ATT_009a_Task_Report.pdf
PDF 2 MB Posted
- Solicitation number
- AG-32SC-S-14-0010
About this file
ATT 009
View the file
Other files
Show 40 more
Latest 50 of 96 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1Page
Task Report (Full List)
National Center Agricultural Utilization Research1/21/2014
Task No. 5 YR INSPECTION/TEST
5 YR INSPECTION/TEST ITEMS
Assigned To WO Type
Expense Class
Priority Multitask
In-service Task
PM
3.00 No Yes
Description
Site NCAUR
Craft Estimated Labor HoursCrew Size
ELEC 1.00 12.00
PIPE 2.00 12.00
SUB 32.00
INTERMAL INSPECTION OF SYSTEM CHECK VALVE
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
Perform Every 5.00 Year(s)
Date Last Performed Next Due Date 9/20/2017
Schedule Type Duplicates Task Duration
No. of Times Completed Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. FIRE-SPRINK-CHECK VALVE
INTERNAL INSPECTION OF FIRE SPRINKLER SYSTEMS PIPI
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
Perform Every 5.00 Year(s)
Date Last Performed Next Due Date
Schedule Type Duplicates Task Duration
No. of Times Completed Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. FIRE-SPRINK-SPRINKLER PIPING
STANDPIPE TEST ON INSTALLED WET STANDPIPES
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
Perform Every 5.00 Year(s)
Date Last Performed Next Due Date
Schedule Type Duplicates Task Duration
No. of Times Completed Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. FIRE-SPRINK-STANDPIPE
SYSTEM GAUGE(S) REPLACEMENT
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
Perform Every 5.00 Year(s)
Date Last Performed Next Due Date
Schedule Type Duplicates Task Duration
No. of Times Completed Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. FIRE-SPRINK-SYS GAUGE
Meter Name Last Performed At
Task Instructions
CHECK THE DATE ON GAUGE AND REPLACE EVERY 5 YEARS AS REQUIRED PER NFPA 25 SEC. 5.3.2 Instruction Code 5 YR 3/11/2013Date Last Edited
Task No. AC-COMP-BLD10-Q QUARTERLY ON CONDENSING UNIT IN BUILDING 10Description
Site NCAUR
AG-32SC-S-14-0010 ATT 009
2Page
National Center Agricultural Utilization Research1/21/2014
Assigned To WO Type
Expense Class
Priority Multitask
In-service Task
PM
3.00 Yes Yes
Craft Estimated Labor HoursCrew Size
HVAC 1.00 2.00
AC COMPRESSOR CONDENSING UNIT & BLOWER
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 10
C
Perform Every 3.00 Month(s)
Date Last Performed 1/17/2014 Next Due Date 4/18/2014
Schedule Type Duplicates Task Duration 14.00
No. of Times Completed 41.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. AC-COMP-BLD10
Meter Name Last Performed At
Task Instructions
A. INSPECT UNIT FOR LOOSE COMPONENTS, CORROSION, ETC.
B. CHECK ELECTRICAL CONNECTIONS FOR TIGHTNESS
C. CLEAN DRAINS
D. CHANGE THE REFRIDGERANT DRIER CORE AS REQUIRED
Instruction Code 069 7/26/2011Date Last Edited
WARNING -
FIRE DETECTORS MUST BE DISABLED BEFORE ANY FLAME OR ARC WELDING WORK
Instruction Code BLDG 10 3/30/2010Date Last Edited
CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT
[ ] ASBESTOS [ ] PERMIT-REQUIRED
[ ] CARCINOGEN [ ] SINGLE-SOURCE
[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"
[ ] INCOMPATIBLE CHEMICALS
[ ] LEAD EYE/FACE PROTECTION
[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES
[ ] CHEMICAL GOOGLES
PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)
[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)
[ ] CONFINED SPACE [ ] UV/WELDER SHIELD
[ ] MANUAL LIFTING
[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION
[ ] NOISE [ ] EARPLUGS
[ ] HAZARDOUS ENERGY: [ ] EARMUFFS
___ ELECTRICAL [ ] BOTH
___ HYDRAULIC
___ PNEUMATIC HAND PROTECTION
___ STEAM [ ] CHEMICAL GLOVES
___ OTHER: [ ] STANDARD WORK GLOVES
[ ] OVERHEAD HAZARDS [ ] GAUNTLETS
[ ] WELDING/BURNING/HOT WORK [ ] OTHER:
[ ] OTHER:
ITEMS NEEDING PERFORMED
PERMITS [ ] COMPELTED WALKDOWN
[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS
[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT
[ ] WELDING/BURNING/HOT WORK
[ ] OTHER: RESPIRATORY PROTECTION
[ ] DUST MASK
ASBESTOS [ ] HALF-FACE RESPIRATOR
[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR
[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR
[ ] ASBESTOS ABATEMENT [ ] SCBA
[ ] ASBESTOS HOUSEKEEPING
Instruction Code C-1 12/19/2011Date Last Edited
3Page
National Center Agricultural Utilization Research1/21/2014
FULL-BODY PROTECTION
[ ] CHEMICAL RESISTANT APRONS
[ ] SLEEVES/GAUNTLETS
[ ] HEAT/FLAME RESISTANT CLOTHING
[X ] SAFETY SHOES
[ ] OTHER:
Task No. AC-COMP-C-A-Q
QUARTERLY ON CENTER & ADMIN WING AC COMPRESSORS
Assigned To WO Type
Expense Class
Priority Multitask
In-service Task
PM
3.00 No Yes
Description
Site NCAUR
Craft Estimated Labor HoursCrew Size
HVAC 1.00 0.32
AC COMPRESSOR
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
ATTIC
BAY KK-LL
ADMIN WING
Perform Every 3.00 Month(s)
Date Last Performed 12/9/2013 Next Due Date 3/4/2014
Schedule Type Duplicates Task Duration 23.00
No. of Times Completed 49.00 Down Time 15.00
Must Be DownYes
Equipment Description
Tenant
Equipment No. AC-COMP-A-01-ATTIC
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
Perform Every 3.00 Month(s)
Date Last Performed Next Due Date
Schedule Type Duplicates Task Duration 15.00
No. of Times Completed Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. AC-COMP-C-01
AC COMPRESSOR
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
ATTIC
BAY M-N
CENTER WING
Perform Every 3.00 Month(s)
Date Last Performed 7/16/2009 Next Due Date
Schedule Type Duplicates Task Duration 7.00
No. of Times Completed 31.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. AC-COMP-C-02
Meter Name Last Performed At
Task Instructions
A. INSPECT UNIT FOR LOOSE COMPONENTS, CORROSION, ETC.
B. CHECK ELECTRICAL CONNECTIONS FOR TIGHTNESS
C. CLEAN DRAINS
D. CHANGE THE REFRIDGERANT DRIER CORE AS REQUIRED
Instruction Code 069 7/26/2011Date Last Edited
CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT
[ ] ASBESTOS [ ] PERMIT-REQUIRED
[ ] CARCINOGEN [ ] SINGLE-SOURCE
[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"
[ ] INCOMPATIBLE CHEMICALS
4Page
National Center Agricultural Utilization Research1/21/2014
[ ] LEAD EYE/FACE PROTECTION
[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES
[ ] CHEMICAL GOOGLES
PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)
[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)
[ ] CONFINED SPACE [ ] UV/WELDER SHIELD
[ ] MANUAL LIFTING
[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION
[ ] NOISE [ ] EARPLUGS
[ ] HAZARDOUS ENERGY: [ ] EARMUFFS
___ ELECTRICAL [ ] BOTH
___ HYDRAULIC
___ PNEUMATIC HAND PROTECTION
___ STEAM [ ] CHEMICAL GLOVES
___ OTHER: [ ] STANDARD WORK GLOVES
[ ] OVERHEAD HAZARDS [ ] GAUNTLETS
[ ] WELDING/BURNING/HOT WORK [ ] OTHER:
[ ] OTHER:
ITEMS NEEDING PERFORMED
PERMITS [ ] COMPELTED WALKDOWN
[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS
[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT
[ ] WELDING/BURNING/HOT WORK
[ ] OTHER: RESPIRATORY PROTECTION
[ ] DUST MASK
ASBESTOS [ ] HALF-FACE RESPIRATOR
[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR
[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR
[ ] ASBESTOS ABATEMENT [ ] SCBA
[ ] ASBESTOS HOUSEKEEPING
FULL-BODY PROTECTION
[ ] CHEMICAL RESISTANT APRONS
[ ] SLEEVES/GAUNTLETS
[ ] HEAT/FLAME RESISTANT CLOTHING
[X ] SAFETY SHOES
[ ] OTHER:
Task No. AC-UNIT-BLD10B-Q
QUARTERLY ON AC UNIT BUILDING 10B
Assigned To WO Type
Expense Class
Priority Multitask
In-service Task
PM
3.00 Yes Yes
Description
Site NCAUR
Craft Estimated Labor HoursCrew Size
HVAC 1.00 0.75
AC FAN EVAPORATOR UNIT
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 010
B
Perform Every 3.00 Month(s)
Date Last Performed 10/22/2013 Next Due Date 4/18/2014
Schedule Type Duplicates Task Duration 7.00
No. of Times Completed 47.00 Down Time 20.00
Must Be DownYes
Equipment Description
Tenant
Equipment No. AC-UNIT-BLD10B
Meter Name Last Performed At
Task Instructions
QUARTERLY PM OF WATER SOURCE HEAT PUMP OR EVAPORATION UNIT
A. SHUT DOWN ELECTRICAL SOURCE & LOCK OUT
B. INSPECT CONDENSATE DRAIN PAN FOR PROPER DRAINAGE
IF EVIDENCE OF STANDING WATER OR CONDENSATE OVERFLOW EXISTS GENERATE CM WORK ORDER FOR
CORRECTIVE MEASURES
C. CHECK FOR MOLD GROWTH IN DRAIN PAN
Instruction Code 067 8/8/2011Date Last Edited
5Page
National Center Agricultural Utilization Research1/21/2014
IF EVIDENCE IS FOUND OF MICROBIAL (MOLD) GROWTH, CLEAN ALL SURFACES PER STEP 1-8 BEFORE
GOING ON TO THE NEXT UNIT
D. GENERATE A CM WORK ORDER AFTER CLEANING TO RECORD ADDITIONAL LABOR HOURS
STEP #1
DISCONNECT ALL ELECTRICAL POWER TO THE UNIT
STEP #2
DON THE APPROPIATE PERSONAL PROTECTIVE EQUIPMENT (PPE)
STEP #3
REMOVE ALL STANDING WATER
STEP #4
USE A SCRAPER OR OTHER TOOLS TO REMOVE ANY SOLID MATTER. REMOVE SOLID MATTER WITH A VACUUM DEVICE THAT UTILIZES HIGH EFFICIENCY PARTICULATE ARRESTANCE (HEPA) FILTERS WITH A MINIMUM
EFFICIENCY OF 99.97% AT 0.3 MICRON PARTICLE SIZE
STEP #5
THROUGHLY CLEAN THE CONTAMINATED AREA(S) WITH A MILD BLEACH & WATER SOLUTION OR AN EPA-APPROVED SANITIZER SPECIFICALLY DESIGNED FOR HVAC USE. CAREFULLY FOLLOW THE SANITIZER MANUFACTURE'S
INSTRUCTIONS REGARDING THE USE OF THE PRODUCT
STEP #6
IMMEDIATLY RINSE THE DRAIN PAN THROUGHLY WITH FRESH WATER TO PREVENT POTENTIAL CORROSIONS
FROM THE CLEANING SOLUTION OF THE PAN & DRAIN LINE COMPONENTS
STEP #7
ALLOW THE UNIT TO DRY THROUGHLY BEFORE PUTTING THE SYSTEM BACK INTO SERVICE
STEP #8
DETERMINE & CORRECT THE CAUSE OF THE MICROBIAL (MOLD) CONTAMINATION
WARNING -
FIRE DETECTORS MUST BE DISABLED BEFORE ANY FLAME OR ARC WELDING WORK
Instruction Code BLDG 10 3/30/2010Date Last Edited
Task No. AC-UNIT-EVAP-Q
QUARTERLY ON AC-UNITS-EVAP
Assigned To WO Type
Expense Class
Priority Multitask
In-service Task
PM
3.00 No Yes
Description
Site NCAUR
Craft Estimated Labor HoursCrew Size
HVAC 1.00 1.44
AC UNIT CEILING MOUNTED EVAPORATOR
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
CENTER WING
3RD FLOOR
Perform Every 3.00 Month(s)
Date Last Performed 7/27/2010 Next Due Date
Schedule Type Duplicates Task Duration 7.00
No. of Times Completed 34.00 Down Time 15.00
Must Be DownNo
Equipment Description
Tenant
Equipment No. AC-UNIT-C-01-3115
HANGING AC EVAPORATOR UNIT
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
CENTER WING
1ST FLOOR
Perform Every 3.00 Month(s)
Date Last Performed 7/27/2010 Next Due Date
Schedule Type Duplicates Task Duration 7.00
No. of Times Completed 24.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. AC-UNIT-C-02-1109
SPLIT SYSTEM AIR COND-EVAP UNIT
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
0120A
CENTER WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/18/2013
Schedule Type Duplicates Task Duration 7.00
No. of Times Completed 6.00 Down Time
Equipment Description Equipment No. AC-UNIT-C-03
6Page
National Center Agricultural Utilization Research1/21/2014
Next Due Date 3/14/2014 Must Be DownNo Tenant
HANGING AC EVAPORATOR UNIT
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
SOUTH WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/10/2013 Next Due Date 3/14/2014
Schedule Type Duplicates Task Duration 7.00
No. of Times Completed 49.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. AC-UNIT-S-01-0317
HANGING AC EVAPORATOR UNIT
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
SOUTH WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/10/2013 Next Due Date 3/14/2014
Schedule Type Duplicates Task Duration 7.00
No. of Times Completed 49.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. AC-UNIT-S-02-0319
Meter Name Last Performed At
Task Instructions
QUARTERLY PM OF WATER SOURCE HEAT PUMP OR EVAPORATION UNIT
A. SHUT DOWN ELECTRICAL SOURCE & LOCK OUT
B. INSPECT CONDENSATE DRAIN PAN FOR PROPER DRAINAGE
IF EVIDENCE OF STANDING WATER OR CONDENSATE OVERFLOW EXISTS GENERATE CM WORK ORDER FOR
CORRECTIVE MEASURES
C. CHECK FOR MOLD GROWTH IN DRAIN PAN
IF EVIDENCE IS FOUND OF MICROBIAL (MOLD) GROWTH, CLEAN ALL SURFACES PER STEP 1-8 BEFORE
GOING ON TO THE NEXT UNIT
D. GENERATE A CM WORK ORDER AFTER CLEANING TO RECORD ADDITIONAL LABOR HOURS
STEP #1
DISCONNECT ALL ELECTRICAL POWER TO THE UNIT
STEP #2
DON THE APPROPIATE PERSONAL PROTECTIVE EQUIPMENT (PPE)
STEP #3
REMOVE ALL STANDING WATER
STEP #4
USE A SCRAPER OR OTHER TOOLS TO REMOVE ANY SOLID MATTER. REMOVE SOLID MATTER WITH A VACUUM DEVICE THAT UTILIZES HIGH EFFICIENCY PARTICULATE ARRESTANCE (HEPA) FILTERS WITH A MINIMUM
EFFICIENCY OF 99.97% AT 0.3 MICRON PARTICLE SIZE
STEP #5
THROUGHLY CLEAN THE CONTAMINATED AREA(S) WITH A MILD BLEACH & WATER SOLUTION OR AN EPA-APPROVED SANITIZER SPECIFICALLY DESIGNED FOR HVAC USE. CAREFULLY FOLLOW THE SANITIZER MANUFACTURE'S
INSTRUCTIONS REGARDING THE USE OF THE PRODUCT
STEP #6
IMMEDIATLY RINSE THE DRAIN PAN THROUGHLY WITH FRESH WATER TO PREVENT POTENTIAL CORROSIONS
FROM THE CLEANING SOLUTION OF THE PAN & DRAIN LINE COMPONENTS
STEP #7
ALLOW THE UNIT TO DRY THROUGHLY BEFORE PUTTING THE SYSTEM BACK INTO SERVICE
STEP #8
DETERMINE & CORRECT THE CAUSE OF THE MICROBIAL (MOLD) CONTAMINATION
Instruction Code 067 8/8/2011Date Last Edited
CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT
[ ] ASBESTOS [ ] PERMIT-REQUIRED
[ ] CARCINOGEN [ ] SINGLE-SOURCE
[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"
[ ] INCOMPATIBLE CHEMICALS
[ ] LEAD EYE/FACE PROTECTION
[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES
[ ] CHEMICAL GOOGLES
7Page
National Center Agricultural Utilization Research1/21/2014
PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)
[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)
[ ] CONFINED SPACE [ ] UV/WELDER SHIELD
[ ] MANUAL LIFTING
[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION
[ ] NOISE [ ] EARPLUGS
[ ] HAZARDOUS ENERGY: [ ] EARMUFFS
___ ELECTRICAL [ ] BOTH
___ HYDRAULIC
___ PNEUMATIC HAND PROTECTION
___ STEAM [ ] CHEMICAL GLOVES
___ OTHER: [ ] STANDARD WORK GLOVES
[ ] OVERHEAD HAZARDS [ ] GAUNTLETS
[ ] WELDING/BURNING/HOT WORK [ ] OTHER:
[ ] OTHER:
ITEMS NEEDING PERFORMED
PERMITS [ ] COMPELTED WALKDOWN
[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS
[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT
[ ] WELDING/BURNING/HOT WORK
[ ] OTHER: RESPIRATORY PROTECTION
[ ] DUST MASK
ASBESTOS [ ] HALF-FACE RESPIRATOR
[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR
[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR
[ ] ASBESTOS ABATEMENT [ ] SCBA
[ ] ASBESTOS HOUSEKEEPING
FULL-BODY PROTECTION
[ ] CHEMICAL RESISTANT APRONS
[ ] SLEEVES/GAUNTLETS
[ ] HEAT/FLAME RESISTANT CLOTHING
[X ] SAFETY SHOES
[ ] OTHER:
Task No. AC-UNIT-N-M
MONTHLY ON HANGING AC EVAPORATOR UNIT
Assigned To WO Type
Expense Class
Priority Multitask
In-service Task
PM
3.00 No Yes
Description
Site NCAUR
Craft Estimated Labor HoursCrew Size
HVAC 1.00 0.47
HANGING AC EVAPORATOR UNIT WEST
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
NORTH WING
3RD FLOOR
Perform Every 1.00 Month(s)
Date Last Performed 1/15/2014 Next Due Date 2/17/2014
Schedule Type Duplicates Task Duration 7.00
No. of Times Completed 148.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. AC-UNIT-N-02-3205
HANGING AC EVAPORATOR UNIT WEST
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
NORTH WING
2ND FLOOR
Perform Every 1.00 Month(s)
Date Last Performed 1/15/2014 Next Due Date 2/17/2014
Schedule Type Duplicates Task Duration 7.00
No. of Times Completed 148.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. AC-UNIT-N-04-2205
HANGING AC EVAPORATOR UNIT EAST
Location BUILDING 001 Perform Every 1.00 Month(s)
Equipment Description Equipment No. EVAPORATOR UNIT EAS
8Page
National Center Agricultural Utilization Research1/21/2014
Sub-location 1 Sub-location 2 Sub-location 3
NORTH WING
2ND FLOOR
Date Last Performed 1/15/2014 Next Due Date 2/17/2014
Schedule Type Duplicates Task Duration 7.00
No. of Times Completed 148.00 Down Time
Must Be DownNo Tenant
HANGING AC EVAPORATOR UNIT EAST
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
NORTH WING
3RD FLOOR
Perform Every 1.00 Month(s)
Date Last Performed 1/15/2014 Next Due Date 2/17/2014
Schedule Type Duplicates Task Duration 7.00
No. of Times Completed 148.00 Down Time 10.00
Must Be DownNo
Equipment Description
Tenant
Equipment No. EVAPORATOR UNIT EAST
Meter Name Last Performed At
Task Instructions
CHECK:
FILTERS AND DATE
DRAIN PAN
EVAPORATOR COIL
MOTOR
BLOWER ASSEMBLY
MOUNTING BRACKETS
Instruction Code AC UNITS 2/28/2012Date Last Edited
CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT
[ ] ASBESTOS [ ] PERMIT-REQUIRED
[ ] CARCINOGEN [ ] SINGLE-SOURCE
[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"
[ ] INCOMPATIBLE CHEMICALS
[ ] LEAD EYE/FACE PROTECTION
[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES
[ ] CHEMICAL GOOGLES
PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)
[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)
[ ] CONFINED SPACE [ ] UV/WELDER SHIELD
[ ] MANUAL LIFTING
[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION
[ ] NOISE [ ] EARPLUGS
[ ] HAZARDOUS ENERGY: [ ] EARMUFFS
___ ELECTRICAL [ ] BOTH
___ HYDRAULIC
___ PNEUMATIC HAND PROTECTION
___ STEAM [ ] CHEMICAL GLOVES
___ OTHER: [ ] STANDARD WORK GLOVES
[ ] OVERHEAD HAZARDS [ ] GAUNTLETS
[ ] WELDING/BURNING/HOT WORK [ ] OTHER:
[ ] OTHER:
ITEMS NEEDING PERFORMED
PERMITS [ ] COMPELTED WALKDOWN
[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS
[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT
[ ] WELDING/BURNING/HOT WORK
[ ] OTHER: RESPIRATORY PROTECTION
[ ] DUST MASK
ASBESTOS [ ] HALF-FACE RESPIRATOR
[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR
[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR
[ ] ASBESTOS ABATEMENT [ ] SCBA
[ ] ASBESTOS HOUSEKEEPING
FULL-BODY PROTECTION
[ ] CHEMICAL RESISTANT APRONS
[ ] SLEEVES/GAUNTLETS
[ ] HEAT/FLAME RESISTANT CLOTHING
9Page
National Center Agricultural Utilization Research1/21/2014
[X ] SAFETY SHOES
[ ] OTHER:
Task No. AC-UNIT-N-SA
SEMI-ANNUAL ON HANGING AC EVAPORATOR UNIT
Assigned To WO Type
Expense Class
Priority Multitask
In-service Task
PM
3.00 Yes Yes
Description
Site NCAUR
Craft Estimated Labor HoursCrew Size
ELEC 1.00 1.00
HVAC 1.00 1.00
HANGING AC EVAPORATOR UNIT WEST
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
NORTH WING
3RD FLOOR
Perform Every 6.00 Month(s)
Date Last Performed 11/8/2013 Next Due Date 5/9/2014
Schedule Type Duplicates Task Duration 7.00
No. of Times Completed 26.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. AC-UNIT-N-02-3205
HANGING AC EVAPORATOR UNIT WEST
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
NORTH WING
2ND FLOOR
Perform Every 6.00 Month(s)
Date Last Performed 11/8/2013 Next Due Date 5/9/2014
Schedule Type Duplicates Task Duration 7.00
No. of Times Completed 26.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. AC-UNIT-N-04-2205
HANGING AC EVAPORATOR UNIT EAST
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
NORTH WING
2ND FLOOR
Perform Every 6.00 Month(s)
Date Last Performed 11/8/2013 Next Due Date 5/9/2014
Schedule Type Duplicates Task Duration 7.00
No. of Times Completed 26.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. EVAPORATOR UNIT EAS
HANGING AC EVAPORATOR UNIT EAST
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
NORTH WING
3RD FLOOR
Perform Every 6.00 Month(s)
Date Last Performed 11/8/2013 Next Due Date 5/9/2014
Schedule Type Duplicates Task Duration 7.00
No. of Times Completed 26.00 Down Time 10.00
Must Be DownYes
Equipment Description
Tenant
Equipment No. EVAPORATOR UNIT EAST
Meter Name Last Performed At
Task Instructions
CHECK:
FILTERS AND DATE
DRAIN PAN
EVAPORATOR COIL
MOTOR
Instruction Code AC UNITS 2/28/2012Date Last Edited
10Page
National Center Agricultural Utilization Research1/21/2014
BLOWER ASSEMBLY
MOUNTING BRACKETS
CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT
[ ] ASBESTOS [ ] PERMIT-REQUIRED
[ ] CARCINOGEN [ ] SINGLE-SOURCE
[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"
[ ] INCOMPATIBLE CHEMICALS
[ ] LEAD EYE/FACE PROTECTION
[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES
[ ] CHEMICAL GOOGLES
PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)
[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)
[ ] CONFINED SPACE [ ] UV/WELDER SHIELD
[ ] MANUAL LIFTING
[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION
[ ] NOISE [ ] EARPLUGS
[ ] HAZARDOUS ENERGY: [ ] EARMUFFS
___ ELECTRICAL [ ] BOTH
___ HYDRAULIC
___ PNEUMATIC HAND PROTECTION
___ STEAM [ ] CHEMICAL GLOVES
___ OTHER: [ ] STANDARD WORK GLOVES
[ ] OVERHEAD HAZARDS [ ] GAUNTLETS
[ ] WELDING/BURNING/HOT WORK [ ] OTHER:
[ ] OTHER:
ITEMS NEEDING PERFORMED
PERMITS [ ] COMPELTED WALKDOWN
[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS
[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT
[ ] WELDING/BURNING/HOT WORK
[ ] OTHER: RESPIRATORY PROTECTION
[ ] DUST MASK
ASBESTOS [ ] HALF-FACE RESPIRATOR
[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR
[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR
[ ] ASBESTOS ABATEMENT [ ] SCBA
[ ] ASBESTOS HOUSEKEEPING
FULL-BODY PROTECTION
[ ] CHEMICAL RESISTANT APRONS
[ ] SLEEVES/GAUNTLETS
[ ] HEAT/FLAME RESISTANT CLOTHING
[X ] SAFETY SHOES
[ ] OTHER:
Instruction Code C-1 12/19/2011Date Last Edited
Task No. AC-WINDOW-1-4-Q
QUARTERLY ON WINDOW AC UNITS
Assigned To WO Type
Expense Class
Priority Multitask
In-service Task
PM
3.00 No Yes
Description
Site NCAUR
Craft Estimated Labor HoursCrew Size
HVAC 1.00 0.50
WINDOW AIR CONDITIONER
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 011
Perform Every 3.00 Month(s)
Date Last Performed 11/7/2013 Next Due Date 4/24/2014
Schedule Type Duplicates Task Duration 7.00
No. of Times Completed 47.00 Down Time 10.00
Must Be DownNo
Equipment Description
Tenant
Equipment No. AC-WINDOW-02
WINDOW AIR CONDITIONEREquipment Description Equipment No. AC-WINDOW-03
11Page
National Center Agricultural Utilization Research1/21/2014
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 011
A
NORTHWALL
Perform Every 3.00 Month(s)
Date Last Performed 11/7/2013 Next Due Date 4/24/2014
Schedule Type Duplicates Task Duration 7.00
No. of Times Completed 48.00 Down Time
Must Be DownNo Tenant
WINDOW AIR CONDITIONER
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 002
Perform Every 3.00 Month(s)
Date Last Performed 11/6/2013 Next Due Date 4/24/2014
Schedule Type Duplicates Task Duration 7.00
No. of Times Completed 49.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. AC-WINDOW-04
Meter Name Last Performed At
Task Instructions
SPRING MAINTENANCE (PRIOR TO START UP)
A. REMOVE ANY PLASTIC OR CLOTH COVERS & STORE THEM FOR FUTURE USE
B. UNPLUG ELECTRICAL CORD FOR SAFETY
C. VISUALLY CHECK UNIT FOR:
1. SECURE MOUNTING
2. CONDITION OF ELECTRICAL CORD
3. PHYSICAL APPEARENCE
4. TIGHT AIRSEAL AROUND UNIT
5. MISSING HARDWARE
6. CLEANLINESS OF DRIP PAN
D. INSPECT AIR FILTER & CLAEN IF REQUIRED
E. INSPECT EVAPORATOR COIL FINS FOR DAMAGE & CLEANLINESS, CORRECT ANY DISCREPANCIES F. VERIFY EVAPORATOR & CONDENSER FANS ROTATE FREELY, LUBRICATE FAN MOTOR BEARINGS IF APPLICABLE
G. VERIFY CONDENSATE DRAIN LINE IS UNOBSTRUCTED
H. PLUG IN POWER CORD & TURN ON FAN ONLY-VERIFY QUIET OPERATION & NORMAL AIR FLOW
I. TURN CONTROLS TO COOLING & VERIFY COMPRESSOR STARTS & UNIT BEGINS TO COOL
J. VERIFY PROPER OPERATION AT ALL CONTROL PANELS
K. MEASURE CURRENT USING CLAMP-ON AMPERE METER, COMPARE WITH NAME PLATE DATA
L. VERIFY THERMOSTAT IS FUNCTIONING PROPERLY
M. SET CONTROLS FOR NORMAL OPERATION & SHUT OFF UNIT
FALL MAINTENANCE (WHEN SECURING UNIT FOR WINTER)
A. OPERATE UNIT TO VERIFY IT IS OPERATIONAL
B. SHUT OFF UNIT & UNPLUG IT
C. CLEAN EVAPORATOR COIL AS REQUIRED
D. VISUALLY INSPECT UNIT FOR:
1. CONDITION OF POWER CORD
2. TIGHT AIR SEAL AROUND UNIT
3. MISSING HARDWARE
4. GENERAL PHYSICAL CONDITION
5. INSTALL WINTERIZING COVERS IF PROVIDED
Instruction Code 065 2/24/2004Date Last Edited
CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT
[ ] ASBESTOS [ ] PERMIT-REQUIRED
[ ] CARCINOGEN [ ] SINGLE-SOURCE
[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"
[ ] INCOMPATIBLE CHEMICALS
[ ] LEAD EYE/FACE PROTECTION
[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES
[ ] CHEMICAL GOOGLES
PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)
[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)
[ ] CONFINED SPACE [ ] UV/WELDER SHIELD
[ ] MANUAL LIFTING
[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION
[ ] NOISE [ ] EARPLUGS
12Page
National Center Agricultural Utilization Research1/21/2014
[ ] HAZARDOUS ENERGY: [ ] EARMUFFS
___ ELECTRICAL [ ] BOTH
___ HYDRAULIC
___ PNEUMATIC HAND PROTECTION
___ STEAM [ ] CHEMICAL GLOVES
___ OTHER: [ ] STANDARD WORK GLOVES
[ ] OVERHEAD HAZARDS [ ] GAUNTLETS
[ ] WELDING/BURNING/HOT WORK [ ] OTHER:
[ ] OTHER:
ITEMS NEEDING PERFORMED
PERMITS [ ] COMPELTED WALKDOWN
[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS
[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT
[ ] WELDING/BURNING/HOT WORK
[ ] OTHER: RESPIRATORY PROTECTION
[ ] DUST MASK
ASBESTOS [ ] HALF-FACE RESPIRATOR
[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR
[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR
[ ] ASBESTOS ABATEMENT [ ] SCBA
[ ] ASBESTOS HOUSEKEEPING
FULL-BODY PROTECTION
[ ] CHEMICAL RESISTANT APRONS
[ ] SLEEVES/GAUNTLETS
[ ] HEAT/FLAME RESISTANT CLOTHING
[X ] SAFETY SHOES
[ ] OTHER:
Task No. AC-WINDOW-2-4-A
LAMINER
Assigned To WO Type
Expense Class
Priority Multitask
In-service Task
PM
3.00 Yes Yes
Description
Site NCAUR
Craft Estimated Labor HoursCrew Size
HVAC 1.00 1.30
WINDOW AIR CONDITIONER
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 011
B
SOUTHWALL
Perform Every 12.00 Month(s)
Date Last Performed 5/4/2012 Next Due Date 5/15/2014
Schedule Type Duplicates Task Duration 3.00
No. of Times Completed 11.00 Down Time 5.00
Must Be DownNo
Equipment Description
Tenant
Equipment No. AC-WINDOW-02
WINDOW AIR CONDITIONER
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 011
A
NORTHWALL
Perform Every 12.00 Month(s)
Date Last Performed 5/13/2013 Next Due Date 5/15/2014
Schedule Type Duplicates Task Duration 7.00
No. of Times Completed 13.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. AC-WINDOW-03
WINDOW AIR CONDITIONER
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 002
Perform Every 12.00 Month(s)
Date Last Performed 5/13/2013 Next Due Date 5/15/2014
Schedule Type Duplicates Task Duration 7.00
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description Equipment No. AC-WINDOW-04
13Page
National Center Agricultural Utilization Research1/21/2014
Tenant
Meter Name Last Performed At
Task Instructions
A. OBSERVE UNIT IN OPERATION & VERIFY IT IS COOLING PROPERLY & OPERATING SATISFACTORILY
B. SHUT OFF UNIT & INSPECT AIR FILTER, CLEAN IF REQUIRED
C. VERIFY CONDENSATE IS DRAINING PROPERLY
D. RESTART UNIT & VERIFY THERMOSTAT FUNCTIONS PROPERLY
E. VISUALLY CHECK PHYSICAL CONDITION OF UNIT & CONDITION OF AIR SEAL AROUND UNIT
F. LUBRICATE UNIT AS REQUIRED
Instruction Code 064 11/6/2001Date Last Edited
SPRING MAINTENANCE (PRIOR TO START UP)
A. REMOVE ANY PLASTIC OR CLOTH COVERS & STORE THEM FOR FUTURE USE
B. UNPLUG ELECTRICAL CORD FOR SAFETY
C. VISUALLY CHECK UNIT FOR:
1. SECURE MOUNTING
2. CONDITION OF ELECTRICAL CORD
3. PHYSICAL APPEARENCE
4. TIGHT AIRSEAL AROUND UNIT
5. MISSING HARDWARE
6. CLEANLINESS OF DRIP PAN
D. INSPECT AIR FILTER & CLAEN IF REQUIRED
E. INSPECT EVAPORATOR COIL FINS FOR DAMAGE & CLEANLINESS, CORRECT ANY DISCREPANCIES F. VERIFY EVAPORATOR & CONDENSER FANS ROTATE FREELY, LUBRICATE FAN MOTOR BEARINGS IF APPLICABLE
G. VERIFY CONDENSATE DRAIN LINE IS UNOBSTRUCTED
H. PLUG IN POWER CORD & TURN ON FAN ONLY-VERIFY QUIET OPERATION & NORMAL AIR FLOW
I. TURN CONTROLS TO COOLING & VERIFY COMPRESSOR STARTS & UNIT BEGINS TO COOL
J. VERIFY PROPER OPERATION AT ALL CONTROL PANELS
K. MEASURE CURRENT USING CLAMP-ON AMPERE METER, COMPARE WITH NAME PLATE DATA
L. VERIFY THERMOSTAT IS FUNCTIONING PROPERLY
M. SET CONTROLS FOR NORMAL OPERATION & SHUT OFF UNIT
FALL MAINTENANCE (WHEN SECURING UNIT FOR WINTER)
A. OPERATE UNIT TO VERIFY IT IS OPERATIONAL
B. SHUT OFF UNIT & UNPLUG IT
C. CLEAN EVAPORATOR COIL AS REQUIRED
D. VISUALLY INSPECT UNIT FOR:
1. CONDITION OF POWER CORD
2. TIGHT AIR SEAL AROUND UNIT
3. MISSING HARDWARE
4. GENERAL PHYSICAL CONDITION
5. INSTALL WINTERIZING COVERS IF PROVIDED
Instruction Code 065 2/24/2004Date Last Edited
CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT
[ ] ASBESTOS [ ] PERMIT-REQUIRED
[ ] CARCINOGEN [ ] SINGLE-SOURCE
[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"
[ ] INCOMPATIBLE CHEMICALS
[ ] LEAD EYE/FACE PROTECTION
[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES
[ ] CHEMICAL GOOGLES
PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)
[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)
[ ] CONFINED SPACE [ ] UV/WELDER SHIELD
[ ] MANUAL LIFTING
[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION
[ ] NOISE [ ] EARPLUGS
[ ] HAZARDOUS ENERGY: [ ] EARMUFFS
___ ELECTRICAL [ ] BOTH
___ HYDRAULIC
___ PNEUMATIC HAND PROTECTION
___ STEAM [ ] CHEMICAL GLOVES
___ OTHER: [ ] STANDARD WORK GLOVES
[ ] OVERHEAD HAZARDS [ ] GAUNTLETS
[ ] WELDING/BURNING/HOT WORK [ ] OTHER:
[ ] OTHER:
ITEMS NEEDING PERFORMED
PERMITS [ ] COMPELTED WALKDOWN
14Page
National Center Agricultural Utilization Research1/21/2014
[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS
[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT
[ ] WELDING/BURNING/HOT WORK
[ ] OTHER: RESPIRATORY PROTECTION
[ ] DUST MASK
ASBESTOS [ ] HALF-FACE RESPIRATOR
[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR
[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR
[ ] ASBESTOS ABATEMENT [ ] SCBA
[ ] ASBESTOS HOUSEKEEPING
FULL-BODY PROTECTION
[ ] CHEMICAL RESISTANT APRONS
[ ] SLEEVES/GAUNTLETS
[ ] HEAT/FLAME RESISTANT CLOTHING
[X ] SAFETY SHOES
[ ] OTHER:
Task No. ACC-CONT-COMP-M
MONTHLY ON ACCESS CONTROL COMPUTER
Assigned To WO Type
Expense Class
Priority Multitask
In-service Task
PM
3.00 No Yes
Description
Site NCAUR
Craft Estimated Labor HoursCrew Size
GRD 1.00 1.00
NORTHERN ACCESS CONTROL GATE PANEL
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
GUARD OFFICE
Perform Every 1.00 Month(s)
Date Last Performed 1/16/2014 Next Due Date 2/17/2014
Schedule Type Duplicates Task Duration 3.00
No. of Times Completed 113.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACS-MAIN
Meter Name Last Performed At
Task Instructions
MONTHLY ON ACCESS CONTROL COMPUTER SYSTEM PWS 6.3
BACKUP IS NOW DONE BY I.T. 4/3/06
1. CHECK OPERATION OF PRINTER.
2. CLEAN COMPUTER, MONITOR AND PRINTER.
Instruction Code 143 8/5/2008Date Last Edited
Task No. ACC-CONT-COMP-Q
QUARTERLY ON ACCESS CONTROL SYSTEM
Assigned To WO Type
Expense Class
Priority Multitask
In-service Task
PM
3.00 Yes Yes
Description
Site NCAUR
Craft Estimated Labor HoursCrew Size
ELEC 1.00 6.00
NORTHERN ACCESS CONTROL GATE PANEL
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 010
C
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013
Schedule Type Duplicates Task Duration 7.00
No. of Times Completed 14.00 Down Time
Equipment Description Equipment No. ACC-CONT-GATE-PNL-01-BLDG10C
15Page
National Center Agricultural Utilization Research1/21/2014
Next Due Date 3/7/2014 Must Be DownNo Tenant
NORTHERN ACCESS CONTROL PANEL-2 DOOR
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
NORTH WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PNL-01-0225
NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
NORTH WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PNL-02-0212
NORTHERN ACCESS CONTROL PANEL-4DOOR
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
ADMIN WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PNL-03-0016
NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
0120A
CENTER WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PNL-04-0120A
NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
ADMIN WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PNL-05-0041
NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
BASEMENT
WEST
SOUTH WING
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PNL-06
Equipment No. ACC-CONT-PNL-07-BLDG002
16Page
National Center Agricultural Utilization Research1/21/2014
NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 002
SOUTH
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
SOUTH WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PNL-08-0314
NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
SOUTH WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PNL-09-0315
NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
ATTIC
ADMIN WING
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PNL-10-ATTIC
NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
ATTIC
ADMIN WING
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PNL-11-ATTIC
NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
ATTIC
ADMIN WING
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PNL-12-ATTIC
NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location Sub-location 1
BUILDING 001
Perform Every 3.00 Month(s) Schedule Type Duplicates
Equipment Description Equipment No. ACC-CONT-PNL-13-0032
17Page
National Center Agricultural Utilization Research1/21/2014
Sub-location 2 Sub-location 3 ADMIN WING
BASEMENT
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Task Duration No. of Times Completed 14.00
Down Time Must Be DownNo
Tenant
NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
ADMIN WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PNL-14-0019
NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
0120A
CENTER WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PNL-15-0120A
NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
CENTER WING
3RD FLOOR
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PNL-16-3135
NORTHERN ACCESS CONTROL POWER SUPPLY
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
NORTH WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PWR-SUP-01-0225
NORTHERN ACCESS CONTROL POWER SUPPLY
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
NORTH WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PWR-SUP-02-0212
NORTHERN ACCESS CONTROL POWER SUPPLY
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
ADMIN WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description Equipment No. ACC-CONT-PWR-SUP-03-0016
18Page
National Center Agricultural Utilization Research1/21/2014
Tenant
NORTHERN ACCESS CONTROL POWER SUPPLY
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
0120A
CENTER WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PWR-SUP-04-0120A
NORTHERN ACCESS CONTROL POWER SUPPLY
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
ADMIN WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PWR-SUP-05-0041
NORTHERN ACCESS CONTROL POWER SUPPLY
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
BASEMENT
WEST
SOUTH WING
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PWR-SUP-06
NORTHERN ACCESS CONTROL POWER SUPPLY
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 002
SOUTH
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PWR-SUP-07-BLDG02
NORTHERN ACCESS CONTROL POWER SUPPLY
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
SOUTH WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PWR-SUP-08-0314
NORTHERN ACCESS CONTROL POWER SUPPLY
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
SOUTH WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PWR-SUP-09-0315
NORTHERN ACCESS CONTROL POWER SUPPLYEquipment Description Equipment No. ACC-CONT-PWR-SUP-10-ATTIC
19Page
National Center Agricultural Utilization Research1/21/2014
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
ATTIC
ADMIN WING
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo Tenant
NORTHERN ACCESS CONTROL POWER SUPPLY
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
ATTIC
ADMIN WING
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PWR-SUP-11-ATTIC
NORTHERN ACCESS CONTROL POWER SUPPLY
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
ATTIC
ADMIN WING
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PWR-SUP-12-ATTIC
NORTHERN ACCESS CONTROL POWER SUPPLY
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
ADMIN WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PWR-SUP-13-0032
NORTHERN ACCESS CONTROL POWER SUPPLY
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
ADMIN WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PWR-SUP-14-0019
NORTHERN ACCESS CONTROL POWER SUPPLY
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
0120A
CENTER WING
BASEMENT
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PWR-SUP-15-0120A
NORTHERN ACCESS CONTROL POWER SUPPLY
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
CENTER WING
3RD FLOOR
Perform Every 3.00 Month(s) Schedule Type Duplicates Task Duration
No. of Times Completed 14.00
Equipment Description Equipment No. ACC-CONT-PWR-SUP-16-3135
20Page
National Center Agricultural Utilization Research1/21/2014
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Down Time Must Be DownNo
Tenant
NORTHERN ACCESS CONTROL POWER SUPPLY
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 010
C
Perform Every 3.00 Month(s)
Date Last Performed 12/6/2013 Next Due Date 3/7/2014
Schedule Type Duplicates Task Duration
No. of Times Completed 14.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. ACC-CONT-PWR-SUP-17-BLDG10C
Meter Name Last Performed At
Task Instructions
PWS 6.3
1. CHECK WIRE TERMINATIONS AND VOLTAGES IN ACCESS PANEL IN SERVICE BUILDING FOR REMOTE
GATE.
________12 VOLT DC
________24 VOLT AC
________24 VOLT DC
________120 VOLT AC
2. CHECK CIRCUIT BOARDS, WIRE TERMINATIONS AND VOLTAGES IN ACCESS PANELS ACC-CONT-PNL-01 THRU -16
LOCATED THROUGHOUT THE BUILDING.
ACC-CONT-GATE-PNL-01-BLDG10C
________12 VOLT DC
________12 VOLT AC
________24 VOLT DC
________24 VOLT AC
ACC-CONT-PNL-01 ACC-CONT-PNL-02
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
ACC-CONT-PNL-03 ACC-CONT-PNL-04
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PNL-05 ACC-CONT-PNL-06
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PNL-07 ACC-CONT-PNL-08
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PNL-09 ACC-CONT-PNL-10
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PNL-11 ACC-CONT-PNL-12
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
Instruction Code 142 3/25/2011Date Last Edited
21Page
National Center Agricultural Utilization Research1/21/2014
ACC-CONT-PNL-13 ACC-CONT-PNL-14
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PNL-15 ACC-CONT-PNL-16
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
3. CHECK WIRE TERMINATIONS AND VOLTAGES IN ACCESS CONTROL POWER SUPPLIES ACC-CONT-PWR SUP-01
THRU -17
ACC-CONT-PWR-SUP-01 ACC-CONT-PWR-SUP-02
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PWR-SUP-03 ACC-CONT-PWR-SUP-04
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PWR-SUP-05 ACC-CONT-PWR-SUP-06
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PWR-SUP-07 ACC-CONT-PWR-SUP-08
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PWR-SUP-09 ACC-CONT-PWR-SUP-10
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PWR-SUP-11 ACC-CONT-PWR-SUP-12
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PWR-SUP-13 ACC-CONT-PWR-SUP-14
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PWR-SUP-15 ACC-CONT-PWR-SUP-16
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PWR-SUP-17
________12 VOLT DC
________24 VOLT AC
________24 VOLT DC
________120 VOLT AC
WARNING -
FIRE DETECTORS MUST BE DISABLED BEFORE ANY FLAME OR ARC WELDING WORK
22Page
National Center Agricultural Utilization Research1/21/2014
Task No. ADDITIONAL WORK
ADDITIONAL WORK
Assigned To WO Type
Expense Class
Priority Multitask
In-service Task
AW
3.00 No Yes
Description
Site NCAUR
Craft Estimated Labor HoursCrew Size
Meter Name Last Performed At
Task No. AIR-COMP-01-02-SA
SEMI-ANNUAL ON AIR COMPRESSORS
Assigned To WO Type
Expense Class
Priority Multitask
In-service Task
PM
3.00 No Yes
Description
Site NCAUR
Craft Estimated Labor HoursCrew Size
PIPE 1.00 1.56
AIR COMPRESSOR
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
SOUTH WING
BASEMENT
Perform Every 180.00 Day(s)
Date Last Performed 12/4/2013 Next Due Date 6/3/2014
Schedule Type Duplicates Task Duration 10.00
No. of Times Completed 25.00 Down Time 15.00
Must Be DownYes
Equipment Description
Tenant
Equipment No. AIR-COMP-01-0330
AIR COMPRESSOR
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
SOUTH WING
BASEMENT
Perform Every 180.00 Day(s)
Date Last Performed 11/25/2013 Next Due Date 5/27/2014
Schedule Type Duplicates Task Duration 10.00
No. of Times Completed 21.00 Down Time
Must Be DownNo
Equipment Description
Tenant
Equipment No. AIR-COMP-02-0330
Meter Name Last Performed At
Task Instructions
AIR-COMP-01
SERVICE CHECK LIST
AIR FILTER- CHANGE FILTER WHEN MESSAGE IS DISPLAYED TO DO SO.
OIL SEPARATOR - CHANGE ELEMENT WHEN MESSAGE IS DISPLAYED TO DO SO.
AIR COMPRESSOR 01 METER READING __________
DAILY
1. CHECK THE RESERVOIR OIL LEVEL - ADD OIL IF REQUIRED. SEE SECTION 5 OF O&M FOR OIL CHANGING
INSTRUCTIONS.
IF OIL CONSUMPTION IS HIGH, REFER TO EXCESSIVE OIL CONSUMPTION ON PG 65 OF O&M DO NOT MIX
LUBRICANTS
2. OBSERVE IF THE UNIT LOADS AND UNLOADS PROPERLY.
3. CHECK DISCHARGE PRESSURE AND TEMPERATURE.
Instruction Code AIRCOMP-01 7/14/2011Date Last Edited
23Page
National Center Agricultural Utilization Research1/21/2014
4. CHECK PANEL LEDS'S FOR ADVISORIES.
EVERY 125 HOURS
1. CHECK FOR DIRT ACCUMULATION ON OIL/AFTERCOOLER CORE FACES AND COOLING FAN.
IF CLEANING IS REQUIRED CLEAN EXTERIOR FIN SURFACES OF THE CORES BY BLOWING COMPRESSED AIR CARRYING A NONFLAMMABLE SAFETY SOLVENT IN A DIRECTION OPPOSITE THAT OF THE COOLING FAN AIR
FLOW.
THIS CLEANING OPERATION WILL KEEP THE EXTERIOR COOLING SURFACES CLEAN AND ENSURE HEAT
DISSIPATION.
EVERY 1000 HOURS
CHANGE THE OIL FILTER ELEMENT.
EVERY 8000 HOURS
CHANGE THE COMPRESSOR LUBRICANT. UNDER ADVERSE CONDITIONS, CHENGE MORE FREQUENTLY.
FLUSH SYSTEM IF REQUIRED.
EVERY YEAR
1. CHECK THE RELIEF VALVE FOR PROPER OPERATION. SEE SECTION 4 OF O&M.
2. CHECK SSHUTDOWNS FOR PROPER OPERATION.
CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT
[ ] ASBESTOS [ ] PERMIT-REQUIRED
[ ] CARCINOGEN [ ] SINGLE-SOURCE
[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"
[ ] INCOMPATIBLE CHEMICALS
[ ] LEAD EYE/FACE PROTECTION
[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES
[ ] CHEMICAL GOOGLES
PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)
[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)
[ ] CONFINED SPACE [ ] UV/WELDER SHIELD
[ ] MANUAL LIFTING
[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION
[ ] NOISE [ ] EARPLUGS
[ ] HAZARDOUS ENERGY: [ ] EARMUFFS
___ ELECTRICAL [ ] BOTH
___ HYDRAULIC
___ PNEUMATIC HAND PROTECTION
___ STEAM [ ] CHEMICAL GLOVES
___ OTHER: [ ] STANDARD WORK GLOVES
[ ] OVERHEAD HAZARDS [ ] GAUNTLETS
[ ] WELDING/BURNING/HOT WORK [ ] OTHER:
[ ] OTHER:
ITEMS NEEDING PERFORMED
PERMITS [ ] COMPELTED WALKDOWN
[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS
[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT
[ ] WELDING/BURNING/HOT WORK
[ ] OTHER: RESPIRATORY PROTECTION
[ ] DUST MASK
ASBESTOS [ ] HALF-FACE RESPIRATOR
[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR
[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR
[ ] ASBESTOS ABATEMENT [ ] SCBA
[ ] ASBESTOS HOUSEKEEPING
FULL-BODY PROTECTION
[ ] CHEMICAL RESISTANT APRONS
[ ] SLEEVES/GAUNTLETS
[ ] HEAT/FLAME RESISTANT CLOTHING
[X ] SAFETY SHOES
[ ] OTHER:
Instruction Code C-1 12/19/2011Date Last Edited
Task No. AIR-COMP-01-M
MONTHLY ON AIR COMPRESSOR
Assigned To WO Type
Priority MultitaskPM
3.00 No
Description
24Page
National Center Agricultural Utilization Research1/21/2014
Expense Class In-service Task Yes
Craft Estimated Labor HoursCrew Size
PIPE 1.00 2.00
AIR COMPRESSOR
Location Sub-location 1 Sub-location 2 Sub-location 3
BUILDING 001
SOUTH WING
BASEMENT
Perform Every 28.00 Day(s)
Date Last Performed 12/4/2013 Next Due Date 1/27/2014
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .