This is a bid schedule form for the Pepperhill Road Drainage project in Clifton Forge Town, Virginia. The schedule outlines 10 line items for drainage construction work, including mobilization, site preparation, various VDOT stone installations (Gabion, No. 21B, No. 3, and No. 57), erosion control straw blanket installation (1,200 S.Y.), 15" HDPE culvert pipe installation (20 L.F.), culvert clean out, and revegetation of 1 acre. The quantities are specifically defined for each line item, with some items designated as lump sum jobs.
The pricing terms require bidders to submit unit prices for each line item, with the total bid price comprising line items 1-10. Mobilization costs are capped at 10% of the total base bid amount. A bid bond is required for all bids of $100,000 or more. Payment will be based on actual units used and verified in the field. The form specifies that unit prices shall govern in case of extension errors, and any bidder who enters $0 as a unit price or leaves the unit price blank will be considered nonresponsive.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid
Line Item
No.
Terms &
Conditions
Section
Approx.
Quantity Units Unit Price Total Price
1 1 Job L.S. N/A
2 2 Job L.S. N/A
3 4.B.i 29 Ton
4 4.B.ii 294 Ton
5 4.B.iii 110 Ton
6 4.B.iv 44 Ton
7 5.C.i 1,200 S.Y.
8 6.B.ii 20 L.F.
9 7.B Job L.S. N/A
10 8 1 Acre
PEPPERHILL ROAD DRAINAGE BID SCHEDULE
"The Total Bid Price will be utilized for determining the amount of bid, to establish a contract award value, and to determine the performance and payment bond amounts for the successful Bidder. Each Bidder must submit a bid bond for all bids of $100,000 or more. Payment will be made on actual units used and verified in the field. Correct pricing is extremely important and price should be double checked before submitting a bid. In the case of errors in the extension of prices, the unit price shall govern." Any bidder who enters $0 as a unit price or leaves the unit price blank shall be considered a nonresponsive bidder.
VDOT Gabion Stone
VDOT No. 21B Stone
VDOT No. 3 Stone
Erosion Control Straw Blanket
15" HDPE Culvert Pipe
Culvert Clean Out
Revegetation
Measurement Unit Definitions
(Firm)
Item Name
L.S. - Lump Sum
Mobilization
Site Preparation
Maximum Limit of No greater than 10% of Total Base
Bid amount.
L.F. - Linear Feet
S.F. - Square Feet
S.Y. - Square Yard
Total Base Bid (Line Items 2 - 10)
Total Bid Price (Line Items 1 - 10)
VDOT No. 57 Stone