHER:

[ ] OTHER:

ITEMS NEEDING PERFORMED

PERMITS [ ] COMPELTED WALKDOWN

[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS

[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT

[ ] WELDING/BURNING/HOT WORK

[ ] OTHER: RESPIRATORY PROTECTION

[ ] DUST MASK

ASBESTOS [ ] HALF-FACE RESPIRATOR

[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR

[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR

[ ] ASBESTOS ABATEMENT [ ] SCBA

[ ] ASBESTOS HOUSEKEEPING

Instruction Code C-1 12/19/2011Date Last Edited

3Page

National Center Agricultural Utilization Research1/21/2014

FULL-BODY PROTECTION

[ ] CHEMICAL RESISTANT APRONS

[ ] SLEEVES/GAUNTLETS

[ ] HEAT/FLAME RESISTANT CLOTHING

[X ] SAFETY SHOES

[ ] OTHER:

Task No. AC-COMP-C-A-Q

QUARTERLY ON CENTER & ADMIN WING AC COMPRESSORS

Assigned To WO Type

Expense Class

Priority Multitask

In-service Task

PM

3.00 No Yes

Description

Site NCAUR

Craft Estimated Labor HoursCrew Size

HVAC 1.00 0.32

AC COMPRESSOR

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

ATTIC

BAY KK-LL

ADMIN WING

Perform Every 3.00 Month(s)

Date Last Performed 12/9/2013 Next Due Date 3/4/2014

Schedule Type Duplicates Task Duration 23.00

No. of Times Completed 49.00 Down Time 15.00

Must Be DownYes

Equipment Description

Tenant

Equipment No. AC-COMP-A-01-ATTIC

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

Perform Every 3.00 Month(s)

Date Last Performed Next Due Date

Schedule Type Duplicates Task Duration 15.00

No. of Times Completed Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. AC-COMP-C-01

AC COMPRESSOR

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

ATTIC

BAY M-N

CENTER WING

Perform Every 3.00 Month(s)

Date Last Performed 7/16/2009 Next Due Date

Schedule Type Duplicates Task Duration 7.00

No. of Times Completed 31.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. AC-COMP-C-02

Meter Name Last Performed At

Task Instructions

A. INSPECT UNIT FOR LOOSE COMPONENTS, CORROSION, ETC.

B. CHECK ELECTRICAL CONNECTIONS FOR TIGHTNESS

C. CLEAN DRAINS

D. CHANGE THE REFRIDGERANT DRIER CORE AS REQUIRED

Instruction Code 069 7/26/2011Date Last Edited

CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT

[ ] ASBESTOS [ ] PERMIT-REQUIRED

[ ] CARCINOGEN [ ] SINGLE-SOURCE

[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"

[ ] INCOMPATIBLE CHEMICALS

4Page

National Center Agricultural Utilization Research1/21/2014

[ ] LEAD EYE/FACE PROTECTION

[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES

[ ] CHEMICAL GOOGLES

PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)

[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)

[ ] CONFINED SPACE [ ] UV/WELDER SHIELD

[ ] MANUAL LIFTING

[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION

[ ] NOISE [ ] EARPLUGS

[ ] HAZARDOUS ENERGY: [ ] EARMUFFS

___ ELECTRICAL [ ] BOTH

___ HYDRAULIC

___ PNEUMATIC HAND PROTECTION

___ STEAM [ ] CHEMICAL GLOVES

___ OTHER: [ ] STANDARD WORK GLOVES

[ ] OVERHEAD HAZARDS [ ] GAUNTLETS

[ ] WELDING/BURNING/HOT WORK [ ] OTHER:

[ ] OTHER:

ITEMS NEEDING PERFORMED

PERMITS [ ] COMPELTED WALKDOWN

[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS

[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT

[ ] WELDING/BURNING/HOT WORK

[ ] OTHER: RESPIRATORY PROTECTION

[ ] DUST MASK

ASBESTOS [ ] HALF-FACE RESPIRATOR

[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR

[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR

[ ] ASBESTOS ABATEMENT [ ] SCBA

[ ] ASBESTOS HOUSEKEEPING

FULL-BODY PROTECTION

[ ] CHEMICAL RESISTANT APRONS

[ ] SLEEVES/GAUNTLETS

[ ] HEAT/FLAME RESISTANT CLOTHING

[X ] SAFETY SHOES

[ ] OTHER:

Task No. AC-UNIT-BLD10B-Q

QUARTERLY ON AC UNIT BUILDING 10B

Assigned To WO Type

Expense Class

Priority Multitask

In-service Task

PM

3.00 Yes Yes

Description

Site NCAUR

Craft Estimated Labor HoursCrew Size

HVAC 1.00 0.75

AC FAN EVAPORATOR UNIT

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 010

B

Perform Every 3.00 Month(s)

Date Last Performed 10/22/2013 Next Due Date 4/18/2014

Schedule Type Duplicates Task Duration 7.00

No. of Times Completed 47.00 Down Time 20.00

Must Be DownYes

Equipment Description

Tenant

Equipment No. AC-UNIT-BLD10B

Meter Name Last Performed At

Task Instructions

QUARTERLY PM OF WATER SOURCE HEAT PUMP OR EVAPORATION UNIT

A. SHUT DOWN ELECTRICAL SOURCE & LOCK OUT

B. INSPECT CONDENSATE DRAIN PAN FOR PROPER DRAINAGE

IF EVIDENCE OF STANDING WATER OR CONDENSATE OVERFLOW EXISTS GENERATE CM WORK ORDER FOR

CORRECTIVE MEASURES

C. CHECK FOR MOLD GROWTH IN DRAIN PAN

Instruction Code 067 8/8/2011Date Last Edited

5Page

National Center Agricultural Utilization Research1/21/2014

IF EVIDENCE IS FOUND OF MICROBIAL (MOLD) GROWTH, CLEAN ALL SURFACES PER STEP 1-8 BEFORE

GOING ON TO THE NEXT UNIT

D. GENERATE A CM WORK ORDER AFTER CLEANING TO RECORD ADDITIONAL LABOR HOURS

STEP #1

DISCONNECT ALL ELECTRICAL POWER TO THE UNIT

STEP #2

DON THE APPROPIATE PERSONAL PROTECTIVE EQUIPMENT (PPE)

STEP #3

REMOVE ALL STANDING WATER

STEP #4

USE A SCRAPER OR OTHER TOOLS TO REMOVE ANY SOLID MATTER. REMOVE SOLID MATTER WITH A VACUUM DEVICE THAT UTILIZES HIGH EFFICIENCY PARTICULATE ARRESTANCE (HEPA) FILTERS WITH A MINIMUM

EFFICIENCY OF 99.97% AT 0.3 MICRON PARTICLE SIZE

STEP #5

THROUGHLY CLEAN THE CONTAMINATED AREA(S) WITH A MILD BLEACH & WATER SOLUTION OR AN EPA-APPROVED SANITIZER SPECIFICALLY DESIGNED FOR HVAC USE. CAREFULLY FOLLOW THE SANITIZER MANUFACTURE'S

INSTRUCTIONS REGARDING THE USE OF THE PRODUCT

STEP #6

IMMEDIATLY RINSE THE DRAIN PAN THROUGHLY WITH FRESH WATER TO PREVENT POTENTIAL CORROSIONS

FROM THE CLEANING SOLUTION OF THE PAN & DRAIN LINE COMPONENTS

STEP #7

ALLOW THE UNIT TO DRY THROUGHLY BEFORE PUTTING THE SYSTEM BACK INTO SERVICE

STEP #8

DETERMINE & CORRECT THE CAUSE OF THE MICROBIAL (MOLD) CONTAMINATION

WARNING -

FIRE DETECTORS MUST BE DISABLED BEFORE ANY FLAME OR ARC WELDING WORK

Instruction Code BLDG 10 3/30/2010Date Last Edited

Task No. AC-UNIT-EVAP-Q

QUARTERLY ON AC-UNITS-EVAP

Assigned To WO Type

Expense Class

Priority Multitask

In-service Task

PM

3.00 No Yes

Description

Site NCAUR

Craft Estimated Labor HoursCrew Size

HVAC 1.00 1.44

AC UNIT CEILING MOUNTED EVAPORATOR

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

CENTER WING

3RD FLOOR

Perform Every 3.00 Month(s)

Date Last Performed 7/27/2010 Next Due Date

Schedule Type Duplicates Task Duration 7.00

No. of Times Completed 34.00 Down Time 15.00

Must Be DownNo

Equipment Description

Tenant

Equipment No. AC-UNIT-C-01-3115

HANGING AC EVAPORATOR UNIT

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

CENTER WING

1ST FLOOR

Perform Every 3.00 Month(s)

Date Last Performed 7/27/2010 Next Due Date

Schedule Type Duplicates Task Duration 7.00

No. of Times Completed 24.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. AC-UNIT-C-02-1109

SPLIT SYSTEM AIR COND-EVAP UNIT

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

0120A

CENTER WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/18/2013

Schedule Type Duplicates Task Duration 7.00

No. of Times Completed 6.00 Down Time

Equipment Description Equipment No. AC-UNIT-C-03

6Page

National Center Agricultural Utilization Research1/21/2014

Next Due Date 3/14/2014 Must Be DownNo Tenant

HANGING AC EVAPORATOR UNIT

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

SOUTH WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/10/2013 Next Due Date 3/14/2014

Schedule Type Duplicates Task Duration 7.00

No. of Times Completed 49.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. AC-UNIT-S-01-0317

HANGING AC EVAPORATOR UNIT

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

SOUTH WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/10/2013 Next Due Date 3/14/2014

Schedule Type Duplicates Task Duration 7.00

No. of Times Completed 49.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. AC-UNIT-S-02-0319

Meter Name Last Performed At

Task Instructions

QUARTERLY PM OF WATER SOURCE HEAT PUMP OR EVAPORATION UNIT

A. SHUT DOWN ELECTRICAL SOURCE & LOCK OUT

B. INSPECT CONDENSATE DRAIN PAN FOR PROPER DRAINAGE

IF EVIDENCE OF STANDING WATER OR CONDENSATE OVERFLOW EXISTS GENERATE CM WORK ORDER FOR

CORRECTIVE MEASURES

C. CHECK FOR MOLD GROWTH IN DRAIN PAN

IF EVIDENCE IS FOUND OF MICROBIAL (MOLD) GROWTH, CLEAN ALL SURFACES PER STEP 1-8 BEFORE

GOING ON TO THE NEXT UNIT

D. GENERATE A CM WORK ORDER AFTER CLEANING TO RECORD ADDITIONAL LABOR HOURS

STEP #1

DISCONNECT ALL ELECTRICAL POWER TO THE UNIT

STEP #2

DON THE APPROPIATE PERSONAL PROTECTIVE EQUIPMENT (PPE)

STEP #3

REMOVE ALL STANDING WATER

STEP #4

USE A SCRAPER OR OTHER TOOLS TO REMOVE ANY SOLID MATTER. REMOVE SOLID MATTER WITH A VACUUM DEVICE THAT UTILIZES HIGH EFFICIENCY PARTICULATE ARRESTANCE (HEPA) FILTERS WITH A MINIMUM

EFFICIENCY OF 99.97% AT 0.3 MICRON PARTICLE SIZE

STEP #5

THROUGHLY CLEAN THE CONTAMINATED AREA(S) WITH A MILD BLEACH & WATER SOLUTION OR AN EPA-APPROVED SANITIZER SPECIFICALLY DESIGNED FOR HVAC USE. CAREFULLY FOLLOW THE SANITIZER MANUFACTURE'S

INSTRUCTIONS REGARDING THE USE OF THE PRODUCT

STEP #6

IMMEDIATLY RINSE THE DRAIN PAN THROUGHLY WITH FRESH WATER TO PREVENT POTENTIAL CORROSIONS

FROM THE CLEANING SOLUTION OF THE PAN & DRAIN LINE COMPONENTS

STEP #7

ALLOW THE UNIT TO DRY THROUGHLY BEFORE PUTTING THE SYSTEM BACK INTO SERVICE

STEP #8

DETERMINE & CORRECT THE CAUSE OF THE MICROBIAL (MOLD) CONTAMINATION

Instruction Code 067 8/8/2011Date Last Edited

CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT

[ ] ASBESTOS [ ] PERMIT-REQUIRED

[ ] CARCINOGEN [ ] SINGLE-SOURCE

[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"

[ ] INCOMPATIBLE CHEMICALS

[ ] LEAD EYE/FACE PROTECTION

[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES

[ ] CHEMICAL GOOGLES

7Page

National Center Agricultural Utilization Research1/21/2014

PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)

[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)

[ ] CONFINED SPACE [ ] UV/WELDER SHIELD

[ ] MANUAL LIFTING

[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION

[ ] NOISE [ ] EARPLUGS

[ ] HAZARDOUS ENERGY: [ ] EARMUFFS

___ ELECTRICAL [ ] BOTH

___ HYDRAULIC

___ PNEUMATIC HAND PROTECTION

___ STEAM [ ] CHEMICAL GLOVES

___ OTHER: [ ] STANDARD WORK GLOVES

[ ] OVERHEAD HAZARDS [ ] GAUNTLETS

[ ] WELDING/BURNING/HOT WORK [ ] OTHER:

[ ] OTHER:

ITEMS NEEDING PERFORMED

PERMITS [ ] COMPELTED WALKDOWN

[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS

[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT

[ ] WELDING/BURNING/HOT WORK

[ ] OTHER: RESPIRATORY PROTECTION

[ ] DUST MASK

ASBESTOS [ ] HALF-FACE RESPIRATOR

[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR

[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR

[ ] ASBESTOS ABATEMENT [ ] SCBA

[ ] ASBESTOS HOUSEKEEPING

FULL-BODY PROTECTION

[ ] CHEMICAL RESISTANT APRONS

[ ] SLEEVES/GAUNTLETS

[ ] HEAT/FLAME RESISTANT CLOTHING

[X ] SAFETY SHOES

[ ] OTHER:

Task No. AC-UNIT-N-M

MONTHLY ON HANGING AC EVAPORATOR UNIT

Assigned To WO Type

Expense Class

Priority Multitask

In-service Task

PM

3.00 No Yes

Description

Site NCAUR

Craft Estimated Labor HoursCrew Size

HVAC 1.00 0.47

HANGING AC EVAPORATOR UNIT WEST

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

NORTH WING

3RD FLOOR

Perform Every 1.00 Month(s)

Date Last Performed 1/15/2014 Next Due Date 2/17/2014

Schedule Type Duplicates Task Duration 7.00

No. of Times Completed 148.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. AC-UNIT-N-02-3205

HANGING AC EVAPORATOR UNIT WEST

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

NORTH WING

2ND FLOOR

Perform Every 1.00 Month(s)

Date Last Performed 1/15/2014 Next Due Date 2/17/2014

Schedule Type Duplicates Task Duration 7.00

No. of Times Completed 148.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. AC-UNIT-N-04-2205

HANGING AC EVAPORATOR UNIT EAST

Location BUILDING 001 Perform Every 1.00 Month(s)

Equipment Description Equipment No. EVAPORATOR UNIT EAS

8Page

National Center Agricultural Utilization Research1/21/2014

Sub-location 1 Sub-location 2 Sub-location 3

NORTH WING

2ND FLOOR

Date Last Performed 1/15/2014 Next Due Date 2/17/2014

Schedule Type Duplicates Task Duration 7.00

No. of Times Completed 148.00 Down Time

Must Be DownNo Tenant

HANGING AC EVAPORATOR UNIT EAST

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

NORTH WING

3RD FLOOR

Perform Every 1.00 Month(s)

Date Last Performed 1/15/2014 Next Due Date 2/17/2014

Schedule Type Duplicates Task Duration 7.00

No. of Times Completed 148.00 Down Time 10.00

Must Be DownNo

Equipment Description

Tenant

Equipment No. EVAPORATOR UNIT EAST

Meter Name Last Performed At

Task Instructions

CHECK:

FILTERS AND DATE

DRAIN PAN

EVAPORATOR COIL

MOTOR

BLOWER ASSEMBLY

MOUNTING BRACKETS

Instruction Code AC UNITS 2/28/2012Date Last Edited

CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT

[ ] ASBESTOS [ ] PERMIT-REQUIRED

[ ] CARCINOGEN [ ] SINGLE-SOURCE

[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"

[ ] INCOMPATIBLE CHEMICALS

[ ] LEAD EYE/FACE PROTECTION

[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES

[ ] CHEMICAL GOOGLES

PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)

[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)

[ ] CONFINED SPACE [ ] UV/WELDER SHIELD

[ ] MANUAL LIFTING

[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION

[ ] NOISE [ ] EARPLUGS

[ ] HAZARDOUS ENERGY: [ ] EARMUFFS

___ ELECTRICAL [ ] BOTH

___ HYDRAULIC

___ PNEUMATIC HAND PROTECTION

___ STEAM [ ] CHEMICAL GLOVES

___ OTHER: [ ] STANDARD WORK GLOVES

[ ] OVERHEAD HAZARDS [ ] GAUNTLETS

[ ] WELDING/BURNING/HOT WORK [ ] OTHER:

[ ] OTHER:

ITEMS NEEDING PERFORMED

PERMITS [ ] COMPELTED WALKDOWN

[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS

[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT

[ ] WELDING/BURNING/HOT WORK

[ ] OTHER: RESPIRATORY PROTECTION

[ ] DUST MASK

ASBESTOS [ ] HALF-FACE RESPIRATOR

[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR

[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR

[ ] ASBESTOS ABATEMENT [ ] SCBA

[ ] ASBESTOS HOUSEKEEPING

FULL-BODY PROTECTION

[ ] CHEMICAL RESISTANT APRONS

[ ] SLEEVES/GAUNTLETS

[ ] HEAT/FLAME RESISTANT CLOTHING

9Page

National Center Agricultural Utilization Research1/21/2014

[X ] SAFETY SHOES

[ ] OTHER:

Task No. AC-UNIT-N-SA

SEMI-ANNUAL ON HANGING AC EVAPORATOR UNIT

Assigned To WO Type

Expense Class

Priority Multitask

In-service Task

PM

3.00 Yes Yes

Description

Site NCAUR

Craft Estimated Labor HoursCrew Size

ELEC 1.00 1.00

HVAC 1.00 1.00

HANGING AC EVAPORATOR UNIT WEST

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

NORTH WING

3RD FLOOR

Perform Every 6.00 Month(s)

Date Last Performed 11/8/2013 Next Due Date 5/9/2014

Schedule Type Duplicates Task Duration 7.00

No. of Times Completed 26.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. AC-UNIT-N-02-3205

HANGING AC EVAPORATOR UNIT WEST

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

NORTH WING

2ND FLOOR

Perform Every 6.00 Month(s)

Date Last Performed 11/8/2013 Next Due Date 5/9/2014

Schedule Type Duplicates Task Duration 7.00

No. of Times Completed 26.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. AC-UNIT-N-04-2205

HANGING AC EVAPORATOR UNIT EAST

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

NORTH WING

2ND FLOOR

Perform Every 6.00 Month(s)

Date Last Performed 11/8/2013 Next Due Date 5/9/2014

Schedule Type Duplicates Task Duration 7.00

No. of Times Completed 26.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. EVAPORATOR UNIT EAS

HANGING AC EVAPORATOR UNIT EAST

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

NORTH WING

3RD FLOOR

Perform Every 6.00 Month(s)

Date Last Performed 11/8/2013 Next Due Date 5/9/2014

Schedule Type Duplicates Task Duration 7.00

No. of Times Completed 26.00 Down Time 10.00

Must Be DownYes

Equipment Description

Tenant

Equipment No. EVAPORATOR UNIT EAST

Meter Name Last Performed At

Task Instructions

CHECK:

FILTERS AND DATE

DRAIN PAN

EVAPORATOR COIL

MOTOR

Instruction Code AC UNITS 2/28/2012Date Last Edited

10Page

National Center Agricultural Utilization Research1/21/2014

BLOWER ASSEMBLY

MOUNTING BRACKETS

CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT

[ ] ASBESTOS [ ] PERMIT-REQUIRED

[ ] CARCINOGEN [ ] SINGLE-SOURCE

[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"

[ ] INCOMPATIBLE CHEMICALS

[ ] LEAD EYE/FACE PROTECTION

[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES

[ ] CHEMICAL GOOGLES

PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)

[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)

[ ] CONFINED SPACE [ ] UV/WELDER SHIELD

[ ] MANUAL LIFTING

[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION

[ ] NOISE [ ] EARPLUGS

[ ] HAZARDOUS ENERGY: [ ] EARMUFFS

___ ELECTRICAL [ ] BOTH

___ HYDRAULIC

___ PNEUMATIC HAND PROTECTION

___ STEAM [ ] CHEMICAL GLOVES

___ OTHER: [ ] STANDARD WORK GLOVES

[ ] OVERHEAD HAZARDS [ ] GAUNTLETS

[ ] WELDING/BURNING/HOT WORK [ ] OTHER:

[ ] OTHER:

ITEMS NEEDING PERFORMED

PERMITS [ ] COMPELTED WALKDOWN

[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS

[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT

[ ] WELDING/BURNING/HOT WORK

[ ] OTHER: RESPIRATORY PROTECTION

[ ] DUST MASK

ASBESTOS [ ] HALF-FACE RESPIRATOR

[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR

[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR

[ ] ASBESTOS ABATEMENT [ ] SCBA

[ ] ASBESTOS HOUSEKEEPING

FULL-BODY PROTECTION

[ ] CHEMICAL RESISTANT APRONS

[ ] SLEEVES/GAUNTLETS

[ ] HEAT/FLAME RESISTANT CLOTHING

[X ] SAFETY SHOES

[ ] OTHER:

Instruction Code C-1 12/19/2011Date Last Edited

Task No. AC-WINDOW-1-4-Q

QUARTERLY ON WINDOW AC UNITS

Assigned To WO Type

Expense Class

Priority Multitask

In-service Task

PM

3.00 No Yes

Description

Site NCAUR

Craft Estimated Labor HoursCrew Size

HVAC 1.00 0.50

WINDOW AIR CONDITIONER

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 011

Perform Every 3.00 Month(s)

Date Last Performed 11/7/2013 Next Due Date 4/24/2014

Schedule Type Duplicates Task Duration 7.00

No. of Times Completed 47.00 Down Time 10.00

Must Be DownNo

Equipment Description

Tenant

Equipment No. AC-WINDOW-02

WINDOW AIR CONDITIONEREquipment Description Equipment No. AC-WINDOW-03

11Page

National Center Agricultural Utilization Research1/21/2014

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 011

A

NORTHWALL

Perform Every 3.00 Month(s)

Date Last Performed 11/7/2013 Next Due Date 4/24/2014

Schedule Type Duplicates Task Duration 7.00

No. of Times Completed 48.00 Down Time

Must Be DownNo Tenant

WINDOW AIR CONDITIONER

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 002

Perform Every 3.00 Month(s)

Date Last Performed 11/6/2013 Next Due Date 4/24/2014

Schedule Type Duplicates Task Duration 7.00

No. of Times Completed 49.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. AC-WINDOW-04

Meter Name Last Performed At

Task Instructions

SPRING MAINTENANCE (PRIOR TO START UP)

A. REMOVE ANY PLASTIC OR CLOTH COVERS & STORE THEM FOR FUTURE USE

B. UNPLUG ELECTRICAL CORD FOR SAFETY

C. VISUALLY CHECK UNIT FOR:

1. SECURE MOUNTING

2. CONDITION OF ELECTRICAL CORD

3. PHYSICAL APPEARENCE

4. TIGHT AIRSEAL AROUND UNIT

5. MISSING HARDWARE

6. CLEANLINESS OF DRIP PAN

D. INSPECT AIR FILTER & CLAEN IF REQUIRED

E. INSPECT EVAPORATOR COIL FINS FOR DAMAGE & CLEANLINESS, CORRECT ANY DISCREPANCIES F. VERIFY EVAPORATOR & CONDENSER FANS ROTATE FREELY, LUBRICATE FAN MOTOR BEARINGS IF APPLICABLE

G. VERIFY CONDENSATE DRAIN LINE IS UNOBSTRUCTED

H. PLUG IN POWER CORD & TURN ON FAN ONLY-VERIFY QUIET OPERATION & NORMAL AIR FLOW

I. TURN CONTROLS TO COOLING & VERIFY COMPRESSOR STARTS & UNIT BEGINS TO COOL

J. VERIFY PROPER OPERATION AT ALL CONTROL PANELS

K. MEASURE CURRENT USING CLAMP-ON AMPERE METER, COMPARE WITH NAME PLATE DATA

L. VERIFY THERMOSTAT IS FUNCTIONING PROPERLY

M. SET CONTROLS FOR NORMAL OPERATION & SHUT OFF UNIT

FALL MAINTENANCE (WHEN SECURING UNIT FOR WINTER)

A. OPERATE UNIT TO VERIFY IT IS OPERATIONAL

B. SHUT OFF UNIT & UNPLUG IT

C. CLEAN EVAPORATOR COIL AS REQUIRED

D. VISUALLY INSPECT UNIT FOR:

1. CONDITION OF POWER CORD

2. TIGHT AIR SEAL AROUND UNIT

3. MISSING HARDWARE

4. GENERAL PHYSICAL CONDITION

5. INSTALL WINTERIZING COVERS IF PROVIDED

Instruction Code 065 2/24/2004Date Last Edited

CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT

[ ] ASBESTOS [ ] PERMIT-REQUIRED

[ ] CARCINOGEN [ ] SINGLE-SOURCE

[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"

[ ] INCOMPATIBLE CHEMICALS

[ ] LEAD EYE/FACE PROTECTION

[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES

[ ] CHEMICAL GOOGLES

PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)

[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)

[ ] CONFINED SPACE [ ] UV/WELDER SHIELD

[ ] MANUAL LIFTING

[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION

[ ] NOISE [ ] EARPLUGS

12Page

National Center Agricultural Utilization Research1/21/2014

[ ] HAZARDOUS ENERGY: [ ] EARMUFFS

___ ELECTRICAL [ ] BOTH

___ HYDRAULIC

___ PNEUMATIC HAND PROTECTION

___ STEAM [ ] CHEMICAL GLOVES

___ OTHER: [ ] STANDARD WORK GLOVES

[ ] OVERHEAD HAZARDS [ ] GAUNTLETS

[ ] WELDING/BURNING/HOT WORK [ ] OTHER:

[ ] OTHER:

ITEMS NEEDING PERFORMED

PERMITS [ ] COMPELTED WALKDOWN

[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS

[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT

[ ] WELDING/BURNING/HOT WORK

[ ] OTHER: RESPIRATORY PROTECTION

[ ] DUST MASK

ASBESTOS [ ] HALF-FACE RESPIRATOR

[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR

[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR

[ ] ASBESTOS ABATEMENT [ ] SCBA

[ ] ASBESTOS HOUSEKEEPING

FULL-BODY PROTECTION

[ ] CHEMICAL RESISTANT APRONS

[ ] SLEEVES/GAUNTLETS

[ ] HEAT/FLAME RESISTANT CLOTHING

[X ] SAFETY SHOES

[ ] OTHER:

Task No. AC-WINDOW-2-4-A

LAMINER

Assigned To WO Type

Expense Class

Priority Multitask

In-service Task

PM

3.00 Yes Yes

Description

Site NCAUR

Craft Estimated Labor HoursCrew Size

HVAC 1.00 1.30

WINDOW AIR CONDITIONER

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 011

B

SOUTHWALL

Perform Every 12.00 Month(s)

Date Last Performed 5/4/2012 Next Due Date 5/15/2014

Schedule Type Duplicates Task Duration 3.00

No. of Times Completed 11.00 Down Time 5.00

Must Be DownNo

Equipment Description

Tenant

Equipment No. AC-WINDOW-02

WINDOW AIR CONDITIONER

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 011

A

NORTHWALL

Perform Every 12.00 Month(s)

Date Last Performed 5/13/2013 Next Due Date 5/15/2014

Schedule Type Duplicates Task Duration 7.00

No. of Times Completed 13.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. AC-WINDOW-03

WINDOW AIR CONDITIONER

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 002

Perform Every 12.00 Month(s)

Date Last Performed 5/13/2013 Next Due Date 5/15/2014

Schedule Type Duplicates Task Duration 7.00

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description Equipment No. AC-WINDOW-04

13Page

National Center Agricultural Utilization Research1/21/2014

Tenant

Meter Name Last Performed At

Task Instructions

A. OBSERVE UNIT IN OPERATION & VERIFY IT IS COOLING PROPERLY & OPERATING SATISFACTORILY

B. SHUT OFF UNIT & INSPECT AIR FILTER, CLEAN IF REQUIRED

C. VERIFY CONDENSATE IS DRAINING PROPERLY

D. RESTART UNIT & VERIFY THERMOSTAT FUNCTIONS PROPERLY

E. VISUALLY CHECK PHYSICAL CONDITION OF UNIT & CONDITION OF AIR SEAL AROUND UNIT

F. LUBRICATE UNIT AS REQUIRED

Instruction Code 064 11/6/2001Date Last Edited

SPRING MAINTENANCE (PRIOR TO START UP)

A. REMOVE ANY PLASTIC OR CLOTH COVERS & STORE THEM FOR FUTURE USE

B. UNPLUG ELECTRICAL CORD FOR SAFETY

C. VISUALLY CHECK UNIT FOR:

1. SECURE MOUNTING

2. CONDITION OF ELECTRICAL CORD

3. PHYSICAL APPEARENCE

4. TIGHT AIRSEAL AROUND UNIT

5. MISSING HARDWARE

6. CLEANLINESS OF DRIP PAN

D. INSPECT AIR FILTER & CLAEN IF REQUIRED

E. INSPECT EVAPORATOR COIL FINS FOR DAMAGE & CLEANLINESS, CORRECT ANY DISCREPANCIES F. VERIFY EVAPORATOR & CONDENSER FANS ROTATE FREELY, LUBRICATE FAN MOTOR BEARINGS IF APPLICABLE

G. VERIFY CONDENSATE DRAIN LINE IS UNOBSTRUCTED

H. PLUG IN POWER CORD & TURN ON FAN ONLY-VERIFY QUIET OPERATION & NORMAL AIR FLOW

I. TURN CONTROLS TO COOLING & VERIFY COMPRESSOR STARTS & UNIT BEGINS TO COOL

J. VERIFY PROPER OPERATION AT ALL CONTROL PANELS

K. MEASURE CURRENT USING CLAMP-ON AMPERE METER, COMPARE WITH NAME PLATE DATA

L. VERIFY THERMOSTAT IS FUNCTIONING PROPERLY

M. SET CONTROLS FOR NORMAL OPERATION & SHUT OFF UNIT

FALL MAINTENANCE (WHEN SECURING UNIT FOR WINTER)

A. OPERATE UNIT TO VERIFY IT IS OPERATIONAL

B. SHUT OFF UNIT & UNPLUG IT

C. CLEAN EVAPORATOR COIL AS REQUIRED

D. VISUALLY INSPECT UNIT FOR:

1. CONDITION OF POWER CORD

2. TIGHT AIR SEAL AROUND UNIT

3. MISSING HARDWARE

4. GENERAL PHYSICAL CONDITION

5. INSTALL WINTERIZING COVERS IF PROVIDED

Instruction Code 065 2/24/2004Date Last Edited

CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT

[ ] ASBESTOS [ ] PERMIT-REQUIRED

[ ] CARCINOGEN [ ] SINGLE-SOURCE

[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"

[ ] INCOMPATIBLE CHEMICALS

[ ] LEAD EYE/FACE PROTECTION

[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES

[ ] CHEMICAL GOOGLES

PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)

[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)

[ ] CONFINED SPACE [ ] UV/WELDER SHIELD

[ ] MANUAL LIFTING

[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION

[ ] NOISE [ ] EARPLUGS

[ ] HAZARDOUS ENERGY: [ ] EARMUFFS

___ ELECTRICAL [ ] BOTH

___ HYDRAULIC

___ PNEUMATIC HAND PROTECTION

___ STEAM [ ] CHEMICAL GLOVES

___ OTHER: [ ] STANDARD WORK GLOVES

[ ] OVERHEAD HAZARDS [ ] GAUNTLETS

[ ] WELDING/BURNING/HOT WORK [ ] OTHER:

[ ] OTHER:

ITEMS NEEDING PERFORMED

PERMITS [ ] COMPELTED WALKDOWN

14Page

National Center Agricultural Utilization Research1/21/2014

[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS

[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT

[ ] WELDING/BURNING/HOT WORK

[ ] OTHER: RESPIRATORY PROTECTION

[ ] DUST MASK

ASBESTOS [ ] HALF-FACE RESPIRATOR

[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR

[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR

[ ] ASBESTOS ABATEMENT [ ] SCBA

[ ] ASBESTOS HOUSEKEEPING

FULL-BODY PROTECTION

[ ] CHEMICAL RESISTANT APRONS

[ ] SLEEVES/GAUNTLETS

[ ] HEAT/FLAME RESISTANT CLOTHING

[X ] SAFETY SHOES

[ ] OTHER:

Task No. ACC-CONT-COMP-M

MONTHLY ON ACCESS CONTROL COMPUTER

Assigned To WO Type

Expense Class

Priority Multitask

In-service Task

PM

3.00 No Yes

Description

Site NCAUR

Craft Estimated Labor HoursCrew Size

GRD 1.00 1.00

NORTHERN ACCESS CONTROL GATE PANEL

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

GUARD OFFICE

Perform Every 1.00 Month(s)

Date Last Performed 1/16/2014 Next Due Date 2/17/2014

Schedule Type Duplicates Task Duration 3.00

No. of Times Completed 113.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACS-MAIN

Meter Name Last Performed At

Task Instructions

MONTHLY ON ACCESS CONTROL COMPUTER SYSTEM PWS 6.3

BACKUP IS NOW DONE BY I.T. 4/3/06

1. CHECK OPERATION OF PRINTER.

2. CLEAN COMPUTER, MONITOR AND PRINTER.

Instruction Code 143 8/5/2008Date Last Edited

Task No. ACC-CONT-COMP-Q

QUARTERLY ON ACCESS CONTROL SYSTEM

Assigned To WO Type

Expense Class

Priority Multitask

In-service Task

PM

3.00 Yes Yes

Description

Site NCAUR

Craft Estimated Labor HoursCrew Size

ELEC 1.00 6.00

NORTHERN ACCESS CONTROL GATE PANEL

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 010

C

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013

Schedule Type Duplicates Task Duration 7.00

No. of Times Completed 14.00 Down Time

Equipment Description Equipment No. ACC-CONT-GATE-PNL-01-BLDG10C

15Page

National Center Agricultural Utilization Research1/21/2014

Next Due Date 3/7/2014 Must Be DownNo Tenant

NORTHERN ACCESS CONTROL PANEL-2 DOOR

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

NORTH WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PNL-01-0225

NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

NORTH WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PNL-02-0212

NORTHERN ACCESS CONTROL PANEL-4DOOR

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

ADMIN WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PNL-03-0016

NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

0120A

CENTER WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PNL-04-0120A

NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

ADMIN WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PNL-05-0041

NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

BASEMENT

WEST

SOUTH WING

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PNL-06

Equipment No. ACC-CONT-PNL-07-BLDG002

16Page

National Center Agricultural Utilization Research1/21/2014

NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 002

SOUTH

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

SOUTH WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PNL-08-0314

NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

SOUTH WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PNL-09-0315

NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

ATTIC

ADMIN WING

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PNL-10-ATTIC

NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

ATTIC

ADMIN WING

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PNL-11-ATTIC

NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

ATTIC

ADMIN WING

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PNL-12-ATTIC

NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location Sub-location 1

BUILDING 001

Perform Every 3.00 Month(s) Schedule Type Duplicates

Equipment Description Equipment No. ACC-CONT-PNL-13-0032

17Page

National Center Agricultural Utilization Research1/21/2014

Sub-location 2 Sub-location 3 ADMIN WING

BASEMENT

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Task Duration No. of Times Completed 14.00

Down Time Must Be DownNo

Tenant

NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

ADMIN WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PNL-14-0019

NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

0120A

CENTER WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PNL-15-0120A

NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

CENTER WING

3RD FLOOR

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PNL-16-3135

NORTHERN ACCESS CONTROL POWER SUPPLY

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

NORTH WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PWR-SUP-01-0225

NORTHERN ACCESS CONTROL POWER SUPPLY

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

NORTH WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PWR-SUP-02-0212

NORTHERN ACCESS CONTROL POWER SUPPLY

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

ADMIN WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description Equipment No. ACC-CONT-PWR-SUP-03-0016

18Page

National Center Agricultural Utilization Research1/21/2014

Tenant

NORTHERN ACCESS CONTROL POWER SUPPLY

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

0120A

CENTER WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PWR-SUP-04-0120A

NORTHERN ACCESS CONTROL POWER SUPPLY

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

ADMIN WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PWR-SUP-05-0041

NORTHERN ACCESS CONTROL POWER SUPPLY

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

BASEMENT

WEST

SOUTH WING

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PWR-SUP-06

NORTHERN ACCESS CONTROL POWER SUPPLY

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 002

SOUTH

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PWR-SUP-07-BLDG02

NORTHERN ACCESS CONTROL POWER SUPPLY

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

SOUTH WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PWR-SUP-08-0314

NORTHERN ACCESS CONTROL POWER SUPPLY

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

SOUTH WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PWR-SUP-09-0315

NORTHERN ACCESS CONTROL POWER SUPPLYEquipment Description Equipment No. ACC-CONT-PWR-SUP-10-ATTIC

19Page

National Center Agricultural Utilization Research1/21/2014

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

ATTIC

ADMIN WING

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo Tenant

NORTHERN ACCESS CONTROL POWER SUPPLY

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

ATTIC

ADMIN WING

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PWR-SUP-11-ATTIC

NORTHERN ACCESS CONTROL POWER SUPPLY

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

ATTIC

ADMIN WING

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PWR-SUP-12-ATTIC

NORTHERN ACCESS CONTROL POWER SUPPLY

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

ADMIN WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PWR-SUP-13-0032

NORTHERN ACCESS CONTROL POWER SUPPLY

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

ADMIN WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PWR-SUP-14-0019

NORTHERN ACCESS CONTROL POWER SUPPLY

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

0120A

CENTER WING

BASEMENT

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PWR-SUP-15-0120A

NORTHERN ACCESS CONTROL POWER SUPPLY

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

CENTER WING

3RD FLOOR

Perform Every 3.00 Month(s) Schedule Type Duplicates Task Duration

No. of Times Completed 14.00

Equipment Description Equipment No. ACC-CONT-PWR-SUP-16-3135

20Page

National Center Agricultural Utilization Research1/21/2014

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Down Time Must Be DownNo

Tenant

NORTHERN ACCESS CONTROL POWER SUPPLY

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 010

C

Perform Every 3.00 Month(s)

Date Last Performed 12/6/2013 Next Due Date 3/7/2014

Schedule Type Duplicates Task Duration

No. of Times Completed 14.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. ACC-CONT-PWR-SUP-17-BLDG10C

Meter Name Last Performed At

Task Instructions

PWS 6.3

1. CHECK WIRE TERMINATIONS AND VOLTAGES IN ACCESS PANEL IN SERVICE BUILDING FOR REMOTE

GATE.

________12 VOLT DC

________24 VOLT AC

________24 VOLT DC

________120 VOLT AC

2. CHECK CIRCUIT BOARDS, WIRE TERMINATIONS AND VOLTAGES IN ACCESS PANELS ACC-CONT-PNL-01 THRU -16

LOCATED THROUGHOUT THE BUILDING.

ACC-CONT-GATE-PNL-01-BLDG10C

________12 VOLT DC

________12 VOLT AC

________24 VOLT DC

________24 VOLT AC

ACC-CONT-PNL-01 ACC-CONT-PNL-02

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

ACC-CONT-PNL-03 ACC-CONT-PNL-04

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PNL-05 ACC-CONT-PNL-06

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PNL-07 ACC-CONT-PNL-08

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PNL-09 ACC-CONT-PNL-10

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PNL-11 ACC-CONT-PNL-12

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

Instruction Code 142 3/25/2011Date Last Edited

21Page

National Center Agricultural Utilization Research1/21/2014

ACC-CONT-PNL-13 ACC-CONT-PNL-14

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PNL-15 ACC-CONT-PNL-16

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

3. CHECK WIRE TERMINATIONS AND VOLTAGES IN ACCESS CONTROL POWER SUPPLIES ACC-CONT-PWR SUP-01

THRU -17

ACC-CONT-PWR-SUP-01 ACC-CONT-PWR-SUP-02

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PWR-SUP-03 ACC-CONT-PWR-SUP-04

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PWR-SUP-05 ACC-CONT-PWR-SUP-06

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PWR-SUP-07 ACC-CONT-PWR-SUP-08

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PWR-SUP-09 ACC-CONT-PWR-SUP-10

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PWR-SUP-11 ACC-CONT-PWR-SUP-12

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PWR-SUP-13 ACC-CONT-PWR-SUP-14

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PWR-SUP-15 ACC-CONT-PWR-SUP-16

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PWR-SUP-17

________12 VOLT DC

________24 VOLT AC

________24 VOLT DC

________120 VOLT AC

WARNING -

FIRE DETECTORS MUST BE DISABLED BEFORE ANY FLAME OR ARC WELDING WORK

22Page

National Center Agricultural Utilization Research1/21/2014

Task No. ADDITIONAL WORK

ADDITIONAL WORK

Assigned To WO Type

Expense Class

Priority Multitask

In-service Task

AW

3.00 No Yes

Description

Site NCAUR

Craft Estimated Labor HoursCrew Size

Meter Name Last Performed At

Task No. AIR-COMP-01-02-SA

SEMI-ANNUAL ON AIR COMPRESSORS

Assigned To WO Type

Expense Class

Priority Multitask

In-service Task

PM

3.00 No Yes

Description

Site NCAUR

Craft Estimated Labor HoursCrew Size

PIPE 1.00 1.56

AIR COMPRESSOR

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

SOUTH WING

BASEMENT

Perform Every 180.00 Day(s)

Date Last Performed 12/4/2013 Next Due Date 6/3/2014

Schedule Type Duplicates Task Duration 10.00

No. of Times Completed 25.00 Down Time 15.00

Must Be DownYes

Equipment Description

Tenant

Equipment No. AIR-COMP-01-0330

AIR COMPRESSOR

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

SOUTH WING

BASEMENT

Perform Every 180.00 Day(s)

Date Last Performed 11/25/2013 Next Due Date 5/27/2014

Schedule Type Duplicates Task Duration 10.00

No. of Times Completed 21.00 Down Time

Must Be DownNo

Equipment Description

Tenant

Equipment No. AIR-COMP-02-0330

Meter Name Last Performed At

Task Instructions

AIR-COMP-01

SERVICE CHECK LIST

AIR FILTER- CHANGE FILTER WHEN MESSAGE IS DISPLAYED TO DO SO.

OIL SEPARATOR - CHANGE ELEMENT WHEN MESSAGE IS DISPLAYED TO DO SO.

AIR COMPRESSOR 01 METER READING __________

DAILY

1. CHECK THE RESERVOIR OIL LEVEL - ADD OIL IF REQUIRED. SEE SECTION 5 OF O&M FOR OIL CHANGING

INSTRUCTIONS.

IF OIL CONSUMPTION IS HIGH, REFER TO EXCESSIVE OIL CONSUMPTION ON PG 65 OF O&M DO NOT MIX

LUBRICANTS

2. OBSERVE IF THE UNIT LOADS AND UNLOADS PROPERLY.

3. CHECK DISCHARGE PRESSURE AND TEMPERATURE.

Instruction Code AIRCOMP-01 7/14/2011Date Last Edited

23Page

National Center Agricultural Utilization Research1/21/2014

4. CHECK PANEL LEDS'S FOR ADVISORIES.

EVERY 125 HOURS

1. CHECK FOR DIRT ACCUMULATION ON OIL/AFTERCOOLER CORE FACES AND COOLING FAN.

IF CLEANING IS REQUIRED CLEAN EXTERIOR FIN SURFACES OF THE CORES BY BLOWING COMPRESSED AIR CARRYING A NONFLAMMABLE SAFETY SOLVENT IN A DIRECTION OPPOSITE THAT OF THE COOLING FAN AIR

FLOW.

THIS CLEANING OPERATION WILL KEEP THE EXTERIOR COOLING SURFACES CLEAN AND ENSURE HEAT

DISSIPATION.

EVERY 1000 HOURS

CHANGE THE OIL FILTER ELEMENT.

EVERY 8000 HOURS

CHANGE THE COMPRESSOR LUBRICANT. UNDER ADVERSE CONDITIONS, CHENGE MORE FREQUENTLY.

FLUSH SYSTEM IF REQUIRED.

EVERY YEAR

1. CHECK THE RELIEF VALVE FOR PROPER OPERATION. SEE SECTION 4 OF O&M.

2. CHECK SSHUTDOWNS FOR PROPER OPERATION.

CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT

[ ] ASBESTOS [ ] PERMIT-REQUIRED

[ ] CARCINOGEN [ ] SINGLE-SOURCE

[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"

[ ] INCOMPATIBLE CHEMICALS

[ ] LEAD EYE/FACE PROTECTION

[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES

[ ] CHEMICAL GOOGLES

PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)

[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)

[ ] CONFINED SPACE [ ] UV/WELDER SHIELD

[ ] MANUAL LIFTING

[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION

[ ] NOISE [ ] EARPLUGS

[ ] HAZARDOUS ENERGY: [ ] EARMUFFS

___ ELECTRICAL [ ] BOTH

___ HYDRAULIC

___ PNEUMATIC HAND PROTECTION

___ STEAM [ ] CHEMICAL GLOVES

___ OTHER: [ ] STANDARD WORK GLOVES

[ ] OVERHEAD HAZARDS [ ] GAUNTLETS

[ ] WELDING/BURNING/HOT WORK [ ] OTHER:

[ ] OTHER:

ITEMS NEEDING PERFORMED

PERMITS [ ] COMPELTED WALKDOWN

[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS

[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT

[ ] WELDING/BURNING/HOT WORK

[ ] OTHER: RESPIRATORY PROTECTION

[ ] DUST MASK

ASBESTOS [ ] HALF-FACE RESPIRATOR

[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR

[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR

[ ] ASBESTOS ABATEMENT [ ] SCBA

[ ] ASBESTOS HOUSEKEEPING

FULL-BODY PROTECTION

[ ] CHEMICAL RESISTANT APRONS

[ ] SLEEVES/GAUNTLETS

[ ] HEAT/FLAME RESISTANT CLOTHING

[X ] SAFETY SHOES

[ ] OTHER:

Instruction Code C-1 12/19/2011Date Last Edited

Task No. AIR-COMP-01-M

MONTHLY ON AIR COMPRESSOR

Assigned To WO Type

Priority MultitaskPM

3.00 No

Description

24Page

National Center Agricultural Utilization Research1/21/2014

Expense Class In-service Task Yes

Craft Estimated Labor HoursCrew Size

PIPE 1.00 2.00

AIR COMPRESSOR

Location Sub-location 1 Sub-location 2 Sub-location 3

BUILDING 001

SOUTH WING

BASEMENT

Perform Every 28.00 Day(s)

Date Last Performed 12/4/2013 Next Due Date 1/27/2014