851 HAZARD AND OBSTRUCTION REMOVAL
851.01 Service Required
Remove and/or stabilize hazards and obstructions.
851.02
Performance Standard Work is complete when hazards have been removed or stabilized and when the road is passable by the intended traffic.
851.03 Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
851.04 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
851.05 Payment
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 807 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
Pay Item
Pay Unit
851(1) Logging Out (ML 3-5)
Mile
851(2) Logging Out (ML 2)
851(3) Danger Tree Removal
851(4) Danger Tree Removal
Each
851(5) Hazard or Obstruction Removal
851(6) Hazard or Obstruction Removal
Each
851.04 Acceptable Quality Levels
| Discription |
| Major |
| Minor |
| Allowable Defects |
| Required Action |
| Defect |
| Defect |
| Major |
| Minor |
| Major |
| Minor |
| Utilization of Timber |
| Log lengths do not meet utilization standards (see SPS or Task Order) |
| N/A |
| 0 |
| N/A |
| Charge for loss of stumpage |
| N/A |
| Stump Heights |
| Exceed Specified Height by more than 18 inches |
| Exceed Specified Height by up to 12 inches |
| 0 |
| 10% of work ordered |
| N/A |
| Rework if greater than10% of work ordered |
| Tree damage caused by Service Provider's operations |
| Damage to more than 30% of the tree bole |
| Damage to 30% or less of the tree bole |
| 0 |
| 10% of work ordered |
| Remove or Treat |
| Treat |
| Impeded flow for ditches, inlet/outlet channels, and catch basins caused by Service Provider's Operations |
| Water will be diverted out of the drainage structure or system |
| 20% or less impeded, but water will stay in the channel. |
| 0 |
| N/A |
| Rework |
| N/A |
| Marked Danger Trees and Snags |
| Any remaining snags or danger trees that were marked |
| Any remaining snags or danger trees that were not marked |
| 0 |
| 10 per acre |
| Rework |
| Assess and Rework |
| Hazards that interfere with the use of the road (rocks, logs, etc) (ML 3-5) |
| Unstable hazards that remain in the Clearing Limits |
| N/A |
| 0 |
| N/A |
| Rework |
| N/A |
| Hazards that interfere with the use of the road (rocks, logs, etc) (ML 2) |
| Unstable hazards that remain within X distance of the Traveled way |
| N/A |
| 0 |
| N/A |
| Rework |
| N/A |
| Log Out |
| Horizontal clearance - more than 20% not cleared to specified distance |
| Horizontal clearance - 20% or less not cleared to specified distance |
| 0 |
| N/A |
| Rework |
| N/A |
| Vertical clearance -more than 20% not cleared to specified distance |
| Vertical clearance - 20% or less not cleared to specified distance |
| 0 |
| 0 |
| Rework |
| Rework |
| Work Area Management |
| Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures |
| N/A |
| 0 |
| 0 |
| Suspend work until in compliance |
| N/A |
851 Hazard Removal (09/10/04) 4