Pepperhill Road Drainage_BID SCHEDULE.pdf

PDF 85 KB Posted

Attached to
Pepperhill Road Drainage
Solicitation number
83623
Issued by
Clifton Forge Town, Virginia

About this file

This is a bid schedule form for the Pepperhill Road Drainage project in Clifton Forge Town, Virginia. The schedule outlines 10 line items for drainage construction work, including mobilization, site preparation, various VDOT stone installations (Gabion, No. 21B, No. 3, and No. 57), erosion control straw blanket installation (1,200 S.Y.), 15" HDPE culvert pipe installation (20 L.F.), culvert clean out, and revegetation of 1 acre. The quantities are specifically defined for each line item, with some items designated as lump sum jobs.

The pricing terms require bidders to submit unit prices for each line item, with the total bid price comprising line items 1-10. Mobilization costs are capped at 10% of the total base bid amount. A bid bond is required for all bids of $100,000 or more. Payment will be based on actual units used and verified in the field. The form specifies that unit prices shall govern in case of extension errors, and any bidder who enters $0 as a unit price or leaves the unit price blank will be considered nonresponsive.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid

Line Item

No.

Terms &

Conditions

Section

Approx.

Quantity Units Unit Price Total Price

1 1 Job L.S. N/A

2 2 Job L.S. N/A

3 4.B.i 29 Ton

4 4.B.ii 294 Ton

5 4.B.iii 110 Ton

6 4.B.iv 44 Ton

7 5.C.i 1,200 S.Y.

8 6.B.ii 20 L.F.

9 7.B Job L.S. N/A

10 8 1 Acre

PEPPERHILL ROAD DRAINAGE BID SCHEDULE

"The Total Bid Price will be utilized for determining the amount of bid, to establish a contract award value, and to determine the performance and payment bond amounts for the successful Bidder. Each Bidder must submit a bid bond for all bids of $100,000 or more. Payment will be made on actual units used and verified in the field. Correct pricing is extremely important and price should be double checked before submitting a bid. In the case of errors in the extension of prices, the unit price shall govern." Any bidder who enters $0 as a unit price or leaves the unit price blank shall be considered a nonresponsive bidder.

VDOT Gabion Stone

VDOT No. 21B Stone

VDOT No. 3 Stone

Erosion Control Straw Blanket

15" HDPE Culvert Pipe

Culvert Clean Out

Revegetation

Measurement Unit Definitions

(Firm)

Item Name

L.S. - Lump Sum

Mobilization

Site Preparation

Maximum Limit of No greater than 10% of Total Base

Bid amount.

L.F. - Linear Feet

S.F. - Square Feet

S.Y. - Square Yard

Total Base Bid (Line Items 2 - 10)

Total Bid Price (Line Items 1 - 10)

VDOT No. 57 Stone

(Signature) (Title)

(Date)

File details come from the government source that posted it. Updated .