About this file
This is a set of engineering plans from Virginia Energy's Mined Land Repurposing Abandoned Mine Land Section for the Pepperhill Road Drainage Project located in Wise County, Virginia. The project involves drainage improvements and stabilization work including the installation/replacement of three culverts, treatment of an eroded area with No. 3 stone armor, installation of straw matting for erosion control, and construction of riprap buttresses. The plans detail site conditions through topographic maps, cross-sections, and elevation profiles showing existing ground conditions and proposed improvements.
The technical specifications require HDPE pipe with 1' minimum cover installed at 3% minimum grade, meeting ADS N-12 Poe standards. Erosion control measures include specific staple patterns and installation requirements for rolled erosion control products (RECPs), with detailed instructions for soil preparation, anchoring, and overlap requirements. The project involves coordination with existing infrastructure including a residential water line, septic tank, and access road. All construction activities must be coordinated with the Agency and require proper utility clearance through Miss Utility before excavation begins.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pepperhill Road Drainage Project
MINED LAND REPURPOSING
ABANDONED MINED LAND SECTION
Pro· ect Location Tennessee
West
Virginia
Virginia
North
Carolina
Maryland
GENERAL NOTES
1. Before performing any excavation, contact Miss Utility, (800) 810-7197, to confirm the location of any below ground utility lines in the work area.
2. Before starting the work, contact the Agency for proper clearance and be governed by the Agency's instructions.
3. The contractor is responsible for scheduling, expediting, directing, inspecting and coordinating the work so as to complete the work in the time agreed upon.
4. Work in close cooperation with the Agency and others engaged in the project so that the work will be completed in an orderly manner.
5. Provide temporary supports as may be required during construction to ensure the stability of the proposed excavation.
1000 0 1000
L�=----=--,t_•=--.__I
SCALE:1 "=1000'
INDEX OF SHEETS
DESCRIPTION
1 . Cover Sheet
2. Site Pion
3. Slide Area
4. Upper Drcin Arec
5. Driveway
6. Details
| Cover (1) |
| Pepperhill Draft Plans Site Plan |
| Slide (1) |
| Driveway (1) |
| Upper Drain (1) |
| Details (1) |
| 2024-12-06T14:11:34-0500 | |
| Holly F White |
| 2024-12-06T14:11:37-0500 | |
| Holly F White |
| 2024-12-06T14:11:41-0500 | |
| Holly F White |
| 2024-12-06T14:11:42-0500 | |
| Holly F White |
| 2024-12-06T14:11:42-0500 | |
| Holly F White |
| 2024-12-06T14:11:43-0500 | |
| Holly F White |
File details come from the government source that posted it. Updated .