814 ASPHALT SURFACE MAINTENANCE
814.01 Service Required
Repair and cleaning of pavement surfaces.
814.02 Performance Standard
This work is complete when the pavement is clean and free of cracks, potholes, and surface irregularities.
Follow industry standards as outlined in the Asphalt Institute Manual Series Number 16.
814.03 Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
814.04 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Single Lane Roads: The work activity will be measured along the centerline of the roadway. Turnouts are incidental. Measurement will be to the nearest one-tenth (0.1) mile.
B. Double Lane Roads: The work activity will be measured along the centerline of the roadway. Measurement will be to the nearest one-tenth (0.1) mile.
C. Road Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
D. Ton: Material measured by the ton shall be verified by certified weight tickets.
E. Linear Foot: Work activity by the linear foot will be measured using standard survey methods rounded to the nearest one (1) foot.
814.05 Payment
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 814 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
Pay Item
Pay Unit
814(1) Pothole Patching
Ton
814(2) Skin Patching
Ton
814(3) Crack Sealing
Linear Foot
814(4) Crack Sealing
Mile
814(5) Paved Surface Cleaning (Single Lane)
Mile
814(6) Paved Surface Cleaning (Double Lane)
Mile
814(7) Paved Surface Cleaning
Each 814.05 Acceptable Quality Levels
| Description |
| Major |
| Minor |
| Allowable Defects |
| Required Action |
| Defect |
| Defect |
| Major |
| Minor |
| Major |
| Minor |
| Pothole Patching |
| Finished elevation does not match adjoining segments by less than 1/4 inch |
| N/A |
| 0 |
| N/A |
| Rework |
| N/A |
| Patched material does not properly adhere to adjacent surfaces |
| N/A |
| 0 |
| N/A |
| Rework |
| N/A |
| Area to be patched is not properly prepared |
| N/A |
| 0 |
| N/A |
| Rework |
| N/A |
| Skin Patching |
| Finished skin patch does not make smooth transition with adjoining pavement. |
| N/A |
| 0 |
| N/A |
| Rework |
| N/A |
| Patched material does not properly adhere to adjacent surfaces |
| N/A |
| 0 |
| N/A |
| Rework |
| N/A |
| Area to be patched is not properly prepared |
| N/A |
| 0 |
| N/A |
| Rework |
| N/A |
| Crack Sealing |
| Crack Sealant does not completely fill the cracks greater than 1/4 inch |
| Crack Sealant does not completely fill the cracks 1/4 inch or less |
| 0 |
| X per unit |
| Rework |
| Accept |
| Crack sealant does not properly adhere to adjacent surfaces |
| N/A |
| 0 |
| N/A |
| Rework |
| N/A |
| Area to be sealed is not properly prepared |
| N/A |
| 0 |
| N/A |
| Rework |
| N/A |
| Surface Cleaning |
| More than 5% of surface is not cleaned as specified |
| Less than 5% of surface is not cleaned as specified |
| 0 |
| Less than 5% of area not cleaned |
| Rework |
| Reduce payment by 10% for every 1% of area not cleaned as specified. |
| Asphalt Quality |
| Product and gradation does not meet Specifications and is not suitable for job. |
| Product and gradation does not meet Specifications but is otherwise suitable for job. |
| 0 |
| N/A |
| Reject and replace |
| N/A |
| Work Area Management |
| Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures |
| Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures |
| 0 |
| 0 |
| Suspend work until in compliance |
| Suspend work until in compliance |
814 - ASPHALT PAVEMENT PATCHING (09/10/04) 3