Pepperhill Road Drainage_PLANS.pdf

PDF 11 MB Posted

Attached to
Pepperhill Road Drainage
Solicitation number
83623
Issued by
Clifton Forge Town, Virginia

About this file

This is a set of engineering plans from Virginia Energy's Mined Land Repurposing division for the Pepperhill Road Drainage Project located in Coeburn, Virginia. The project involves drainage improvements including the installation of three culverts, erosion control measures, and addressing a slide area. The plans detail specific work including replacing Culvert #1 with 15" HDPE pipe, cleaning out Culverts #2 and #3, installing stone armor areas, implementing straw matting for erosion control, and managing a residential water line in the project area. The plans include site topography, access roads, and existing infrastructure details across six sheets covering the overall site plan, slide area details, drainage profiles, and technical specifications.

The plans show detailed technical requirements including proper staple patterns for erosion control materials, culvert installation specifications requiring minimum 1' cover and 3% grade, and detailed cross-sections showing existing ground conditions and proposed improvements. The project includes temporary anchoring systems for straw blankets and riprap buttressing for slope stabilization. Three elevation profiles (A-A', B-B', and C-C') demonstrate the existing ground conditions and proposed improvements for the slide area, with elevations ranging from approximately 2075 to 2225 feet.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pepperhill Road Drainage Project

MINED LAND REPURPOSING

ABANDONED MINED LAND SECTION

Pro· ect Location Tennessee

West

Virginia

Virginia

North

Carolina

Maryland

GENERAL NOTES

1. Before performing any excavation, contact Miss Utility, (800) 810-7197, to confirm the location of any below ground utility lines in the work area.

2. Before starting the work, contact the Agency for proper clearance and be governed by the Agency's instructions.

3. The contractor is responsible for scheduling, expediting, directing, inspecting and coordinating the work so as to complete the work in the time agreed upon.

4. Work in close cooperation with the Agency and others engaged in the project so that the work will be completed in an orderly manner.

5. Provide temporary supports as may be required during construction to ensure the stability of the proposed excavation.

1000 0 1000

L�=----=--,t_•=--.__I

SCALE:1 "=1000'

INDEX OF SHEETS

DESCRIPTION

1 . Cover Sheet

2. Site Pion

3. Slide Area

4. Upper Drcin Arec

5. Driveway

6. Details

Cover (1)
Pepperhill Draft Plans Site Plan
Slide (1)
Driveway (1)
Upper Drain (1)
Details (1)
2024-12-06T14:11:34-0500
Holly F White
2024-12-06T14:11:37-0500
Holly F White
2024-12-06T14:11:41-0500
Holly F White
2024-12-06T14:11:42-0500
Holly F White
2024-12-06T14:11:42-0500
Holly F White
2024-12-06T14:11:43-0500
Holly F White

File details come from the government source that posted it. Updated .