Attch_2_Dolly_Copp_Specs_Wastewater_03-16-16.pdf
PDF 1 MB Posted
- Attached to
- Dolly Copp Campground Renovation Federal contract opportunity
- Solicitation number
- AG-1484-S-16-0002
About this file
Attch 2 Dolly Copp_Specs_Wastewater_03-16-16
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Additional_clarification_on_question_1.docx | DOCX document | |
| Dolly_Copp_Q A_041816_Posting.pdf | ||
| AG-1484-S-16-0002-000001_Complete.pdf | ||
| Attch_12_DBWD_NH160008_012616_NH8_Building_Coos_Co.docx | DOCX document | |
| Attch_4_Dolly_Copp_Plans_RoadandSite_Construction_2016-03-11.pdf | ||
| Attch_11_Submittals.pdf | ||
| AG-1484-S-16-0002_Complete.pdf | ||
| Attch_8_Boring_Data_and_Maps.pdf | ||
| Attch_9_Dolly_Copp_PreBid_Mtg_QandA.docx | DOCX document | |
| Attch_7_DollyCopp_PlanClarification.docx | DOCX document | |
| Attch_1_Dolly_Copp_Specs_RoadandSite.pdf | ||
| Attch_6_Dolly_Copp_Plans_WaterElectric_Construction_03-15-16.pdf | ||
| Attch_10_Dolly_Copp_Permit_Documents.pdf | ||
| Attch_3_Dolly_Copp_Specs_WaterElectric_03-11-16.pdf | ||
| Attch_5_Dolly_Copp_Plans_Wastewater_Construction_03-16-16.pdf | ||
| Attch_13_DOT_Contractor_Sample_Safety_Plan-Guide-Form.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA - Forest Service
White Mountain National Forest Androscoggin Ranger District
Dolly Copp Campground Wastewater Renovation Specification Package
For additional specifications covering Contracting, see:
the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-03) and
FP-03 Supplemental Specifications in the Dolly Copp Campground Roads and Site Renovation Specification Package
If there is conflict between specifications, the more stringent specification shall take precedence.
Wastewater Renovations (2016) Table of Contents
1/2
General Requirements
DIVISION 01 – GENERAL REQUIREMENTS
01 10 00 SUMMARY
01 20 00 PRICE AND PAYMENT PROCEDURES
01 25 00 SUBSTITUTION PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 16 CONSTRUCTION PROGRESS SCHEDULE
01 33 00 SUBMITTAL REQUIREMENTS
01 40 00 QUALITY REQUIREMENTS
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS
Facility Construction
DIVISION 02 – EXISTING CONDITIONS
02 41 16 STRUCTURE DEMOLITION
02 41 26 SELECTIVE ELECTRICAL DEMOLITION
DIVISION 13 – SPECIAL CONSTRUCTION
13 34 23 PREFABRICATED CONCRETE FLUSH TOILET AND FLUSH TOILET/SHOWER BUILDINGS
Facility services
DIVISION 26 – ELECTRICAL
26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 24 16 PANELBOARDS
26 28 19 ENCLOSED SWITCHES
Site and Infrastructure
DIVISION 31 – EARTHWORK
31 05 13 SOILS FOR EARTHWORK
31 05 16 AGGREGATES FOR EARTHWORK
31 10 00 SITE CLEARING
31 23 17 TRENCHING
31 23 18 ROCK REMOVAL
31 23 19 DEWATERING
DIVISION 32 EXTERIOR IMPROVEMENTS
32 92 00 GRASS SEEDING
Wastewater Renovations (2016) Table of Contents
2/2
DIVISION 33 UTILITIES
33 05 13 MANHOLES AND STRUCTURES
33 12 13 WATER SERVICE CONNECTIONS
33 13 00 DISINFECTING OF WATER UTILITY DISTRIBUTION
33 31 00 SANITARY UTILITY SEWERAGE PIPING
33 36 00 UTILITY SEPTIC TANKS
33 36 13 UTILITY SEPTIC TANK AND EFFLUENT WET WELLS
33 36 16 UTILITY SEPTIC TANK EFFLUENT PUMPS
33 71 73 ELECTRICAL UTILITY SERVICES
END OF TABLE OF CONTENTS
White Mountain National Forest 01 10 00 - 1/8
Wastewater Renovations
SECTION 01 10 00 - SUMMARY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Contract description.
2. Work by the Government or other Work at the Site.
3. Government-furnished products.
4. Contractor's use of Site and Premises.
5. Work sequence.
6. Government occupancy.
7. Specification conventions.
1.2 CONTRACT DESCRIPTION
A. Work of the Project includes renovation of wastewater facilities at Dolly Copp Campground, White Mountain National Forest. This Project is referred to as “Phase 2.”
Without limiting the full scope of work required for the project the following listing is provided to identify the major work items involved:
1. Toilet/Shower Buildings:
a. Contractor is responsible for the purchase and installation of new toilet and toilet/shower buildings as indicated on the drawings.
b. Demolition of existing toilet/shower buildings, construction of building subgrade, construction of concrete sidewalks surrounding connecting walks and parking spaces (where indicated) are to be completed under additional Project documents. See plans titled “Dolly Copp Campground Roads and Site Renovation”.
c. New toilet/shower building corners will be located under additional Project documents. See plans titled “Dolly Copp Campground Roads and Site Renovation”.
d. Toilet buildings #9 (Ozark 1), #10 (Cortez), #11 & #12 (Arapaho) will require a boost in water pressure to meet the 40 psi minimum required by the building manufacturer. These toilet buildings shall include a factory installed Amtrol, 01 10 00 - Summary
White Mountain National Forest 01 10 00 - 2/8
Wastewater Renovations
High-Performance Pressuriser, Model RP-15HP including the necessary piping, valving and power supply for a complete, properly operating unit.
2. Wastewater:
a. Installation of new subsurface disposal systems including pipe, septic tanks, sewage pumps, concrete manholes, tank and manhole frame and covers, distribution boxes, leaching pipe, vents, cleanouts and associated earthwork as indicated on the drawings.
b. Connection of buildings and host site sewer hook-ups to the new subsurface disposal systems including pipe, fittings, cleanouts and associated earthwork as indicated on the drawings.
c. Removal or abandonment of existing subsurface disposal systems including pipe, tanks and leaching systems as indicated on the drawings.
d. Existing septic tanks can remain in-place if filled with flowable concrete fill.
3. Electrical: The following information is provided to clarify the intent of the Scope of Work expected to be provided by the Contractor for the electrical bid for the Wastewater/Toilet Building improvements Project. It is provided solely to describe the scope of the installations required, and all ancillary work, material, labor, etc.
required are to be considered as included whether specifically noted in detail or not.
As examples: trench, backfill, spacers for conduit in trenches, utility meter enclosures, conduit and wiring associated with the new Toilet Buildings and their appurtenant items, etc. are part of the Contractor's work and are not repeated or noted throughout the descriptions.
Electrical work - Provide all conduit, conduit fittings and caps, expansion fittings, classified conduit fittings, utility meter enclosures, enclosed breakers (where drawings or Scope of Work these are part of the project, fused and un-fused disconnect switches and/or breakers, etc., and all labor and equipment to install all those items provided. Refer to the project specifications and drawings for detailed indications of work and description of devices, electrical equipment, methods, etc.
The Contract drawings indicate the below noted letter references and the descriptions noted below are to assist the Contractor and understanding the apparent electrical installations at each location. New Toilet Buildings are provided with distribution panelboards, lights, receptacles, etc. factory installed and prewired.
a. Toilet Building #1 (Big Meadow East): Remove existing conductors and cut back existing conduit as necessary for the removal of existing Toilet Building #1. Extension of 2” conduit to new panel location and new Toilet Building #1.
Provide new distribution feeders (3 - # 2 Cu, 1 # 8 Cu Ground) from the existing 100 A , 2 pole circuit breaker at the new electrical distribution structure BH-1 to new Toilet Building panel. Field coordinate new conduit extension routing and include any required, Code sized, junction or pull boxes.
White Mountain National Forest 01 10 00 - 3/8
Wastewater Renovations
b. Toilet Building #2 (Big Meadow North): Remove existing feeder conductors and cut back existing conduit as necessary for the removal of existing Toilet Building # 2. Install extension of 3“conduit to new panel location and new Toilet Building #2. Provide new distribution feeders (3 # -250 kcmil AL, 1- #2 Cu Ground) from the existing 200 A, 2 pole circuit breaker at the electrical distribution structure BH-2 to new Toilet Building panel. The circuit breaker used to power the existing Toilet Building shall remain in the distribution panel as a “spare”. Field coordinate new conduit extension routing and include any required, code sized, junction or pull boxes.
c. Toilet Building #3 (Big Meadow South): Remove existing feeder conductors and cut back existing conduit as necessary for the removal of existing Toilet Building #3. Cap end of conduit and abandon in place. Locate existing 2” underground conduit stub in the vicinity of new Toilet Building #3 and extend it to the new Toilet Building panel location in the new building. Provide new distribution feeders (3 # -2 Cu, 1 - #8 Cu Ground) from the existing 100 A, 2 pole circuit breaker at the electrical distribution structure BH-3 to new Toilet Building panel. Field coordinate a new conduit extension routing and any and include any required, code sized, junction or pull boxes.
d. Toilet Building #4 (Hayes Field North): Remove existing feeder conductors and cut back existing conduit as necessary for the removal of existing Toilet Building #4. Install extension of 3” conduit to new panel location and new Toilet Building #4. Provide new distribution feeders (3 # -250 kcmil AL, 1 - #2 Cu Ground) from the existing 200 A, 2 pole circuit breaker at the electrical distribution structure of BH-4 to new Toilet Building panel. The circuit breaker used to power the existing Toilet Building shall remain in the distribution panel as a “spare”. Field coordinate new conduit extension routing and include any required, code sized, junction or pull boxes.
e. Toilet Building #5 (Hayes Field South): Remove existing feeder conductors and cut back existing conduit as necessary for the removal of existing Toilet Building #5. Install extension of 3” conduit to new panel location and new Toilet Building #5. Provide new distribution feeders (3 # -250 kcmil AL, 1 - #2 Cu Ground) from the existing 200 A, 2 pole circuit breaker at the electrical distribution structure BH-5 to new Toilet Building panel. The circuit breaker used to power the existing Toilet Building shall remain in the distribution panel as a “spare.” Field coordinate new conduit extension routing and include any required, code size, junction or pull boxes.
f. Toilet Building #6 (Birch Lane): Remove existing feeder conductors and cut back existing conduit as necessary for the removal of existing Toilet Building #6. Install extension of 3” conduit to new panel location and new Toilet Building #6. Provide a new distribution feeder (3 - # 2 Cu, 1 #8 Cu Ground) from the existing 100 A, 2 pole circuit breaker at the electrical distribution structure BH–6 to new Toilet Building panel. Field coordinate new conduit extension routing and include any required, code sized, junction or pull boxes.
White Mountain National Forest 01 10 00 - 4/8
Wastewater Renovations
g. Toilet Building #7: Locate existing 3” underground conduit stub in the vicinity of new Toilet Building #7 and extend it to the new Toilet Building panel location in the new building. Provide new distribution feeders (3 # -250 kcmil AL, 1 - #2 Cu Ground) from the existing 200 A, 2 pole circuit breaker at the electrical distribution structure BH – 7 to new Toilet Building panel. The circuit breaker used to power the existing Toilet Building shall remain and the distribution panel as a “spare.” Field coordinate new conduit extension routing and include any required, code sized, junction or pull boxes. Remove existing feeders from existing Visitor Center Building to adjacent existing Toilet Building. Cut and cap conduit near existing Toilet Building and cap, abandoning in place.
h. Toilet Building # 8 (End Loop): Remove existing feeder conductors and utility meter from existing Toilet Building #8. Cut back conduit as needed for removal of existing building and installation of new building. Provide new utility meter with 10 Ampere main breaker, field located with Owner and Utility, at new Toilet Building #8. Extend cut back 3” conduit to new utility meter. Provide new metal wireway from new main breaker to new Toilet Building panelboard. Provide and install 3 #2 Cu, 1- #8 Cu from existing transformer T-8 to new meter and from main breaker to new building panelboard. Field coordinate new conduit extension routing and include any required, code sized, junction or pull boxes.
i. Toilet Building #9 (High Fields): Remove existing feeder conductors and utility meter from existing Toilet Building #9. Cut back conduit as needed for removal of existing building and installation of new building. Provide new utility meter with 100 Ampere main breaker, field located with Owner and Utility, at new Toilet Building #9. Extend cut back 3” conduit to new utility meter. Provide new metal wireway from new main breaker to new Toilet Building panelboard.
Provide and install 3 #2 Cu, 1- # 8 Cu Ground from existing transformer T-9 to new meter and from main breaker to new building panelboard. Field coordinate new conduit extension routing and include any required, code sized, junction or pull boxes.
Toilet Building #9 contains a factory installed, piped and wired booster water pump installation. There is no field wiring by the Contractor for this.
Provide circuit breaker in new Toilet Building #9 panelboard for 1/3 HP, simplex, waste water pump and control. System consists of 3 float switches, one pump, and associated motor controls and one alarm light for field installation. Provide NEMA 3R enclosed, NF, 240 Volt, 30 A, disconnect and field locate with Owner within sight of pump access point. Disconnect shall be pad-lockable in the “ON” and “OFF” position. All wiring entering the Wet Well shall be rigid galvanized steel, and each float switch and the motor shall have a separate conduit. Provide Class 1, Division 1, Group C, D seal fittings on all conduit routed from the wet well and rising at the Toilet Building exterior.
Provide expansion fittings above the explosion-proof seal fittings. The 3 float switch conduits shall terminate in a NEMA 3R, pad-lockable pull box, field located with the Owner, and shall be spliced to conductors at the pull box that are routed to the pump control panel that will be field located within the building.
The motor conduit from the wet well shall be routed to the external disconnect
White Mountain National Forest 01 10 00 - 5/8
Wastewater Renovations switch. Motor feeder conductors from their interior mounted pump control panel shall be routed to the exterior disconnect switch. The alarm light shall be field located with the Owner on the building exterior, and shall be wired in metallic conduit to the pump control panel inside the building. A NEMA 1 pad-lockable disconnect shall be provided and installed adjacent to the pump controls, with power from the panelboard wiring to it, and from it to the pump control panel.
j. Toilet Building #10 (High Woods): Remove existing feeder conductors and cut back existing conduit as necessary for the removal of existing Toilet Building #10. Install extension of 3” conduit to new panel location in new Toilet Building #10. Provide new distribution feeders (3 - # 4/0 AL, 1 # 4 Cu Ground) from the existing 100 A, 2 pole circuit breaker at the panelboard HW located in the Well Control Building to new Toilet Building panel. Field coordinate new conduit extension routing and include any required, code sized, junction or pull boxes.
New Toilet Building # 10 contains a factory installed, piped, and wired booster water pump installation. There is no field wiring by the Contractor for this.
k. Toilet Building #11 (Brook Loop): Remove existing feeder conductors and utility meter from existing Toilet Building #11. Cut back conduit as needed for removal of existing building and installation of new building. Provide a new meter with 200 Ampere main breaker, field located with Owner and Utility, at new Toilet Building #11. Extend cut back 3” conduit to new utility meter. Provide new metal conduit from new main breaker to new Toilet Building panelboard. Provide and install 3 #250 kcmil AL, 1-#6 Cu Ground from existing transformer T-11 to new meter and from main breaker to new building panelboard. Field coordinate new conduit extension routing and include any required, code sized, junction or pull boxes.
Toilet Building # 11 contains a factory installed, piped, and wired booster water pump installation. There is no field wiring by the Contractor for this.
l. Toilet Building #12 (Spruce Woods): Remove existing feeder conductors and cut back existing conduit as necessary for the removal of existing Toilet Building #12. Install extension of 3” conduit to new panel location in new Toilet Building #12. Provide new distribution feeder (3 # -250 kcmil AL, 1 - #2 Cu Ground) from the existing 200 A, 2 pole circuit breaker at the electrical distribution structure BH-12 to new Toilet Building panel. The circuit panel used to power the existing Toilet Building shall remain in the distribution panel as a “spare.” Field coordinate new conduit extension routing and include any required, code sized, junction or pull boxes.
Toilet Building #12 contains a factory installed, piped, and wired booster water pump installation. There is no field wiring by the Contractor for this.
B. Perform Work of each Contract under additional Project documents with the Government according to Conditions of Contract.
C. Work of each Phase is identified in the following and on Drawings.
White Mountain National Forest 01 10 00 - 6/8
Wastewater Renovations
1. Phase 1 – Water & Electrical Renovations
2. Phase 2 – Wastewater Renovations
1.3 WORK BY THE GOVERNMENT OR OTHERS
A. If Government-awarded contracts interfere with each other due to work being performed at the same time or at the same Site, the Government will determine the sequence of work under all contracts according to "Work Sequence" and "Contractor's Use of Site" Articles in this Section.
B. Coordinate Work with utilities of the Government and public or private agencies.
C. Work under these Contracts will include:
1. Phase 3 – Roadway and Site Improvements; Volunteer Loop and South of Culhane Brook
2. Phase 4 – Roadway and Site Improvements; North of Culhane Brook
1.4 CONTRACTOR'S USE OF SITE AND PREMISES
A. Limit use of Site and premises to allow:
1. Government occupancy.
2. Use of Site and premises by the public.
B. Construction Operations: Limited to areas identified by the Government.
C. Time Restrictions for Performing Exterior Work: All work shall be performed between 7 a.m. and 6 p.m. during week days only, except in the case of emergency.
D. Utility Outages and Shutdown:
1. Coordinate and schedule electrical and other utility outages with the Government.
2. Outages: Allowed only at previously agreed upon times.
3. At least one week before scheduled outage, submit Outage Request Plan to the Government itemizing the dates, times, and duration of each requested outage.
E. Construction Plan: Before start of construction, submit three copies of construction plan regarding access to Work, use of Site, and utility outages for acceptance by the Government. After acceptance of plan, construction operations shall comply with accepted plan unless deviations are accepted by the Government in writing.
White Mountain National Forest 01 10 00 - 7/8
Wastewater Renovations
1.5 WORK SEQUENCE
A. Construct Work in phases during construction period. Coordinate construction schedule and operations with the Government.
B. For Construction Occurring Between May 15 and October 15:
1. Contractor shall have the option to close half of the campground to the public, while maintaining full access to the other half. The demarcation line shall be the bridge on the main road between Brook Loop/Little Meadow and Hayes Field/High Woods.
2. Limited outages of water and electrical services (24 hour maximum duration) are acceptable, within the open portion of the campground.
3. Water and electrical service outages, within the open portion of the campground, shall be coordinated with the Contracting Officer a minimum of 48 hours prior to the service outages.
4. The contractor shall phase work to avoid conflicts with the operation of the campground, and shall submit a construction sequence to the Contracting Officer which will demonstrate how water and electrical service will be maintained during this period.
C. For Construction Occurring Between October 15 and May 15
1. The entire campground shall be closed to the public.
2. Water and electrical service outages can be scheduled for the entire campground at the liberty of the contractor.
D. Sequencing of Construction Plan: Before start of construction, submit three copies of construction plan regarding phasing of demolition, renovation, and new Work for acceptance by the Government. After acceptance of plan, construction sequencing shall comply with accepted plan unless deviations are accepted by the Government in writing.
1.6 GOVERNMENT OCCUPANCY
A. The Government will occupy Site premises during entire period of construction.
B. Cooperate with the Government to minimize conflict and to facilitate the Government's operations.
C. Schedule the Work to accommodate Government occupancy.
1.7 SPECIFICATION CONVENTIONS
A. These Specifications are written in imperative mood and streamlined form. This imperative language is directed to Contractor unless specifically noted otherwise. The
White Mountain National Forest 01 10 00 - 8/8
Wastewater Renovations words "shall be" are included by inference where a colon (:) is used within sentences or phrases.
PART 2 - PRODUCTS - Not Used
PART 3 - EXECUTION - Not Used
END OF SECTION
White Mountain National Forest 01 20 00 - 1/5
Wastewater Renovations
SECTION 01 20 00 - PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Schedule of Values.
B. Application for Payment.
C. Change procedures.
D. Unit prices.
E. Alternates.
1.2 SCHEDULE OF VALUES
A. Submit printed schedule on Progress Estimate schedule on EJCDC C-620.
B. Submit Schedule of Values in duplicate within 15 days after date of the Government- Contractor Agreement.
C. Format: Use Table of Contents of this Project Manual. Identify each line item with number and title of major Specification Section.
D. Include within each line item, direct proportional amount of Contractor's overhead and profit.
E. Revise schedule to list approved Change Orders with each Application for Payment.
1.3 APPLICATION FOR PAYMENT
A. Submit three copies of each Application for Payment on EJCDC C-620 - Contractor's Application for Payment.
B. Content and Format: Use Schedule of Values for listing items in Application for Payment.
C. Submit updated construction schedule with each Application for Payment.
D. Payment Period: Submit at intervals stipulated in the Agreement.
E. Submit submittals with transmittal letter as specified in Section 01 33 00 - Submittal Procedures.
F. Substantiating Data: When Contracting Officer requires substantiating information, submit data justifying dollar amounts in question. Include the following with Application for Payment:
01 20 00 - Price And Payment Procedures
White Mountain National Forest 01 20 00 - 2/5 Dolly Copp Campground Wastewater Renovations
1. Current construction photographs specified in Section 01 33 00 - Submittal Procedures.
2. Partial release of liens from major Subcontractors and vendors.
3. Record Documents as specified in Section 01 70 00 - Execution and Closeout Requirements, for review by the Government, which will be returned to Contractor.
4. Affidavits attesting to off-Site stored products.
5. Construction Progress Schedule, revised and current as specified in Section 01 33 00 - Submittal Procedures.
1.4 CHANGE PROCEDURES
A. Submittals: Submit name of individual who is authorized to receive change documents and is responsible for informing others in Contractor's employ or Subcontractors of changes to the Work.
B. Carefully study and compare Contract Documents before proceeding with fabrication and installation of Work. Promptly advise Contracting Officer of any error, inconsistency, omission, or apparent discrepancy.
C. Requests for Interpretation (RFI) and Clarifications: Allot time in construction scheduling for liaison with Contracting Officer; establish procedures for handling queries and clarifications.
1. Use CSI Form 13.2A - Request for Interpretation for requesting interpretations.
2. Contracting Officer may respond with a direct answer on the Request for Interpretation form, EJCDC C-942 - Field Order, or CSI Form 13/6A - Change Order Request (Proposal).
D. Contracting Officer will advise of minor changes in the Work not involving adjustment to Contract Sum/Price or Contract Time by issuing supplemental instructions on EJCDC C- 942.
E. Contracting Officer may issue CSI Form 13/6A including a detailed description of proposed change with supplementary or revised Drawings and Specifications, a change in Contract Time for executing the change with stipulation of overtime work required and with the period of time during which the requested price will be considered valid.
Contractor will prepare and submit estimate within 15 days.
F. Document requested substitutions according to Section 01 25 00 - Substitution Procedures.
G. Stipulated Sum/Price Change Order: Based on CSI Form 13/6A and Contractor's fixed price quotation or Contractor's request for Change Order as approved by Contracting Officer.
White Mountain National Forest 01 20 00 - 3/5 Dolly Copp Campground Wastewater Renovations
H. Unit Price Change Order: For Contract unit prices and quantities, the Change Order will be executed on a fixed unit price basis. For unit costs or quantities of units of that which are not predetermined, execute Work under Work Directive Change. Changes in Contract Sum/Price or Contract Time will be computed as specified for Time and Material Change Order.
I. Work Directive Change: Contracting Officer may issue directive, on EJCDC C-940 - Work Change Directive signed by the Government, instructing Contractor to proceed with change in the Work, for subsequent inclusion in a Change Order. Document will describe changes in the Work and designate method of determining any change in Contract Sum/Price or Contract Time. Promptly execute change.
J. Time and Material Change Order: Submit itemized account and supporting data after completion of change, within time limits indicated in Conditions of the Contract.
Contracting Officer will determine change allowable in Contract Sum/Price and Contract Time as provided in Contract Documents.
K. Maintain detailed records of Work done on time and material basis. Provide full information required for evaluation of proposed changes and to substantiate costs for changes in the Work.
L. Document each quotation for change in Project Cost or Time with sufficient data to allow evaluation of quotation.
M. Change Order Forms: EJCDC C-941 - Change Order.
N. Execution of Change Orders: Contracting Officer will issue Change Orders for signatures of parties as provided in Conditions of the Contract.
O. Correlation of Contractor Submittals:
1. Promptly revise Schedule of Values and Application for Payment forms to record each authorized Change Order as separate line item and adjust Contract Sum/Price.
2. Promptly revise Progress Schedules to reflect change in Contract Time, revise subschedules to adjust times for other items of Work affected by the change, and resubmit.
3. Promptly enter changes in Record Documents.
1.5 UNIT PRICES
A. Authority: Measurement methods are delineated in individual Specification Sections.
B. Measurement methods delineated in individual Specification Sections complement criteria of this Section. In event of conflict, requirements of individual Specification Section govern.
White Mountain National Forest 01 20 00 - 4/5 Dolly Copp Campground Wastewater Renovations
C. The Government will take measurements and compute quantities accordingly. Provide assistance in taking of measurements.
D. Unit Quantities: Quantities and measurements indicated on Bid Form are for Contract purposes only. Quantities and measurements supplied or placed in the Work shall determine payment.
1. When actual Work requires more or fewer quantities than those quantities indicated, provide required quantities at contracted unit sum/prices.
2. When actual Work requires 25 percent or greater change in quantity than those quantities indicated, the Government or Contractor may claim a Contract Price adjustment.
E. Payment Includes: Full compensation for required labor, products, tools, equipment, plant and facilities, transportation, services and incidentals; erection, application, or installation of item of the Work; overhead and profit.
F. Final payment for Work governed by unit prices will be made on basis of actual measurements and quantities accepted by Contracting Officer multiplied by unit sum/price for Work incorporated in or made necessary by the Work.
G. Measurement of Quantities:
1. Measurement by Weight: Concrete reinforcing steel, rolled or formed steel, or other metal shapes will be measured by handbook weights. Welded assemblies will be measured by handbook or scale weight.
2. Measurement by Volume: Measured by cubic dimension using mean length, width, and height or thickness.
3. Measurement by Area: Measured by square dimension using mean length and width or radius.
4. Linear Measurement: Measured by linear dimension, at item centerline or mean chord.
5. Stipulated Sum/Price Measurement: Items measured by weight, volume, area, or linear means or combination, as appropriate, as completed item or unit of the Work.
1.6 ALTERNATES
A. Alternates quoted on Bid Forms will be reviewed and accepted or rejected at the Government's option. Accepted Alternates will be identified in the Government- Contractor Agreement. The Government-Contractor Agreement may identify certain Alternates to remain a Government option for a stipulated period of time.
White Mountain National Forest 01 20 00 - 5/5 Dolly Copp Campground Wastewater Renovations
B. Coordinate related Work and modify surrounding Work. Description for each Alternate is recognized to be abbreviated but requires that each change shall be complete for scope of Work affected.
1. Coordinate related requirements among Specification Sections as required.
2. Include as part of each Alternate: Miscellaneous devices, appurtenances, and similar items incidental to or necessary for complete installation.
3. Coordinate Alternate with adjacent Work and modify or adjust as necessary to ensure integration.
C. Schedule of Alternates:
1. Phase 1 – Water & Electrical Renovations
a. Alternate No. 1: Water Tank Supply & Distribution
b. Alternate No. 2: Hayes Field Water
c. Alternate No. 3: Big Meadow Water
2. Phase 1 – Roads and Site Renovation
a. Alternate No. 4: Box Culvert
3. Phase 2 – Wastewater Renovations
a. Alternate No. 5: Area A
b. Alternate No. 6: Area B
PART 2 PRODUCTS - Not Used
PART 3 EXECUTION - Not Used
White Mountain National Forest 01 25 00 - 1/3
Wastewater Renovations
SECTION 01 25 00 - SUBSTITUTION PROCEDURES
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Quality assurance.
B. Product options.
C. Product substitution procedures.
1.2 QUALITY ASSURANCE
A. Contracts are based on products and standards established in Contract Documents without consideration of proposed substitutions.
B. Products specified define standard of quality, type, function, dimension, appearance, and performance required.
C. Substitution Proposals: Permitted for specified products except where specified otherwise. Do not substitute products unless substitution has been accepted and approved in writing by the Government.
1.3 PRODUCT OPTIONS
A. See Section 01 60 00 - Product Requirements.
1.4 PRODUCT SUBSTITUTION PROCEDURES
A. Contracting Officer will consider requests for substitutions only within 30 days after date established in Notice to Proceed.
B. Substitutions may be considered when a product becomes unavailable through no fault of Contractor.
C. Document each request with complete data, substantiating compliance of proposed substitution with Contract Documents, including:
1. Manufacturer's name and address, product, trade name, model, or catalog number, performance and test data, and reference standards.
2. Itemized point-by-point comparison of proposed substitution with specified product, listing variations in quality, performance, and other pertinent characteristics.
3. Reference to Article and Paragraph numbers in Specification Section.
4. Cost data comparing proposed substitution with specified product and amount of net change to Contract Sum.
01 25 00 - Substitution Procedures
White Mountain National Forest 01 25 00 - 2/3 Dolly Copp Campground Wastewater Renovations
5. Changes required in other Work.
6. Availability of maintenance service and source of replacement parts as applicable.
7. Certified test data to show compliance with performance characteristics specified.
8. Samples when applicable or requested.
9. Other information as necessary to assist Contracting Officer's evaluation.
D. A request constitutes a representation that Bidder or Contractor:
1. Has investigated proposed product and determined that it meets or exceeds quality level of specified product.
2. Will provide same warranty for substitution as for specified product.
3. Will coordinate installation and make changes to other Work that may be required for the Work to be complete with no additional cost to the Government.
4. Waives claims for additional costs or time extension that may subsequently become apparent.
5. Will coordinate installation of the accepted substitute, making such changes as may be required for the Work to be complete in all respects.
6. Will reimburse the Government and Contracting Officer for review or redesign services associated with reapproval by authorities having jurisdiction.
E. Substitutions will not be considered when they are indicated or implied on Shop Drawing or Product Data submittals without separate written request or when acceptance will require revision to Contract Documents.
F. Substitution Submittal Procedure:
1. Submit requests for substitutions on CSI Form 13.1A Substitution Request-After the Bidding/Negotiating Stage.
2. Submit three copies of Request for Substitution for consideration. Limit each request to one proposed substitution.
3. Submit Shop Drawings, Product Data, and certified test results attesting to proposed product equivalence. Burden of proof is on proposer.
4. Contracting Officer will notify Contractor in writing of decision to accept or reject request.
01 25 00 - Substitution Procedures
White Mountain National Forest 01 25 00 - 3/3 Dolly Copp Campground Wastewater Renovations
1.5 INSTALLER SUBSTITUTION PROCEDURES
A. Contracting Officer will consider requests for substitutions only within 30 days after date established in Notice to Proceed.
B. Document each request with:
1. Installer's qualifications.
2. Installer's experience in work similar to that specified.
3. Other information as necessary to assist Contracting Officer's evaluation.
C. Substitution Submittal Procedure:
1. Submit three copies of Request for Substitution for consideration. Limit each request to one proposed substitution.
2. Contracting Officer will notify Contractor in writing of decision to accept or reject request.
PART 2 - PRODUCTS - Not Used
PART 3 - EXECUTION - Not Used
White Mountain National Forest 01 30 00 - 1/6
Wastewater Renovations
SECTION 01 30 00 - ADMINISTRATIVE REQUIREMENTS
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Coordination and Project conditions.
B. Preconstruction meeting.
C. Site mobilization meeting.
D. Progress meetings.
E. Preinstallation meetings.
F. Closeout meeting.
1.2 COORDINATION AND PROJECT CONDITIONS
A. Coordinate scheduling, submittals, and Work of various Sections of Project Manual to ensure efficient and orderly sequence of installation of interdependent construction elements, with provisions for accommodating items installed later.
B. Verify that utility requirements and characteristics of operating equipment are compatible with building utilities. Coordinate Work of various Sections having interdependent responsibilities for installing, connecting to, and placing operating equipment in service.
C. Coordinate space requirements, supports, and installation of mechanical and electrical Work indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit as closely as practical; place runs parallel with lines of building. Use spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.
1. Coordination Drawings: Prepare as required to coordinate all portions of Work.
Show relationship and integration of different construction elements that require coordination during fabrication or installation to fit in space provided or to function as intended. Indicate locations where space is limited for installation and access and where sequencing and coordination of installations are important.
D. Coordination Meetings: In addition to other meetings specified in this Section, hold coordination meetings with personnel and Subcontractors to ensure coordination of Work.
E. In finished areas except as otherwise indicated, conceal pipes, ducts, and wiring within construction. Coordinate locations of fixtures and outlets with finish elements.
01 30 00 - Administrative Requirements
White Mountain National Forest 01 30 00 - 2/6 Dolly Copp Campground Wastewater Renovations
F. Coordinate completion and cleanup of Work of separate Sections in preparation for Substantial Completion and for portions of Work designated for the Government's occupancy.
G. After the Government's occupancy of premises, coordinate access to Site for correction of defective Work and Work not complying with Contract Documents, to minimize disruption of the Government's activities.
1.3 PRECONSTRUCTION MEETING
A. The Government will schedule and preside over meeting after Notice of Award.
B. Attendance Required: Contracting Officer, the Government, appropriate governmental agency representatives, major Subcontractors, and Contractor.
C. Minimum Agenda:
1. Execution of the Government-Contractor Agreement.
2. Submission of executed bonds and insurance certificates.
3. Distribution of Contract Documents.
4. Submission of list of Subcontractors, list of products, schedule of values, and Progress Schedule.
5. Designation of personnel representing parties in Contract, the Government and Contracting Officer.
6. Communication procedures.
7. Procedures and processing of requests for interpretations, field decisions, field orders, submittals, substitutions, Applications for Payments, proposal request, Change Orders, and Contract closeout procedures.
8. Scheduling.
9. Critical Work sequencing.
D. Contractor: Record minutes and distribute copies to participants within 5 days after meeting, with copies each to Contracting Officer, the Government, and those affected by decisions made.
1.4 SITE MOBILIZATION MEETING
A. The Government will schedule and preside over meeting at Project Site prior to Contractor occupancy.
White Mountain National Forest 01 30 00 - 3/6 Dolly Copp Campground Wastewater Renovations
B. Attendance Required: Contracting Officer, the Government, Contractor, Contractor's superintendent, special consultants, major Subcontractors.
C. Minimum Agenda:
1. Use of premises by the Government and Contractor.
2. The Government's requirements and occupancy.
3. Construction facilities and controls provided by the Government.
4. Temporary utilities.
5. Survey and building layout.
6. Security and housekeeping procedures.
7. Schedules.
8. Procedures for testing.
9. Procedures for maintaining record documents.
10. Requirements for startup of equipment.
11. Inspection and acceptance of equipment put into service during construction period.
D. Contractor: Record minutes and distribute copies to participants within 5 days after meeting, with copies each to Contracting Officer, the Government, and those affected by decisions made.
1.5 PROGRESS MEETINGS
A. Schedule and administer meetings throughout progress of the Work at maximum monthly intervals.
B. Contracting Officer will make arrangements for meetings, prepare agenda with copies for participants, and preside over meetings.
C. Attendance Required: Job superintendent, major Subcontractors Contractors and suppliers, and Contracting Officer, the Government, and campground concessionaire representative, as appropriate to agenda topics for each meeting.
D. Minimum Agenda:
1. Review minutes of previous meetings.
2. Review of Work progress.
3. Field observations, problems, and decisions.
White Mountain National Forest 01 30 00 - 4/6 Dolly Copp Campground Wastewater Renovations
4. Identification of problems impeding planned progress.
5. Review of submittal schedule and status of submittals.
6. Review of off-Site fabrication and delivery schedules.
7. Maintenance of Progress Schedule.
8. Corrective measures to regain projected schedules.
9. Planned progress during succeeding work period.
10. Coordination of projected progress.
11. Maintenance of quality and work standards.
12. Effect of proposed changes on Progress Schedule and coordination.
13. Other business relating to Work.
E. Contractor: Record minutes and distribute copies to participants within 5 days after meeting, with copies each to Contracting Officer, the Government, and those affected by decisions made.
1.6 PREINSTALLATION MEETINGS
A. When required in individual Specification Sections, convene preinstallation meetings at Project Site before starting Work of specific Section.
B. Require attendance of parties directly affecting, or affected by, Work of specific Section.
C. Notify Contracting Officer four days in advance of meeting date.
D. Prepare agenda and preside over meeting:
1. Review conditions of installation, preparation, and installation procedures.
2. Review coordination with related Work.
E. Record minutes and distribute copies to participants within 5 days after meeting, with copies each to Contracting Officer, the Government, and those affected by decisions made.
1.7 CLOSEOUT MEETING
A. Schedule Project closeout meeting with sufficient time to prepare for requesting Substantial Completion. Preside over meeting and be responsible for minutes.
B. Attendance Required: Contractor, major Subcontractors, Contracting Officer, the Government, and others appropriate to agenda.
White Mountain National Forest 01 30 00 - 5/6 Dolly Copp Campground Wastewater Renovations
C. Notify Contracting Officer four days in advance of meeting date.
D. Minimum Agenda:
1. Start-up of facilities and systems.
2. Operations and maintenance manuals.
3. Testing, adjusting, and balancing.
4. System demonstration and observation.
5. Operation and maintenance instructions for the Government's personnel.
6. Contractor's inspection of Work.
7. Contractor's preparation of an initial "punch list."
8. Procedure to request Contracting Officer inspection to determine date of Substantial Completion.
9. Completion time for correcting deficiencies.
10. Inspections by authorities having jurisdiction.
11. Certificate of Occupancy and transfer of insurance responsibilities.
12. Partial release of retainage.
13. Final cleaning.
14. Preparation for final inspection.
15. Closeout Submittals:
a. Project record documents.
b. Operating and maintenance documents.
c. Operating and maintenance materials.
d. Affidavits.
16. Final Application for Payment.
17. Contractor's demobilization of Site.
18. Maintenance.
White Mountain National Forest 01 30 00 - 6/6 Dolly Copp Campground Wastewater Renovations
E. Record minutes and distribute copies to participants within 5 days after meeting, with copies each to Contracting Officer, the Government, and those affected by decisions made.
PART 2 - PRODUCTS - Not Used
PART 3 - EXECUTION – Not Used
White Mountain National Forest 01 32 16 - 1/6
Wastewater Renovations
SECTION 01 32 16 - CONSTRUCTION PROGRESS SCHEDULE
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Submittals.
B. Quality assurance.
C. Format for network analysis schedules.
D. Network analysis schedules.
E. Bar chart schedules.
F. Review and evaluation.
G. Updating schedules.
H. Distribution.
1.2 SUBMITTALS
A. Within 10 days after date of the Government-Contractor Agreement, submit proposed preliminary network diagram defining planned operations for first 60 days of Work, with general outline for remainder of Work.
B. Participate in review of preliminary and complete network diagrams jointly with Contracting Officer.
C. Within 20 days after joint review of proposed preliminary network diagram, submit draft of proposed complete network diagram for review. Include written certification that major Subcontractors have reviewed and accepted proposed schedule.
D. Within 10 days after joint review, submit complete network analysis consisting of network diagrams and mathematical analyses.
E. Submit updated network schedules with each Application for Payment.
F. Submit number of opaque reproductions Contractor requires, plus two copies Contracting Officer will retain.
G. Submit network schedules under transmittal letter form specified in Section 01 33 00 - Submittal Procedures.
H. Schedule Updates:
1. Overall percent complete, projected and actual.
01 32 16 - Construction Progress Schedule
White Mountain National Forest 01 32 16 - 2/6 Dolly Copp Campground Wastewater Renovations
2. Completion progress by listed activity and subactivity, to within five working days prior to submittal.
3. Changes in Work scope and activities modified since submittal.
4. Delays in submittals or resubmittals, deliveries, or Work.
5. Adjusted or modified sequences of Work.
6. Other identifiable changes.
7. Revised projections of progress and completion.
I. Narrative Progress Report:
1. Submit with each monthly submission of Progress Schedule.
2. Summary of Work completed during the past period between reports.
3. Work planned during the next period.
4. Explanation of differences between summary of Work completed and Work planned in previously submitted report.
5. Current and anticipated delaying factors and estimated impact on other activities and completion milestones.
6. Corrective action taken or proposed.
1.3 QUALITY ASSURANCE
A. Scheduler: Contractor's personnel specializing in CPM scheduling with two years' minimum experience in scheduling construction work of complexity comparable to the Project, and having use of computer facilities capable of delivering detailed graphic printout within 48 hours of request.
B. Contractor's Administrative Personnel: 2 years' minimum experience in using and monitoring CPM schedules on comparable Projects.
1.4 FORMAT FOR NETWORK ANALYSIS SCHEDULE
A. Listings: Reading from left to right, in ascending order for each activity. Identify each activity with applicable Specification Section number.
B. Diagram Sheet Size: 24 inches high x 36 inches wide.
C. Scale and Spacing: To allow for notations and revisions.
White Mountain National Forest 01 32 16 - 3/6 Dolly Copp Campground Wastewater Renovations
1.5 NETWORK ANALYSIS SCHEDULES
A. Prepare network analysis diagrams and supporting mathematical analyses using critical path method.
B. Illustrate order and interdependence of activities and sequence of Work; how start of given activity depends on completion of preceding activities, and how completion of activity may restrain start of subsequent activities.
C. Illustrate complete sequence of construction by activity, identifying Work of separate phases. Indicate dates for submittals and return of submittals; dates for procurement and delivery of critical products; and dates for installation and provision for testing. Include legend for symbols and abbreviations used.
D. Mathematical Analysis: Tabulate each activity of detailed network diagrams using calendar dates, and identify for each activity:
1. Preceding and following event numbers.
2. Activity description.
3. Estimated duration of activity, in maximum 15-day intervals. Status of critical activities.
4. Earliest start date.
5. Earliest finish date.
6. Actual start date.
7. Actual finish date.
8. Latest start date.
9. Latest finish date.
10. Total and free float; accrue float time to the Government and to the Government's benefit.
11. Monetary value of activity, keyed to Schedule of Values.
12. Percentage of activity completed.
13. Responsibility.
E. Analysis Program: Capable of compiling monetary value of completed and partially completed activities, of accepting revised completion dates, and of recomputing of scheduled dates and float.
White Mountain National Forest 01 32 16 - 4/6 Dolly Copp Campground Wastewater Renovations
F. Required Sorts: List activities in sorts or groups:
1. By preceding Work item or event number from lowest to highest.
2. By longest float, then in order of early start.
3. By responsibility in order of earliest possible start date.
4. In order of latest allowable start dates.
5. In order of latest allowable finish dates.
6. Contractor's periodic payment request sorted by Specification Sections.
7. List of basic input data-generating report.
8. List of activities on critical path.
G. Prepare subschedules for each stage of Work and Sequencing of Construction Plan identified in Section 01 10 00 - Summary.
H. Coordinate contents with Schedule of Values in Section 01 33 00 - Submittal Procedures.
1.6 BAR CHART SCHEDULES
A. Format: Bar chart Schedule, to include at least:
1. Identification and listing in chronological order of those activities reasonably required to complete the Work, including:
a. Subcontract Work.
b. Major equipment design, fabrication, factory testing, and delivery dates including required lead times.
c. Move-in and other preliminary activities.
d. Equipment and equipment system test and startup activities.
e. Project closeout and cleanup.
f. Work sequences, constraints, and milestones.
2. Listings identified by Specification Section number.
3. Identification of the following:
a. Horizontal time frame by year, month, and week.
White Mountain National Forest 01 32 16 - 5/6 Dolly Copp Campground Wastewater Renovations
b. Duration, early start, and completion for each activity and subactivity.
c. Critical activities and Project float.
d. Subschedules to further define critical portions of Work.
1.7 REVIEW AND EVALUATION
A. Participate in joint review and evaluation of schedules with Contracting Officer at each submittal.
B. Evaluate Project status to determine Work behind schedule and Work ahead of schedule.
C. After review, revise schedules incorporating results of review, and resubmit within 10 days.
1.8 UPDATING SCHEDULES
A. Maintain schedules to record actual start and finish dates of completed activities.
B. Indicate progress of each activity to date of revision, with projected completion date of each activity. Update schedules to depict current status of Work.
C. Identify activities modified since previous submittal, major changes in Work, and other identifiable changes.
D. Upon approval of a Change Order, include the change in the next schedule submittal.
E. Indicate changes required to maintain Date of Substantial Completion.
F. Submit sorts as required to…