Amendment No. 1 RFQ AG-05GG-S-09-0057 August 4, 2009 Okanogan & Wenatchee NF
Forest-Wide Road Maintenance
Remove existing pages 3 - 7 and replace with the following: Page 3 of 52
SCHEDULE OF ITEMS
| Item No. |
| Description |
| Pay Unit |
| Est Quant. |
| Unit Price |
| Total Price |
| 811(3) |
| Surface Maintenance Level 3 roads |
| Single Lane Mile |
| 250 |
| $__________ |
| $__________ |
| 811(3)(b) |
| Surface Maintenance Level 3 roads with water |
| Single Lane Mile |
| 250 |
| $__________ |
| $__________ |
| 811(4) |
| Surface Maintenance Level 3 roads |
| Double Lane Mile |
| 10 |
| $__________ |
| $__________ |
| 811(4)(b) |
| Surface Maintenance Level 3 roads with water |
| Double Lane Mile |
| 10 |
| $__________ |
| $__________ |
| 811(5) |
| Surface Maintenance Level 2 roads |
| Single Lane Mile |
| 125 |
| $__________ |
| $__________ |
| 811(5)(b) |
| Surface Maintenance Level 2 roads with water |
| Single Lane Mile |
| 150 |
| $__________ |
| $__________ |
| 811(7) |
| Shoulder Maintenance |
| Road Mile |
| 100 |
| $__________ |
| $__________ |
| 813(1) |
| Spot Surfacing, Gradation C |
| Cubic Yard |
| 1000 |
| $__________ |
| $__________ |
| 813(3) |
| Spot Surfacing, Gradation C |
| Ton |
| 500 |
| $__________ |
| $__________ |
| 814(1) |
| Pothole Patching |
| Ton |
| 100 |
| $__________ |
| $__________ |
| 814(2) |
| Skin Patching |
| Ton |
| 500 |
| $__________ |
| $__________ |
| 814(5) |
| Paved Surface Cleaning (Single Lane) |
| Mile |
| 100 |
| $__________ |
| $__________ |
| 814(6) |
| Paved Surface Cleaning (Double Lane) |
| Mile |
| 100 |
| $__________ |
| $__________ |
| 832(1) |
| Load, Haul, and Place Material |
| Cubic Yard |
| 350 |
| $__________ |
| $__________ |
| 832(2) |
| Load, Haul, and Place Material |
| Mile |
| 200 |
| $__________ |
| $__________ |
| 833(1) |
| ACTUAL PRODUCT TO BE INCLUDED IN INDIVIDUAL TASK ORDER |
________Inch corrugated metal pipe
________Inch thickness for steel, ________Inch thickness for aluminum or
________Inch thickness for Plastic
| Linear Foot |
| 300 |
| $PER T.O. |
| $PER T.O. |
| 833(2) |
| Culvert Removal |
| Each |
| 10 |
| $__________ |
| $__________ |
| 833(3) |
| Water-bar Installation |
| Each |
| 30 |
| $__________ |
| $__________ |
| 833(4) |
| Water-bar Installation |
| Mile |
| 20 |
| $__________ |
| $__________ |
| 833(5) |
| Water-bar Removal |
| Each |
| 20 |
| $__________ |
| $__________ |
| 833(6) |
| Water-bar Removal |
| Mile |
| 10 |
| $__________ |
| $__________ |
| 833(7) |
| Cross Ditch Installation |
| Each |
| 30 |
| $__________ |
| $__________ |
| 833(8) |
| Cross Ditch Installation |
| Mile |
| 20 |
| $__________ |
| $__________ |
| Item No. |
| Description |
| Pay Unit |
| Est Quant. |
| Unit Price |
| Total Price |
| 833(9) |
| Cross Ditch Removal |
| Each |
| 10 |
| $__________ |
| $__________ |
| 833(10) |
| Cross Ditch Removal |
| Mile |
| 10 |
| $__________ |
| $__________ |
| 833(11) |
| Driveable Drain Dip Installation |
| Each |
| 20 |
| $__________ |
| $__________ |
| 833(12) |
| Driveable Drain Dip Installation |
| Mile |
| 10 |
| $__________ |
| $__________ |
| 834(1) |
| Clean and Recondition Culverts |
| Each |
| 50 |
24 inch Diameter and under
| 834(2) |
| Clean and Recondition Culverts |
| Each |
| 10 |
Over 24 inch through 48 inch Dia
| 834(3) |
| Clean and Recondition Culverts |
| Each |
| 10 |
Over 48 inch Diameter
| 834(4) |
| Clean Ditches |
| Mile |
| 100 |
| $__________ |
| $__________ |
| 834(5) |
| Clean Ditches and Drainage Structures |
| Mile |
| 50 |
| $__________ |
| $__________ |
| 834(6) |
| Clean Drainage Structures |
| Mile |
| 10 |
| $__________ |
| $__________ |
| 841(1) |
| Establish Vegetation |
| Acres |
| 30 |
| $__________ |
| $__________ |
| 841(2) |
| Establish Vegetation |
| Mile |
| 20 |
| $__________ |
| $__________ |
| 841(3) |
| Establish Vegetation |
| Lump sum |
| 10 |
| $__________ |
| $__________ |
| 842(1) |
| Vegetation Maintenance Level 4&5 roads |
| Mile |
| 20 |
| $__________ |
| $__________ |
| 842(2) |
| Vegetation Maintenance Level 3 roads |
| Mile |
| 80 |
| $__________ |
| $__________ |
| 842(3) |
| Vegetation Maintenance Level 2 roads |
| Mile |
| 80 |
| $__________ |
| $__________ |
| 861(1) |
| Recondition/clean one-lane cattleguard |
| Each |
| 10 |
| $__________ |
| $__________ |
| 861(2) |
| Recondition/clean two-lane cattleguard |
| Each |
| 10 |
| $__________ |
| $__________ |
| 861(4) |
| Recondition/clean traffic gate |
| Each |
| 20 |
| $__________ |
| $__________ |
| 872(3) |
| Install or Replace Single Post and Sign |
| Each |
| 20 |
| $__________ |
| $__________ |
| 872(4) |
| Install or Replace Doulbe Post and Sign |
| Each |
| 10 |
| $__________ |
| $__________ |
| 872(5) |
| Install or Replace Sign |
| Each |
| 50 |
| $__________ |
| $__________ |
| 881(3) |
| Equipment Moving |
| Mile |
| 150 |
| $__________ |
| $__________ |
| 881(4) |
| Equipment Moving |
| Hour |
| 30 |
| $__________ |
| $__________ |
Total
SCHEDULE OF ITEMS - EQUIPMENT RENTAL
| Item No. |
| Description |
| Pay Unit |
| Est. Quant. |
| Unit Price |
| Total Price |
| 807(1)(a) |
| Grader Rental. 145-220 HP. Examples: Cat 120H, 12H, John Deere 670CH, Case 865D, New Holland RG. Minimum blade length: 14 feet. |
| Hour |
| 400 |
| $__________ |
| $__________ |
| 807(1)(b) |
| Grader Rental. 115-145 HP. Examples: Cat 12H (Global), Case 845. Minimum blade length 12 feet. |
| Hour |
| 150 |
| $__________ |
| $__________ |
| 807(2) |
| Backhoe Rental. 75 HP minimum. Front loader bucket capacity: 1 cubic yard minimum. |
| Hour |
| 45 |
| $__________ |
| $__________ |
| 807(3) |
| Wheeled Front End Loader. 3-5 cubic yard rated bucket capacity. Minimum 140 HP. |
| Hour |
| 40 |
| $__________ |
| $__________ |
| 807(4) |
| Tractor Mounted Rotary, Cylinder, or Flail roadside brush cutter Rental |
| Hour |
| 160 |
| $__________ |
| $__________ |
| 807(5)(a) |
| Dumptruck Rental. 10 cubic yard bed capacity minimum. |
| Hour |
| 60 |
| $__________ |
| $__________ |
| 807(5)(b) |
| Dumptruck w/ Pup trailer Rental. 20 cubic yard total bed capacity. |
| Hour |
| 40 |
| $__________ |
| $__________ |
| 807(5)(c) |
| Belly Dump Truck Rental. 20 cubic yard minimum capacity. |
| Hour |
| 30 |
| $__________ |
| $__________ |
| 807(6) |
| Rock Truck, articulated. 30 ton 6x6 wheel drive. |
| Hour |
| 80 |
| $__________ |
| $__________ |
| 807(7)(a) |
| Dozer Rental. (Track-type). 70-120 HP. 5-way articulating blade. With Rippers. Example: Cat D4G XL, D5G XL. |
| Hour |
| 60 |
| $__________ |
| $__________ |
| 807(7)(b) |
| Dozer Rental. (Track-type). 5-way articulating blade. With Rippers. 120-160 HP Example: Cat D5N XL, John Deere 750. |
| Hour |
| 60 |
| $__________ |
| $__________ |
| 807(7)(c) |
| Dozer Rental. (Track-type).120-160 HP, with tow behind 15-20 ton grid roller. Example: Cat D5N XL, John Deere 750. |
| Hour |
| 60 |
| $__________ |
| $__________ |
| 807(7)(d) |
| Dozer Rental. (Track-type). 5-way articulating blade. With Rippers. 200-285 HP. Example: Cat D7R. |
| Hour |
| 40 |
| $__________ |
| $__________ |
| 807(7)(e) |
| Dozer Rental. (Track-type). 5-way articulating blade. With Rippers. 285 HP and above. Example: Cat D8. |
| Hour |
| 40 |
| $__________ |
| $__________ |
| 807(8)(a) |
| Finn or equivalent Hydroseeder, 1700 gallon capacity. Includes two operators |
| Hour |
| 80 |
| $__________ |
| $__________ |
| Item No. |
| Description |
| Pay Unit |
| Est. Quant. |
| Unit Price |
| Total Price |
| 807(8)(b) |
| Finn or equivalent Hydroseeder, 3300 gallon capacity. Includes two operators. |
| Hour |
| 80 |
| $__________ |
| $__________ |
| 807(9)(a) |
| Hydraulic Excavator Rental. 90-110 HP. Thumb attachment on bucket. Examples: Cat 312C, Hitachi 120 |
| Hour |
| 60 |
| $__________ |
| $__________ |
| 807(9)(b) |
| Hydraulic Excavator Rental. 111-140 HP. Thumb attachment on bucket. Examples: Cat 320C, Hitachi 200LC, EX200LC. |
| Hour |
| 60 |
| $__________ |
| $__________ |
| 807(9)(c) |
| Hydraulic Excavator Rental 141-180 HP. Thumb attachment on bucket. Example: Cat 322C |
| Hour |
| 60 |
| $__________ |
| $__________ |
| 807(9)(d) |
| Hydraulic Excavator Rental 141-180 HP. Hydraulic Rock Breaker attachment. Example: Cat 322C. |
| Hour |
| 60 |
| $__________ |
| $__________ |
| 807(9)(e) |
| Hydraulic Excavator Rental 181-260 HP. Thumb attachment on bucket. Example: Cat 330C, Hitachi 230CL. |
| Hour |
| 30 |
| $__________ |
| $__________ |
| 807(10)(a) |
| Water Truck with spreader bar Rental. 1000-2500 gallon capacity. |
| Hour |
| 250 |
| $__________ |
| $__________ |
| 807(10)(b) |
| Water Truck with spreader bar Rental. 2500-5000 gallon capacity. |
| Hour |
| 250 |
| $__________ |
| $__________ |
| 807(11) |
| Smooth Steel Drum, Tandem or Single, Roller Rental. Riding. Minimum HP: 75. Minimum Drum Width: 4 feet. 7-11 ton. |
| Hour |
| 200 |
| $__________ |
| $__________ |
| 807(12) |
| Materials Transport-Tractor Trailer combination rental; 40 foot trailer. |
| Hour |
| 40 |
| $__________ |
| $__________ |
| 807(13)(a)(1) |
| Equipment Transport Rental- 0-20 ton. |
| Hour |
| 40 |
| $__________ |
| $__________ |
| 807(13)(a)(2) |
| Equipment Transport Rental- 0-20 ton. Daily rate staged w/out operator. |
| Daily |
| 40 |
| $__________ |
| $__________ |
| 807(13)(b)(1) |
| Equipment Transport Rental- 20-40 ton. |
| Hour |
| 40 |
| $__________ |
| $__________ |
| 807(13)(b)(2) |
| Equipment Transport Rental- 20-40 ton. Daily rate staged w/out operator. |
| Daily |
| 40 |
| $__________ |
| $__________ |
| 807(13)(c)(1) |
| Equipment Transport Rental- 40+ ton. |
| Hour |
| 40 |
| $__________ |
| $__________ |
| 807(13)(c)(2) |
| Equipment Transport Rental- 40+ ton. Daily rate staged w/out operator. |
| Daily |
| 40 |
| $__________ |
| $__________ |
| 807(14) |
| Vibratory Plate Compactor, Hand operated, Rental. |
| Hour |
| 80 |
| $__________ |
| $__________ |
| 807(15) |
| Cut Off Saw, gasoline or electric Rental. Capable of cutting 12 gauge galvanized corrugated steel culvert. |
| Hour |
| 40 |
| $__________ |
| $__________ |
| 807(16) |
| Volume Pump Rental. Minimum capacity 250 gallons per minute. |
| Hour |
| 200 |
| $__________ |
| $__________ |
SCHEDULE OF ITEMS - EQUIPMENT RENTAL
| Item No. |
| Description |
| Pay Unit |
| Est. Quant. |
| Unit Price |
| Total Price |
| 807(17) |
| Timber Falling. (Includes vehicle, all equipment and supplies). |
| Hour |
| 120 |
| $__________ |
| $__________ |
| 807(18) |
| General Labor. (Includes vehicle, incidental equipment and supplies). |
| Hour |
| 120 |
| $__________ |
| $__________ |
807 Items Total:
B.1 EXECUTIVE SUMMARY: Contractor shall provide repair and maintenance services of Forest Service roads within and adjacent to the Okanogan and Wenatchee National Forest. Work may include, but not be limited to, the routine blading of aggregate and native surfaced single lane roads, ditch cleaning, dust abatement and road brushing. Other work that may be ordered includes culvert cleaning, culvert replacement, minor paving, and aggregate surfacing.
Contractor shall furnish all supervision, labor, materials, equipment, tools, transportation, and supplies, and perform all work required to maintain the facilities in accordance with drawings and specifications of the contract. Contractor will be paid for actual work performed. Items of work not listed herein that are considered within the general scope of the contract shall be negotiated on a lump sum basis based on material and equipment rental unit prices established in the contract. This is an indefinite delivery, indefinite quantity firm fixed priced multiple year contract. Task orders may be placed against this contract until September 30, 2013.
Minimum and Maximum Contract Amounts: As referred to in paragraph (b) of clause 52.216-22, entitled "Indefinite Quantity," the minimum quantity and contract guarantee for this contract is $5,000 with a maximum of $100,000 per task order not to be exceeded without the contractor's approval. (see clauses in section I).
Solicitation submittals: The primary performance time is estimated to be from May 15th to October 30th of each calendar year, starting in 2009 (see Section F). Contractor shall submit a signed SF-1449 and pricing information using the schedule of items. Other required submittals include an experience questionnaire with past experience, past projects and references (attached), a listing of make and type of equipment being offered, and Certifications and Representations (ensure your ORCA is up to date) (following the schedule of items pricing page).
Ordering: Task orders may be issued/signed only by a warranted Contracting Officer/Purchasing Agent with the requisite warrant authority to sign an individual task order. Orders placed will contain the following information: task order number and date, units to be worked, performance period, and accounting data.
The Task Order award document will be on any of the following:
a. OF-347 – Order for Supplies or Services
b. SF-1449