Section_J_Exhibit_A-CDRL_Technical_Manuals.pdf

PDF 2 MB Posted

Attached to
Advanced Pilot Training (APT) Family of Systems (FoS) program, commonly referred to as "T-X"
Solicitation number
Not on record
Issued by

About this file

EXHIBIT A - CONTRACT DATA REQUIREMENTS LIST -TECHNICAL MANUALS

View the file

Other files

File Type Posted
Response_to_Industry_Comments_on_30DEC_RFP_23Feb2017.pdf PDF
AMEND_0001_-_Section_J_-_Attachment_2_-_Statement_of_Work_for_the_Advanced_Pilot_Training_(APT)_Program.pdf PDF
AMEND_0001_-_Section_J_-_Attachment_16_-_Quality_Assurance_Surveillance_Plan_for_the_Advanced_Pilot_Training_Program.pdf PDF
AMEND_0001_-_Exhibit_C_-_Contract_Data_Requirements_List_-_Other_Data.pdf PDF
FA8617-17-R-6219_Amendment_0001.pdf PDF
AMEND_0001_-_Section_L_-_Attachment_1a_-_Total_Evaluated_Price_Affordability_Worksheets.xlsx XLSX spreadsheet
AMEND_0001_-_Changes_to_Model_Contract_FA8617-17-R-6219.pdf PDF
AMEND_0001_-_Section_J_-_Attachment_4_-_System_Specification_for_the_APT_Program_Ground_Based_Training_System.pdf PDF
AMEND_0001_-_Section_J_-_Attachment_17_-_Section_L_-_Instructions,_Conditions,_and_Notices_to_Offerors.pdf PDF
AMEND_0001_-_Section_J_-_Attachment_18_-_Section_M_-_Evaluation_Factors_for_Award.pdf PDF
AMEND_0001_-_Section_L_-_Attachment_12_-_Flight_Test_Procedures.pdf PDF
AMEND_0001_-_Section_J_-_Attachment_3_-_Aircraft_System_Specification_for_the_Advanced_Pilot_Training_(APT_Program).pdf PDF
AMEND_0001_-_Section_L_-_Attachment_9_-_Aircraft_System_Specification_Appendix_D.pdf PDF
Response_to_Industry_Comments_on_30DEC_RFP_27Jan2016.pdf PDF
Section_J_Atch_3-Aircraft_System_Spec_for_APT_Program.pdf PDF
RFP_Model_Contract_Sections_A-M.pdf PDF
Section_L_Atch_3-CEO_Certification_Letter.pdf PDF
Section_J_Atch_19-Pack_and_Trans_Form_158.pdf PDF
Section_L_Atch_1b-Pricing_Tables.xlsx XLSX spreadsheet
Section_J_Atch_10a-CSDR_APT_EMD_Prime_Plan.xls XLS spreadsheet
Section_J_Atch_10g_CSDR_APT_ICS_Plan.xls XLS spreadsheet
Section_J_Atch_10b-CSDR_APT_EMD_Engine_Plan.xls XLS spreadsheet
Section_J_Atch_2-SOW_for_APT_Program.pdf PDF
Section_L_Atch_25-Identification_and_Assertion_of_Restrictions.pdf PDF
Section_L_Atch_15-Integrated_Master_Plan.xlsx XLSX spreadsheet
Section_L_Atch_10-Appendix_G_to_APT_GBTS_System_Spec.pdf PDF
Section_L_Atch_9-Appendix_D_to_APT_Aircraft_System_Spec.pdf PDF
Section_J_Atch_19-Pack_and_Trans_Form_1653.pdf PDF
Section_L_Atch_8-Software_License_Ground_Rules.pdf PDF
Section_J_Atch_17-Sec_L_Instructions_to_Offerors.pdf PDF
Section_J_Atch_16-QASP_for_APT_Program.pdf PDF
Section_J_Atch_10f-CSDR_APT_Production_GBTS_Plan.xls XLS spreadsheet
Section_J_Atch_5-DD254_for_APT_Program.pdf PDF
Section_J_Atch_10c-CSDR_APT_EMD_GBTS_Plan.xls XLS spreadsheet
Section_J_Atch_4-System_Spec_for_APT_Program_GBTS.pdf PDF
Section_J_Atch_10d-CSDR_APT_Production_Prime_Plan.xls XLS spreadsheet
Section_L_Atch_21-Inst_for_Aircrew_Anthro_Test_Report.pdf PDF
Section_J_Atch_10e-CSDR_APT_Production_Engine_Plan.xls XLS spreadsheet
Section_J_Exhibit_B-CDRL_Tech_Data_Pkg.pdf PDF
Section_L_Atch_17-Airworthiness_Plan_for_APT_Program.pdf PDF
Section_J_Atch_10h_CSDR_APT_Resource_Distribution_Table.xls XLS spreadsheet
Section_L_Atch_1a-TEP_Worksheets.xlsx XLSX spreadsheet
Section_L_Atch_18-TACC_for_APT.xlsx XLSX spreadsheet
Section_J_Atch_18-Sec_M_Eval_Factors_for_Award.pdf PDF
Section_L_Atch_2-Proposal_Cross_Ref_Matrix.pdf PDF
Section_J_Exhibit_C-CDRL_Other_Data.pdf PDF
Section_J_Atch_11-Host_Base_Agreement.pdf PDF
Section_L_Atch_12-Flight_Test_Procedures.pdf PDF
43_-_AR_MACC_MIL-HDBK_516_Final.xlsx XLSX spreadsheet
Bidders_Library_List_-_Unsecured(2).pdf PDF
Show 40 more

Latest 50 of 246 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

GENERAL INSTRUCTIONS

FOR THE

ADVANCED PILOT TRAINING PROGRAM

EXHIBITS A, B & C

December 23, 2016

CONTRACT NUMBER: FA8617-17-R-6219

Prepared by:

Air Force Life Cycle Management Center (AFLCMC)

Mobility Directorate (WL)

Training Aircraft Division (WLZ)

Advanced Pilot Training Branch (WLZG)

WPAFB, OH 45433

Solicitation FA8617-17-R-6219 Section J -- Exhibit A

Contract Data Requirements List - Technical Manuals

- 1 -

CONTRACT DATA REQUIREMENTS LIST (CDRL) MODIFICATION MATRIX

This matrix identifies the CDRL changes as implemented by contract modification.

CHANGE

AUTHORITY

(ECP No., Mod

No., etc.)

CDRL

REV NO.

DATE CDRL/PAGES REVISED

Contract Award Basic xx-xx-xx All. Chart to be completed at time of contract award.

- 2 -

TABLE OF CONTENTS

1 Scope

2 Applicable Documents

3 Reference Documents

4 Data Deliveries

English Language

Delivery Dates and Times

Tailored Data Items

Approval of Data

Resubmittal of Data

Final Submittal of Data

DD Form 250, Material Inspection and Receiving Report Requirements

Classified Data

5 Electronic Data Transmission

Submission Using MEARS

Alternative Delivery Formats

Editable Format Requirements

6 Method of Transmittal

Required Format (General)

Required Format (Paper)

Required Format (E-mail)

7 Common Abbreviations

8 Modification of Data Requirements

CDRL Changes

Changes to Contract Price (Limits and Conditions)

Subsequent Submittals

9 Marking Technical Documentation

Solicitation FA8617-17-R-6219 Section J -- Exhibit A

- 3 -

Distribution Marking System

Marking Technical Data

Distribution Statements

Controlling Office

Export-Controlled Warning Statement

Destruction Notice

Restrictions for Distribution Statement A

10 Mailing Lists

Acronyms

- 4 -

Scope

The Contract Data Requirements List (CDRL) establishes the data to be delivered by the

Contractor to include the submittal, approval, and distribution requirements of all of the data items contained within. The data requirements are listed on the enclosed copies of the

Department of Defense (DD) Forms 1423, Contract Data Requirements List. The Contractor is legally obligated to meet these requirements because the CDRL is a contractual document and, as such, is, therefore, binding in and of itself.

Applicable Documents

The associated data item description (DID) is identified in Block 4 of the enclosed copies of each

DD Form 1423. All DIDs are available to the Contractor at the following website:

http://quicksearch.dla.mil/.

Reference Documents

DoD 5220.22-M, National Industrial Security Program Operating Manual, 28 February

Department of Defense Directive (DoDD) 5010.12-M, Procedures for the Acquisition and Management of Technical Data, May 1993

DoDD 5230.09, Clearance of DoD Information for Public Release, 22 August 2015

DoDD 5230.24, Distribution Statements on Technical Documents, 23 August 2012

DoDD 5230.25, Withholding of Unclassified Technical Data From Public Disclosure, 18

August 1995

DoDD 5400.07-R, DoD Freedom of Information Act, 4 September 1998

Data Deliveries

English Language

The Contractor shall prepare all CDRLs using the English language per Federal Acquisition

Regulation (FAR) 52.214-34 -- Submission of Offers in the English Language.

Delivery Dates and Times

The Contractor shall submit CDRL deliverables in accordance with Blocks 10, 11, 12, 13 & 14 of each CDRL as a minimum. In addition, the Contractor shall submit out-of-cycle updates whenever an update is required due to the program activities.

Unless otherwise specified in Block 16 of the CDRL, all references to “days” shall refer to calendar days. The data must be delivered by 1400 (2:00 pm) Central Standard Time on the due date in order to be counted as on-time. In the event a CDRL delivery date falls on a Saturday or

Sunday, the delivery must be made by the Friday before the weekend to be counted as an on-time

Solicitation FA8617-17-R-6219 Section J -- Exhibit A

Contract Data Requirements List - Technical Manuals

- 5 -http://quicksearch.dla.mil/ delivery. In the event a CDRL delivery date falls on a holiday, the delivery must be made by close of business on the last work day before the holiday to be counted as an on-time delivery.

Tailored Data Items

Tailoring instructions are as described in Block 16 of each affected CDRL. If the data preparation instructions contained in Block 16 of the CDRL are different than the instructions contained in Block 10 of the DID, the instructions in the CDRL shall take precedence.

Approval of Data

An "A" designator in Block 8 of the CDRL indicates the Government will formally reply to each data submittal with either: (1) an approval, (2) approval with comments, (3) rejection, or (4) disapproval. The Government will respond to all data deliveries requiring an approval by issuing a Contracting Officer (CO) letter to the Contractor. AFLCMC/WLZG will respond within 60 calendar days, unless otherwise specified in Block 16. If the Government cannot respond within the 60 days, the Contractor will be notified and a new suspense date will be mutually established.

If the program office fails to provide a written response or a written request for an extension from the CO to a data delivery within 60 days of receipt, the data will be considered approved.

The Government will approve a data delivery with comments if there is a reasonable expectation the document can be corrected to meet the requirements. The Government will reject a data delivery if it is determined to be incomplete or inadequate to the point where a comprehensive review cannot occur. The Government will disapprove a data delivery if, after a comprehensive review, it is determined the document is not acceptable as prepared.

This 60-day response time does not apply to Engineering Change Proposals (ECP) or Contract

Change Proposals (CCP). Any ECP or CCP will be reviewed and briefed to the Government

Configuration Control Board (CCB) for disposition. After the CCB, a CO letter will be sent apprising the Contractor of the action taken, followed by a contract modification to implement the change.

For those CDRLs with an "N/A" in Block 8, Government approval of the content is not required;

however, compliance with data item format and content requirements as specified in either Block

10 or the Requirements paragraph of the DID (and as tailored in Block 16 of the CDRL) is mandatory. If there is an “N/A” in Block 8, the Government will not provide a formal response back to the Contractor; however, the Government retains the right to reject or disapprove any data submittal(s) not in compliance with requirements of the contract, the DID, or the CDRL.

For those CDRLS with a “BLK16” in Block 8, the Government will provide an approval on the first submittal for content, format and methodology of determining the data. The Government will not provide approvals on subsequent submittals unless the Contractor changes either the content, format or methodology.

Resubmittal of Data

If resubmittal of a CDRL is required, it shall be resubmitted within 30 calendar days after the date the CO letter is sent, unless otherwise specified in the CO letter. Should the Contractor disagree with the proposed resubmittal requirements, it shall submit its comments in writing to the CO within 15 calendar days of notification.

Solicitation FA8617-17-R-6219 Section J -- Exhibit A

- 6 -

When resubmission of data is directed, complete documents shall be submitted unless otherwise specified in the CO letter. The Contractor shall identify all changes made using a standard tool like track changes or a vertical change bar along the side of the change. The document revision number shall be indicated both on the title page of the data delivery and in the header of each page of the data delivery.

The Contractor shall insert a “revision” page in each data delivery resubmitted. The revision page shall provide a history of changes made to the document. The page shall include the following, as a minimum:

a. The reason for the revision (e.g., proposal number, modification number),

b. A brief description of the changes made,

c. Revision identification letter or number and revision date.

Final Submittal of Data

For the final delivery against each CDRL in the contract/delivery order, the Contractor shall clearly state in its Letter of Transmittal (LT) that the last submittal is being made and that all contractual requirements concerning that data item have been fulfilled. The proper format and required information for the Contractor’s LT is covered in section 6 below.

DD Form 250, Material Inspection and Receiving Report Requirements

Block 7 of the CDRL directs the method of submittal— an individual DD Form 250 is required only if indicated in Block 7. All other submittals shall be via an LT.

Classified Data

In the event a data delivery containing classified data shall be submitted, the Contractor shall contact the CO for the appropriate mailing address. The Contractor shall submit the data delivery in accordance with the requirements established by the Contractor’s DD Form 254, Contract Security Classification Specification. In addition, the Contractor shall submit an unclassified copy of the LT in Multi-User ECP Automated Review System (MEARS).

Electronic Data Transmission

Submission Using MEARS

The Contractor shall submit all CDRL deliveries in electronic format using MEARS unless otherwise directed in Block 14 and Block 16 of the individual DD Form 1423. The Contractor shall ensure versions of the software used for data deliverables remain compatible with current

Advanced Pilot Training (APT) Program Office software.

Alternative Delivery Formats

The Contractor shall inform the APT Program Office in writing if any of their data deliverables cannot comply with the required electronic formats. In such cases the Contractor shall recommend, for Program Office approval, an alternative delivery format(s). A request for an

Solicitation FA8617-17-R-6219 Section J -- Exhibit A

- 7 -alternative delivery format should not be considered an automatic approval for late delivery of the data.

Editable Format Requirements

When the Contractor is required to make deliveries in Microsoft (MS) Excel or in MS Project, the Contractor may submit a second, duplicate copy in a .pdf format. The two copies shall be identical and shall be submitted together. The .pdf file will be documented as the formal data delivery.

Method of Transmittal

Required Format (General)

All data deliveries shall include an LT. As a minimum, the LT shall contain:

letter date and control number

Contractor’s address and point of contact (POC) contract number, delivery order, CLIN and program name document revision level reference to the original document(s) if a resubmittal is required document date and document control number

CDRL sequence number

DID number data title/subtitle reason/frequency of submittal (monthly, draft, final, update, etc.)

list of all previous/pertinent correspondence relating to the documentation being submitted list of distribution addressees as identified in Block 14 of the CDRL

Required Format (Paper)

If a paper copy of the data delivery must be prepared, a complete list of addressees shall be placed at the end of the letter, annotating the recipients (as identified on the DD Form 1423, Block 14), including the transmittal-letter-only recipients. Paper copies shall be submitted on standard 8 1/2 x 11-inch document size bond paper. Fold-outs are permissible for large tables/flow-charts.

Required Format (E-mail)

If submittal is made via e-mail, the list of addressees in the “To” line shall include the complete list of addressees and shall be considered sufficient.

Solicitation FA8617-17-R-6219 Section J -- Exhibit A

- 8 -

Common Abbreviations

Block 7: SS Source (ACO) Source (ACO)

DD Destination (PCO) Destination (PCO)

LT Letter of Transmittal

Block 8: A Approval

N/A Approval Not Required

BLK16 See Block 16 for further instructions

Blocks 10, 11, 12 & 13: ANNLY Annually

ASREQ As Required

BLK16 See Block 16

EOQ End of Quarter

MTHLY Monthly

ONE/R Once with Revisions

OTIME One Time

QRTLY Quarterly

2TIME 2 Times

Modification of Data Requirements

CDRL Changes

During the performance of this contract, the CO may unilaterally accomplish Changes to

Exhibits A, B and C and the associated CLINs. Subject changes may include, but are not limited to the following:

increase or decrease the number of addressees, increase or decrease the number of paper copies provided, change the place of delivery, change the requiring office for the CDRL, other administrative and/or clarification changes.

Changes to Contract Price (Limits and Conditions)

Any amendment shall be made at no change in contract price, provided the increase for an individual line item of data is not greater than 150 percent nor a decrease to less than 50 percent in the total number of copies initially specified in the CDRL. In the event of an increase greater than 150 percent or of a decrease to less than 50 percent, the parties will negotiate any equitable adjustment.

The contract price will constitute full satisfaction of any entitlement of equitable adjustment under the “Changes” clause, provided the Contractor agrees to accept such change at no change in contract price. Unilateral action shall be by the issuance of a CO's letter, which will reference

Solicitation FA8617-17-R-6219 Section J -- Exhibit A

- 9 -this paragraph as its authority. The Contractor shall notify the CO of the estimated cost if the changes impact the contract price.

Subsequent Submittals

Action directed by these paragraphs shall be put in place by the Contractor beginning with the first submission of the particular data item or items after receipt by the Contractor of the CO’s direction.

Marking Technical Documentation

Distribution Marking System

Required distribution statements have been annotated in Block 9 of each CDRL and are defined in paragraph 9.2 below. If the Contractor feels a different distribution statement is appropriate, the Contractor must notify the CO with its recommendation and justification. The Government will review the request, determine which statement is the most appropriate, and provide the

Contractor with either an acceptance of its proposed change or the Government’s reason for not accepting the Contractor’s request for change.

Marking Technical Data

9.2.1 The Contractor shall mark all requested technical information, regardless of its medium, with a distribution statement. This marking requirement for technical data includes technical reports, blueprints, drawings, technical orders, technical manuals, plans, instructions, computer software, film, technical papers, photographs, CDs/DVDs, etc. If the document contains export-controlled technical data, it also must be marked with an export control warning statement.

Distribution statements can be applied to technical data that contain or reveal proprietary information.

9.2.2 Certain types of technical data may preclude placing the entire notice on the document.

To accommodate this problem, each distribution statement contains an authorized abbreviation form. Abbreviated distribution statements are to be used only when the available space precludes placing the entire notice on the document. The use and wording of these statements are described in the following paragraphs.

Distribution Statements

One of the following statements, in accordance with Block 9 of the CDRL, regarding distribution must appear on the cover and title page of each document submitted, including the first sheet of each drawing.

Distribution Statement A:

DISTRIBUTION A. Approved for public release: Distribution unlimited.

The abbreviated form is: Statement A, Public Release

- 10 -

Distribution Statement B:

DISTRIBUTION B. Distribution authorized to U.S. Government Agencies (reason)

(date of determination). Other requests for this document shall be referred to

Training Aircraft Division, APT Program Office, AFLCMC/WLZG, Bldg 11A, Room 201, 1970 Monahan Way, WPAFB, OH 45433-7211.

The abbreviated form is: Statement B, US Government, (AFLCMC/WLZG)

Distribution Statement C:

DISTRIBUTION C. Distribution authorized to U.S. Government Agencies and their contractors (reason) (date of determination). Other requests for this document shall be referred to Training Aircraft Division, APT Program Office, AFLCMC/WLZG, Bldg

11A, Room 201, 1970 Monahan Way, WPAFB, OH 45433-7211.

The abbreviated form is: Statement C, US Government & Contractors, (AFLCMC/WLZG)

Distribution Statement D:

DISTRIBUTION D. Distribution authorized to Department of Defense and U.S.

DoD Contractors only (reason) (date of determination). Other requests for this document shall be referred to Training Aircraft Division, APT Program Office, AFLCMC/WLZG, Bldg 11A, Room 201, 1970 Monahan Way, WPAFB, OH 45433-

7211.

The abbreviated form is: Statement D, DoD & US DoD Contractors, (AFLCMC/WLZG).

Distribution Statement E:

DISTRIBUTION E. Distribution authorized to DoD components only (reason) (date of determination). Other requests for this document shall be referred to Training

Aircraft Division, APT Program Office, AFLCMC/WLZG, Bldg 11A, Room 201, 1970 Monahan Way, WPAFB, OH 45433-7211.

The abbreviated form is: Statement E, DoD Only, (AFLCMC/WLZG).

- 11 -

Distribution Statement F:

DISTRIBUTION F. Further dissemination only as directed by the Training Aircraft

Division, APT Program Office, AFLCMC/WLZG, Bldg 11A, Room 201, 1970

Monahan Way, WPAFB, OH 45433-7211 (date of determination) or higher authority.

The abbreviated form is: Statement F, Request Approval from AFLCMC/WLZG.

Controlling Office

The following address will be used on all documentation for the “controlling office” of this program:

AFLCMC/WLZG

TRAINING AIRCRAFT DIVISION

ADVANCED PILOT TRAINING PGM

BLDG 11A, Room 201

1970 MONAHAN WAY

WPAFB, OH 45433-7211

Export-Controlled Warning Statement

Besides a distribution statement, the marking system also requires the use of a warning notice on all documents that contain export-controlled technical data. The warning notice may be used in conjunction with any of the five limited distribution statements: “B,” “C,” “D,” “E,” and “F.”

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export

Administration Act Of 1979, Title 50, U.S.C., App. 2401, et seq.), as amended.

Violations of these export laws are subject to severe criminal penalties.

Disseminate in accordance with provisions of DOD 5230.25.

Destruction Notice

All unclassified technical data marked with distribution statements “B,” “C,” “D,” “E,” or “F” shall be handled and destroyed as “For Official Use Only” documents, in accordance with DoD

5400.7-R, DOD Freedom of Information Act Program, September 1998. Classified data and classified limited technical data shall be handled and destroyed in accordance with the procedures in Chapter IX of DoD 5200.1-R, Information Security Program Regulation, or follow the procedures in DoD 5220.22-M, Industrial Security Manual.

Restrictions for Distribution Statement A

Distribution Statement “A,” which denotes public release, cannot be used in conjunction with the export-control warning notice. Data deliveries marked as Distribution Statement A must be approved in accordance with DoD Directive 5230.09 prior to release.

Solicitation FA8617-17-R-6219 Section J -- Exhibit A

- 12 -

Data that is intended for public release will be handled as Distribution Statement “D” until such time as it is approved for release. At that time, the markings will be changed.

Mailing Lists

The Government will provide the following information for each recipient identified in

Block 14: Office symbol, mailing address, point of contact, e-mail, and phone number.

Office/Symbol POC Phone/Email

Detailed contact information will be provided at the time of contract award.

- 13 -

Acronyms

APT Advanced Pilot Training

CCB Configuration Control Board

CCP Contract Change Proposal

CDRL Contract Data Requirements List

CO Contracting Officer

DD Department of Defense

DID Data Item Description

DoD Department of Defense

DoDD Department of Defense Directive

ECP Engineering Change Proposal

LT Letter of Transmittal

MEARS Multi-User Engineering Change

Proposal Automated Review System

MS Microsoft

POC Point of Contact

US United States

- 14 -

CONTRACT #: FA8617-17-R-6219

CONTRACTOR: TBD

SET NAME: APT - Exhibit A - TMs SYSTEM ITEM: APT - Technical Manuals

PROGRAM: Training Aircraft

DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH

A001 AFLCMC/WLZG DI-ALSS-81531 SOW Para 3.6.1

Time Compliance Technical Order (TCTO) Supply Data

A002 AFLCMC/WLZG DI-TMSS-80067B SOW Para 3.6.1

TM CFAE/CFE Notices - See BLK16

A003 AFLCMC/WLZG DI-TMSS-81532C SOW Para 3.6.1

Emergency Services Source Data - See BLK16

A004 AFLCMC/WLZG DI-TMSS-81805 SOW Para 3.6.1

Data Module Requirements List S1000D

A005 AFLCMC/WLZG DI-TMSS-81810 SOW Para 3.6.1

Technical Manual Organization Plan (TMOP)

A006 AFLCMC/WLZG DI-TMSS-81812 SOW Para 3.6.1

Technical Manual Schedule and Status Report

A007 AFLCMC/WLZG TM-86-01P See BLK16

Technical Manual Contract Requirements

CDRL Table of Contents

Solicitation FA8617-17-R-6219 Section J -- Exhibit A

- 15 -

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0002 and 0039

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER ALSS

D. SYSTEM/ITEM

APT - Technical Manuals

E. CONTRACT/PR NO.

FA8617-17-R-6219

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Time Compliance Technical Order (TCTO) Supply Data

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ALSS-81531

5. CONTRACT REFERENCE

SOW Para 3.6.1

6. REQUIRING OFFICE

AFLCMC/WLZG

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

Block 4: This DID is tailored as follows: See attached Form 874 for required format.

Block 9: See General Instructions for detailed requirements.

Blocks 10, 12, & 13: The Contractor shall provide a parts/kit list for TCTO supply data anytime a TCTO is processed by either the Contractor or the Government.

AFLCMC/WLZG 1 1

15. TOTAL 1 1 0

G. PREPARED BY

Prepared for Release with Final RFP

H. DATE

2016/12/23

I. APPROVED BY J. DATE

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

Solicitation FA8617-17-R-6219 Section J -- Exhibit A

- 16 -

- 17 -

- 18 -

- 19 -

- 20 -

- 21 -

- 22 -

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0002 and 0039

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER TMSS

D. SYSTEM/ITEM

APT - Technical Manuals

E. CONTRACT/PR NO.

FA8617-17-R-6219

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

TM CFAE/CFE Notices - See BLK16

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-TMSS-80067B

5. CONTRACT REFERENCE

SOW Para 3.6.1

6. REQUIRING OFFICE

AFLCMC/WLZG

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

Block 2: The complete title for the referenced Data Item Description is as follows: Technical Manual (TM) Contractor Furnished Aeronautical Equipment or Contractor Furnished Equipment (CFAE/CFE) Notices

Block 4 This DID is tailored as follows:

a. Identify the need for supporting Technical Orders (TOs) and recommend development of new TOs or modification of existing Non-Development Item (NDI) TOs.

b. The Contractor shall obtain authorization from the design activity for the Government to produce and use any copyrighted and/or limited rights information contained in commercial data.

Block 9: See General Instructions for detailed requirements.

Blocks 10, 12, 13 & 14: The Contractor shall deliver documents concurrent with the delivery requirements identified under TM 86-01P.

MEARS LT LT

BLK16

15. TOTAL 0 0 0

G. PREPARED BY

Prepared for Release with Final RFP

H. DATE

2016/12/23

I. APPROVED BY J. DATE

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

Solicitation FA8617-17-R-6219 Section J -- Exhibit A

- 23 -

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0002 and 0039

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER TMSS

D. SYSTEM/ITEM

APT - Technical Manuals

E. CONTRACT/PR NO.

FA8617-17-R-6219

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Emergency Services Source Data - See BLK16

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-TMSS-81532C

5. CONTRACT REFERENCE

SOW Para 3.6.1

6. REQUIRING OFFICE

AFLCMC/WLZG

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

BLK16

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

Block 4: The complete title for this Data Item Description is as follows: Aerospace Emergency Rescue and Mishap Response Information (Emergency Services) Source Data

Block 9: See General Instructions for detailed requirements. The Contractor shall treat the document as if Distribution D applies until approved for release by Public Affairs. After approval for release, the document will be treated as Distribution A.

Blocks 10, 12, & 13: The Contractor shall make the first submittal NLT 90 days prior to flying aircraft at any Government test location. The Contractor shall submit updates as technical updates or changes to the system occur that will affect this source data.

WLZG/MEARS 1 1

15. TOTAL 1 1 0

G. PREPARED BY

Prepared for Release with Final RFP

H. DATE

2016/12/23

I. APPROVED BY J. DATE

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

Solicitation FA8617-17-R-6219 Section J -- Exhibit A

- 24 -

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER TMSS

D. SYSTEM/ITEM

APT - Technical Manuals

E. CONTRACT/PR NO.

FA8617-17-R-6219

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Data Module Requirements List S1000D

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-TMSS-81805

5. CONTRACT REFERENCE

SOW Para 3.6.1

6. REQUIRING OFFICE

AFLCMC/WLZG

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

Block 4: This DID is tailored as follows:

a. Change all references to “Navy” to read “Air Force”.

b. Use/Relationship: (add) "The DMRL shall comply with MIL-STD-3048A." at the end of 2nd para.

c. Paragraph 2.e: Change to read “systemCode”

d. Paragraph 2.f: Change to read “subsystemCode”

e. Paragraph 2.g: Change to read “subSubsystemCode”

f. Paragraph 2.h: Change to read “assyCode”

g. Paragraph 2.i: Change to read “disassyCode”

h. Paragraph 2.j: Change to read “disassyCodeVariant”

i. Paragraph 2.k: Change to read “disassyCodeVariant”

j. Paragraph 2.l: Change to read “infoCodeVariant”

k. Paragraph 2.m: Change to read “itemLocationCode”

l. Paragraph 2.n: Change to read “techName”

m. Paragraph 2.o: Change to read “infoName”

n. Paragraph 2.2.7: Change to read “systemCode Column. The systemCode column is the first portion of the Standard Numbering System(SNS)and represents the general systems and the basic structure of the Product.”

o. Paragraph 2.2.8: Change to read “subsystemCode Column. The subsystemCode column is the first element subsystem portion of the SNS.”

p. Paragraph 2.2.9: Change to read “subSubsystemCode Column. The subSubsystemCode column is the second element sub-subsystem portion of the SNS.”

q. Paragraph 2.2.10: Change to read “assyCode Column. The assyCode column is the unit or assembly element of the SNS.”

r. Paragraph 2.2.11: Change to read “disassyCode Column. The disassyCode shall identify the breakdown condition of an assembly to which maintenance information applies.”

s. Paragraph 2.1.12: Change to read “disassyCodeVariant Column. The disassyCodeVariant shall designate alternative items of equipment or components.”

t. Paragraph 2.2.13: Change to read “disassyCodeVariant Column. The disassyCodeVariant column identifies the type of information within a data module.”

u. Paragraph 2.2.14: Change to read “infoCodeVariant Column. The infoCodeVariant column indicates any variation in the activity defined by the information code.

v. Paragraph 2.2.15: Change to read “itemLocationCode Column. The itemLocationCode column indicates where the maintenance task will be carried out in terms of a Product or where the information is applicable.”

w. Paragraph 2.2.16: Change to read “techName Column. The techName column identifies the nomenclature of the hardware or function.”

WLZG-MEARS 1 1

15. TOTAL 1 1 0

G. PREPARED BY

Prepared for Release with Final RFP

H. DATE

2016/12/23

I. APPROVED BY J. DATE

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages

Solicitation FA8617-17-R-6219 Section J -- Exhibit A

- 25 -

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER TMSS

D. SYSTEM/ITEM

APT - Technical Manuals

E. CONTRACT/PR NO.

FA8617-17-R-6219

F. CONTRACTOR

TBD

16. REMARKS (Continued)

x. Paragraph 2.2.17: Change to read “infoName Column. The infoName column is the short description of the information code.”

y. Paragraph 2.2.18: Change to read “DMTYPE Column. The DMTYPE column indicates the DM type to the Air Force’s CSDB. This column shall be entered with the following DM type as applicable:

a. descript. The descript DM type designates a descriptive DM.

b. proced. The proced DM type designates a procedural DM.

c. maint. The maint DM type designates a maintenance planning DM

d. ipd. The ipd DM type designates an illustrated parts data DM.

e. crew. The crew DM type designates a crew/operator DM.

f. fault. The fault DM type designates a fault isolation DM.

g. process. The process DM type designates a process DM.

h. techrep. The techrep DM type designates a technical repository DM

i. schedule. The schedule DM type designates a maintenance schedule DM.

j. wrngdata. The wrngdata DM type designates a wiring diagram data DM.

k. wrngflds. The wrngflds DM type designates a wiring field DM

Block 9: See General Instructions for detailed requirements.

Blocks 10, 12 & 13: The Contractor shall submit the first list NLT 90 days after contract award. The Contractor shall submit the final list NLT 30 days after conclusion of the Business Rule Conference.

DD FORM 1423-1, FEB 2001 Page 2 of 2 Pages

Solicitation FA8617-17-R-6219 Section J -- Exhibit A

- 26 -

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0002 and 0039

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER TMSS

D. SYSTEM/ITEM

APT - Technical Manuals

E. CONTRACT/PR NO.

FA8617-17-R-6219

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Technical Manual Organization Plan (TMOP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-TMSS-81810

5. CONTRACT REFERENCE

SOW Para 3.6.1

6. REQUIRING OFFICE

AFLCMC/WLZG

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

Block 9: See General Instructions for detailed requirements.

Blocks 10, 12, 13, & 14: The Contractor shall submit the draft Technical Manual Organization Plan (TMOP) at the TO Guidance Conference for review. The Contractor shall provide a paper copy for each attendee scheduled to attend the conference. The Contractor shall provide paper copies on 8 1/2 x 11 inch paper, with no smaller than 10 font. In addition, the Contractor shall submit the draft plan using the electronic format described for all CDRL deliveries NLT than the first day of the conference. The Contractor shall submit the updated plan NLT 30 days after receipt of Government comments. The Contractor shall submit annual updates. In the event there are no changes to the TMOP, the Contractor shall submit a letter stating there are no changes to the most recent submittal.

WLZG/MEARS 1 1

BLK14

15. TOTAL 1 1 0

G. PREPARED BY

Prepared for Release with Final RFP

H. DATE

2016/12/23

I. APPROVED BY J. DATE

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

Solicitation FA8617-17-R-6219 Section J -- Exhibit A

- 27 -

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0002 and 0039

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER TMSS

D. SYSTEM/ITEM

APT - Technical Manuals

E. CONTRACT/PR NO.

FA8617-17-R-6219

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

Technical Manual Schedule and Status Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-TMSS-81812

5. CONTRACT REFERENCE

SOW Para 3.6.1

6. REQUIRING OFFICE

AFLCMC/WLZG

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

Block 9: See General Instructions for detailed requirements.

Blocks 10, 12 & 13: The Contractor shall submit the draft Technical Manual Organization Plan (TMOP) at the TO Guidance Conference for review. The Contractor shall provide a paper copy for each attendee scheduled to attend the conference. The Contractor shall provide paper copies on 8 1/2 x 11 inch paper, with no smaller than 10 font. In addition, the Contractor shall submit the draft plan using the electronic format described for all CDRL deliveries NLT than the first day of the conference. The Contractor shall submit subsequent submissions quarterly. The Contractor shall submit the reports on the 15th of the month following the end of the quarter.

WLZG/MEARS 1

15. TOTAL 0 1 0

G. PREPARED BY

Prepared for Release with Final RFP

H. DATE

2016/12/23

I. APPROVED BY J. DATE

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

Solicitation FA8617-17-R-6219 Section J -- Exhibit A

- 28 -

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0002 and 0039

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER TMCR

D. SYSTEM/ITEM

APT - Technical Manuals

E. CONTRACT/PR NO.

FA8617-17-R-6219

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

Technical Manual Contract Requirements

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

TM-86-01P

5. CONTRACT REFERENCE

See BLK16

6. REQUIRING OFFICE

AFLCMC/WLZG

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

See attached tailoring for requirements.

Block 5: SOW Para 3.4.1.5, 3.4.2.2, 3.5.2.1, 3.5.2.2, 3.5.2.3, 3.5.2.4, 3.5.2.5, 3.5.2.6, 3.6.1, 3.6.2.4.

Blocks 10, 12 & 13: The Contractor shall adhere to the delivery requirements in the TM-86- 01P.

FOR MTS DATA PACKAGE ONLY

The Contractor shall deliver the following:

a. Initial draft technical manuals to be delivered 45 days prior to Aircraft PDR

b. Updated draft technical manuals to be delivered 45 days prior to Aircraft CDR

c. Additional drafts as required

FOR TEST USE ONLY:

a. The Contractor shall submit Technical manuals for DT&E aircraft ground and flight operations in accordance with the instructions set forth in TM-86-01P

b. The Contractor shall deliver GBTS preliminary manuals in accordance with the instructions set forth in TM-86-01P

Block 14: In addition to the delivery requirements below, the Contractor shall submit all cover letters through MEARS. The delivery date will be the date all media has been received.

Provide the manuals in electronic media.

WLZG/MEARS LT LT

412 TW/416 FLTS 5 5

15. TOTAL 5 5 0

G. PREPARED BY

Prepared for Release with Final RFP

H. DATE

2016/12/23

I. APPROVED BY J. DATE

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

Solicitation FA8617-17-R-6219 Section J -- Exhibit A

- 29 -

T M - 8 6 - 0 1 P 9 D E C 2 0 1 4

Air Force Technical Manual Contract Requirements (TMCR) for the Advanced Pilot Training (APT) Program

DRAFT (28 October 2016)

FOR CONTRACT DATA REQUIREMENTS LIST (CDRL)

SEQUENCE NUMBER A007

ATTACHMENT 1, TO CDRL SEQUENCE NUMBER A007, EXHIBIT A

REQUEST FOR PROPOSAL/CONTRACT: FA8617-17-R-6219

SECTION 1. TECHNICAL ORDER (TO) PROGRAM REQUIREMENTS

1. TMCR Tailoring. This TMCR has been tailored by the APT Program Office, including the associated tables, matrices, and Specification/Standard Interface Records (SIRs). The Contractor may propose and submit, in writing, additional tailoring to the TO Management Agent / TO

Management Agency (TOMA) and Procuring Contracting Officer (PCO) for consideration. The

Government’s tailored TMCR shall be attached to the CDRL for TO delivery and shall be included in the proposal as a separate exhibit, referenced in the proposal Statement of Work

(SOW).

2. General.

2.1. The Contractor shall provide, within each section as well as within associated tables and appendices contained in this TMCR, its contractual comprehensive approach to the development, certification, and delivery of all TOs required to meet the Government-identified technical data requirements. No tailoring of this TMCR is permitted without prior

Government approval. The Contractor shall not delete any Government-identified requirements but may identify additional TOs or capability required to support the APT

Program’s Training System.

2.2. The Contractor shall comply with the most current version of all Military

Performance Specification (MIL-PRF), Military Specification (MIL-SPEC), Military

Standard (MIL-STD), Military Detail (MIL-DTL), TO, and other guidance/requirement documents called out in this TMCR. The most current version is defined as the latest version available at the time of contract award.

2.3. United States Air Force (USAF) TO acquisition procedures for this document are found in TO 00-5-3, AF TO Life Cycle Management, located at http://www.tinker.af.mil/technicalorders/index.asp. A copy may also be obtained from the

APT Program TOMA. Any terms or procedures found in this document may be researched there.

Solicitation FA8617-17-R-6219 Section J -- Exhibit A

Contract Data Requirements List - Technical Manuals

- 30 -http://www.tinker.af.mil/technicalorders/index.asp

3. TO Program Scope. The Contractor may recommend additional Section 2 tailoring to propose new TO types (Table 1), TO updates (Table 2), and source data required to support the

APT Program objectives.

3.1. The APT Aircraft System requires technically usable TOs that are safe, current, accurate, and concurrent with aircraft and Ground Based Training System (GBTS) configuration(s). These TOs will support all facets of the APT Program to include

Operations, Maintenance, Installation and Training (OMIT). In addition, these TOs shall meet the requirements for flight operations, Organizational Level (O-Level), Depot Level

(D-Level), and Intermediate Level (I-Level) (backshop) maintenance. The Government will support the APT Aircraft with an organic two-level maintenance concept, utilizing organic and contracted O-Level maintainers and organic D-Level personnel, as appropriate.

Existing I-Level (backshop) capabilities at the bases will be utilized, as appropriate.

3.2. All aircraft maintenance TOs shall be in accordance with (IAW) Interactive

Electronic Technical Manual (IETM) database structure using ASD/AIA S1000D Issue 4.1, International Specification for Technical Publications Utilizing a Common Source

Database, and MIL-STD-3048A, Air Force Business Rules for the Implementation of

S1000D, to support maintenance activities for the aircraft and engines.

3.3. Flight manuals shall be developed IAW MIL-DTL-7700 (USAF), Detail

Specification Flight Manual, Performance Data Appendix, Mission Crew Manual, Supplemental Manual, and Abbreviated Flight Crew Checklist / 25 April 2014 (or subsequent versions) and provided in media types identified in Section 2, Table 3. Flight

Manuals shall comply with Air Force Instruction (AFI) 11-215, USAF Flight Manuals

Program (FMP), standards and procedures, to include the use of the (Air Force) AF Form

847 program and Enhanced Technical Information Management System to manage the catalog, requisition, subscription, and distribution of both paper and electronic flight manuals.

4. Commercial Manuals. The Contractor shall recommend the use of existing commercial manuals to the maximum extent possible without impairing program support objectives. All proposed commercial manuals are subject to Government review and approval. NOTE: a) The

Contractor shall use the Data Item Description (DID), Data Item (DI)-Technical Manual

Specifications and Standards (TMSS)-80067B, Technical Manual (TM) Contractor Furnished

Aeronautical Equipment or Contractor Furnished Equipment (CFAE/CFE) Notices, to provide recommendation data and b) The Government will use MIL-PRF-32216, Evaluation of

Commercial Off-The-Shelf Manuals and Preparation of Supplemental Data, as a guide for review and acceptance of all recommended commercial manuals.

4.1. All commercial manuals shall be delivered in Indexed Portable Document Format

(IPDF). Data rights for commercial manuals shall be IAW DFARS 252.227-7015, Technical Data-Commercial Items, to allow the USAF to electronically store, print, distribute, and separate copies of commercial manuals to allow for printing.

- 31 -

4.2. Approved commercial manuals shall be delivered with an Identifying TO Publication

Sheet IAW TO 00-5-1, AF Technical Order System; TO 00-5-3; and MIL-STD-38784A, Department of Defense Standard Practice for Manuals, Technical: General Style and

Format Requirements. All IPDF files of commercial data shall be non-password protected to allow the AF to separate copies of the manual for printing.

4.3. If the proposed commercial data is found to be insufficient after review by the

Government, the Contractor shall prepare supplemental data for the commercial manual, as required, IAW TO 00-5-1, TO 00-5-3, and MIL-STD-38784A. If the commercial data cannot be supplemented sufficiently, the Contractor may be tasked to develop new TO data

IAW the applicable TMSS listed in Section 2, Table 1.

5. TMSS. The Contractor shall submit, in writing, all questions, deficiencies, and suggested improvements concerning TMSS requirements, along with justified suggestions for resolution, through the PCO and TOMA. Approved recommendations, corrections, and clarifications will be maintained with contract documentation.

6. Subsequent TO/Data Requirements. When new TO requirements are identified the

Contractor shall notify the Government, utilizing DI-TMSS-80067B, Technical Manual (TM)

Contractor Furnished Aeronautical Equipment or Contractor Furnished Equipment

(CFAE/CFE) Notices. This process shall require Government review and approval of recommended additional requirements prior to developing additional data.

6.1. All external process requirements contained in the Functionality Matrix must interface with existing AF data systems. AF processes and systems are identified in AFI 21-

101, Aircraft and Equipment Maintenance Management, and AFI 23-101, Air Force

Materiel Management.

7. TO Development. TOs shall be written to a scope and depth of coverage required to support

APT Program operations, O-Level, I-Level, and D-Level maintenance concepts.

7.1. Aircraft maintenance TO Data shall be developed IAW S1000D Issue 4.1 and MIL-

STD-3048A, Air Force Business Rules for the Implementation of S1000D. This includes a program-tailored S1000D Functionality Matrix developed by the Government and project business rules presented by the contractor, using MIL-STD-3048A, with final review and approval by the Government in support of the program’s S1000D implementation. The

Government-tailored Functionality Matrix for MIL-STD-3048A is included in the SIR found in Section 3 of this document. If needed, the Contractor shall contact the PCO and

TOMA to request guidance…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .