Pepperhill Road Drainage_PLANS.pdf

PDF 11 MB Posted

Attached to
Pepperhill Road Drainage
Solicitation number
83623
Issued by
Clifton Forge Town, Virginia

About this file

This is a set of engineering plans from Virginia Energy's Mined Land Repurposing Abandoned Mine Land Section for the Pepperhill Road Drainage Project located in Wise County, Virginia. The project involves drainage improvements and stabilization work including the installation/replacement of three culverts, treatment of an eroded area with No. 3 stone armor, installation of straw matting for erosion control, and construction of riprap buttresses. The plans detail site conditions through topographic maps, cross-sections, and elevation profiles showing existing ground conditions and proposed improvements.

The technical specifications require HDPE pipe with 1' minimum cover installed at 3% minimum grade, meeting ADS N-12 Poe standards. Erosion control measures include specific staple patterns and installation requirements for rolled erosion control products (RECPs), with detailed instructions for soil preparation, anchoring, and overlap requirements. The project involves coordination with existing infrastructure including a residential water line, septic tank, and access road. All construction activities must be coordinated with the Agency and require proper utility clearance through Miss Utility before excavation begins.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pepperhill Road Drainage Project

MINED LAND REPURPOSING

ABANDONED MINED LAND SECTION

Pro· ect Location Tennessee

West

Virginia

Virginia

North

Carolina

Maryland

GENERAL NOTES

1. Before performing any excavation, contact Miss Utility, (800) 810-7197, to confirm the location of any below ground utility lines in the work area.

2. Before starting the work, contact the Agency for proper clearance and be governed by the Agency's instructions.

3. The contractor is responsible for scheduling, expediting, directing, inspecting and coordinating the work so as to complete the work in the time agreed upon.

4. Work in close cooperation with the Agency and others engaged in the project so that the work will be completed in an orderly manner.

5. Provide temporary supports as may be required during construction to ensure the stability of the proposed excavation.

1000 0 1000

L�=----=--,t_•=--.__I

SCALE:1 "=1000'

INDEX OF SHEETS

DESCRIPTION

1 . Cover Sheet

2. Site Pion

3. Slide Area

4. Upper Drcin Arec

5. Driveway

6. Details

Cover (1)
Pepperhill Draft Plans Site Plan
Slide (1)
Driveway (1)
Upper Drain (1)
Details (1)
2024-12-06T14:11:34-0500
Holly F White
2024-12-06T14:11:37-0500
Holly F White
2024-12-06T14:11:41-0500
Holly F White
2024-12-06T14:11:42-0500
Holly F White
2024-12-06T14:11:42-0500
Holly F White
2024-12-06T14:11:43-0500
Holly F White

File details come from the government source that posted it. Updated .