Section_J_Exhibit_B-CDRL_Tech_Data_Pkg.pdf

PDF 893 KB Posted

Attached to
Advanced Pilot Training (APT) Family of Systems (FoS) program, commonly referred to as "T-X"
Solicitation number
Not on record
Issued by

About this file

EXHIBIT B - CONTRACT DATA REQUIREMENTS LIST -TECHNICAL DATA PACKAGE

View the file

Other files

File Type Posted
Response_to_Industry_Comments_on_30DEC_RFP_23Feb2017.pdf PDF
AMEND_0001_-_Section_J_-_Attachment_2_-_Statement_of_Work_for_the_Advanced_Pilot_Training_(APT)_Program.pdf PDF
AMEND_0001_-_Section_J_-_Attachment_16_-_Quality_Assurance_Surveillance_Plan_for_the_Advanced_Pilot_Training_Program.pdf PDF
AMEND_0001_-_Exhibit_C_-_Contract_Data_Requirements_List_-_Other_Data.pdf PDF
FA8617-17-R-6219_Amendment_0001.pdf PDF
AMEND_0001_-_Section_L_-_Attachment_1a_-_Total_Evaluated_Price_Affordability_Worksheets.xlsx XLSX spreadsheet
AMEND_0001_-_Changes_to_Model_Contract_FA8617-17-R-6219.pdf PDF
AMEND_0001_-_Section_J_-_Attachment_4_-_System_Specification_for_the_APT_Program_Ground_Based_Training_System.pdf PDF
AMEND_0001_-_Section_J_-_Attachment_17_-_Section_L_-_Instructions,_Conditions,_and_Notices_to_Offerors.pdf PDF
AMEND_0001_-_Section_J_-_Attachment_18_-_Section_M_-_Evaluation_Factors_for_Award.pdf PDF
AMEND_0001_-_Section_L_-_Attachment_12_-_Flight_Test_Procedures.pdf PDF
AMEND_0001_-_Section_J_-_Attachment_3_-_Aircraft_System_Specification_for_the_Advanced_Pilot_Training_(APT_Program).pdf PDF
AMEND_0001_-_Section_L_-_Attachment_9_-_Aircraft_System_Specification_Appendix_D.pdf PDF
Response_to_Industry_Comments_on_30DEC_RFP_27Jan2016.pdf PDF
Section_J_Atch_3-Aircraft_System_Spec_for_APT_Program.pdf PDF
RFP_Model_Contract_Sections_A-M.pdf PDF
Section_L_Atch_3-CEO_Certification_Letter.pdf PDF
Section_J_Atch_19-Pack_and_Trans_Form_158.pdf PDF
Section_L_Atch_1b-Pricing_Tables.xlsx XLSX spreadsheet
Section_J_Atch_10a-CSDR_APT_EMD_Prime_Plan.xls XLS spreadsheet
Section_J_Atch_10g_CSDR_APT_ICS_Plan.xls XLS spreadsheet
Section_J_Atch_10b-CSDR_APT_EMD_Engine_Plan.xls XLS spreadsheet
Section_J_Atch_2-SOW_for_APT_Program.pdf PDF
Section_L_Atch_25-Identification_and_Assertion_of_Restrictions.pdf PDF
Section_L_Atch_15-Integrated_Master_Plan.xlsx XLSX spreadsheet
Section_L_Atch_10-Appendix_G_to_APT_GBTS_System_Spec.pdf PDF
Section_L_Atch_9-Appendix_D_to_APT_Aircraft_System_Spec.pdf PDF
Section_J_Atch_19-Pack_and_Trans_Form_1653.pdf PDF
Section_L_Atch_8-Software_License_Ground_Rules.pdf PDF
Section_J_Atch_17-Sec_L_Instructions_to_Offerors.pdf PDF
Section_J_Atch_16-QASP_for_APT_Program.pdf PDF
Section_J_Atch_10f-CSDR_APT_Production_GBTS_Plan.xls XLS spreadsheet
Section_J_Atch_5-DD254_for_APT_Program.pdf PDF
Section_J_Atch_10c-CSDR_APT_EMD_GBTS_Plan.xls XLS spreadsheet
Section_J_Atch_4-System_Spec_for_APT_Program_GBTS.pdf PDF
Section_J_Atch_10d-CSDR_APT_Production_Prime_Plan.xls XLS spreadsheet
Section_L_Atch_21-Inst_for_Aircrew_Anthro_Test_Report.pdf PDF
Section_J_Atch_10e-CSDR_APT_Production_Engine_Plan.xls XLS spreadsheet
Section_J_Exhibit_A-CDRL_Technical_Manuals.pdf PDF
Section_L_Atch_17-Airworthiness_Plan_for_APT_Program.pdf PDF
Section_J_Atch_10h_CSDR_APT_Resource_Distribution_Table.xls XLS spreadsheet
Section_L_Atch_1a-TEP_Worksheets.xlsx XLSX spreadsheet
Section_L_Atch_18-TACC_for_APT.xlsx XLSX spreadsheet
Section_J_Atch_18-Sec_M_Eval_Factors_for_Award.pdf PDF
Section_L_Atch_2-Proposal_Cross_Ref_Matrix.pdf PDF
Section_J_Exhibit_C-CDRL_Other_Data.pdf PDF
Section_J_Atch_11-Host_Base_Agreement.pdf PDF
Section_L_Atch_12-Flight_Test_Procedures.pdf PDF
43_-_AR_MACC_MIL-HDBK_516_Final.xlsx XLSX spreadsheet
Bidders_Library_List_-_Unsecured(2).pdf PDF
Show 40 more

Latest 50 of 246 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT #: FA8617-17-R-6219

CONTRACTOR: TBD

SET NAME: APT - Exhibit B - TDP SYSTEM ITEM: APT - Technical Data Package

PROGRAM: Training Aircraft

DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH

B001 AFLCMC/WLZG DI-EGDS-80918 SOW Para 3.5.2.9.8, 3.5.3.2.7.9, Technical Data Package Index

GBTS Master Technical Library

B002 AFLCMC/WLZG DI-SESS-80776A SOW Para 3.6.2.1, 3.7.5, Technical Data Package 3.8.3

TDP for Aircraft

B003 AFLCMC/WLZG DI-SESS-80776A SOW Para 3.5.4.2.4, 3.6.2.2, 3.6.2.3

Technical Data Package

BLK16

B004 AFLCMC/WLZG DI-SESS-81000E SOW Para 3.2.8.12

Product Drawings/Models and Associated List

Cockpit Configuration CAD Package

B005 AFLCMC/WLZG DI-SESS-80776A SOW Para 3.3.1.11, 3.5.3.2.7.4, 3.5.4.2.4, Technical Data Package 3.6.2.1, 3.6.2.4

TDP for GBTS and MTS

CDRL Table of Contents

Solicitation FA8617-17-R-6219 Section J - Exhibit B

Contract Data Requirements List - Technical Data Package

- 1 -

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0003 and 0040

B. EXHIBIT

B

C. CATEGORY:

TDP TM OTHER EGDS

D. SYSTEM/ITEM

APT - Technical Data Package

E. CONTRACT/PR NO.

FA8617-17-R-6219

F. CONTRACTOR

TBD

1. DATA ITEM NO.

B001

2. TITLE OF DATA ITEM

Technical Data Package Index

3. SUBTITLE

GBTS Master Technical Library

4. AUTHORITY (Data Acquisition Document No.)

DI-EGDS-80918

5. CONTRACT REFERENCE

SOW Para 3.5.2.9.8, 3.5.3.2.7.9,

6. REQUIRING OFFICE

AFLCMC/WLZG

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

Block 4: This DID is tailored as follows:

a. Paragraph 10.2.1, Change to read: "Contractor shall deliver data as non-proprietary standard electronic media. If unable to do so, delivery shall be made by CD/DVD."

b. Para 10.2.2: Delete

c. Paragraph 10.3.3.a, Change to read: "Drawing-A number assigned to uniquely identify a specific item or document."

d. Paragraphs 10.3.3.e thru 10.3.3h, and 10.3.3.j - 10.3.3k: Delete

e. Paragraph 10.3.3.i, Change to read: "Next higher assembly drawing -The drawing number for the next higher level of indenture."

Block 9: See General Instructions for detailed requirements.

Blocks 10, 12, & 13: The Contractor shall submit the draft NLT 60 days following the first GBTS component acceptance. The Contractor shall submit the final NLT 30 days after DD250 of APT EMD effort. The Contractor shall submit updates annually. The Contractor shall submit an updated final NLT 60 days prior to the end of the contract.

Block 14: If the delivery is made via CD/DVD, the contractor shall submit all cover letters through MEARS. The delivery date will be the date all disk and/or electronic media have been received.

WLZG/MEARS LT LT

TSSC 1 1

AETC/A5 1 1

AETC/A3 1 1

DCMA 1 1

15. TOTAL 4 4 0

G. PREPARED BY

Prepared for Release with Final RFP

H. DATE

2016/12/23

I. APPROVED BY J. DATE

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

Solicitation FA8617-17-R-6219 Section J - Exhibit B

- 2 -

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0003 and 0040

B. EXHIBIT

B

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

APT - Technical Data Package

E. CONTRACT/PR NO.

FA8617-17-R-6219

F. CONTRACTOR

TBD

1. DATA ITEM NO.

B002

2. TITLE OF DATA ITEM

Technical Data Package

3. SUBTITLE

TDP for Aircraft

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80776A

5. CONTRACT REFERENCE

SOW Para 3.6.2.1, 3.7.5, 3.8.3

6. REQUIRING OFFICE

AFLCMC/WLZG

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

BLK16

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

Block 4:

a. See attached Technical Data Package (TDP) Option Selection Worksheet

b. Drawings shall be IAW ASME Y14.100-2013 (including Appendices B, C,D, E), ASME Y14.24, ASME Y14.3, ASME Y14.34, ASME Y14.35, ASME Y14.5. Tailoring to these documents as indicated on this DD1423. Block 4: DI-SESS-80776A and Technical Data Package Option Worksheet (defined in MIL-STD-31000A) are applicable. Tailoring to DID per TDP Option Selection Worksheet. Legibility and Reproducibility: All documents prepared or submitted shall meet the legibility and reproducibility requirements of the specification or standard controlling the media in which the data is delivered. As a minimum, all lines, symbols, letters, and numerals shall be readable, as per ASME Y14.2-2014.

c. The Contractor shall prepare Source Control Drawings and/or Vendor Item Control Drawings for existing Commercial-off-the-shelf (COTS) items or vendor developed items, with the exception of bulk items. All drawings and associated lists shall have the contract number identified on sheet one of each document.

Block 9: See General Instructions for detailed requirements. For drawings with Unlimited Rights use "DISTRIBUTION STATEMENT D." For drawings with less that Unlimited Rights use "DISTRIBUTION STATEMENT B."

Blocks 10, 12 & 13:

a. The Contractor shall submit the draft digital copies to Block 14 addressees NLT 60 days prior to Aircraft CDR. Contractor shall submit updated draft digital copies to Block 14 addresses NLT 60 days prior to Aircraft PCA. The Government requires 60 days to review drawings and provide comments back to the contractor via Government PCOL. The Contractor shall respond with corrections/comments NLT 120 days. The Contractor shall submit JEDMICS/TEAMCENTER compatible digital data sample (See JEDMICS/TEAMCENTER instructions below), including Metadata file prepared in Microsoft Access for drawings and associated lists, no later than 15 days after Aircraft PCA. The Contractor shall submit final Drawings and Associated Lists to Block 14 addressees NLT 45 working days after Aircraft PCA (See Block 14 instructions below). All newly created Drawings and Associated Lists shall be released at the Basic Revision. All updated/ revised Drawings and Associated Lists shall be delivered with all outstanding Engineering Change Orders (ECOs) incorporated. Other ECO's shall be provided in Contractor format. Final delivery format shall match sample formats defined below or as agreed upon by the Government. The Government requires 60 working days for final inspection and acceptance of delivery. CD- ROM label(s) shall be marked with Date, Contract Number, Company Name, Data Item Number and System.

WLZG/MEARS LT LT

AFLCMC/WLZG 4 4 4

AFLCMC/WWAEJ 1 1 1

AFLCMC/LZPEM 1 1 1

15. TOTAL 6 6 6

G. PREPARED BY

Prepared for Release with Final RFP

H. DATE

2016/12/23

I. APPROVED BY J. DATE

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 3 Pages

Solicitation FA8617-17-R-6219 Section J - Exhibit B

- 3 -

A. CONTRACT LINE ITEM NO.

0003 and 0040

B. EXHIBIT

B

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

APT - Technical Data Package

E. CONTRACT/PR NO.

FA8617-17-R-6219

F. CONTRACTOR

TBD

16. REMARKS (Continued)

b. Shipping List: A shipping list shall be provided with each shipment of engineering data delivery. Each shipping list shall identify each and every document being furnished in the TDP in alphanumeric order. The Contractor shall identify all data that is proprietary.

c. The Contractor shall submit all cover letters through MEARS. The delivery date will be the date all discs have been received.

d. Contractor shall deliver 2-D assembly engineering drawings in PDF and associated list media PDF.

Contractor shall deliver applicable 3-D CAD model in native file.

e. ISO 10303 Standard for Exchange of Product Model data-STEP format; the following shall be delivered as applicable:

ELEMENT TITLE COMMENTS

AP 202 Associative Drafting Includes 3-D geometry imbedded in 2-D raster necessary in some circumstances AP 203 Configuration Controlled 3-D Principle application of STEP for DoD Models (design) AP 209 Structural Analysis For handling analysis data- usually not exchanged or saved AP 210 Electromechanical Assembly Particular constructs for electronics AP 238 Machining (STEP NC)

f. Tailoring to ASME’s as follows:

ASME Y 14.100-2013

ASME Y 14.34 Associated Lists

ASME Y 14.35

1. Redrawn Drawings shall be IAW para. 4.3, sub-para 4.3.2

2. Revision column shall be IAW para 6.1, sub-para 6.1.2 & 6.1.3 Contractor shall maintain revision history in its entirety.

3. Revision Letters shall be IAW para 7.1, sub-paras 7.1.1 (a), (b), (d), & (e), and para 7.2, sub-para 7.2.1 (a), (b), & (c).

4. Revision History Block shall be IAW para 7.1, sub-para 7.1.2 (a) & (b).

5. Revision status of sheets block shall be IAW para 7.4, sub-para 7.4.2 (a), (b), & (c).

6. Adding sheets shall be IAW para 7.5, sub-para 7.5.1(a)

7. Deleting sheets shall be IAW para 7.5, sub-para 7.5.2 (a)

ASME Y14.5 Dimensioning and Tolerancing shall be IAW para 1.6 and shall be decimal inch.

ASME Y14.3 Angle of projection shall be IAW paragraph 1.6.1 third angle projection.

ASME Y14.100 INVOKED APPENDICES:

1. Appendix B- Non Commercial Drawing Practices

2. Appendix C- Drawing Titles

3. Appendix D- Numbering, Coding, and Identification

4. Appendix E- Markings on Engineering Drawings

5. Appendix E- for para E7 see DD1423 Block 9

Block 14:

a. In addition to the delivery requirements below, the Contractor shall submit all cover letters through MEARS. The delivery date will be the date all discs and/or paper copies have been received.

b. JEDMICS REQUIREMENTS:

1. Prior to final delivery, a digital data sample, including Metadata file prepared in Microsoft Access for drawings and associated lists, shall be submitted NLT 15 working days after Aircraft PCA. The Government requires 30 days for inspection and acceptance of sample Metadata.

AFLCMC/LZPEM will provide sample Metadata file and instructions when final delivery media has been determined. The Metadata shall be prepared using option 2 from the 9579776 (Rev M) document. This document may be located in the JEDMICS Repository or shall be furnished upon request. See attached TDP Option Selection Worksheet for media delivery type information. New drawings and associated lists shall be released at the Basic Revision, any changes will require a revision roll as per ASME Y14.100-2013, 6.5.2.1 and an EO (Engineering Order).

Contractor shall prepare Metadata in Microsoft Access.

2. Final submittal media of drawings shall be in proper format per direction from AFLCMC/LZPEM on a CD-ROM to AFLCMC/LZPEM 45 working days after Aircraft PCA. The Government requires 60 working days for inspection and acceptance of sample files. Metadata shall be submitted in Microsoft Access. AFLCMC/LZPEM will provide Sample Metadata file (including Microsoft Access database) as an attachment to the CDRL package (Attach - CD ROM).

DD FORM 1423-1, FEB 2001 Page 2 of 3 Pages

Solicitation FA8617-17-R-6219 Section J - Exhibit B

- 4 -

A. CONTRACT LINE ITEM NO.

0003 and 0040

B. EXHIBIT

B

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

APT - Technical Data Package

E. CONTRACT/PR NO.

FA8617-17-R-6219

F. CONTRACTOR

TBD

16. REMARKS (Continued)

c. TEAMCENTER REQUIREMENTS:

1. All documents (Drawings and Associated Lists) shall be submitted in PDF Format, all other documents/files in their native formats.

Metadata shall be prepared IAW latest version of A-10 Date Exchange Specification (ADES), 12-A10DOC-002, Hill Air Force Base. Contractor shall submit a Digital Data Sample in PDF, including Metadata (indexing file) for Drawings and Associated Lists and native format for all other document/files. Sample shall be submitted on CD ROM or as agreed upon by the Government to AFLCMC/WWAEJ NLT 15 working days after Aircraft PCA. The Government requires 30 working days for inspection and acceptance of sample files. Metadata shall be submitted in PLMXML and must conform to the neutral file format specified in the ADES.

2. The Contractor shall submit final Drawings and Associated Lists to Block 14 addressees NLT 45 working days after Aircraft PCA. All newly created Drawings and Associated Lists shall be released at the Basic Revision. All updated/ revised Drawings and Associated Lists shall be delivered with all outstanding Engineering Change Orders (ECOs) incorporated. Other ECO's shall be provided in Contractor format. Final delivery format shall match sample formats defined above or as agreed upon by the government. Government requires 60 working days for final inspection and acceptance of delivery. CD-ROM label(s) shall be marked with Date, Contract Number, Company Name, Data Item Number and System.

3. Deliveries shall be provided electronically to the Program Manager, Program Engineer, Data Manager, and the Contracting Officer Representative. CD/DVD s will be provided upon Government request. Data shall be provided in current version of Government approved MS Office applications and engineering tools running on latest version of MS Windows. A shipping list shall be provided with each shipment of engineering data. This shipping list shall identify, in alphanumeric document number order, each document furnished in the package.

d. The Contractor shall not deliver the TDP index as a password protected document.

DD FORM 1423-1, FEB 2001 Page 3 of 3 Pages

Solicitation FA8617-17-R-6219 Section J - Exhibit B

- 5 -

TDP OPTION SELECTION WORKSHEET

SYSTEM: DATE PREPARED:

A. CONTRACT NO. B. EXHIBIT/ATTACHMENT NO. C. CLIN D. CDRL DATA

ITEM NO(s).

1. TDP Level (X and complete as applicable .)

A. CONCEPTUAL LEVEL

DEVELOPMENTAL LEVEL

PRODUCTION LEVEL

B. REMARKS:

2. TYPE AND FORMAT (X all that apply and complete as applicable .)

A.

TYPE 2D: 2D DRAWINGS

TYPE 3D: 3D MODELS ONLY

TYPE 3D: 3D MODELS WITH

ASSOCIATED 2D DRAWINGS

B.

NATIVE CAD (SPECIFY TYPE) ____________________________________

ISO 10303 STEP FORMAT (Specify STEP PROTOCOL AP203, AP 214 etc.)

ISO 32000 PORTABLE DOCUMENT FORMAT ________________________

OTHER ELECTRONIC FORMAT (SPECIFY TYPE)

HARDCOPY ___________________________________________________

REMARKS : ______________________________________________________

3. CAGE Code AND DOCUMENT

NUMBERS

A. CONTRACTOR CAGE AND DOCUMENT NUMBERS

GOVERNMENT CAGE (COMPLETE 3B & 3C OR 3D)

D. To Be Assigned By:

B. USE CAGE CODE: C. USE DOCUMENT NUMBERS:

4. DRAWING FORMATS (X one and complete as applicable)

CONTRACTOR FORMAT.

GOVERNMENT FORMAT.

REMARKS: ______________________________________________________________________________________

5. TDP ELEMENTS REQUIRED (X all that apply ) ELEMENTS REQUIRED TO BE DETERMINED BY CONTRACTOR - OR THE FOLLOWING ARE REQUIRED:

CONCEPTUAL DRAWINGS/MODELS AND ASSOCIATED LISTS

DEVELOPMENTAL DESIGN DRAWINGS/MODELS AND ASSOCIATED LISTS

PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS

COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LISTS

QUALITY ASSURANCE PROVISIONS

SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS/MODELS AND ASSOCIATED LISTS

SPECIAL TOOLING (ST) DRAWINGS/MODELS AND ASSOCIATED LISTS

SPECIFICATIONS

SOFTWARE DOCUMENTATION

SPECIAL PACKAGING INSTRUCTIONS (SPI) DRAWINGS/MODELS AND ASSOCIATED LISTS

6. ASSOCIATED LIST (X and complete as applicable)

A. PARTS LIST (X ONE) (1) INTEGRAL (2) SEPARATE

B. DATA LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

C. INDEX LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY) D. WIRING LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY) E. INDENTURED DATA LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY) F. APPLICATION LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

7. APPLICABILITY OF STANDARDS. The following Standards apply: (X as applicable)

ASME Y14.100

ENGINEERING DRAWING

PRACTICES

WITH APPENDICES:

B C D E

ASME Y14.24 TYPES AND APPLICATIONS OF

ENGINEERING DRAWINGS

ASME Y14.34 ASSOCIATED LIST

ASME Y14.35M REVISION OF ENGINEERING

DRAWINGS AND ASSOCIATED LIST

ASME Y14.41 DIGITAL PRODUCT DEFINITION DATA

PRACTICES

ASME Y14.5 DIMENSIONING AND TOLERANCING

OTHER STANDARDS

APPLY AS

DESCRIBED:

COMPANY STANDARDS

PERMITTED

8. OTHER TAILORING (Attach additional sheets as necessary)

Siemens NX v.8.5 compatible

AP 202, AP 203, AP 209, AP 210, AP 238

PDF

JEDMICS Metadata-Access 2013

For large or complex assemblies

Ref 5 if product level drawings are not available than commercial drawings will be accepted in .pdf format, as a minimum.

Ref 6. Engineering data delivery shall include a shipping list identifying each document in alphanumeric order and all proprietary data.

Ref 7 ASME Y14.2, Y14.3 also apply.

Solicitation FA8617-17-R-6219 Section J - Exhibit B

- 6 -

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0003 and 0040

B. EXHIBIT

B

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

APT - Technical Data Package

E. CONTRACT/PR NO.

FA8617-17-R-6219

F. CONTRACTOR

TBD

1. DATA ITEM NO.

B003

2. TITLE OF DATA ITEM

Technical Data Package

3. SUBTITLE

BLK16

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80776A

5. CONTRACT REFERENCE

SOW Para 3.5.4.2.4, 3.6.2.2, 3.6.2.3

6. REQUIRING OFFICE

AFLCMC/WLZG

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

Blk16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

Block 3: Subtitles are as follows:

a. Aircraft System Integration Laboratory (SIL) TDP - SOW Para 3.6.2.2

b. GBTS TSSC TDP - SOW Para 3.6.2.2, 3.5.4.2.4

c. Aircraft Software Development Laboratory (SDL) TDP - SOW Para 3.6.2.3

d. GBTS TSSC Transition TDP - SOW Para 3.5.4.2.4

Block 4: This DID is tailored as follows:

a. Tailoring of DI-SESS-80776A is documented herein and in the attached MIL-STD- 31000A, TDP Option Selection Worksheet. AF Drawing 9579776, Rev. M, is part of this CDRL. A copy of the drawing may be obtained from the JEDMICS repository or will be furnished upon request.

b. All submitted documents shall meet the legibility and reproducibility requirements of the specification or standard controlling the media in which the data is delivered. As a minimum, all lines, symbols, letters, and numerals shall be readable per ASME Y14.2, para 6.6.

c. The contractor shall prepare Source Control Drawings and/or Vendor Item Control Drawings for existing commercial off-the-shelf items or vendor developed items, with the exception of bulk items.

d. All drawings and associated lists shall have the contract number identified on sheet one of each document. New drawings and associated lists shall be released at the basic revision level; any changes will require a revision roll per ASME Y14.100 and an Engineering Order.

All updated/revised drawings and associated lists shall be delivered with all outstanding Engineering Change Orders (ECO) incorporated. Other ECOs shall be provided in Contractor format. Final delivery format shall match sample formats defined below or as agreed upon by the Government. CD-ROM label(s) shall be marked with Date, Contract Number, Company Name, Data Item Number and System.

e. A shipping list shall be provided with each shipment of engineering data delivery. Each shipping list shall identify each document being furnished in the TDP in alphanumeric order.

The contractor shall identify all data that is proprietary.

f. The Contractor shall not deliver the TDP index as a password protected document.

WLZG-MEARS LT LT

15. TOTAL 0 0 0

G. PREPARED BY

Prepared for Release with Final RFP

H. DATE

2016/12/23

I. APPROVED BY J. DATE

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages

Solicitation FA8617-17-R-6219 Section J - Exhibit B

- 7 -

A. CONTRACT LINE ITEM NO.

0003 and 0040

B. EXHIBIT

B

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

APT - Technical Data Package

E. CONTRACT/PR NO.

FA8617-17-R-6219

F. CONTRACTOR

TBD

16. REMARKS (Continued)

JEDMICS REQUIREMENTS

A digital data sample of the drawings and associated lists, including a metadata file in Microsoft Access format, shall be submitted in PDF format as well as in native file format NLT 30 working days prior to final delivery. Submit the sample on CD-ROM, or as agreed upon by the Government, to AFLCMC/LZPEM. AFLCMC/LZPEM will provide a sample metadata file and instructions when final delivery media has been determined.

Metadata shall be prepared using AF Drawing 9579776, Rev. M, Option #2. See attached TDP Option Selection Worksheet for media delivery type information.

TEAMCENTER REQUIREMENTS

A digital data sample of the drawings and associated lists, including a metadata file, shall be submitted in PDF format as well as in native file format NLT 30 working days prior to final delivery. Submit the sample on CD-ROM, or as agreed upon by the Government, to AFLCMC/LZPEM.

Metadata shall be prepared IAW the latest version of A-10 Date Exchange Specification (ADES), 12-A10DOC-002, Hill Air Force Base (furnished upon request). Metadata shall be submitted in PLMXML and must conform to the neutral file format specified in the ADES.

Tailor documents per applicable ASME standards as follows:

ASME Y14.100

a. Appendix E, Paragraph E-7 - See DD Form 1423-1, Block 9.

ASME Y14.35

a. Redrawn drawings shall be IAW Paragraph 4.3, Sub-paragraph 4.3.2.

b. Revision column shall be IAW Paragraph 6.1, Sub-paragraph 6.1.2 & 6.1.3. The Contractor shall maintain revision history in its entirety.

c. Revision letters shall be IAW Paragraph 7.1, Sub-paragraphs 7.1.1 (a), (b), (d), and (e), and Paragraph 7.2, Sub-paragraph 7.2.1 (a), (b), and (c).

d. Revision History block shall be IAW Paragraph 7.1, Sub-paragraph 7.1.2 (a) and (b).

e. Revision Status of Sheets block shall be IAW Paragraph 7.4, Sub-paragraph 7.4.2 (a), (b), and (c).

f. Adding sheets shall be IAW Paragraph 7.5, Sub-paragraph 7.5.1 (a).

g. Deleting sheets shall be IAW Paragraph 7.5, Sub-paragraph 7.5.2 (a).

ASME Y14.5

a. Dimensioning and tolerancing shall be IAW Paragraph 1.6 and shall be decimal inch.

ASME Y14.3

a. Angle of projection shall be IAW Paragraph 5.3.1, Third-Angle Projection.

Block 9: See General Instructions for detailed requirements.

Blocks 3, 10, 12, 13:

a. Aircraft System Integration Laboratory (SIL) TDP: Draft TDP due 30 days after completion of the Aircraft SVR. Final TDP due 60 days after Government approval.

b. GBTS TSSC TDP: Draft TDP due 30 days after completion of the GBTS SVR. Final TDP due 60 days after Government approval. An updated TDP, incorporating any changes to the previously approved version of the TDP, due 90 days before the end of the contract.

c. Aircraft Software Development Laboratory (SDL) TDP: Draft TDP due 30 days after completion of the Aircraft SVR. Final TDP due 60 days after Government approval.

d. GBTS TSSC Transition TDP: The Contractor shall submit the updated TDP 2 years before the end of the contract.

Block 14: In addition to the JEDMICS Requirements and TEAMCENTER requirements, the Contractor shall submit all cover letters through MEARS. The delivery date will be the date all discs and/or paper copies have been received.

DD FORM 1423-1, FEB 2001 Page 2 of 2 Pages

Solicitation FA8617-17-R-6219 Section J - Exhibit B

- 8 -

A. CONTRACT NO. B. EXHIBIT/ATTACHMENT NO. C. CLIN D. CDRL DATA

ITEM NO(s).

1. TDP Level (X and complete as applicable .)

A. CONCEPTUAL LEVEL

DEVELOPMENTAL LEVEL

PRODUCTION LEVEL

B. REMARKS:

2. TYPE AND FORMAT (X all that apply and complete as applicable .)

A.

TYPE 2D: 2D DRAWINGS

TYPE 3D: 3D MODELS ONLY

TYPE 3D: 3D MODELS WITH

ASSOCIATED 2D DRAWINGS

B.

NATIVE CAD (SPECIFY TYPE) ____________________________________

ISO 10303 STEP FORMAT (Specify STEP PROTOCOL AP203, AP 214 etc.)

ISO 32000 PORTABLE DOCUMENT FORMAT ________________________

OTHER ELECTRONIC FORMAT (SPECIFY TYPE)

HARDCOPY ___________________________________________________

REMARKS : ______________________________________________________

3. CAGE Code AND DOCUMENT

NUMBERS

A. CONTRACTOR CAGE AND DOCUMENT NUMBERS

GOVERNMENT CAGE (COMPLETE 3B & 3C OR 3D)

D. To Be Assigned By:

B. USE CAGE CODE: C. USE DOCUMENT NUMBERS:

4. DRAWING FORMATS (X one and complete as applicable)

CONTRACTOR FORMAT.

GOVERNMENT FORMAT.

REMARKS: ______________________________________________________________________________________

5. TDP ELEMENTS REQUIRED (X all that apply ) ELEMENTS REQUIRED TO BE DETERMINED BY CONTRACTOR - OR THE FOLLOWING ARE REQUIRED:

CONCEPTUAL DRAWINGS/MODELS AND ASSOCIATED LISTS

DEVELOPMENTAL DESIGN DRAWINGS/MODELS AND ASSOCIATED LISTS

PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS

COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LISTS

QUALITY ASSURANCE PROVISIONS

SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS/MODELS AND ASSOCIATED LISTS

SPECIAL TOOLING (ST) DRAWINGS/MODELS AND ASSOCIATED LISTS

SPECIFICATIONS

SOFTWARE DOCUMENTATION

SPECIAL PACKAGING INSTRUCTIONS (SPI) DRAWINGS/MODELS AND ASSOCIATED LISTS

6. ASSOCIATED LIST (X and complete as applicable)

A. PARTS LIST (X ONE) (1) INTEGRAL (2) SEPARATE

B. DATA LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

C. INDEX LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY) D. WIRING LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY) E. INDENTURED DATA LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY) F. APPLICATION LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

7. APPLICABILITY OF STANDARDS. The following Standards apply: (X as applicable)

ASME Y14.100

ENGINEERING DRAWING

PRACTICES

WITH APPENDICES:

B C D E

ASME Y14.24 TYPES AND APPLICATIONS OF

ENGINEERING DRAWINGS

ASME Y14.34 ASSOCIATED LIST

ASME Y14.35M REVISION OF ENGINEERING

DRAWINGS AND ASSOCIATED LIST

ASME Y14.41 DIGITAL PRODUCT DEFINITION DATA

PRACTICES

ASME Y14.5 DIMENSIONING AND TOLERANCING

OTHER STANDARDS

APPLY AS

DESCRIBED:

COMPANY STANDARDS

PERMITTED

8. OTHER TAILORING (Attach additional sheets as necessary)

APT

AutoCAD, Siemens NX Version 8.5 compatible_

PDF

JEDMICS Metadata-Access 2010

For large or complex assemblies

Ref 5 - If product level drawings are not available, then commercial drawings will be accepted in .pdf format, as a minimum.

Ref 6 - Engineering data delivery shall include a shipping list identifying each document in alphanumeric order and all proprietary data.

Ref 7 - ASME Y14.2 and Y14.3 also apply.

Solicitation FA8617-17-R-6219 Section J - Exhibit B

- 9 -

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

APT - Technical Data Package

E. CONTRACT/PR NO.

FA8617-17-R-6219

F. CONTRACTOR

TBD

1. DATA ITEM NO.

B004

2. TITLE OF DATA ITEM

Product Drawings/Models and Associated List

3. SUBTITLE

Cockpit Configuration CAD Package

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81000E

5. CONTRACT REFERENCE

SOW Para 3.2.8.12

6. REQUIRING OFFICE

AFLCMC/WLZG

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

Block 3: The complete sub-title is Cockpit Configuration Computer Aided Design (CAD) Package

Block 4: This Data Item is tailored as follows:

Paragraph 4. Content: Change to read: "Requirements are annotated on the MIL-STD- 31000A TDP OPTION SELECTION WORKSHEET. Required components/views are as follows:

a. All visible surfaces contained in the cockpit, such as; instrument panels, center and side consoles detailing all controls and displays,

b. Primary flight controls (control stick, rudders, throttle) and full range of movement and adjustability (if applicable),

c. Transparencies (in open and closed positions),

d. Ejection seat range of motion (adjustability) in all axis,

e. Dimensions of escape path clearance for the ejection seat in the most forward, aft, upper and lower positions,

f. An ejection seat model that that can be positioned throughout the range of motion and can be examined independently,

g. Bulkheads, and all other operator interfaces,

h. Aircraft design eye point (DEP),

i. For aircraft utilizing a fixed Head-Up Display (HUD), the CAD package shall include the Eye Reference Point, if different than the aircraft DEP, and all outer boundaries required for viewing all HUD symbology and display features (e.g. HUD eye box/head motion box),

j. For aircraft utilizing a Helmet Mounted Display, the CAD package shall show the head motion box, if applicable,

k. The aircraft attitude, in degrees from horizontal, referenced to the aircraft waterline shall be shown under level flight, full-flap, and no-flap approach configurations.

l. The angle of the aircraft sill referenced to the aircraft waterline shall be shown."

Block 9: See General Instructions for detailed requirements.

Blocks 10, 12 & 13: The Contractor shall provide a Cockpit Configuration CAD Package 30 days before the preliminary anthropometric evaluation (which will execute between 90 and 120 days after contract award). The Contractor shall provide an updated Cockpit Configuration CAD Package 30 days before the Aircraft CDR anthropometric evaluation (which will execute within 60 days after Aircraft CDR). The Contractor shall provide a final Cockpit Configuration CAD Package 30 days before the final verification anthropometric evaluation. The Contractor shall provide an updated Cockpit Configuration CAD Package 30 days before any additional Government anthropometric evaluations, as required by the Government.

MEARS LT LT

AFLCMC/WLZG 1 1

DCMA 1 1

15. TOTAL 2 2 0

G. PREPARED BY

Prepared for Release with Final RFP

H. DATE

2016/12/23

I. APPROVED BY J. DATE

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages

Solicitation FA8617-17-R-6219 Section J - Exhibit B

- 10 -

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

APT - Technical Data Package

E. CONTRACT/PR NO.

FA8617-17-R-6219

F. CONTRACTOR

TBD

16. REMARKS (Continued)

Block 14:

a. In addition to the delivery requirements below, the Contractor shall submit all cover letters through MEARS. The delivery date will be the date all disc's and/or paper copies have been received.

b. The Contractor shall deliver data as non-proprietary standard electronic media. If unable to do so, delivery shall be made by CD/DVD.

c. The Contractor shall not deliver the TDP index as a password protected document.

DD FORM 1423-1, FEB 2001 Page 2 of 2 Pages

Solicitation FA8617-17-R-6219 Section J - Exhibit B

- 11 -

A. CONTRACT NO. B. EXHIBIT/ATTACHMENT NO. C. CLIN D. CDRL DATA

ITEM NO(s).

1. TDP Level (X and complete as applicable .)

A. CONCEPTUAL LEVEL

DEVELOPMENTAL LEVEL

PRODUCTION LEVEL

B. REMARKS:

2. TYPE AND FORMAT (X all that apply and complete as applicable .)

A.

TYPE 2D: 2D DRAWINGS

TYPE 3D: 3D MODELS ONLY

TYPE 3D: 3D MODELS WITH

ASSOCIATED 2D DRAWINGS

B.

NATIVE CAD (SPECIFY TYPE) ____________________________________

ISO 10303 STEP FORMAT (Specify STEP PROTOCOL AP203, AP 214 etc.)

ISO 32000 PORTABLE DOCUMENT FORMAT ________________________

OTHER ELECTRONIC FORMAT (SPECIFY TYPE)

HARDCOPY ___________________________________________________

REMARKS : ______________________________________________________

3. CAGE Code AND DOCUMENT

NUMBERS

A. CONTRACTOR CAGE AND DOCUMENT NUMBERS

GOVERNMENT CAGE (COMPLETE 3B & 3C OR 3D)

D. To Be Assigned By:

B. USE CAGE CODE: C. USE DOCUMENT NUMBERS:

4. DRAWING FORMATS (X one and complete as applicable)

CONTRACTOR FORMAT.

GOVERNMENT FORMAT.

REMARKS: ______________________________________________________________________________________

5. TDP ELEMENTS REQUIRED (X all that apply ) ELEMENTS REQUIRED TO BE DETERMINED BY CONTRACTOR - OR THE FOLLOWING ARE REQUIRED:

CONCEPTUAL DRAWINGS/MODELS AND ASSOCIATED LISTS

DEVELOPMENTAL DESIGN DRAWINGS/MODELS AND ASSOCIATED LISTS

PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS

COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LISTS

QUALITY ASSURANCE PROVISIONS

SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS/MODELS AND ASSOCIATED LISTS

SPECIAL TOOLING (ST) DRAWINGS/MODELS AND ASSOCIATED LISTS

SPECIFICATIONS

SOFTWARE DOCUMENTATION

SPECIAL PACKAGING INSTRUCTIONS (SPI) DRAWINGS/MODELS AND ASSOCIATED LISTS

6. ASSOCIATED LIST (X and complete as applicable)

A. PARTS LIST (X ONE) (1) INTEGRAL (2) SEPARATE

B. DATA LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

C. INDEX LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY) D. WIRING LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY) E. INDENTURED DATA LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY) F. APPLICATION LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

7. APPLICABILITY OF STANDARDS. The following Standards apply: (X as applicable)

ASME Y14.100

ENGINEERING DRAWING

PRACTICES

WITH APPENDICES:

B C D E

ASME Y14.24 TYPES AND APPLICATIONS OF

ENGINEERING DRAWINGS

ASME Y14.34 ASSOCIATED LIST

ASME Y14.35M REVISION OF ENGINEERING

DRAWINGS AND ASSOCIATED LIST

ASME Y14.41 DIGITAL PRODUCT DEFINITION DATA

PRACTICES

ASME Y14.5 DIMENSIONING AND TOLERANCING

OTHER STANDARDS

APPLY AS

DESCRIBED:

COMPANY STANDARDS

PERMITTED

8. OTHER TAILORING (Attach additional sheets as necessary)

Figure 1:

APT

AUTOCAD, Siemens NX v.8.5 compatible

AP 202, AP 203, AP 209, AP 210, AP 238

PDF

Initial Graphics Exchange Specification (IGES)

For large or complex assemblies

Ref 7 ASME Y14.2, Y14.3 also apply.

Solicitation FA8617-17-R-6219 Section J - Exhibit B

- 1 -

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0003 and 0040

B. EXHIBIT

B

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

APT - Technical Data Package

E. CONTRACT/PR NO.

FA8617-17-R-6219

F. CONTRACTOR

TBD

1. DATA ITEM NO.

B005

2. TITLE OF DATA ITEM

Technical Data Package

3. SUBTITLE

TDP for GBTS and MTS

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80776A

5. CONTRACT REFERENCE

SOW Para 3.3.1.11, 3.5.3.2.7.4, 3.5.4.2.4, 3.6.2.1, 3.6.2.4

6. REQUIRING OFFICE

AFLCMC/WLZG

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

BLK16

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

Blk16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

Block 3: Subtitles are as follows:

a. GBTS TDP - SOW Para 3.5.3.2.7.4, 3.5.4.2.4, 3.6.2.1

b. MTS TDP - SOW Para 3.6.2.4, 3.3.1.11

c. GBTS Transition TDP - SOW Para 3.5.4.2.4

Block 4: This DID is tailored as follows:

a. Tailoring of DI-SESS-80776A is documented herein and in the attached MIL-STD-31000A, TDP Option Selection Worksheet. AF Drawing 9579776, Rev. M, is part of this CDRL. A copy of the drawing may be obtained from the JEDMICS repository or will be furnished upon request.

b. All submitted documents shall meet the legibility and reproducibility requirements of the specification or standard controlling the media in which the data is delivered. As a minimum, all lines, symbols, letters, and numerals shall be readable per ASME Y14.2, Paragraph 6.6.

c. The Contractor shall prepare Source Control Drawings and/or Vendor Item Control Drawings for existing commercial off-the-shelf items or vendor developed items, with the exception of bulk items.

d. All drawings and associated lists shall have the contract number identified on sheet one of each document. New drawings and associated lists shall be released at the basic revision level; any changes will require a revision roll per ASME Y14.100 and an Engineering Order. All updated/revised drawings and associated lists shall be delivered with all outstanding Engineering Change Orders (ECO) incorporated. Other ECOs shall be provided in Contractor format. Final delivery format shall match sample formats defined below or as agreed upon by the Government. CD-ROM label(s) shall be marked with Date, Contract Number, Company Name, Data Item Number, and System.

e. A shipping list shall be provided with each shipment of engineering data delivery. Each shipping list shall identify each document being furnished in the TDP in alphanumeric order.

The contractor shall identify all data that is proprietary.

JEDMICS REQUIREMENTS: The Contractor shall submit a digital data sample of the drawings and associated lists, including a metadata file in Microsoft Access format as well as in native file format NLT 30 working days prior to final delivery. See Attached TDP Option Selection Worksheet for media delivery type information.

TEAMCENTER REQUIREMENTS: The Contractor shall submit a digital data sample of the drawings and associated lists, including a metadata file in Microsoft Access format as well as in native file format NLT 30 working days prior to final delivery. See Attached TDP Option Selection Worksheet for media delivery type information.

Tailor documents per applicable ASME standards as follows:

ASME Y14.100

MEARS LT LT

15. TOTAL 0 0 0

G. PREPARED BY

Prepared for Release with Final RFP

H. DATE

2016/12/23

I. APPROVED BY J. DATE

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages

Solicitation FA8617-17-R-6219 Section J - Exhibit B

- 12 -

A. CONTRACT LINE ITEM NO.

0003 and 0040

B. EXHIBIT

B

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

APT - Technical Data Package

E. CONTRACT/PR NO.

FA8617-17-R-6219

F. CONTRACTOR

TBD

16. REMARKS (Continued)

a. Appendix E, Paragraph E-7 - See DD Form 1423-1, Block 9.

ASME Y14.35

a. Redrawn drawings shall be IAW Paragraph 4.3, Sub-paragraph 4.3.2.

b. Revision column shall be IAW Paragraph 6.1, Sub-paragraph 6.1.2 & 6.1.3. The Contractor shall maintain revision history in its entirety.

c. Revision letters shall be IAW Paragraph 7.1, Sub-paragraphs 7.1.1 (a), (b), (d), and (e), and Paragraph 7.2, Sub-paragraph 7.2.1 (a), (b), and (c).

d. Revision History block shall be IAW Paragraph 7.1, Sub-paragraph 7.1.2 (a) and (b).

e. Revision Status of Sheets block shall be IAW Paragraph 7.4, Sub-paragraph 7.4.2 (a), (b), and (c).

f. Adding sheets shall be IAW Paragraph 7.5, Sub-paragraph 7.5.1 (a).

g. Deleting sheets shall be IAW Paragraph 7.5, Sub-paragraph 7.5.2 (a).

ASME Y14.5

a. Dimensioning and tolerancing shall be IAW Paragraph 1.6 and shall be decimal inch.

ASME Y14.3

a. Angle of projection shall be IAW Paragraph 5.3.1, Third-Angle Projection.

Block 9: See General Instructions for detailed requirements.

Blocks 3, 10, 12, 13:

a. GBTS TDP: The Contractor shall submit the draft TDP NLT 30 days after completion of the GBTS SVR. The Contractor shall submit the final TDP 60 days after Government approval. The Contractor shall submit additional updates as required.

b. MTS TDP: The Contractor shall submit the preliminary draft MTS TDP to be delivered NLT 30 days prior to Aircraft PDR. The Contractor shall submit the draft MTS TDP NLT 30 days prior to the Aircraft CDR. The Contractor shall submit additional updates as required.

c. GBTS Transition TDP: The Contractor shall submit the updated TDP 2 years before the end of the contract.

Block 14:

a. In addition to the delivery requirements below, the Contractor shall submit all cover letters through MEARS. The delivery date will be the date all discs and/or paper copies have been received.

b. Provide in electronic media.

DD FORM 1423-1, FEB 2001 Page 2 of 2 Pages

Solicitation FA8617-17-R-6219 Section J - Exhibit B

- 13 -

A. CONTRACT NO. B. EXHIBIT/ATTACHMENT NO. C. CLIN D. CDRL DATA

ITEM NO(s).

1. TDP Level (X and complete as applicable .)

A. CONCEPTUAL LEVEL

DEVELOPMENTAL LEVEL

PRODUCTION LEVEL

B. REMARKS:

2. TYPE AND FORMAT (X all that apply and complete as applicable .)

A.

TYPE 2D: 2D DRAWINGS

TYPE 3D: 3D MODELS ONLY

TYPE 3D: 3D MODELS WITH

ASSOCIATED 2D DRAWINGS

B.

NATIVE CAD (SPECIFY TYPE) ____________________________________

ISO 10303 STEP FORMAT (Specify STEP PROTOCOL AP203, AP 214 etc.)

ISO 32000 PORTABLE DOCUMENT FORMAT ________________________

OTHER ELECTRONIC FORMAT (SPECIFY TYPE)

HARDCOPY ___________________________________________________

REMARKS : ______________________________________________________

3. CAGE Code AND DOCUMENT

NUMBERS

A. CONTRACTOR CAGE AND DOCUMENT NUMBERS

GOVERNMENT CAGE (COMPLETE 3B & 3C OR 3D)

D. To Be Assigned By:

B. USE CAGE CODE: C. USE DOCUMENT NUMBERS:

4. DRAWING FORMATS (X one and complete as applicable)

CONTRACTOR FORMAT.

GOVERNMENT FORMAT.

REMARKS: ______________________________________________________________________________________

5. TDP ELEMENTS REQUIRED (X all that apply ) ELEMENTS REQUIRED TO BE DETERMINED BY CONTRACTOR - OR THE FOLLOWING ARE REQUIRED:

CONCEPTUAL DRAWINGS/MODELS AND ASSOCIATED LISTS

DEVELOPMENTAL DESIGN DRAWINGS/MODELS AND ASSOCIATED LISTS

PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS

COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LISTS

QUALITY ASSURANCE PROVISIONS

SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS/MODELS AND ASSOCIATED LISTS

SPECIAL TOOLING (ST) DRAWINGS/MODELS AND ASSOCIATED LISTS

SPECIFICATIONS

SOFTWARE DOCUMENTATION

SPECIAL PACKAGING INSTRUCTIONS (SPI) DRAWINGS/MODELS AND ASSOCIATED LISTS

6. ASSOCIATED LIST (X and complete as applicable)

A. PARTS LIST (X ONE) (1) INTEGRAL (2) SEPARATE

B. DATA LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

C. INDEX LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY) D. WIRING LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY) E. INDENTURED DATA LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY) F. APPLICATION LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

7. APPLICABILITY OF STANDARDS. The following Standards apply: (X as applicable)

ASME Y14.100

ENGINEERING DRAWING

PRACTICES

WITH APPENDICES:

B C D E

ASME Y14.24 TYPES AND APPLICATIONS OF

ENGINEERING DRAWINGS

ASME Y14.34 ASSOCIATED LIST

ASME Y14.35M REVISION OF ENGINEERING

DRAWINGS AND ASSOCIATED LIST

ASME Y14.41 DIGITAL PRODUCT DEFINITION DATA

PRACTICES

ASME Y14.5 DIMENSIONING AND TOLERANCING

OTHER STANDARDS

APPLY AS

DESCRIBED:

COMPANY STANDARDS

PERMITTED

8. OTHER TAILORING (Attach additional sheets as necessary)

APT

AUTOCAD, Siemens NX v.8.5 compatible

AP 202, AP 203, AP 209, AP 210, AP 238

PDF

JEDMICS Metadata-Access 2010

For large or complex assemblies

Ref 5 if product level drawings are not available than commercial drawings will be accepted in .pdf format, as a minimum.

Ref 6. Engineering data delivery shall include a shipping list identifying each document in alphanumeric order and all proprietary data.

Ref 7 ASME Y14.2, Y14.3 also apply.

Solicitation FA8617-17-R-6219 Section J - Exhibit B

- 14 -

File details come from the government source that posted it. Updated .