SECTION J - ATTACHMENT 10G - COST AND SOFTWARE DATA REPORTING - APT ICS PLAN
View the file
Other files
Show 40 more
Latest 50 of 246 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 2794, Pg 1
COST AND SOFTWARE DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
| 1. MAJOR PROGRAM | a. NAME: | APT - Advanced Pilot Training | ||||||||||
| b. PHASE/MILESTONE | c. PRIME MISSION PRODUCT | 2. WBS SYSTEM TYPE | 3. SUBMISSION TYPE | 4. CURRENT SUBMISSION DATE (YYYYMMDD) | 5. LAST APPROVED PLAN DATE (YYYYMMDD) | |||||||
| Pre-A | B | C-FRP | Advanced Pilot Training (APT) ICS | Aircraft System | X | INITIAL | ||||||
| A | C-LRIP | X | O&S | CHANGE | 20160525 | |||||||
| 6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code) | 6b. TELEPHONE NUMBER (Include Area Code) | 6c. FAX NUMBER (Include Area Code) | 6d. E-MAIL ADDRESS | |||||||||
| Tiffany Ehresman |
1970 Monahan Way (Bldg 11A)
| Wright-Patterson AFB, OH 45433 | 937-904-4185 | 937-656-6316 | Tiffany.Ehresman@us.af.mil | ||||||||||||||
| 7. PLAN TYPE | 8. PREPARING ORGANIZATION | 9a. CONTRACTOR NAME/ADDRESS | 9b. CONTRACT NUMBER | 9c. APPROPRIATION | 10. APPROVED PLAN NUMBER | ||||||||||||
| PROGRAM | X | CONTRACT (PRIME) | i. PERFORMING ORGANIZATION | ii. DIVISION | TBD | RDT&E | AF-16-B-C2 | ||||||||||
| CONTRACT (SUB) | AFLCMC/WLZ | TBD | X | PROCUREMENT | |||||||||||||
| O&M | |||||||||||||||||
| 11. WBS ELEMENT CODE | 12. | ||||||||||||||||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | ||||||||||||||||
| (X if applicable) | DD 1921-3 (CBDR): | DD 1921-1 / 1921-5 EAC: | EVM Reporting: | ||||||||||||||
| X | X | ||||||||||||||||
| a. PROGRAM/ | |||||||||||||||||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | ||||||||||||||||
| SUBCONTRACT | a. CWBS | ||||||||||||||||
| DICTIONARY | CCDR | g. SRDR | |||||||||||||||
| FORMATS | h. IPMR |
FORMAT 1
| b. DD 1921 | ||||||||||||||||
| (CDSR) | c. DD 1921-1 | |||||||||||||||
| (FCHR) | d. DD 1921-2 | |||||||||||||||
| (PCR) | e. DD 1921-5 | |||||||||||||||
| (SFCHR) | f. EAC | |||||||||||||||
| 1.9.5 | 1.0 | Sustainment Effort | X | X | X | X | X | |||||||||
| 1.9.5 | 1.1 | Unit-Level Manpower (System Level Cost Only) | X | N/A | ||||||||||||
| 1.9.5 | 1.2 | Unit Operations (System Level Cost Only) | X | N/A | ||||||||||||
| 1.9.5 | 1.3 | Maintenance | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.1 | Consumables and Repair Parts | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.1.1 | Airframe/Hull/Vehicle Consumables and Repair Parts | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.1.2 | Propulsion Consumables and Repair Parts | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.1.3 | Electronics/Avionics Consumables and Repair Parts | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.1.4 | Other Major Subsystem Consumables and Repair Parts 1..n (Specify) | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.1.5 | Other Consumables and Repair Parts | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.2 | Depot Level Reparables (DLRs) / Repair of Reparables (RORs) | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.2.1 | Airframe/Hull/Vehicle DLRs | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.2.2 | Propulsion DLRs | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.2.3 | Electronics/Avionics DLRs | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.2.4 | Other Major Subsystems DLRs 1..n (Specify) | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.2.5 | Other DLRs | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.3 | Intermediate Maintenance | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.3.1 | Intermediate Maintenance Consumable Materials and Repair Parts | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.3.2 | Intermediate-Level Government Maintenance | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.3.3 | Intermediate-Level Contractor Maintenance | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.3.4 | Other Intermediate-Level Maintenance | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.4 | Depot Maintenance | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.4.1 | Scheduled Overhaul | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.4.1.1 | Airframe/Hull/Vehicle Scheduled Overhaul | X | N/A | ||||||||||||
| 1.9.5 | 1.3.4.1.2 | Propulsion Scheduled Overhaul | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.4.1.3 | Electronics/Avionics Scheduled Overhaul | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.4.1.4 | Other Major Subsystems Scheduled Overhaul 1..n (Specify) | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.4.1.5 | Other Scheduled Overhaul | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.4.2 | Unscheduled Overhaul | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.4.2.1 | Airframe/Hull/Vehicle Unscheduled Overhaul | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.4.2.2 | Propulsion Unscheduled Overhaul | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.4.2.3 | Electronics/Avionics Unscheduled Overhaul | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.4.2.4 | Other Major Subsystems Unscheduled Overhaul 1..n (Specify) | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.4.2.5 | Other Unscheduled Unscheduled Overhaul | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.5 | Other Maintenance | X | X | X | X | ||||||||||
| 1.9.5 | 1.3.6 | Packing, Handling, Shipping and Transportation | X | X | X | |||||||||||
| 1.9.5 | 1.4 | Sustaining Support (System Level Cost Only) | X | X | X | X | ||||||||||
| 1.9.5 | 1.4.1 | System Specific Training | X | X | X | X | ||||||||||
| 1.9.5 | 1.4.1.1 | Operator Training | X | X | X | |||||||||||
| 1.9.5 | 1.4.1.2 | Maintenance Training | X | X | X | |||||||||||
| 1.9.5 | 1.4.1.3 | Other Training | X | X | X | |||||||||||
| 1.9.5 | 1.4.2 | Support Equipment Replacement and Repair | X | X | X | X | ||||||||||
| 1.9.5 | 1.4.2.1 | Support Equipment Replacement | X | X | X | |||||||||||
| 1.9.5 | 1.4.2.2 | Support Equipment Repair | X | X | X | |||||||||||
| 1.9.5 | 1.4.3 | Sustaining/Systems Engineering | X | X | X | X | X | |||||||||
| DD FORM 2794, AUGUST 2015 | PREVIOUS EDITION IS OBSOLETE | |||||||||||||||
| 11. WBS ELEMENT CODE | 12. | |||||||||||||||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | |||||||||||||||
| (X if applicable) | DD 1921-3 (CBDR): | DD 1921-1 / 1921-5 EAC: | EVM Reporting: | |||||||||||||
| X | X | |||||||||||||||
| a. PROGRAM/ | ||||||||||||||||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | |||||||||||||||
| SUBCONTRACT | a. CWBS | |||||||||||||||
| DICTIONARY | CCDR | g. SRDR | ||||||||||||||
| FORMATS | h. IPMR |
FORMAT 1
| b. DD 1921 | |||||||||||
| (CDSR) | c. DD 1921-1 | ||||||||||
| (FCHR) | d. DD 1921-2 | ||||||||||
| (PCR) | e. DD 1921-5 | ||||||||||
| (SFCHR) | f. EAC | ||||||||||
| 1.9.5 | 1.4.3.1 | Reliability And Maintainability Engineering | X | X | X | ||||||
| 1.9.5 | 1.4.3.2 | Logistics Engineering (LSA Updates, Logistics Analysis) | X | X | X | ||||||
| 1.9.5 | 1.4.3.3 | Supply Analysis Efforts | X | X | X | ||||||
| 1.9.5 | 1.4.3.4 | Safety/Human Systems Integration Engineering | X | X | X | ||||||
| 1.9.5 | 1.4.3.5 | Affordability Engineering | X | X | X | ||||||
| 1.9.5 | 1.4.3.6 | Obsolescence Engineering | X | X | X | ||||||
| 1.9.5 | 1.4.3.7 | Availability Management | X | X | X | ||||||
| 1.9.5 | 1.4.3.8 | Product Engineering Support | X | X | X | ||||||
| 1.9.5 | 1.4.3.9 | Certification and Accreditation | X | X | X | X | |||||
| 1.9.5 | 1.4.3.10 | Configuration Management | X | X | X | ||||||
| 1.9.5 | 1.4.3.11 | System Performance Analysis | X | X | X | ||||||
| 1.9.5 | 1.4.3.12 | Supply | X | X | X | ||||||
| 1.9.5 | 1.4.3.13 | Data Analysis | X | X | X | ||||||
| 1.9.5 | 1.4.3.14 | Physical Security | X | X | X | ||||||
| 1.9.5 | 1.4.4 | Program Management | X | X | X | X | X | ||||
| 1.9.5 | 1.4.4.1 | Contractor Logistics Support (CLS) Management | X | X | X | ||||||
| 1.9.5 | 1.4.4.2 | CLS Supply Management | X | X | X | ||||||
| 1.9.5 | 1.4.4.3 | Financial/Schedule Planning and Reporting | X | X | X | ||||||
| 1.9.5 | 1.4.4.4 | Transition to Lead Service | X | X | X | ||||||
| 1.9.5 | 1.4.4.5 | Quality Assurance (Program Level) | X | X | X | ||||||
| 1.9.5 | 1.4.4.6 | Administrative Security | X | X | X | ||||||
| 1.9.5 | 1.4.4.7 | Transition to Performance Based Logistics (PBL) | X | N/A | |||||||
| 1.9.5 | 1.4.4.8 | Risk Mitigation | X | X | X | ||||||
| 1.9.5 | 1.4.5 | Information Systems | X | N/A | |||||||
| 1.9.5 | 1.4.6 | Data and Technical Publications | X | X | X | X | X | ||||
| 1.9.5 | 1.4.7 | Simulator/Training Device Operations and Repair | X | N/A | |||||||
| 1.9.5 | 1.4.8 | Other Sustaining Support (Specify in Remarks) | X | N/A | |||||||
| 1.9.5 | 1.5 | Continuing System Improvements | X | X | X | X | |||||
| 1.9.5 | 1.5.1 | Hardware Modifications | X | N/A | |||||||
| 1.9.5 | 1.5.2 | Software Support | X | X | X | X | X | ||||
| 1.9.5 | 1.5.2.1 | Software Changes | X | X | X | X | |||||
| 1.9.5 | 1.5.2.1.1 | Release 1...n (Specify) | X | X | X | X | |||||
| 1.9.5 | 1.5.2.1.1.1 | WBS Name 1...n (Specify) | X | X | X | X | |||||
| 1.9.5 | 1.5.2.1.1.1.1 | Correction of Deficiencies | X | X | X | ||||||
| 1.9.5 | 1.5.2.1.1.1.2 | Enhancements | X | X | X | ||||||
| 1.9.5 | 1.5.2.2 | Software License Management | X | X | X | ||||||
| 1.9.5 | 1.5.2.3 | System Facilities | X | X | X | ||||||
| 1.9.5 | 1.5.2.4 | Field Software Engineering (FSE) | X | X | X | X | |||||
| 1.9.5 | 1.5.2.5 | Operational Management | X | X | X | X | |||||
| 1.9.5 | 1.6 | Installation and Personnel Support (System Level Only) | X | N/A | |||||||
| Subtotal Cost | X | X | |||||||||
| Reporting Contractor G&A | X | X | |||||||||
| Reporting Contractor Undistributed Budget | X | X | |||||||||
| Reporting Contractor Management Reserve | X | X | |||||||||
| Reporting Contractor FCCM | X | X | |||||||||
| Total Cost | X | X | |||||||||
| Reporting Contractor Profit/Loss or Fee | X | X | |||||||||
| Total Price | X | X | |||||||||
| DD FORM 2794, AUGUST 2015 | PREVIOUS EDITION IS OBSOLETE |
&R&8Solicitation FA8617-17-R-6219 Section J - Attachment 10g APT ICS CSDR Plan Industry Release AF-16-B-C2
DD Form 2794, Pg 2
| 14. CSDR SUBMISSION DATES | |||||||
| a. | |||||||
| SUBMISSION | b. | ||||||
| FORM(S) | c. | ||||||
| EVENT | d. | ||||||
| REPORT TYPE | e. AS OF DATE | f. DUE DATE | |||||
| (YYYYMMDD) | (YYYYMMDD) | ||||||
| 1 | CWBS Dictionary | ICS Year 1 CWBS Dictionary | Final | 20240831 | 20241031 | ||
| 2 | 1921, 1921-5 | ICS Year 1 Complete | Final | 20240831 | 20241031 | ||
| 3 | SRDR Development | ICS Year 1 Complete - Software Maintenance | Final | 20240831 | 20241031 | ||
| 4 | 1921, 1921-5 | ICS Year 2 Complete | Final | 20250831 | 20251031 | ||
| 5 | CWBS Dictionary | ICS Year 2 CWBS Dictionary | Final | 20250831 | 20251031 | ||
| 6 | SRDR Development | ICS Year 2 Complete - Software Maintenance | Final | 20250831 | 20251031 | ||
| 7 | 1921, 1921-5 | ICS Year 3 Complete | Final | 20260831 | 20261031 | ||
| 8 | CWBS Dictionary | ICS Year 3 CWBS Dictionary | Final | 20260831 | 20261031 | ||
| 9 | SRDR Development | ICS Year 3 Complete - Software Maintenance | Final | 20260831 | 20261031 | ||
| 10 | 1921, 1921-5 | ICS Year 4 Complete | Final | 20270831 | 20271031 | ||
| 11 | CWBS Dictionary | ICS Year 4 CWBS Dictionary | Final | 20270831 | 20271031 | ||
| 12 | SRDR Development | ICS Year 4 Complete - Software Maintenance | Final | 20270831 | 20271031 | ||
| 13 | 1921, 1921-5 | ICS Year 5 Complete | Final | 20280831 | 20281031 | ||
| 14 | CWBS Dictionary | ICS Contract Completion | Final | 20280831 | 20281031 | ||
| 15 | SRDR Development | ICS Year 5 Complete - Software Maintenance | Final | 20280831 | 20281031 | ||
| 15. REMARKS | |||||||
| Non-Recurring/Recurring Definitions: | |||||||
| Refer to the specific definitions and requirements in the CSDR Manual (DoD 5000.04-M-1) and the definitions in the DIDs for the DD Forms 1921, 1921-1 and 1921-2. Any refinements or expansions of these definitions must be agreed to in the pre-contract or post contract award conference between the PM/CWIPT and the reporting contractor and approved by the OSD CAIG Chair before being incorporated into the contract. The contractor will utilize the specific definitions and requirements in the CSDR Manual (DoD 5000.04-M-1) and the definitions in the DIDs for the DD Forms 1921, 1921-1 and 1921-2 to segregate recurring and nonrecurring costs. Refinements or expansions to these definitions are TBD pending the pre-contract or post contract award conference. Recurring cost results from repetitive activities that vary with the quantity being produced. Nonrecurring cost results from non-repetitive activities that do not vary with the quantity being produced. The above definitions apply to any system life cycle phase or appropriation. Further amplification: | |||||||
| Prime Mission Equipment (PME): | |||||||
| In the all phases, recurring hardware costs include fabrication; assembly; procurement of raw materials, purchased parts and equipment, and major and minor subcontracts; integration; installation and checkout; and quality control/assurance/inspection. | |||||||
| Nonrecurring PME activities include design and development effort such as preliminary, critical prototype and test article design activities, and software design and maintenance, regardless of whether the purpose is to correct deficiencies or add capabilities. Hardware components, subassemblies, assemblies with less than 100% complete design are considered nonrecurring developmental items with additional design work required before they can become production representative. Pre-production activities such as production planning and production line maintenance line set-up are nonrecurring. In the development phases, hardware component costs are nonrecurring until such times as those components are no longer prototypical but are protoqual, i.e. ready to be delivered on a recurring basis as production representative. Components, sub-assemblies, assemblies with 100% complete design are considered production representative. Test articles built to an operational configuration are considered production representative. The costs of production representative items are recurring. Subcontractor, vendor, and supplier cost should be obtained and reported in recurring and nonrecurring categories, wherever reasonably possible. (If vendor amortizes their nonrecurring costs across a lot buy resulting in non-visibility of a recurring/nonrecurring split, annotate as such.) | |||||||
| Non-PME | |||||||
| System Test and Evaluation (ST&E) activities are typically nonrecurring such as non-production-representative test articles built for testing purposes only such as test stands, wind tunnel models, bench and coupon test articles; structural development, static, fatigue, software, and ballistics testing; stress analysis; flight, ground, or sea testing of system properties; redesign as a result of testing; and retesting efforts. | |||||||
| System Engineering, Program Management, and Data activities occur throughout the system life cycle and are supportive in nature; as such, these costs take on the characteristics of the underlying activities being performed. | |||||||
| Nonrecurring cost categories include design and development of Support Equipment and Training devices; Support Equipment and Training activity such as initial equipment design and test efforts, test program sets, initial courseware development, and simulator development are nonrecurring. Training and Support Equipment efforts are recurring when they pertain to repetitive activities that vary with the quantity of training devices or support items being produced. | |||||||
| Operational/Site Activation efforts are typically nonrecurring. Consider select Operational/Site Activation as recurring when the activity pertains to a series of sites or organization and those activities repetitively repeat for each site. | |||||||
| Initial Spares and Repair Parts are recurring as they pertain to repetitively producing hardware. | |||||||
| Industrial Facilities are nonrecurring as well as nonrecurring tooling activities such as special test equipment, special tooling, procurement of initial and rate tooling, tool replacement (with exact same tool), and tool modification (to accommodate product configuration changes). For situations not explicitly addressed above, categorize any cost as recurring if it represents repetitive effort that is sensitive to quantity. | |||||||
| Software Systems Engineering and Software Program Management are only to be populated on 1921 reports if Systems Engineering and Program Management are discretely identified on the SRDR. The values on the 1921 reports shall be consistent with the values on the SRDR reports. | |||||||
| Cost Accounting Standards (CAS) Disclosure Statement Differences: | |||||||
| Refer to the specific definitions and requirements in the CSDR Manual (DoD 5000.04-M-1) and the definitions in the DIDs for the DD Forms 1921, 1921-1 and 1921-2. Any refinements or expansions of these definitions must be agreed to in the pre-contract or post contract award conference between the PM/CWIPT and the reporting contractor and approved by the OSD CAIG Chair before being incorporated into the contract. The contractor will utilize the specific definitions and requirements in the CSDR Manual (DoD 5000.04-M-1) and the definitions in the DIDs for the DD Forms 1921, 1921-1 and 1921-2 to segregate recurring and nonrecurring costs. Refinements or expansions to these definitions are TBD pending the pre-contract or post contract award conference. | |||||||
| Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable. | |||||||
| 1921-3 Contractor Business Data Report: | |||||||
| The DD Form 1921-3 is a mandatory requirement for all prime contractors and subcontractors performing work on contracts which contain CSDR requirements. As such, the contractor must ensure that its FPR business entity submits a completed DD Form 1921-3 within 60 days subsequent to the end of the contractor’s fiscal year. Only one DD Form 1921-3 submission is required per Rev 5, 20090603 5 FPR business entity, independent of the number of contracts with CSDR requirements held by the business entity. | |||||||
| a. The Contractor Business Data Report is prepared by and for the business entity (e.g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government. b. Reports are submitted annually at the end of the contractor's fiscal year. c. Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years. | |||||||
| DD Form 1921-2, Progress Curve Report (If Required): | |||||||
| a. Unit or Lot Reporting: Reporting to be provided by UNIT/LOT. b. Product Characteristics: 1921-2 must include the WEIGHT and POWER. Note on 1921-2 remarks: CWIPT determines Unit or Lot reporting and product characteristics to be collected for Progress Curve report. DCARC Analyst must update comments as applicable. | |||||||
| Final Cost Report to be submitted when final end item has been delivered and accepted by the government (e.g., as evidenced by a completed DD 250) and 95% or more of total contract costs have been incurred | |||||||
| Sustainment: Contractor shall provide the following Quantity information in the Remarks section of the 1921 and 1921-5: number of systems supported by this contract, and number of repairs performed. The Contractor must state the nominal capacity planned for each Delivery Order (e.g., the # of repairs, # of overhauls, # of flight hours, etc.) identified in the plan. This requirement is intended to capture what services are being bought with each effort. | |||||||
| DD FORM 2794 (PAGE 2), AUGUST 2015 | PREVIOUS EDITION IS OBSOLETE |