Attch_7_DollyCopp_PlanClarification.docx

DOCX document 21 KB Posted

Attached to
Dolly Copp Campground Renovation Federal contract opportunity
Solicitation number
AG-1484-S-16-0002
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

Attch 7 DollyCopp_PlanClarification

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dolly Copp Utility, Wastewater, and Road Renovations Androscoggin Ranger District White Mountain National Forest Martins Location, New Hampshire

Plan Clarification A. Design Plan Notes:

1. Dolly Copp Campground Roads and Site Renovation, Dolly Copp Campground Wastewater Renovations, and Dolly Copp Campground Water and Electrical Renovations 11”x17” plan sets have been reduced for printing. Scales may not be as indicated on the drawing.

2. To the Dolly Copp Wastewater Plan Set add a note to Drawing C-212 that says: “Existing septic system not identified in the survey. Anticipate septic tank removal and disposal. Remove and dispose of old leachfield as encountered (Subsidiary to item.).”

3. To the Dolly Copp Wastewater Plan Set add a note to Drawings C-501 to C-514 Typical Sewer Trench Detail that says: ““Existing pavement to be disturbed shall be sawcut and removed and replaced to match existing pavement depth and grade.”