Pepperhill Road Drainage_BID SCHEDULE.pdf
PDF 85 KB Posted
- Attached to
- Pepperhill Road Drainage
- Solicitation number
- 83623
- Issued by
- Clifton Forge Town, Virginia
About this file
This is a bid schedule document for the Pepperhill Road Drainage project. The schedule outlines 10 line items including mobilization, site preparation, various VDOT stone materials (Gabion, No. 21B, No. 3, and No. 57), erosion control straw blanket, HDPE culvert pipe, culvert clean out, and revegetation. Specific quantities include 29 tons of VDOT Gabion Stone, 294 tons of No. 21B Stone, 110 tons of No. 3 Stone, 44 tons of No. 57 Stone, 1,200 square yards of erosion control straw blanket, 20 linear feet of 15" HDPE culvert pipe, and 1 acre of revegetation.
The pricing terms specify that the Total Bid Price will be used to determine the bid amount, establish contract award value, and determine performance and payment bond amounts. A bid bond is required for all bids of $100,000 or more. Mobilization costs are capped at 10% of the Total Base Bid amount. Unit prices must be included for all items - bidders who enter $0 or leave unit prices blank will be considered nonresponsive. Payment will be based on actual units used and verified in the field, with unit prices governing in case of extension errors.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid
Line Item
No.
Terms &
Conditions
Section
Approx.
Quantity Units Unit Price Total Price
1 1 Job L.S. N/A
2 2 Job L.S. N/A
3 4.B.i 29 Ton
4 4.B.ii 294 Ton
5 4.B.iii 110 Ton
6 4.B.iv 44 Ton
7 5.C.i 1,200 S.Y.
8 6.B.ii 20 L.F.
9 7.B Job L.S. N/A
10 8 1 Acre
PEPPERHILL ROAD DRAINAGE BID SCHEDULE
"The Total Bid Price will be utilized for determining the amount of bid, to establish a contract award value, and to determine the performance and payment bond amounts for the successful Bidder. Each Bidder must submit a bid bond for all bids of $100,000 or more. Payment will be made on actual units used and verified in the field. Correct pricing is extremely important and price should be double checked before submitting a bid. In the case of errors in the extension of prices, the unit price shall govern." Any bidder who enters $0 as a unit price or leaves the unit price blank shall be considered a nonresponsive bidder.
VDOT Gabion Stone
VDOT No. 21B Stone
VDOT No. 3 Stone
Erosion Control Straw Blanket
15" HDPE Culvert Pipe
Culvert Clean Out
Revegetation
Measurement Unit Definitions
(Firm)
Item Name
L.S. - Lump Sum
Mobilization
Site Preparation
Maximum Limit of No greater than 10% of Total Base
Bid amount.
L.F. - Linear Feet
S.F. - Square Feet
S.Y. - Square Yard
Total Base Bid (Line Items 2 - 10)
Total Bid Price (Line Items 1 - 10)
VDOT No. 57 Stone
(Signature) (Title)
(Date)
File details come from the government source that posted it. Updated .