813 Spot Surfacing

View the file

Other files

File Type Posted
schedule of iems.doc DOC document
wen riv.pdf PDF
Naches_District roads.pdf PDF
CleElum_D_Map.pdf PDF
chelan.pdf PDF
833 3 culvert.pdf PDF
841_pbsc.doc DOC document
833 2 drain dip.pdf PDF
index of attachments.doc DOC document
entiat.pdf PDF
vicinity map.pdf PDF
Amendment 1.pdf PDF
SPS 842-1 Cutting Roadway Vegetation.doc DOC document
Tonasket Vicinity Map 11by17.doc DOC document
SPS 881-1 Mobilization-Equipment moving.doc DOC document
834_Roadway_Drainage_System_Maintenance_pbsc.doc DOC document
832_Load_Haul_and_Place_Materials_perf_based.doc DOC document
811_Surface Maintenance_perf_based.doc DOC document
807_Equipment_Rental_Perf_based.doc DOC document
872_sign_maintenance_pbsc.doc DOC document
834-1_Catch_Basin_Cleaning_Illustration.pdf PDF
833-1_X-Ditching_Illustration.pdf PDF
861_Guardrail_Traffic_Gates_and_Cattleguard_Maint_pbsc.doc DOC document
801-1_Illustration_of_Road_Structure_Terms.pdf PDF
RFQ AG-05GG-S-09-0057.doc DOC document
851-1_Hazard_Removal_Illustration.pdf PDF
881_Mob_Equip_Moving_pbsc.doc DOC document
842_Roadway_Veg_Maint_pbsc.doc DOC document
Methow Valley Vicinity map 8by11.doc DOC document
851_Hazard_Removal_pbsc.doc DOC document
Vicinity Map_WA_State.doc DOC document
851-2_Hazard_Removal_Illustration.pdf PDF
SPS811.02C.doc DOC document
Abbrev_MLs_Rd_Structure_details.doc DOC document
808_work area management.doc DOC document
814_Asphalt_Surface_Maintenance_perf_based.doc DOC document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

813 SPOT SURFACING

813.01 Service Required

Load, haul, and place surface material to repair or stabilize road surfaces.

813.02 Performance Standard

A. Spot surfacing is complete when the designated quantity of the ordered material has been placed.

B. All materials transported onto National Forest System land will be weed-free. Written documentation of methods used to determine the weed-free status of any and all materials furnished by the contractor will be furnished to the Contracting Officer before transport of any materials onto National Forest System land.

813.03 Location of Work

As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.

813.04 Measurement

Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.

A. The quantity will be the number of cubic yards measured in the vehicles, or square yards of aggregate placed.

B. Material measured by the ton shall be verified by certified weight tickets.

813.05 Payment

The accepted quantities will be paid at the contract price per unit of measurement for the Section 813 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.

Pay Item

Pay Unit

813(1)

Spot Surfacing, Gradation _____ Cubic Yard

813(2)

Square Yard

813(3)

Ton 813.04 Acceptable Quality Levels

Description
Major
Minor
Allowable Defects
Required Action
Defect
Defect
Major
Minor
Major
Minor
Depth of Aggregate
Dimension of spot surfacing deviates by more than 1" from depth specified. Or less than 1" from dimension specified but is consistently high or low.
Dimension of spot surfacing deviates by 1" or less than from depth specified and not consistently high or low.
0
N/A
If depth is low, correct placement of aggregate to specified dimensions. If depth is high only pay for ordered amount
Accept aggregate as placed, pay only for delivered quantities.
Width of Aggregate
Dimension of spot surfacing is less than specified width or more than 1' wider than specified.
Dimension of spot surfacing is up to 1' wider than specified but not consistently wide.
0
N/A
If width is narrow, correct placement of aggregate to specified dimensions. If width is too wide reshape.
Accept aggregate as placed, pay only for delivered quantities.
Length
Dimension of spot surfacing is shorter than specified length or more than 100' longer than specified.
Dimension of spot surfacing is shorter than specified length or up to 100' longer than specified.
0
N/A
If length is shorter than specified, correct placement of aggregate to specified dimensions. If too long pay only for ordered amount.
Accept aggregate as placed, pay only for delivered quantities.
Compaction
Visible displacement occurs under heavy spreading equipment
N/A
0
N/A
Rework
N/A
Aggregate Quality
Does not meet specified gradation or durability requirements and is not suitable for intended use
Does not meet specified gradation or durability requirements and is suitable for intended use
0
N/A
Reject and replace
Reduce payment by 50%.
Material source does not meet weed free requirement
N/A
0
N/A
Reject source
N/A
Finish Quality
Spot surfacing doesn’t conform to the adjacent road segments and traffic is impeded.
Spot surfacing generally conforms to the adjacent road segments, but traffic may be slowed.
0
0
Reshape or recompact surfacing as needed.
Reshape or recompact surfacing as needed.