02 1602100 F Electrical CTG Ver 1.0 08-12-2024 D.pdf
PDF 118 KB Posted
- Attached to
- UEM B3163, CTG Solar Turbine (deleted HRSG Boiler, and Gas Booster) Reoccurring Maintenance
- Solicitation number
- ACQR6050761
About this file
This document appears to be a deliverables list related to a federal contract opportunity for "UEM, B3163, CTG Solar Turbine, HRSG Boiler, and Gas Booster Reoccurring Maintenance" at the Naval Support Facility in Indian Head, MD. The contract is an Indefinite Delivery Indefinite Quantity (IDIQ) with a 1-year base period and four 1-year option periods. The deliverables include engine overhaul and repair, planned maintenance visit schedules, unscheduled maintenance and field service call outs, a site service manager, and scope of work obligations. The contract will be a firm-fixed price award set aside for 8(a) small businesses. Proposals are due by 2:00 PM EST on June 24, 2024.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1602100 – Electrical Power Generation, Transmission and Distribution
SECTION F: DELIVERIES OR PERFORMANCE
DELIVERABLES
1602100 F Electrical CTG
Annex/Spec Item
Form Attachment
Number Deliverable
Title Date (s) of Submission
Distribution
Frequency Original/ Copies
Number of Copies (including original)
1602100 / 3 N/A Engine Overhaul and
Repair
15 days after award
KO 4 As required
1602100 / 3.1 N/A Planned Maintenance
Visits
Schedule 30 days in advance of visit
KO 4 4,000 hour Level A and 8000 hour Level
B
1602100 / 3.2 N/A Unscheduled Maintenance and Field Service Call
Outs
15 days after award
KO 4 As required
1602100 / 3.3 N/A Site Service Manager
15 days after award
KO 4 Continuously
1602100 / 3.4 N/A InSight Platform and Connect
Not Required
KO 4 Not Allowed
1602100 / 3.5 N/A Scope of Work Obligations
15 days after award
KO 4 As required
Report Preparation Instruction
Report Title: Maintenance Summary Report
Form Attachment No.: J-1602100-XX
Government Approval Required: __ Yes __ No
Media:
__ Hard Copy __ Electronic __ Direct System Input
Preparation Instructions:
The report shall be prepared using Microsoft Office Word software.
The Trouble Call Summary Report shall be a compilation of the previous months trouble call reports with the following information:
a. Detailed description of work actually completed, problems encountered and recommended follow-up actions required.
b. Brief description of material and parts used, including quantities and cost.
c. Date and time work began.
d. Date and time work was completed.
e. Total hours of labor (by craft) expended, including travel time.
f. Name of person accepting the work and any comments written on the trouble ticket.
g. Last name and first initial of the Contractor employee(s) performing the work.
Submit a copy of the summary report via email to KO for Government review and comment.
An example of unclear instructions:
“As determined by the contractor to include all applicable regulatory information.”