Addendum 1.pdf

PDF 287 KB Posted

Attached to
Pepperhill Road Drainage
Solicitation number
83623
Issued by
Clifton Forge Town, Virginia

About this file

This is Addendum No. 1 issued by the Virginia Department of Energy for IFB #25AML08 regarding the Pepperhill Road Drainage project (Commodity Code 96273). The addendum provides clarifications through a Q&A format, addressing questions about slope repair, profile drawings, and disposal areas. Key changes include: no slope repair is required beyond securing the existing slope with erosion control blanket and supplementing the Slide Area with aggregate; profile drawings show existing rather than expected grade; and excavated material disposal will be against the Highwall near the north project area as determined by the site inspector. The bid due date has been changed to Thursday, December 19, 2024 at 2pm.

The document requires bidders to acknowledge receipt by signing and returning the addendum prior to the bid due date or attaching it to their bid submission. Contact information is provided for the AML Contracting Officer Jillian Bullock. The document includes the Virginia Department of Energy letterhead with office locations in Richmond, Big Stone Gap, and Charlottesville, along with corresponding contact information.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

December 16, 2024

ADDENDUM NO. 1 TO ALL OFFERORS:

Reference – Request for Unsealed Bid: IFB #:25AML08, Pepperhill Road Drainage Commodity: 96273

Dated: December 11, 2024 Unsealed Bids Due: See Below

The above is hereby adding additional information with the following question/answers:

1. What is the expectation of the slope repair? Any reshaping work expected?

No slope repair. We just need to secure existing slope with erosion control blanket and supplement around the Slide Area with aggregate at the discretion of the onsite inspector. The only excavation at the Slide Area will be digging the anchor trench for the erosion control blanket.

2. Are the profile drawings existing grade, or expected grade?

Profile drawings depict the existing grade.

3. Where is the onsite disposal area?

Disposal area for excavated material will likely be against the Highwall near the north of the project area.

Exact placement will be determined by on site inspector. (See image below)

4. Unsealed bids are now due on Thursday, December 19, 2024 at 2pm.

Note: A signed acknowledgment of this addendum must be received at the location indicated on the Unsealed IFB either prior to the bid due date and hour or attached to your bid. Signature on this addendum does not substitute for your signature on the original bid document. The original bid document must be signed.

Sincerely, Jillian Bullock AML Contracting Officer Phone: 276-455-6979