Addendum 2.pdf
PDF 2 MB Posted
- Attached to
- Parkersburg Armory Boiler(s) Replacement
- Solicitation number
- CRFQ-0603-ADJ2500000034-4
- Issued by
- Upshur County, West Virginia
About this file
This is Addendum No. 2 for a Centralized Request for Quote (CRFQ) issued by the West Virginia Army National Guard for the Parkersburg Armory Boiler(s) Replacement project. The solicitation (CRFQ ADJ2500000034) involves removing and disposing of existing boilers and installing two new water tube boilers at the Parkersburg National Guard Armory. The bid opening date has been moved to May 6, 2025, at 1:30 pm EST, and the addendum includes responses to vendor technical questions from a pre-bid meeting held on April 17, 2025.
The addendum provides critical technical clarifications, including specifications that boilers must be water tube design, confirmation that existing tanks above boilers will be removed, and details about additional equipment replacements. These include a 5HP, 80-gallon air compressor, a wall-hung air dryer, and requirements that all existing and new hydronic piping in the mechanical room must be insulated. The agency will evaluate any proposed "equal" boilers based on meeting all design specifications provided during the bidding process, with the final determination made by the agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date Printed: Apr 24, 2025 Page: 1 FORM ID: WV-PRC-CRFQ-002 2020/05
Department of Administration Purchasing Division 2019 Washington Street East Post Office Box 50130 Charleston, WV 25305-0130
State of West Virginia Centralized Request for Quote
Proc Folder: 1666305 Reason for Modification:
Doc Description: Parkersburg Armory Boiler(s) Replacement Addendum No. 2
Proc Type: Central Purchase Order
Date Issued Solicitation Closes Solicitation No Version
2025-04-24 2025-05-06 13:30 CRFQ 0603 ADJ2500000034 3
BID RECEIVING LOCATION
BID CLERK
DEPARTMENT OF ADMINISTRATION
PURCHASING DIVISION
2019 WASHINGTON ST E
CHARLESTON WV 25305
US
VENDOR
Vendor Customer Code:
Vendor Name :
Address :
Street :
City :
State : Country : Zip :
Principal Contact :
Vendor Contact Phone: Extension:
FOR INFORMATION CONTACT THE BUYER
David H Pauline 304-558-0067 david.h.pauline@wv.gov
Vendor Signature X FEIN# DATE
All offers subject to all terms and conditions contained in this solicitation
Date Printed: Apr 24, 2025 Page: 2 FORM ID: WV-PRC-CRFQ-002 2020/05
ADDITIONAL INFORMATION
Addendum No. 2
1. Provide copies of the Pre-Bid meeting sign-in sheets (see attached)
2. Provide responses to Vendor Technical questions (see attached)
3. To move the bid opening date to May 6, 2025, 1:30 pm., EST.
No other changes.
INVOICE TO SHIP TO
ADJUTANT GENERALS
OFFICE
PARKERSBURG NATIONAL
GUARD ARMORY
1707 COONSKIN DR 1500 BLIZZARD DR
CHARLESTON WV PARKERSBURG WV
US US
Line Comm Ln Desc Qty Unit Issue Unit Price Total Price 1 Parkersburg Armory Boilers Replacement
Comm Code Manufacturer Specification Model #
72151002
Extended Description:
Input Pricing on Exhibit "A" Form
Provide Labor, materials and all associated costs to remove and dispose of boilers, and to install two (2) new boilers per the attached specifications.
SCHEDULE OF EVENTS
Line Event Event Date 1 Mandatory Prebid Meeting At 10:00 am., est. 2025-04-17 2 Vendory Technical Questions Due By 11:00 am., est. 2025-04-22
SOLICITATION NUMBER: CRFQ ADJ2500000034
Addendum Number: 2
The purpose of this addendum is to modify the solicitation identified as (“ADJ2500000034”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
☒ Modify bid opening date and time.
☐ Modify specifications of product or service being sought.
☒ Attachment of vendor questions and responses.
☒ Attachment of pre-bid sign-in sheet.
☐ Correction of error.
☐ Other.
Description of Modification to Solicitation:
1. Provide copies of the Pre-Bid meeting sign-in sheets (see attached)
2. Provide responses to Vendor Technical questions (see attached)
3. To move the bid opening date to May 6, 2025, 1:30 pm., EST.
No Other Changes.
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provisions of the Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Solicitation by completing an Addendum Acknowledgment, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
Solicitation Number: ADJ2500000034 --------------
Pre-Bid Sign-In Sheet Date of Pre-Bid Meeting: April 17th, 2025 ------------ Location of Prebid Meeting: Parkersburg, WV
Please Note:
Vendors must sign-in on this sheet to verify attendance at the Pre-Bid meeting.
Failure to legibly sign in may be grounds for declaring a vendor ineligible to bid.
For further verification, please also provide a business card if possible.
Firm Represented:* Rep Name {Printed): Firm Address:
·q1p~ -- -- 4£> I j_ rtd,.. :3t:.r~e-t-lec~.~ \.J o hf"L J~n r 'Ac {
Cv.4o 1ec1,,.,r,,,1 e, ... ff C-v.t,,, 15 4 rJ leoY\ 5,,..//.'v,ti.
J.JtlV fLN ,1o L!tr. ,. t.Jc/
Telephone#: Fax#: Email:
~ 0 ~Vh j e.nn ,' n~~ -o ~S,2.__f)
I ~0 c.t, > e, ,- o5lf 11 cw,'b.,I\ l~k' ,..L-UD>,U1'Qil s--rn l l\t:~ 1,-ut:,~ m ~70JTI 1p.rm;e:CI;C\)\\U;ll\C0\91l«JY'
&~ 3~1/-8ft-oJi J
· ¼JO lfJ P~ 30~ 'Si3-~o3i f{ t~C<,J~+-.+ect .c0~
*One Vendor Per Representative - No one individual is permitted to represent more than one vendor at the pre-bid meeting. Any individual that does attempt to represent two or more vendors will be required to select one vendor to which the individual 's attendance will be attributed. The vendors not selected will be deemed to have not attended the pre-bid meeting unless another individual attended on their behalf.
Solicitation Number: ADJ2500000034 --------------
Pre-Bid Sign-In Sheet Date of Pre-Bid Meeting: April 17th, 2025 ------------ Location of Prebid Meeting: Parkersburg, WV
Please Note:
Vendors must sign-in on this sheet to verify attendance at the Pre-Bid meeting.
Failure to legibly sign in may be grounds for declaring a vendor ineligible to bid.
For further verification, please also provide a business card if possible.
Firm Re~resented:* Re~ Name (Printed}: Firm Address:
OS() f?r;,5 sis 7rvl Av (2 •
M-eclv,-,,'c~ I 1-f~rle>...S S'<J,;..{J, ctq_s. w v zs--30-3
, - c~ f.o. l~y._ S J /)Qe,-t-ed\ fY)}. /kJ;o WV U,61c1 p 6M 1 ~ ~;" f'[ <,_ c, tfr. ·c ->l'h- . } 4 b(J)C? >0 rA 5,r,~
Ch6rler-ro,. '1/() i,sJ~'I
J o t/f'l~t>N /:fot/£/Z 6°? 11'J;I-µ, F~~: fr 6/
£41 (///5r 8£11/ t(L)?D /))c) (/JOe)c?
~t>\k\\ 1(\( L.offl (\ A \\,V\ \10 'S\-f{0t,wf\ \<_ Qtf\t
\ rc-..-..,0 ~o.tt\\ ~~ ~~ \1,(\ ~\J CU,2,SO c:.. E:t..:;;- V fell ~c.,,:[_ Po 8oA. '-( I~
--r1.P11( t+-f 1 a,b!?t!J1v 1 ·~ \ii.
Tele~hone #: Fax#: Email:
J(J'1-7V'-/ - bl,et.,./eJS ~ 0SOJ#t,e.cA ~'179
,'~O'f CPS') q L/13 c-+,')kr@-\-ru.~k.h~v.c°""
1"'t-12s-- Jo 'IA 9 t.J" - er,·c S1-t.,':-f-'i@
664't '-/ 2 ~6 Jc,""1"f l'T'zCd. Co""'--
~'f ,)_~ ;J_X)7C, ,-r-~£,r~ f o fltV':DN
"3t>t./ cJ- ~).,~
1io l{ -, '2,\-']l,\C\l\ f Dwt \ \ i "(JJ~ yc-c ~OO,Co n,,, .5- AI~, ~ h ~ u, '11U>d}rl-lOIO i/2-6} ~ -:).t//J8 jct j11tr1t1't&:J -err
CC)W1
lJ!),ta ,_a,A-t..
*One Vendor Per Representative - No one individual is permitted to represent more than one vendor at the pre-bid meeting. Any individual that does attempt to represent two or more vendors will be required to select one vendor to which the individual 's attendance will be attributed. The vendors not selected will be deemed to have not attended the pre-bid meeting unless another individual attended on their behalf m
DEPARTMENT OF THE ARMY
JOINT FORCES HEADQUARTERS WEST VIRGINIA
1707 COONSKIN DRIVE
CHARLESTON, WEST VIRGINIA 25311-1026
April 24, 2025
ADDENDUM NO. 2- CRFQ-ADJ2500000034
RE:
TO:
FROM:
NOTE:
Construction - Parkersburg Armory Boiler(s) Replacement West Virginia Army National Guard Parkersburg Armory, Parkersburg, WV
Prospective Bidders
West Virginia Army National Guard
This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents.
PART 1-INFORMATION FOR BIDDERS
Bid opening date is moved to May 6, 2025 @ 1 :30 pm EST
PART 2 - BIDDERS' QUESTIONS AND RESPONSES
Question No. 1: Please consider adding Lochinvar as an acceptable boiler manufacturer- for Parkersburg Armory?
Response No. 1: The Lochinvar boiler requested is not acceptable due to it being a fire tube boiler and not a water tube boiler.
Question No. 2: I have the following questions for Project ID 2025-00CA Parkersburg Boiler Project, are the tanks above the boilers being removed?
Response No. 2: Yes.
Question No. 3: Air compressors being removed or replaced, if so how many and get the specs?
Response No. 3: Air compressor is being replaced with one (1) air compressor large enough for continuous use.
Question No. 4: Pumps for the boiler being re-used?
Response No. 4: Pumps in the middle of the floor are to remain . Contractors need to refer to manufacturers' recommendations on any new pumps that may need to be installed.
Question No. 5: During the pre-bid there seems to be some confusion as to what controls the existing boiler and what will be needed for the control operations of the new boilers? Please advise.
Response No. 5: The new boilers shall have stand alone controls provided from the boiler manufacturer that operate off of a temperature sensor installed in a well on the supply piping and an outside air temperature sensor to provide an outdoor air reset. Successful bidder will be responsible for checking existing control valves in each area of building to verify proper functioning of equipment once the installation of new boilers is complete.
Question No. 6: Can we use a Lochnivar FBN1501 Crest Boiler?
Response No. 6: No, boiler must be a water tube boiler design. Crest boiler is a fire tube boiler.
Question No. 7: The number for an replacement air compressor is not a good number? How many gallon air compressor, HP? Voltage?
Response No. 7: 5HP, 80 gallon. Contractor to verify voltage before ordering any equipment.
Question No. 8: Confirming that you also want a wall hung replacement air dryer?
Response No. 8: Yes.
Question No. 9: Confirming that all the hydronic piping in the mechanical room gets insulated.?
Response No. 9: Yes, all existing and new piping is to be insulated.
Question No. 10: Who decides if an "equal" boiler meets specs? A State rep or the Boiler salesman that attends all the Prebids??
Response No. 10: All boilers submitted to be equal must meet all design specifications provided during bidding and are evaluated by the agency.
END OF ADDENDUM
ADDENDUM ACKNOWLEDGEMENT FORM
SOLICITATION NO.: CRFQ ADJ2500000034
Instructions: Please acknowledge receipt of all addenda issued with this solicitation by completing this addendum acknowledgment form. Check the box next to each addendum received and sign below.
Failure to acknowledge addenda may result in bid disqualification.
Acknowledgment: I hereby acknowledge receipt of the following addenda and have made the necessary revisions to my proposal, plans and/or specification, etc.
Addendum Numbers Received:
(Check the box next to each addendum received)
☒ Addendum No. 1 ☐ Addendum No. 6
☒ Addendum No. 2 ☐ Addendum No. 7
☐ Addendum No. 3 ☐ Addendum No. 8
☐ Addendum No. 4 ☐ Addendum No. 9
☐ Addendum No. 5 ☐ Addendum No. 10
I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid. I further understand that that any verbal representation made or assumed to be made during any oral discussion held between Vendor’s representatives and any state personnel is not binding. Only the information issued in writing and added to the specifications by an official addendum is binding.
Company
Authorized Signature
Date
NOTE: This addendum acknowledgement should be submitted with the bid to expedite document processing.
| 1 |
| 1 |
| 2 |
File details come from the government source that posted it. Updated .