This Addendum No. 1 document supplements the bidding specifications for the Belgravia Remediation System Construction Support project issued by the State of Michigan Department of Technology, Management and Budget on behalf of the Michigan Department of Environmental Quality Remediation and Redevelopment Division. The project involves the installation and removal of an in-situ thermal remediation system at 125 Elkenburg Street in South Haven, Michigan, with work including permitting, procurement, mobilization, site preparation, facility construction, health and safety management, electrode and well installation, contaminated waste handling and disposal, electrical and plumbing system installation, demobilization, and project closeout documentation. The bid opening date was September 27, 2017, with an estimated Notice-to-Proceed in November 2017. The contract duration is 675 days from the Notice-to-Proceed, divided into two phases. Addendum 1 clarifies bidding requirements, includes a list of mandatory pre-bid meeting attendees, establishes prevailing wage rates as Appendix V, specifies temporary bike path construction timing with paving completion by spring 2018 if not completed before winter 2017, clarifies electrode material delivery by December 8, 2017 with contract time extensions for delayed delivery, defines City of South Haven power service responsibilities, specifies shed removal and replacement procedures on the 107 Orchard Drive Parcel, establishes water and sewer service sizing requirements, and sets forth well cover and piping vault specifications. An updated bid schedule and summary were provided, with the apparent low bidder required to attend a mandatory pre-award meeting in Lansing on September 28, 2017.
The base bid and Alternate 1 bid for the thermal remediation system expansion at 107 Orchard Drive include separate line items with unit prices and lump-sum amounts across two phases of work. Provisional allowances of $50,000 for unforeseen site conditions and $10,000 for City of South Haven power services are included in the base bid. A cash allowance of $35,000 for site restoration at the 107 Orchard Drive Parcel is specified under Alternate 1. The prevailing wage rate schedule, issued September 15, 2017, for Van Buren County and applicable subdivisions establishes hourly rates for multiple construction classifications including laborers, operating engineers, electricians, plumbers, carpenters, and other trades, with straight time, time-and-a-half, and double-time rates specified based on hours worked and day of week. Apprentice rates are provided for qualifying registered apprentices. A performance bond and payment bond are required for all bids exceeding $50,000, and a five percent bid guarantee must accompany all bids. Contractors must post prevailing wage rates on the construction site and maintain accurate records of employee names, occupations, and wages paid. The contract must be awarded by December 14, 2017.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specifications Part 4 07073.pdf | ||
| 07073 Addemdum 3.pdf | ||
| Addendum 2 07073.pdf | ||
| Specifications Part 3 07073.pdf | ||
| Specifications Part 2 07073.pdf | ||
| Specifications Part 7 07073.pdf | ||
| IMPORTANT NOTICE - SIGMA VSS.docx | DOCX document | |
| Specifications Part 5 07073.pdf | ||
| Addendum 4.pdf | ||
| Specifications Part 1 07073.pdf | ||
| Advertisement 07073.pdf | ||
| Specifications Part 6 07073.pdf | ||
| Addendum 5.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PPaaggee 11 ooff 22
STATE OF MICHIGAN Date Issued: 9/19/2017
Department of Technology, Management and Budget Index No(s): 44501
Facilities and Business Services Administration File No: 761/07073.SAR
First Floor Stevens T. Mason Building Department: MDEQ-RRD
P.O. Box 30026 Project Name: Belgravia Lansing, Michigan 48909
Subject: Remediation System Construction Support
Bid Opening Date: 9/27/2017
ADDENDUM NO. 1
TO: All Bidders
SUBJECT: Revision to the Bidding Specifications for the Belgravia Remediation System Construction Support project in South Haven, Michigan
INTENT: This Addendum is issued to further clarify the existing bidding and contract document and provide additional information to aid in the preparation of bid submittals.
Item 1 - A complete list of the prospective bidders which attended the mandatory pre-bid meeting is attached.
Item 2 – The attached Prevailing Wage Rates as provided by the State of Michigan are hereby included in the bidding specifications as Appendix V.
Item 3 – Estimated Notice-to-Proceed Date: Professional anticipates that the Notice-to-Proceed for Phase 1 will be issued in November 2017. A delay in the issuance of the Notice-to-Proceed beyond this estimated date shall not be cause for Contractor to request a Change Order.
Item 4 – Temporary Bike Path Construction Timing: The temporary bike path aggregate base and related signage shall be established before work activities interfere with use of the existing bike path.
Paving of the temporary bike path shall be completed as soon as practicable following the completion of the aggregate base construction; however, if paving of the temporary bike path before winter 2017 is not able to be completed due to seasonal asphalt plant closure, the paving shall be completed in spring 2018 within 2 calendar weeks from seasonal re-opening of asphalt plants. The Contractor shall be responsible for any re-grading of the aggregate base that may be required in spring 2018 to prepare the aggregate base for paving, with costs incidental to the project.
Item 5 – Electrode Delivery Timing: The electrode materials supplied by the Professional will be delivered to the site on or before December 8, 2017. A delay in the delivery of the electrodes beyond this estimated date shall not be cause for Contractor to request a Change Order; however, the Phase 1 Contract Time shall be extended by the number of calendar days the delivery of the electrodes is delayed beyond this estimated date.
Item 6 – City of South Haven Power Services: Direct costs for work required by the City of South Haven to be self-performed related to providing the new primary power service for operating the thermal remediation system as described in Pay Item 3C, Power Service and Transformer for Thermal Remediation System, shall be paid to Contractor under Pay Item 9B, Cash Allowance for City of South Haven Power Services. Similarly, direct costs for work required by the City of South Haven to be self-performed related to decomissioning and removing the primary power service for operating the thermal
PPaaggee 22 ooff 22 remediation system as described in Pay Item 8C, Abandon/Remove Thermal Remediation System Utility Services, shall be paid to Contractor under Pay Item 9B, Cash Allowance for City of South Haven Power Services. A general description of the work that the City of South Haven may require to be self-performd includes: running three phase down a pole near the remediation area and providing and installing cutouts and arrestor with hardware, cable, and a pole riser (as well as diconnect of these items during Phase 2 of the work). The Contractor shall communicate directly with the City of South Haven to develop a clear understanding of the services that are required by the City of South Haven to be self-performed. The Contractor shall provide all labor, materials, and equipment required for the work that is not required by the City of South Haven to be self-performed.
Item 7 – Shed on 107 Orchard Drive Parcel: Removal and replacement of the shed on the 107 Orchard Parcel shall be completed by a subcontractor selected by the Professional with costs paid under the Cash Allowance provisions of the Alternate Bid. The Contractor shall provide to the Professional a desired schedule for completion of shed removal/replacement at least 4 weeks prior to the desired shed removal/replacement date such that the work can be coordinated in advance.
Item 8 – Water and Sewer Service Sizing: Unless otherwise required by the City of South Haven and/or relevant plumbing codes, the water and sewer services provided by the Contractor for the thermal remediation system shall be sized as follows:
Water: not less than 1-inch diameter tap/piping and ¾ inch diameter meter; and
Sewer: not less than 4-inch diameter piping.
Water and sewer piping materials shall comply with the requirements of the City of South Haven and relevant plumbing codes.
Item 9 – Well Covers and Piping Vaults: Where the bid speciications require the Contractor to provide well covers and piping vaults, the covers/vaults shall be fit-for-purpose and designed for housing below-grade infrastructure, for exterior use, and for supporting foot traffic at a minimum.
Item 10 – Updated Bid Schedule: An updated bid schedule has been prepared (copy attached), which includes a new pay item, Pay Item 9B - Cash Allowance for City of South Haven Power Services. This pay item is applicable as described in Addendum No. 1 under Item 6 above.
Item 11 – Updated Bid Summary: An updated bid summary has been prepared (copy attached), which removes reference to Alternates 2 and 3.
Item 12 – Pre-Award Meeting: The apparent low bidder shall attend a mandatory pre-award meeting to be held in Lansing, Michigan on September 28, 2017 at 1:00 PM. The apparent low bidder shall provide the submittals identified in Section 00100 of the bidding specifications to the Professional at the pre-award meeting.
ACKNOWLEDGEMENT: This Addendum must be properly acknowledged on the bidder's proposal for submission of a valid proposal. The changes and information shall become part of the contract documents. (Authority: 1984 PA 431)
Sincerely, Chad Weber Senior Engineer Global Remediation Technologies, Inc.
Attachments (4)
Bidding and Contract Document (R 9/16) Project Name: Belgravia File No. 761/07073.SAR
DTMB-0401D (R 9/16)
BID SUMMARY
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
3111 W. St. Joseph Street Lansing, Michigan 48917
Bids must be submitted electronically through the Buy4Michigan website at www.buy4michigan.com
FILE NUMBER
761/07073.SAR
INDEX NUMBER
44501
DEPARTMENT/AGENCY
Michigan Department of Environmental Quality Remediation and Redevelopment Division
CONTRACT TIME(S)
675 days from Notice-to Proceed
PROJECT NAME
Belgravia
LOCATION
125 Elkenburg Street South Haven, MI 49090
BID OPENING DATE
September 27, 2017 at 2:00 pm Local Time
FOR AN EXAMINATION OF THE SITE CONTACT:
Brian M. Ross, Global Remediation Technologies, Inc.
1102 Cass Street, Traverse City, MI 49684, (231) 941-8622
SEE SECTION 00100 INSTRUCTIONS TO BIDDERS AND SECTION 00700 GENERAL CONDITIONS PROVIDED WITH THE BIDDING DOCUMENTS.
BID: WE PROPOSE TO FURNISH, PERFORM AND COMPLETE THE ENTIRE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS
IN CONSIDERATION OF THE BID PRICE (S) STATED BELOW.
FIRM NAME AND COMPLETE ADDRESS TELEPHONE NUMBER and E-MAIL ADDRESS
□ Qualified Disabled Veteran
FEDERAL I.D. NUMBER
(protected information required for processing payments)
BIDDER'S SIGNATURE AND TITLE DATE
WITNESS' SIGNATURE DATE
By signing this bid above, bidder certifies their enclosed Qualified Disabled Veteran and Michigan-Based Business Certifications.
BASE BID FROM BID SCHEDULE (Include specified Allowances):
____________________________________________________________________________Dollars $____________________ (use words) (in figures)
Alternate 1: (Add/Subtract) ______________________________________________________ Dollars $ ____________________ (use words) (in figures)
Builders Risk Insurance is NOT provided by the State of Michigan. (See Section 00700, No. 3, Paragraph 3.4.)
A PERFORMANCE BOND AND A PAYMENT BOND ARE REQUIRED FOR ALL BIDS OVER $50,000.00. EACH BID MUST BE
ACCOMPANIED BY A FIVE (5) PERCENT BID GUARANTEE.
BIDDERS ARE ALSO CAUTIONED TO FAMILIARIZE THEMSELVES WITH ALL OF THE OTHER CONDITIONS OF THE CONTRACT.
Project Scope of Work: The scope includes, but is not necessarily limited to the following items associated with the installation and removal of an in-situ thermal remediation system: permitting, procurement, planning, mobilization, site prep and facility construction; site health and safety; electrode and well installation; well development, contaminated soil and water waste handling, characterization and disposal; electrical and plumbing system installation; demobilization and site restoration; and the preparation of project close-out documentation.
The project does not include the provision of thermal remediation equipment or operation of the thermal remediation system.
The project site is contaminated, requiring that the Work be completed by Contractor(s) with hazardous waste training and experience. Personal protective equipment (PPE) necessary to safely conduct the work is the responsibility of the Contractor.
The Contractor shall manage and control both hazardous and/or nuisance vapors and dust during drilling and storage/management of contaminated waste materials, with measures potentially including but not limited to covering of drill cutting accumulation areas and waste storage containers, use of vapor suppression foam, etc.
The Bidder must figure its Base Bid on the specified, or Addendum-approved, materials and equipment only. No “or equal” or substitution proposals will be permitted after Bid opening, except as provided in the General Conditions.
Addenda: Bidder acknowledges receipt of Addenda: No. ___ dated: ________, No. ___ dated: ________ No. ___ dated:
FIRM NAME TELEPHONE NUMBER and E-MAIL ADDRESS http://www.buy4michigan.com/
BID SCHEDULE
Base Bid Schedule - The Bidder will complete the Work and accept as full payment, for the Work items listed, the following Unit
Prices and/or Item Bid Prices, as applicable:
Item No. Description Quantity Units
Unit Price
Item Bid Price
PHASE 1
1A Submittals and Site Service 1 Lump Sum
1B Mobilization 1 Lump Sum
1C Construction Field Office - Period Between Phase 1 and Phase 2 8 Month
1D Site Security Guard 12 Month
2A Temporary Bike Path 1 Lump Sum
2B Gravel Access Driveways/Parking Areas and Stone Track-Out Pad 1 Lump Sum
2C Remove Disused Extraction System Piping, Fencing and Tanks/Containment, and Disused Storm Drain Piping 1 Lump Sum
2D Abandon Existing Monitoring Wells 1 Lump Sum
2E Replace Storm Drain Piping 1 Lump Sum
2F Remove Disused Water Line 1 Lump Sum
3A Water Service for Thermal Remediation System 1 Lump Sum
3B Sanitary Sewer Service for Thermal Remediation System 1 Lump Sum
3C Power Service and Transformer for Thermal Remediation System 1 Lump Sum
4A Electrode Wells 84 Each
4B Vertical Multi-Phase Extraction Wells 54 Each
4C Temperature Sensor Wells 6 Each
4D Horizontal Vapor Extraction Wells 1 Lump Sum
4E Concrete Vapor Cap 1 Lump Sum
4F Cold Weather Installation of the Concrete Vapor Cap 1 Lump Sum
5A Shallow Dual-Phase Extraction Wells 12 Each
5B Shallow Dual-Phase Extraction System Piping, Valves, Valve Boxes 1 Lump Sum
6A Containment, Characterization, Transport & Disposal of Non- Hazardous Solid Waste 1200 Tons
6B Containment, Characterization, Transport & Disposal of Hazardous Solid Waste 200 Tons
6C Containment, Characterization, Transport & Disposal of Non- Hazardous Liquid Waste 950 Gallons
6D Containment, Characterization, Transport & Disposal of Hazardous Liquid Waste 2000 Gallons
7 Demobilization 1 Lump Sum
PHASE 2
8A Mobilization 1 Lump Sum
8B Abandon Remediation System Wells 1 Lump Sum
8C Abandon/Remove Thermal Remediation System Utility Services 1 Lump Sum
8D Fencing Removal and Replacement 1 Lump Sum
8E Bike Path Removal/Restoration 1 Lump Sum
8F Concrete Removal and Site Grounds Restoration 1 Lump Sum
8G Demobilization 1 Lump Sum
PROVISIONARY ALLOWANCE
9A Provisionary Allowance for Unforeseen Site Conditions 1 Lump Sum $50,000 $50,000
9B Cash Allowance for City of South Haven Power Services 1 Lump Sum $10,000 $10,000
Total Base Bid
Base Bid (Sum of Item Bid Prices for all Base Bid Items):
__________________________________________________________________ Dollars $__________________________
Schedule of Alternates - The Bidder will complete (or deduct from the Contract) the parts of the Work designated by the
Alternates that follow and accept in full payment (or allow in full credit) for those parts of the Work the following Item Bid Prices:
ALTERNATE 1: Thermal Remediation System Expansion – 107 Orchard
Item No. Description Quantity Units
Unit Price
Item Bid Price
PHASE 1
A.1A Submittals and Site Service 1 Lump Sum
A.1B Mobilization 1 Lump Sum
A.2 Abandon Existing Monitoring Wells 1 Lump Sum
A.3A Electrode Wells 11 Each
A.3B Vertical Multi-Phase Extraction Wells 8 Each
A.3C Horizontal Vapor Extraction Wells 1 Lump Sum
A.3D Concrete Vapor Cap 1 Lump Sum
A.3E Cold Weather Installation of the Concrete Vapor Cap 1 Lump Sum
A.4A Containment, Characterization, Transport & Disposal of Non- Hazardous Solid Waste 150 Tons
A.4B Containment, Characterization , Transport & Disposal of Hazardous Solid Waste 20 Tons
A.4C Containment, Characterization , Transport & Disposal of Non- Hazardous Liquid Waste 50 Gallons
A.4D Containment, Characterization, Transport & Disposal of Hazardous Liquid Waste 100 Gallons
A.5 Demobilization 1 Lump Sum
PHASE 2
A.6A Mobilization 1 Lump Sum
A.6B Abandon Remediation System Wells 1 Lump Sum
A.6C Concrete Vapor Cap Removal 1 Lump Sum
A.6D Demobilization 1 Lump Sum
CASH ALLOWANCE
A.7 Cash Allowance for Site Restoration at 107 Orchard Drive Parcel 1 Lump Sum $35,000 $35,000
Total Alternate 1
Alternate Bid (Sum of Item Bid Prices for all Alternate Bid Items):
__________________________________________________________________ Dollars $__________________________
The Bidder further acknowledges and agrees that the separate prices bid on this “Schedule of Alternates,” where they are applicable and deemed acceptable by the Owner, will be used if incorporated into the Contract when the Owner issues the Notice of Award.
State of Michigan WHPWRequest@michigan.gov
Official Request #: 1125 Requestor: MDEQ Project Description: Belgravia - In-situ thermal remediation system construction and removal support Project Number: (file #): 761/07073.SAR
Van Buren County
Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 9/15/2017 Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Asbestos & Lead Abatement Laborer Asbestos & Lead Abatement Laborer MLDC $41.30 $55.23 $69.16 H H H X X X X D Y 4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive 9/7/2017
Apprentice Rates:
Trainee 600 hours + 1 calendar year $30.22 $33.28 $41.73
Asbestos, Lead and Mold Abatement, Hazardous Material Handler Asbestos, Lead and Mold Abatement, Hazardous AS207 $40.75 $54.25 $67.75 H H H X X X X D Y Material Handler
4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive 3/27/2017
Boilermaker Boilermaker BO169 $54.70 $81.08 $107.45 H H H H H H H D Y 2/17/2015
Apprentice Rates:
1st 6 months $40.31 $59.49 $78.67
2nd 6 months $41.45 $61.21 $80.95
3rd 6 months $42.57 $62.88 $83.19
4th 6 months $43.69 $64.57 $85.43
5th 6 months $44.81 $66.24 $87.67
6th 6 months $48.63 $72.50 $96.36
7th 6 months $49.32 $73.01 $96.69
8th 6 months $51.58 $76.40 $101.21
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
County: Van Buren
Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 9/15/2017 Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Bricklayer Bricklayer and Block BR9-17-BL $44.75 $57.48 $70.20 H H H H H H H D Y Four 10s allowed M-F Make up day allowed comment 11/9/2016 Saturday Apprentice Rates:
0 - 749 hours $33.67 $41.13 $48.58
750 - 1,499 hours $35.06 $43.21 $51.36
1,500 - 2,249 hours $36.44 $45.28 $54.12
2,250 - 2,999 hours $37.83 $47.37 $56.90
3,000 - 3,749 hours $39.21 $49.43 $59.66
3,750 - 4,499 hours $40.60 $51.52 $62.44
5,250 - 6,000 hours $43.37 $55.67 $67.98
Stone, Artificial and Marble Masonry, and BR9-17-S $44.75 $57.48 $70.20 H H H H H H H D Y Pointer, Cleaner, Caulker Four 10s allowed M-F 11/9/2016
Apprentice Rates:
0-749 hours $35.06 $43.21 $51.36
750-1499 hours $36.44 $45.28 $54.12
1500-2249 hours $37.83 $47.37 $56.90
2250-2999 hours $39.21 $49.43 $59.66
3000-3749 hours $40.60 $51.52 $62.44
3750-4499 hours $41.98 $53.59 $65.20
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Carpenter Floor Layer CA-100FL $42.09 $53.76 $65.42 X X H H H H H D N Make up day allowed comment 7/5/2017 Saturday Apprentice Rates:
1st year $32.76 $39.76 $46.76
2nd year $35.09 $43.26 $51.42
3rd year $37.42 $46.75 $56.08
4th year $38.59 $48.50 $58.42
Carpenter CA-525 $41.35 $52.43 $63.50 X X H H H H H D N Make up day allowed comment 7/5/2017 Saturday Apprentice Rates:
1st year $34.70 $42.45 $50.20
2nd year $35.81 $44.12 $52.42
3rd year $38.03 $47.44 $56.86
4th year $40.24 $50.76 $61.28
Resilient Floorlayer CA-525-FL $42.09 $53.76 $65.42 X X X H H H H D N 7/5/2017
Apprentice Rates:
1st year $32.76 $39.76 $46.76
2nd year $35.09 $43.26 $51.42
3rd year $37.42 $46.75 $56.08
4th year $38.59 $48.50 $58.42
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Cement Mason Cement Mason - Four 10s allowed M-F BR9-17-CM $42.48 $53.97 $65.46 X X H X X X H D Y 11/9/2016
Apprentice Rates:
0 - 749 hours $33.68 $41.03 $48.37
750 - 1,499 hours $34.94 $42.91 $50.89
1,500 - 2,249 hours $36.20 $44.81 $53.41
2,250 - 2,999 hours $37.45 $46.68 $55.91
3,000 - 3,749 hours $38.71 $48.57 $58.43
3,750 - 4,499 hours $39.97 $50.46 $60.95
Cement Mason PL16-14 $40.88 $54.37 $67.86 H H H H H H H D Y Four 10s allowed Monday-Thursday with Friday or Saturday inclement weather make up days.
Saturday hours for inclement weather make up shall be paid straight rate unless over 40 hours worked.
Make up day allowed comment 8/18/2016 Friday or Saturday for inclement weather Apprentice Rates:
1st year $31.44 $40.21 $48.98
2nd year $34.14 $44.26 $54.38
3rd year $36.83 $48.30 $59.76
Subdivision of county Townships of South Haven, Covert, Geneva, Bangor, Hartford, Keeler, Hamilton, Lawrence, Arlington, and Columbia
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Cement Mason PL16-5 $38.30 $50.53 $62.75 H H H H H H H D Y
Four 10s allowed Monday-Thursday with Friday or Saturday inclement weather make up days.
Saturday hours for inclement weather make up shall be paid straight rate unless over 40 hours worked.
Make up day allowed comment 8/18/2016 Friday or Saturday inclement weather make up days Apprentice Rates:
1st year $29.74 $37.69 $45.63
2nd year $32.19 $41.36 $50.53
3rd year $34.63 $45.02 $55.41
Subdivision of county Twps of Bloomingdale, Waverly, Paw Paw, Decatur, Porter, Antwerp, Almena, and Pinegrove
Electrician Journeyman Electrician - Inside Wireman EC-131-IW $47.17 $67.49 $87.80 H H H H H H H D Y
Four 10s may be worked if consecutive Monday thru Thursday. Friday may be used as a makeup day.
Make up day allowed comment 8/31/2017 Friday Apprentice Rates:
1st period $21.68 $29.52 $37.36
2nd period $25.38 $35.05 $44.72
3rd period $27.13 $37.67 $48.22
4th period $28.89 $40.32 $51.74
5th period $30.66 $42.97 $55.28
6th period $34.17 $48.24 $62.30
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Sound and Communication Technician EC-131-SC $22.55 $31.35 $40.14 H H H H H H H D Y Make up day allowed 1/19/2006
Apprentice Rates:
1st 6 months $10.96 $15.80 $20.64
2nd 6 months $11.84 $17.12 $22.40
3rd 6 months $12.72 $18.44 $24.16
4th 6 months $13.60 $19.76 $25.92
5th 6 months $14.48 $21.08 $27.68
6th 6 months $15.36 $22.40 $29.44
Elevator Constructor Elevator Constructor Mechanic EL-85 $70.77 $116.32 D D D D D D D D Y comment 4/8/2013 4 tens allowed M-TH Apprentice Rates:
1st year $50.27 $75.32
2nd year $54.83 $84.44
3rd year $57.10 $88.98
4th year $61.66 $98.10
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Glazier Glazier GL-312 $33.79 $46.69 $59.59 X X X X X X X D Y
A four ten hour day work week is allowed. If 4 or more straight-time hours lost due to job being down, Friday may be scheduled as a make up day.
Make up day allowed 10/10/2014
Apprentice Rates:
1st 90 days $19.60 $25.41 $31.21
2nd 90 days $20.89 $27.34 $33.79
2nd 6 months $22.18 $29.27 $36.37
3rd 6 months $23.47 $31.21 $38.95
4th 6 months $24.76 $33.15 $41.53
5th 6 months $26.05 $35.08 $44.11
6th 6 months $27.34 $37.01 $46.69
7th 6 months $28.63 $38.95 $49.27
8th 6 months $29.92 $40.89 $51.85
9th 6 months $31.21 $42.82 $54.43
10th 6 months $32.50 $44.75 $57.01
Heat and Frost Insulator Spray Insulation - Qualified Senior Sprayer, AS25S $29.04 $42.35 X X X H H H H H N application of all products 3/31/2017
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
County: Statewide
Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Heat and Frost Insulator and Asbestos Worker Heat and Frost Insulator and Asbestos Worker AS47 $47.75 $63.01 $78.27 H H H H H H H D Y Make up day allowed comment 7/25/2017 Friday for cancelled work in a 4 10 schedule Apprentice Rates:
1st year $27.88 $35.51 $43.14
2nd year $31.85 $41.00 $50.16
3rd year $35.82 $46.50 $57.18
4th year $39.80 $52.01 $64.22
5th year $43.78 $57.51 $71.25
Ironworker Fence, Sound Barrier & Guardrail IR-25-F2 $31.95 $42.05 $52.15 X X H X X X H D Y erection/installation and Exterior Signage work
Four ten hour work days may be worked during Monday-Saturday.
3/31/2017
Apprentice Rates:
60% Level $22.99 $29.05 $35.11
65% Level $24.11 $30.68 $37.24
70% Level $25.24 $32.31 $39.38
75% Level $26.35 $33.92 $41.50
80% Level $27.47 $35.55 $43.63
85% Level $28.59 $37.18 $45.76
Heavy Hauler IR-25-HH-WEST $41.43 $52.55 $63.67 H H H H H H H D Y Make up day allowed comment 12/5/2016 If Saturday worked as a makeup day, work will be at straight time until 40 hours then time and a half
Apprentice Rates:
1st Year $26.18 $31.74 $37.30
2nd Year $29.52 $36.75 $43.98
3rd Year $34.71 $43.60 $52.50
4th Year $36.94 $46.95 $56.96
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Pre-engineered Metal Work IR-25-PE-Z2 $45.87 $56.03 $66.19 X X H X X X X D Y Make up day allowed comment 3/31/2017 4 tens allowed M-Th with Saturday make up day Apprentice Rates:
Probation 1st Year $26.83 $32.03 $37.23
1st Level $28.96 $34.92 $40.88
2nd Level $28.96 $34.92 $40.88
3rd Level $31.08 $37.79 $44.50
4th Level $33.21 $40.68 $48.15
5th Level $35.33 $43.55 $51.77
6th Level $37.46 $46.43 $55.41
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Reinforcing: any work in connection with field IR-25-REF-WEST $49.25 $61.47 $73.68 H H H H H H H D Y fabrication, post tensioning, prestressing of handling by power, rigging, crane signaling, crane assembly and dismantle, racking, sorting, cutting, bending, hoisting, placing, burning, welding, use of tie gun, and tying of all materials used to reinforce concrete construction.
Realigning of reinforcing steel, wire mesh and placing of steel dowels, as well as refastening and resetting same while concrete is being poured. The handling and placing of j or jack bar on slip form construction. The placing of all clips, bolts, and steel rods and wire fabricator mesh pertaining to gunite construction. Drilling holes in concrete for dowels used to reinforce a concrete slab, beam or wall and the use of a chemical anchoring system (such as epoxy) to secure dowels. The use of a non-metallic carbon fiber or polymer typically used to reinforce concrete. Some brand names are NEFMAC, leadline or Tokyo rope.
Make up day allowed comment 7/5/2017 If Saturday worked as a makeup day, work will be at straight time until 40 hours then time and a half
Apprentice Rates:
1st Level $31.94 $40.13 $48.32
2nd Level $31.94 $40.13 $48.32
3rd Level $33.47 $42.42 $51.37
4th Level $35.00 $44.71 $54.41
5th Level $37.87 $47.72 $57.57
6th Level $38.94 $49.31 $59.69
7th Level $42.45 $53.35 $64.25
8th Level $43.52 $54.95 $66.37
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Rigging, heavy machinery moving and related IR-25-RIG-west $49.25 $61.47 $73.68 X X X X X X X D Y tasks Make up day allowed comment 7/5/2017 Saturday Apprentice Rates:
1st Level $31.94 $40.13 $48.32
2nd Level $31.94 $40.13 $48.32
3rd Level $33.47 $42.42 $51.37
4th Level $35.00 $44.71 $54.41
5th Level $37.87 $47.72 $57.57
6th Level $38.94 $49.31 $59.69
7th Level $42.45 $53.35 $64.25
8th Level $43.52 $54.95 $66.37
Structural, ornamental, welder and pre-cast IR-25-STR-WEST $49.25 $61.47 $73.68 H H H H H H H D Y Make up day allowed comment 7/5/2017 If Saturday worked as a makeup day, work will be at straight time until 40 hours then time and a half
Apprentice Rates:
1ST LEVEL $31.94 $40.13 $48.32
2ND LEVEL $31.94 $40.13 $48.32
3RD LEVEL $33.47 $42.42 $51.37
4TH LEVEL $35.00 $44.71 $54.41
5TH LEVEL $37.87 $47.72 $57.57
6TH LEVEL $38.94 $49.31 $59.69
7TH LEVEL $42.45 $53.35 $64.25
8TH LEVEL $43.52 $54.95 $66.37
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Laborer Class A Laborer - All Construction Laborers on L355-1-A $33.19 $43.30 $53.41 X X H H H H H D Y buildings, pumps, well wheels, air, electric or gasoline tools, motor driven buggies, Laborers on fire watch duty, working on swing scaffolds, heavy construction work, confined space and FME, carpenter tender, cement finisher tender, heater tender, flagperson, except foremen and others falling within specified classifications.
Make up day allowed comment 5/31/2017 Monday - Saturday Apprentice Rates:
0-1,000 work hours $28.13 $35.71 $43.29
1,001-2,000 work hours $29.15 $37.24 $45.33
2,001-3,000 work hours $30.16 $38.75 $47.35
3,001-4,000 work hours $32.18 $41.79 $51.39
Class B Laborer - jackhammer operator, L355-1-B $33.44 $43.68 $53.91 X X H H H H H D Y crocklayer and caisson worker in buildings Make up day allowed comment 5/31/2017 Monday - Saturday Apprentice Rates:
0-1,000 work hours $28.32 $35.99 $43.67
1,001-2,000 work hours $29.35 $37.54 $45.73
2,001-3,000 work hours $30.37 $39.07 $47.77
3,001-4,000 work hours $32.42 $42.15 $51.87
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Class C Laborer - Top men on chimneys or L355-1-C $33.94 $44.43 $54.91 X X H H H H H D Y towers over thirty feet (30’) in height, material mixers, operators of portable mixers, plasterer tenders, mason tenders that have received certification from the MLTAI for mason tending, and MLTAI-certified demolition burner.
Make up day allowed comment 5/31/2017 Monday - Saturday Apprentice Rates:
0-1,000 work hours $28.70 $36.57 $44.43
1,001-2,000 work hours $29.75 $38.14 $46.53
2,001-3,000 work hours $30.79 $39.70 $48.61
3,001-4,000 work hours $32.89 $42.85 $52.81
Class D Laborer - Concrete Specialist When L355-1-D $38.39 $51.05 $63.71 X X H H H H H D Y there are no Cement Finishers available, the classification of Concrete Specialist may be utilized and shall include troweling, finishing, screeding, patching, cutting and curing of cast in place or precast concrete by any and all Make up day allowed comment 5/31/2017 Monday - Saturday Apprentice Rates:
0-1,000 work hours $32.06 $41.55 $51.05
1,001-2,000 work hours $33.33 $43.46 $53.59
2,001-3,000 work hours $34.59 $45.35 $56.11
3,001-4,000 work hours $37.12 $49.15 $61.17
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Laborer - Hazardous Class A Laborer - performing work in conjunction LHAZ-Z9-A $31.79 $44.79 $57.78 H H H H H H H D Y with site preparation and other preliminary work prior to actual removal, handling, or containment of hazardous waste substances not requiring use of personal protective equipment required by state or federal regulations; or a laborer performing work in conjunction with the removal , handling, or containment of hazardous waste substances when use of personal protective equipment level " D" is required.
Make up day allowed comment 11/7/2014 4 10s allowed M-Th or T-F; inclement weather makeup day Friday Apprentice Rates:
0-1,000 work hours $27.04 $37.66 $48.28
1,001-2,000 work hours $27.99 $39.08 $50.18
2,001-3,000 work hours $28.94 $40.51 $52.08
3,001-4,000 work hours $30.84 $43.36 $55.88
Class B Laborer - performing work in conjunction LHAZ-Z9-B $32.79 $46.29 $59.78 H H H H H H H D Y with the removal, handling, or containment of hazardous waste substances when the use of personal protective equipment levels "A", "B" or "C" is required.
Make up day allowed comment 11/7/2014 4 10s allowed M-Th or T-F; inclement weather makeup day Friday Apprentice Rates:
0-1,000 work hours $27.79 $38.78 $49.78
1,001-2,000 work hours $28.79 $40.28 $51.78
2,001-3,000 work hours $29.79 $41.78 $53.78
3,001-4,000 work hours $31.79 $44.78 $57.78
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Laborer Underground - Open Cut, Class VI Grouting man, top man assistant, audio visual LAUC-Z4-6 $31.32 $40.45 $49.57 X X X X X X X D Y television operations and all other operations in connection with closed circuit television inspection, pipe cleaning and pipe relining work & the installation and repair of water service pipe and appurtenances.
9/7/2017
Apprentice Rates:
0-1,000 work hours $27.40 $34.57 $41.73
1,001-2,000 work hours $28.19 $35.76 $43.31
2,001-3,000 work hours $28.97 $36.92 $44.87
3,001-4,000 work hours $30.54 $39.28 $48.01
Laborer Underground - Open Cut, Class I Construction Laborer LAUC-Z4-1 $33.67 $43.98 $54.27 X X X X X X X D Y 9/7/2017
Apprentice Rates:
0-1,000 work hours $29.17 $37.22 $45.27
1,001-2,000 work hours $30.07 $38.58 $47.07
2,001-3,000 work hours $30.97 $39.92 $48.87
3,001-4,000 work hours $32.77 $42.62 $52.47
Laborer Underground - Open Cut, Class II Mortar and material mixer, concrete form man, LAUC-Z4-2 $33.80 $44.17 $54.53 X X X X X X X D Y signal man, well point man, manhole, headwall and catch basin builder, guard rail builders, headwall, seawall, breakwall, dock builder and fence erector.
9/5/2017
Apprentice Rates:
0-1,000 work hours $29.26 $37.36 $45.45
1,001-2,000 work hours $30.17 $38.72 $47.27
2,001-3,000 work hours $31.08 $40.09 $49.09
3,001-4,000 work hours $32.89 $42.80 $52.71
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Laborer Underground - Open Cut, Class III Air, gasoline and electric tool operator, vibrator LAUC-Z4-3 $33.91 $44.34 $54.75 X X X X X X X D Y operator, drillers, pump man, tar kettle operator, bracers, rodder, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars, etc.), cement finisher, welder, pipe jacking and boring man, wagon drill and air track operator and concrete saw operator (under 40 h.p.), windlass and tugger man, and directional boring man.
9/7/2017
Apprentice Rates:
0-1,000 work hours $29.35 $37.50 $45.63
1,001-2,000 work hours $30.26 $38.86 $47.45
2,001-3,000 work hours $31.17 $40.22 $49.27
3,001-4,000 work hours $33.00 $42.97 $52.93
Laborer Underground - Open Cut, Class IV Trench or excavating grade man. LAUC-Z4-4 $33.98 $44.44 $54.89 X X X X X X X D Y 9/7/2017
Apprentice Rates:
0-1,000 work hours $29.40 $37.57 $45.73
1,001-2,000 work hours $30.32 $38.95 $47.57
2,001-3,000 work hours $31.23 $40.32 $49.39
3,001-4,000 work hours $33.06 $43.06 $53.05
Laborer Underground - Open Cut, Class V Pipe Layer LAUC-Z4-5 $34.10 $44.62 $55.13 X X X X X X X D Y 9/7/2017
Apprentice Rates:
0-1,000 work hours $29.49 $37.70 $45.91
1,001-2,000 work hours $30.41 $39.08 $47.75
2,001-3,000 work hours $31.33 $40.46 $49.59
3,001-4,000 work hours $33.18 $43.24 $53.29
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Laborer Underground - Open Cut, Class VII Restoration laborer, seeding, sodding, planting, LAUC-Z4-7 $29.66 $37.96 $46.25 X X X X X X X D Y cutting, mulching and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes, flagstones etc.
9/7/2017
Apprentice Rates:
0-1,000 work hours $26.16 $32.71 $39.25
1,001-2,000 work hours $26.86 $33.76 $40.65
2,001-3,000 work hours $27.56 $34.81 $42.05
3,001-4,000 work hours $28.96 $36.91 $44.85
Laborer Underground - Tunnel, Shaft & Caisson Class I - Tunnel, shaft and caisson laborer, LAUCT-Z2-1 $36.82 $48.70 $60.57 X X X X X X X D Y dump man, shanty man, hog house tender, testing man (on gas), and watchman.
9/7/2017
Apprentice Rates:
0-1,000 work hours $31.52 $40.75 $49.97
1,001-2,000 work hours $32.58 $42.34 $52.09
2,001-3,000 work hours $33.64 $43.93 $54.21
3,001-4,000 work hours $35.76 $47.11 $58.45
Class II - Manhole, headwall, catch basin LAUCT-Z2-2 $36.91 $48.83 $60.75 X X X X X X X D Y builder, bricklayer tender, mortar man, material mixer, fence erector, and guard rail builder 9/7/2017
Apprentice Rates:
0-1,000 work hours $31.58 $40.84 $50.09
1,001-2,000 work hours $32.65 $42.45 $52.23
2,001-3,000 work hours $33.71 $44.03 $54.35
3,001-4,000 work hours $35.84 $47.23 $58.61
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Class III - Air tool operator (jack hammer man, LAUCT-Z2-3 $37.01 $48.98 $60.95 X X X X X X X D Y bush hammer man and grinding man), first bottom man, second bottom man, cage tender, car pusher, carrier man, concrete man, concrete form man, concrete repair man, cement invert laborer, cement finisher, concrete shoveler, conveyor man, floor man, gasoline and electric tool operator, gunnite man, grout operator, welder, heading dinky man, inside lock tender, pea gravel operator, pump man, outside lock tender, scaffold man, top signal man, switch man, track man, tugger man, utility man, vibrator man, winch operator, pipe jacking man, wagon drill and air track operator and concrete saw operator (under 40 h.p.).
9/7/2017
Apprentice Rates:
0-1,000 work hours $31.66 $40.96 $50.25
1,001-2,000 work hours $32.73 $42.57 $52.39
2,001-3,000 work hours $33.80 $44.17 $54.53
3,001-4,000 work hours $35.94 $47.38 $58.81
Class IV - Tunnel, shaft and caisson mucker, LAUCT-Z2-4 $37.17 $49.22 $61.27 X X X X X X X D Y bracer man, liner plate man, long haul dinky driver and well point man.
9/7/2017
Apprentice Rates:
0-1,000 work hours $31.78 $41.14 $50.49
1,001-2,000 work hours $32.86 $42.76 $52.65
2,001-3,000 work hours $33.93 $44.37 $54.79
3,001-4,000 work hours $36.09 $47.61 $59.11
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Class V - Tunnel, shaft and caisson miner, drill LAUCT-Z2-5 $37.43 $49.62 $61.79 X X X X X X X D Y runner, keyboard operator, power knife operator, reinforced steel or mesh man (e.g.
wire mesh, steel mats, dowel bars) 9/7/2017
Apprentice Rates:
0-1,000 work hours $31.97 $41.43 $50.87
1,001-2,000 work hours $33.06 $43.06 $53.05
2,001-3,000 work hours $34.16 $44.71 $55.25
3,001-4,000 work hours $36.34 $47.98 $59.61
Class VI - Dynamite man and powder man. LAUCT-Z2-6 $37.74 $50.08 $62.41 X X X X X X X D Y 9/7/2017
Apprentice Rates:
0-1,000 work hours $32.20 $41.77 $51.33
1,001-2,000 work hours $33.31 $43.43 $53.55
2,001-3,000 work hours $34.42 $45.10 $55.77
3,001-4,000 work hours $36.63 $48.41 $60.19
Class VII - Restoration laborer, seeding, LAUCT-Z2-7 $30.01 $38.48 $46.95 X X X X X X X D Y sodding, planting, cutting, mulching and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes and flagstones.
9/7/2017
Apprentice Rates:
0-1,000 work hours $26.41 $33.09 $39.75
1,001-2,000 work hours $27.13 $34.17 $41.19
2,001-3,000 work hours $27.85 $35.25 $42.63
3,001-4,000 work hours $29.29 $37.41 $45.51
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Landscape Laborer Landscape Specialist includes air, gas, and diesel LLAN-Z2-A $28.25 $39.04 $49.82 X X H X X X H D Y equipment operator, skidsteer (or equivalent), lawn sprinkler installer on landscaping work where seeding, sodding, planting, cutting, trimming, backfilling, rough grading or maintenance of landscape projects occurs.
Sundays paid at time & one half. Holidays paid at double time.
10/13/2015
Skilled Landscape Laborer: small power tool LLAN-Z2-B $24.05 $32.74 $41.42 X X H X X X H D Y operator, lawn sprinkler installers' tender, material mover, truck driver on when seeding, sodding, planting, cutting, trimming, backfilling, rough grading or maintaining of landscape projects occurs Sundays paid at time & one half. Holidays paid at double time.
10/13/2015
Operating Engineer Compressor or Welding Machine EN-AC $46.07 $57.38 $68.68 X X H H D D D D Y
Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.
Make up day allowed comment 6/7/2017 Friday
Forklift or Straight Mast EN-F $47.52 $59.55 $71.58 X X H H D D D D Y
Four 10 hour days may be scheduled M-Th or T-F. Work not performed due to weather on M- Th may be scheduled on Friday Make up day allowed comment 6/7/2017 Friday
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Fireman or Oiler EN-FO $45.04 $55.83 $66.62 X X H H D D D D Y
Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.
Make up day allowed comment 6/7/2017 Friday
Lull or Extend-a-Boom Forklift en-l $53.38 $68.34 $83.30 X X H H D D D D Y
Four 10 hour days may be scheduled M-Th or T-F. Work not performed due to weather on M- Th may be scheduled on Friday Make up day allowed comment 6/7/2017 Friday
Crane with main boom & jib 120' or longer en-os120 $56.92 $80.60 $104.28 X X H H D D D D Y
Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Worked not performed due to weather, Monday-Thursday may be scheuled Friday Make up day allowed comment 6/7/2017 Friday
Crane w/ main Boom & Jib 220' or longer EN-OSA $58.03 $75.32 $92.60 X X H H D D D D Y
Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.
Make up day allowed comment 6/7/2017 Friday
Crane w/ main Boom & Jib 300' or longer EN-OSA3 $59.54 $74.73 $90.41 X X H H D D D D Y
Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work unabled to be performed due to weather, Monday- Thursday may be scheduled on Friday.
Make up day allowed comment 6/7/2017 Friday
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Crane w/ main Boom & Jib 400' or longer EN-OSA4 $61.04 $79.83 $98.62 X X H H D D D D Y
Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.
Make up day allowed comment 6/7/2017 Friday
Crane with main boom and jib 140' or longer EN-OSB $57.74 $74.88 $92.02 X X H H D D D D Y
Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work unabled to be performed due to weather, Monday- Thursday may be scheduled on Friday.
Make up day allowed comment 6/7/2017 Friday
Regular Crane Operator, Job Mechanic, EN-RC $56.06 $72.36 $88.66 X X H H D D D D Y Concrete Pump with Boom
Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.
Make up day allowed comment 6/7/2017 Friday Apprentice Rates:
0-999 hours $44.78 $56.19 $67.60
1,000-1,999 hours $46.41 $58.64 $70.86
2,000-2,999 hours $48.04 $61.08 $74.12
3,000-3,999 hours $49.67 $63.53 $77.38
4,000-4,999 hours $51.31 $65.98 $80.66
5,000-5,999 hours $52.93 $68.42 $83.90
Official Request #: 1125 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Belgravia - In-situ thermal remediation system construction and on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/07073.SAR prescribed in a contract.
Contract must be awarded by: 12/14/2017 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
Regular Engineer, Hydro Excavator & Remote en-re $55.11 $70.94 $86.76 X X H H D D D D Y Controlled Concrete Breaker
Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.
Make up day allowed comment 6/7/2017 Friday
Operating Engineer - DIVER Diver/Wet Tender/Tender/Rov Pilot/Rov Tender GLF D $52.80 $79.20 $105.60 H H H H H H H D N 4/2/2014
Operating Engineer - Marine Construction Diver/Wet Tender, Engineer (hydraulic dredge) GLF-1 $72.32 $93.82 $115.32 X X H H H H H D Y
Make up day allowed 1/23/2017
Subdivision of county all Great Lakes, islands therein, & connecting & tributary waters
Crane/Backhoe Operator, 70 ton or over Tug GLF-2 $70.82 $91.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .