SECTION J - ATTACHMENT 10D - COST AND SOFTWARE DATA REPORTING - APT PRODUCTION PRIME PLAN

View the file

Other files

File Type Posted
Response_to_Industry_Comments_on_30DEC_RFP_23Feb2017.pdf PDF
AMEND_0001_-_Section_J_-_Attachment_2_-_Statement_of_Work_for_the_Advanced_Pilot_Training_(APT)_Program.pdf PDF
AMEND_0001_-_Section_J_-_Attachment_16_-_Quality_Assurance_Surveillance_Plan_for_the_Advanced_Pilot_Training_Program.pdf PDF
AMEND_0001_-_Exhibit_C_-_Contract_Data_Requirements_List_-_Other_Data.pdf PDF
FA8617-17-R-6219_Amendment_0001.pdf PDF
AMEND_0001_-_Section_L_-_Attachment_1a_-_Total_Evaluated_Price_Affordability_Worksheets.xlsx XLSX spreadsheet
AMEND_0001_-_Changes_to_Model_Contract_FA8617-17-R-6219.pdf PDF
AMEND_0001_-_Section_J_-_Attachment_4_-_System_Specification_for_the_APT_Program_Ground_Based_Training_System.pdf PDF
AMEND_0001_-_Section_J_-_Attachment_17_-_Section_L_-_Instructions,_Conditions,_and_Notices_to_Offerors.pdf PDF
AMEND_0001_-_Section_J_-_Attachment_18_-_Section_M_-_Evaluation_Factors_for_Award.pdf PDF
AMEND_0001_-_Section_L_-_Attachment_12_-_Flight_Test_Procedures.pdf PDF
AMEND_0001_-_Section_J_-_Attachment_3_-_Aircraft_System_Specification_for_the_Advanced_Pilot_Training_(APT_Program).pdf PDF
AMEND_0001_-_Section_L_-_Attachment_9_-_Aircraft_System_Specification_Appendix_D.pdf PDF
Response_to_Industry_Comments_on_30DEC_RFP_27Jan2016.pdf PDF
Section_J_Atch_3-Aircraft_System_Spec_for_APT_Program.pdf PDF
RFP_Model_Contract_Sections_A-M.pdf PDF
Section_L_Atch_3-CEO_Certification_Letter.pdf PDF
Section_J_Atch_19-Pack_and_Trans_Form_158.pdf PDF
Section_L_Atch_1b-Pricing_Tables.xlsx XLSX spreadsheet
Section_J_Atch_10a-CSDR_APT_EMD_Prime_Plan.xls XLS spreadsheet
Section_J_Atch_10g_CSDR_APT_ICS_Plan.xls XLS spreadsheet
Section_J_Atch_10b-CSDR_APT_EMD_Engine_Plan.xls XLS spreadsheet
Section_J_Atch_2-SOW_for_APT_Program.pdf PDF
Section_L_Atch_25-Identification_and_Assertion_of_Restrictions.pdf PDF
Section_L_Atch_15-Integrated_Master_Plan.xlsx XLSX spreadsheet
Section_L_Atch_10-Appendix_G_to_APT_GBTS_System_Spec.pdf PDF
Section_L_Atch_9-Appendix_D_to_APT_Aircraft_System_Spec.pdf PDF
Section_J_Atch_19-Pack_and_Trans_Form_1653.pdf PDF
Section_L_Atch_8-Software_License_Ground_Rules.pdf PDF
Section_J_Atch_17-Sec_L_Instructions_to_Offerors.pdf PDF
Section_J_Atch_16-QASP_for_APT_Program.pdf PDF
Section_J_Atch_10f-CSDR_APT_Production_GBTS_Plan.xls XLS spreadsheet
Section_J_Atch_5-DD254_for_APT_Program.pdf PDF
Section_J_Atch_10c-CSDR_APT_EMD_GBTS_Plan.xls XLS spreadsheet
Section_J_Atch_4-System_Spec_for_APT_Program_GBTS.pdf PDF
Section_L_Atch_21-Inst_for_Aircrew_Anthro_Test_Report.pdf PDF
Section_J_Atch_10e-CSDR_APT_Production_Engine_Plan.xls XLS spreadsheet
Section_J_Exhibit_B-CDRL_Tech_Data_Pkg.pdf PDF
Section_J_Exhibit_A-CDRL_Technical_Manuals.pdf PDF
Section_L_Atch_17-Airworthiness_Plan_for_APT_Program.pdf PDF
Section_J_Atch_10h_CSDR_APT_Resource_Distribution_Table.xls XLS spreadsheet
Section_L_Atch_1a-TEP_Worksheets.xlsx XLSX spreadsheet
Section_L_Atch_18-TACC_for_APT.xlsx XLSX spreadsheet
Section_J_Atch_18-Sec_M_Eval_Factors_for_Award.pdf PDF
Section_L_Atch_2-Proposal_Cross_Ref_Matrix.pdf PDF
Section_J_Exhibit_C-CDRL_Other_Data.pdf PDF
Section_J_Atch_11-Host_Base_Agreement.pdf PDF
Section_L_Atch_12-Flight_Test_Procedures.pdf PDF
43_-_AR_MACC_MIL-HDBK_516_Final.xlsx XLSX spreadsheet
Bidders_Library_List_-_Unsecured(2).pdf PDF
Show 40 more

Latest 50 of 246 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 2794, Pg 1

COST AND SOFTWARE DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1. MAJOR PROGRAMa. NAME:APT - Advanced Pilot Training
b. PHASE/MILESTONEc. PRIME MISSION PRODUCT2. WBS SYSTEM TYPE3. SUBMISSION TYPE4. CURRENT SUBMISSION DATE (YYYYMMDD)5. LAST APPROVED PLAN DATE (YYYYMMDD)
Pre-ABXC-FRPAdvanced Pilot Training (APT)Aircraft SystemXINITIAL
AXC-LRIPO&SCHANGE20160525
6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code)6b. TELEPHONE NUMBER (Include Area Code)6c. FAX NUMBER (Include Area Code)6d. E-MAIL ADDRESS
Tiffany Ehresman

1970 Monahan Way (Bldg 11A)

Wright-Patterson AFB, OH 45433937-904-4185937-656-6316Tiffany.Ehresman@us.af.mil
7. PLAN TYPE8. PREPARING ORGANIZATION9a. CONTRACTOR NAME/ADDRESS9b. CONTRACT NUMBER9c. APPROPRIATION10. APPROVED PLAN NUMBER
PROGRAMXCONTRACT (PRIME)i. PERFORMING ORGANIZATIONii. DIVISIONTBDRDT&EAF-16-B-C1
CONTRACT (SUB)AFLCMC/WLZTBDTBDXPROCUREMENT
O&M
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):DD 1921-1 / 1921-5 EAC:EVM Reporting:
XX
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYCCDRg. SRDR
FORMATSh. IPMR

FORMAT 1

b. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-5
(SFCHR)f. EAC
1.01.0Advanced Pilot Trainer (APT) AircraftXXXXX
1.11.1Air Vehicle (AV)XXXXXX
1.1.11.1.1AirframeXXXXX
1.1.1.11.1.1.1Airframe Integration, Assembly, Test, and CheckoutXXXXX
1.1.1.21.1.1.2FuselageXXXXX
1.1.1.21.1.1.2.1Forward FuselageXXXX
1.1.1.21.1.1.2.2Center FuselageXXXX
1.1.1.21.1.1.2.3Aft FuselageXXXX
1.1.1.21.1.1.2.4Other Fuselage (specify)XXXX
1.1.1.31.1.1.3WingXXXXX
1.1.1.41.1.1.4EmpennageXXXXX
1.1.1.51.1.1.5NacelleXN/A
1.1.1.61.1.1.6Other Airframe Components (Specify)XXXXX
1.1.21.1.2Engine/PropulsionXXXXX
1.1.21.1.2.1Propulsion Integration, Assembly, Test And CheckoutXXXX
1.1.21.1.2.2Propulsion HardwareXXXX
1.1.21.1.2.3Propulsion Software Release 1..n (Specify)XN/A
1.1.21.1.2.4Engine (Engine, Type TBD)XXXXX
1.1.31.1.3Vehicle SubsystemsXXXXX
1.1.3.11.1.3.1Vehicle Subsystems Integration, Assembly, Test, and CheckoutXXXXX
1.1.3.21.1.3.2Flight Control SubsystemXXXX
1.1.3.21.1.3.2.1Flight Control Hardware 1..n (Specify)XXXX
1.1.3.31.1.3.3Auxiliary Power SubsystemXXXX
1.1.3.31.1.3.3.1Auxiliary Power Hardware 1..n (Specify)XXXX
1.1.3.41.1.3.4Hydraulic SubsystemXXXX
1.1.3.41.1.3.4.1Hydraulic Hardware 1..n (Specify)XXX
1.1.3.51.1.3.5Electrical SubsystemXXXX
1.1.3.51.1.3.5.1Electrical Hardware 1..n (Specify)XXXX
1.1.3.61.1.3.6Crew Station SubsystemXXXX
1.1.3.61.1.3.6.1Canopy/Cockpit SystemXXXX
1.1.3.61.1.3.6.2Mechanical SystemXXXX
1.1.3.61.1.3.6.3Fire Protection SystemXXXX
1.1.3.61.1.3.6.4Ejection Seat SystemXXXX
1.1.3.71.1.3.7Environmental Control SubsystemXXXX
1.1.3.71.1.3.7.1Environmental Hardware 1..n (Specify)XXXX
1.1.3.81.1.3.8Fuel SubsystemXXXX
1.1.3.81.1.3.8.1Fuel Subsystem Hardware 1..n (Specify)XXXX
1.1.3.91.1.3.9Landing GearXXXX
1.1.3.91.1.3.9.1Landing Gear Hardware 1..n (Specify)XXXX
1.1.3.101.1.3.10Rotor Group/Blades/HubXN/A
1.1.3.101.1.3.10.1Rotor Group/Blades/Hub Hardware 1..n (Specify)XN/A
1.1.3.111.1.3.11Drive SubsystemXN/A
1.1.3.111.1.3.11.1Drive Subsystem Hardware 1..n (Specify)XN/A
1.1.3.121.1.3.12Vehicle Subsystem Software Release 1..n (Specify)XXXXX
1.1.3.121.1.3.12.1Vehicle Subsystem Software CSCI 1..n (Specify)XXXXX
DD FORM 2794, AUGUST 2015PREVIOUS EDITION IS OBSOLETE
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):DD 1921-1 / 1921-5 EAC:EVM Reporting:
XX
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYCCDRg. SRDR
FORMATSh. IPMR

FORMAT 1

b. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-5
(SFCHR)f. EAC
1.1.3.131.1.3.13Other Vehicle Subsystem 1....nXXXX
1.1.3.131.1.3.13.1Other Vehicle Subsystem Hardware 1..n (Specify)XXXX
1.1.41.1.4AvionicsXXXXX
1.1.4.11.1.4.1Avionics Integration, Assembly, Test, and CheckoutXXXXX
1.1.4.21.1.4.2Communications/IdentificationXXXXX
1.1.4.21.1.4.2.1Communication/Identification Hardware 1..n (Specify)XXXX
1.1.4.31.1.4.3Navigation/GuidanceXXXXX
1.1.4.31.1.4.3.1Navigation/Guidance Hardware 1..n (Specify)XXXX
1.1.4.41.1.4.4Mission Computer/ProcessingXXXXX
1.1.4.41.1.4.4.1Mission Computer/Processing Hardware 1..n (Specify)XXXX
1.1.4.51.1.4.5Fire ControlXN/A
1.1.4.51.1.4.5.1Fire Control Hardware 1..n (Specify)XN/A
1.1.4.61.1.4.6Data Display and ControlsXXXXX
1.1.4.61.1.4.6.1Data Display and Controls Hardware 1..n (Specify)XXXX
1.1.4.71.1.4.7SurvivabilityXN/A
1.1.4.71.1.4.7.1Survivability Hardware 1..n (Specify)XN/A
1.1.4.81.1.4.8ReconnaissanceXN/A
1.1.4.81.1.4.8.1Reconnaissance Hardware 1..n (Specify)XN/A
1.1.4.91.1.4.9Automatic Flight ControlXXXXX
1.1.4.91.1.4.9.1Automatic Flight Control Hardware 1..n (Specify)XXXX
1.1.4.101.1.4.10Health Monitoring SystemXXXXX
1.1.4.101.1.4.10.1Health Monitoring System Hardware 1..n (Specify)XXXX
1.1.4.111.1.4.11Stores ManagementXN/A
1.1.4.111.1.4.11.1Stores Management Hardware 1..n (Specify)XN/A
1.1.4.121.1.4.12RadarXN/A
1.1.4.121.1.4.12.1Radar Hardware 1..n (Specify)XN/A
1.1.4.131.1.4.13Avionics Software Release 1....nXXXXX
1.1.4.131.1.4.13.1Avionics Software CSCI 1..n (Specify)XXXXX
1.1.4.141.1.4.14Other Avionics Subsystem 1.....nXXXXX
1.1.4.141.1.4.14.1Other Avionics Subsystem Hardware 1..n (Specify)XXXX
1.1.51.1.5Armament/Weapons DeliveryXN/A
1.1.51.1.5.1Armament/Weapons Delivery System 1..n (Specify)XN/A
1.1.51.1.5.2Armament Installation, Assembly, Test and Checkout 1..n (Specify)XN/A
1.1.61.1.6Auxiliary EquipmentXXXXX
1.1.71.1.7Furnishings and EquipmentXN/A
1.1.81.1.8Air Vehicle Software Release 1....n (Specify)XXXXX
1.1.81.1.8.1Air Vehicle Software CSCI 1.....n (Specify)XXXXX
1.1.91.1.9Air Vehicle Integration, Assembly, Test and CheckoutXXXXX
1.21.2System EngineeringXXXX
1.21.2.1Software Systems EngineeringXXXXX
1.21.2.2Integrated Logistics SupportXXXX
1.21.2.3Airworthiness CertificationXXXX
1.21.2.4Manufacturing/Quality AssuranceXXXX
1.21.2.5Environmental Safety and Occupational Health (ESOH)XXXX
1.21.2.6Human Systems Integration (HSI)XXXX
1.21.2.7Reliability, Availability, Maintainability (RAM)XXXX
1.21.2.8System / Cyber SecurityXXXX
1.21.2.9Other System Engineering 1..n (Specify)XXXX
1.31.3Program ManagementXXXX
1.31.3.1Software Program ManagementXXXXX
1.31.3.2Integrated Logistics SupportXXXX
1.31.3.3Other Program Management 1..n (Specify)XXXX
1.41.4System Test & EvaluationXXXX
1.4.11.4.1Development Test and EvaluationXN/A
1.4.11.4.1.1System Acceptance Test (SAT)XN/A
1.4.21.4.2Operational Test and EvaluationXN/A
1.4.31.4.3Mock-ups / System Integration Labs (SILs)XXX
1.4.41.4.4Test and Evaluation SupportXXX
1.4.51.4.5Test FacilitiesXXX
1.51.5TrainingXXXX
1.5.11.5.1EquipmentXXX
1.5.21.5.2ServicesXXX
1.5.21.5.2.1Training MaterialsXXX
1.5.21.5.2.2Training ServicesXXX
DD FORM 2794, AUGUST 2015PREVIOUS EDITION IS OBSOLETE
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):DD 1921-1 / 1921-5 EAC:EVM Reporting:
XX
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYCCDRg. SRDR
FORMATSh. IPMR

FORMAT 1

b. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-5
(SFCHR)f. EAC
1.5.31.5.3FacilitiesXXX
1.5.31.5.4Training Software Release 1...n (Specify)XXX
1.5.51.5.5Ground Based Training System (GBTS)XXXXX
1.5.61.5.6Maintenance TrainersXXX
1.61.6DataXXXX
1.6.11.6.1Data RightsXXXX
1.6.11.6.1.1Data Rights 1..n (Specify)XXXX
1.6.21.6.2Data DeliverablesXXXX
1.6.21.6.2.1Data Deliverables 1..n (Specify)XXXX
1.6.31.6.3Data DepositoryXXXX
1.71.7Peculiar Support EquipmentXXXX
1.7.11.7.1Test and Measurement EquipmentXXXX
1.7.21.7.2Support and Handling EquipmentXXXX
1.81.8Common Support EquipmentXXXX
1.8.11.8.1Test and Measurement EquipmentXXXX
1.8.21.8.2Support and Handling EquipmentXXXX
1.91.9Operational/Site ActivationXXXX
1.9.11.9.1System Assembly, Installation and Checkout on SiteXXXX
1.9.11.9.1.1Site 1XXXX
1.9.11.9.1.2Site 2XXXX
1.9.11.9.1.3Site 3XXXX
1.9.11.9.1.4Site 4XXXX
1.9.11.9.1.5Site 5XXXX
1.9.21.9.2Contractor Technical SupportXXX
1.9.31.9.3Site ConstructionXXX
1.9.41.9.4Site ConversionXXX
1.9.51.9.5Sustainment/Interim Contractor SupportXXX
1.9.61.9.6Depot ActivationXXX
1.101.10Industrial FacilitiesXXXX
1.10.11.10.1Construction/Conversion/ExpansionXXX
1.10.21.10.2Equipment Acquisition or ModernizationXXX
1.10.31.10.3Maintenance (Industrial Facilities)XXX
1.111.11Initial Spares and Repair PartsXXXX
1.121.12Rate ToolingXXXX
1.121.12.1Rate Tooling by End Item/Subsystem 1...n (Specify)XXXX
1.131.13WarrantyXXX
1.131.13.1Warranty by End Item/Subsystem 1...n (Specify)XXX
Subtotal CostXX
Reporting Contractor G&AXX
Reporting Contractor Undistributed BudgetXX
Reporting Contractor Management ReserveXX
Reporting Contractor FCCMXX
Total CostXX
Reporting Contractor Profit/Loss or FeeXX
Total PriceXX
DD FORM 2794, AUGUST 2015PREVIOUS EDITION IS OBSOLETE

&R&8Solicitation FA8617-17-R-6219 Section J - Attachment 10d APT Production Prime Plan Industry Release AF-16-B-C1

DD Form 2794, Pg 2

14. CSDR SUBMISSION DATES
a.
SUBMISSIONb.
FORM(S)c.
EVENTd.
REPORT TYPEe. AS OF DATEf. DUE DATE
(YYYYMMDD)(YYYYMMDD)
1CWBS DictionaryContract Award plus 12 months (Lot 1, LRIP)Initial2023083120231031
21921, 1921-1, 1921-2Contract Award plus 12 months (Lot 1, LRIP)Initial2023083120231031
31921, 1921-1, 1921-2Completion of Lot 1 (LRIP)Final2024083120241031
4CWBS DictionaryLot 1 CWBS DictionaryFinal2024083120241031
51921, 1921-1, 1921-2Completion of Lot 2 (LRIP)Final2025083120251031
6CWBS DictionaryLot 2 CWBS DictionaryFinal2025083120251031
71921, 1921-1, 1921-2Completion of Lot 3 (FRP)Final2026083120261031
8CWBS DictionaryLot 3 CWBS DictionaryFinal2026083120261031
91921, 1921-1, 1921-2Completion of Lot 4 (FRP)Final2027083120271031
10CWBS DictionaryLot 4 CWBS DictionaryFinal2027083120271031
111921, 1921-1, 1921-2Completion of Lot 5 (FRP)Final2028083120281031
12CWBS DictionaryLot 5 CWBS DictionaryFinal2028083120281031
131921, 1921-1, 1921-2Completion of Lot 6 (FRP)Final2029083120291031
14CWBS DictionaryLot 6 CWBS DictionaryFinal2029083120291031
151921, 1921-1, 1921-2Completion of Lot 7 (FRP)Final2030083120301031
16CWBS DictionaryLot 7 CWBS DictionaryFinal2030083120301031
171921, 1921-1, 1921-2Completion of Lot 8 (FRP)Final2031083120311031
18CWBS DictionaryLot 8 CWBS DictionaryFinal2031083120311031
191921, 1921-1, 1921-2Completion of Lot 9 (FRP)Final2032083120321031
20CWBS DictionaryLot 9 CWBS DictionaryFinal2032083120321031
211921, 1921-1, 1921-2Completion of Lot 10 (FRP)Final2033083120331031
22CWBS DictionaryLot 10 CWBS DictionaryFinal2033083120331031
231921, 1921-1, 1921-2Completion of Lot 11 (FRP)Final2034083120341031
24CWBS DictionaryLot 11 CWBS DictionaryFinal2034083120341031
251921, 1921-1, 1921-2Wildcard Report RequestFinal2034083120341031
26SRDR DevelopmentInitial Software Release - Wildcard Report RequestInitial2034083120341031
27SRDR DevelopmentWildcard Report Request - End of each Software ReleaseFinal2034083120341031
DD FORM 2794 (PAGE 2), AUGUST 2015PREVIOUS EDITION IS OBSOLETE
15. REMARKS
Non-Recurring/Recurring Definitions:
Refer to the specific definitions and requirements in the CSDR Manual (DoD 5000.04-M-1) and the definitions in the DIDs for the DD Forms 1921, 1921-1 and 1921-2. Any refinements or expansions of these definitions must be agreed to in the pre-contract or post contract award conference between the PM/CWIPT and the reporting contractor and approved by the OSD CAIG Chair before being incorporated into the contract. The contractor will utilize the specific definitions and requirements in the CSDR Manual (DoD 5000.04-M-1) and the definitions in the DIDs for the DD Forms 1921, 1921-1 and 1921-2 to segregate recurring and nonrecurring costs. Refinements or expansions to these definitions are TBD pending the pre-contract or post contract award conference. Recurring cost results from repetitive activities that vary with the quantity being produced. Nonrecurring cost results from non-repetitive activities that do not vary with the quantity being produced. The above definitions apply to any system life cycle phase or appropriation. Further amplification:
Prime Mission Equipment (PME):
In the all phases, recurring hardware costs include fabrication; assembly; procurement of raw materials, purchased parts and equipment, and major and minor subcontracts; integration; installation and checkout; and quality control/assurance/inspection.
Nonrecurring PME activities include design and development effort such as preliminary, critical prototype and test article design activities, and software design and maintenance, regardless of whether the purpose is to correct deficiencies or add capabilities. Hardware components, subassemblies, assemblies with less than 100% complete design are considered nonrecurring developmental items with additional design work required before they can become production representative. Pre-production activities such as production planning and production line maintenance line set-up are nonrecurring. In the development phases, hardware component costs are nonrecurring until such times as those components are no longer prototypical but are protoqual, i.e. ready to be delivered on a recurring basis as production representative. Components, sub-assemblies, assemblies with 100% complete design are considered production representative. Test articles built to an operational configuration are considered production representative. The costs of production representative items are recurring. Subcontractor, vendor, and supplier cost should be obtained and reported in recurring and nonrecurring categories, wherever reasonably possible. (If vendor amortizes their nonrecurring costs across a lot buy resulting in non-visibility of a recurring/nonrecurring split, annotate as such.)
Non-PME
System Test and Evaluation (ST&E) activities are typically nonrecurring such as non-production-representative test articles built for testing purposes only such as test stands, wind tunnel models, bench and coupon test articles; structural development, static, fatigue, software, and ballistics testing; stress analysis; flight, ground, or sea testing of system properties; redesign as a result of testing; and retesting efforts.
System Engineering, Program Management, and Data activities occur throughout the system life cycle and are supportive in nature; as such, these costs take on the characteristics of the underlying activities being performed.
Nonrecurring cost categories include design and development of Support Equipment and Training devices; Support Equipment and Training activity such as initial equipment design and test efforts, test program sets, initial courseware development, and simulator development are nonrecurring. Training and Support Equipment efforts are recurring when they pertain to repetitive activities that vary with the quantity of training devices or support items being produced.
Operational/Site Activation efforts are typically nonrecurring. Consider select Operational/Site Activation as recurring when the activity pertains to a series of sites or organization and those activities repetitively repeat for each site.
Initial Spares and Repair Parts are recurring as they pertain to repetitively producing hardware.
Industrial Facilities are nonrecurring as well as nonrecurring tooling activities such as special test equipment, special tooling, procurement of initial and rate tooling, tool replacement (with exact same tool), and tool modification (to accommodate product configuration changes). For situations not explicitly addressed above, categorize any cost as recurring if it represents repetitive effort that is sensitive to quantity.
Software Systems Engineering and Software Program Management are only to be populated on 1921 reports if Systems Engineering and Program Management are discretely identified on the SRDR. The values on the 1921 reports shall be consistent with the values on the SRDR reports.
Cost Accounting Standards (CAS) Disclosure Statement Differences:
Refer to the specific definitions and requirements in the CSDR Manual (DoD 5000.04-M-1) and the definitions in the DIDs for the DD Forms 1921, 1921-1 and 1921-2. Any refinements or expansions of these definitions must be agreed to in the pre-contract or post contract award conference between the PM/CWIPT and the reporting contractor and approved by the OSD CAIG Chair before being incorporated into the contract. The contractor will utilize the specific definitions and requirements in the CSDR Manual (DoD 5000.04-M-1) and the definitions in the DIDs for the DD Forms 1921, 1921-1 and 1921-2 to segregate recurring and nonrecurring costs. Refinements or expansions to these definitions are TBD pending the pre-contract or post contract award conference.
Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable.
1921-3 Contractor Business Data Report:
The DD Form 1921-3 is a mandatory requirement for all prime contractors and subcontractors performing work on contracts which contain CSDR requirements. As such, the contractor must ensure that its FPR business entity submits a completed DD Form 1921-3 within 60 days subsequent to the end of the contractor’s fiscal year. Only one DD Form 1921-3 submission is required per Rev 5, 20090603 5 FPR business entity, independent of the number of contracts with CSDR requirements held by the business entity.
a. The Contractor Business Data Report is prepared by and for the business entity (e.g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government. b. Reports are submitted annually at the end of the contractor's fiscal year. c. Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.
DD Form 1921-2, Progress Curve Report (If Required):
a. Unit or Lot Reporting: Reporting to be provided by UNIT/LOT. b. Product Characteristics: 1921-2 must include the WEIGHT and POWER. Note on 1921-2 remarks: CWIPT determines Unit or Lot reporting and product characteristics to be collected for Progress Curve report. DCARC Analyst must update comments as applicable.
Final Cost Report to be submitted when final end item has been delivered and accepted by the government (e.g., as evidenced by a completed DD 250) and 95% or more of total contract costs have been incurred
Other Contractor Remarks: Wildcard Reports: No SRDR reporting is included for Production, however if software releases occur during production, the Wildcard report will be used to obtain data on Software Releases. This includes the SRDR Initial, SRDR Final, and 1921, 1921-1 coincident with Initial and Final Reports. WBS 1.1.1.2-1.1.1.6: 1921-2 only applies if Contractor is fabricating/assembling the individual airframe elements.
DD FORM 2794 (PAGE 2), AUGUST 2015PREVIOUS EDITION IS OBSOLETE
Signer, CAPE Director:Rick Burke
Signed Date:9/27/2016 3:20:43 PM
Signer, DCARC Director:Daron Fullwood
Signed Date:9/16/2016 11:13:12 AM

&R&8Solicitation FA8617-17-R-6219 Section J - Attachment 10d APT Production Prime Plan Industry Release AF-16-B-C1

File details come from the government source that posted it. Updated .