Amendment_2_ABM_MAC_N00421-18-R-0032.pdf
PDF 506 KB Posted
- Attached to
- AIR-4. 11 ABM Multiple Award Contract (MAC) Federal contract opportunity
- Solicitation number
- Not on record
About this file
This sources sought synopsis requests capability statements from small businesses to provide technical and engineering services for the Naval Air Warfare Center Aircraft Division (NAWCAD) Patuxent River. Services include system certification, technical assistance, engineering analysis, testing and evaluation, logistics support, configuration management, and training for air traffic control and battle management systems.
Interested parties must submit a 10-page capabilities statement by April 18th addressing relevant past performance, management experience, technical skills, and ability to perform over 50% of work requirements as a prime contractor. Respondents must indicate their small business classification and ability to obtain a facility security clearance. The follow-on contract is a cost-plus-fixed-fee multiple award contract with an estimated value of $235M over five years. The North American Industry Classification System code is 541330 with a small business size standard of $38.5M.
ABM MAC N00421-18-D-0032 Amendment 2
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1300552866
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this modif ication is to revise: See Section A Notes for all revisions to this solicitation.
1. CONTRACT ID CODE PAGE OF PAGES
U 1 42
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00421-18-R-0032
X 9B. DATED (SEE ITEM 11)
10-Sep-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Sep-2018
CODE
NAVAL AIR WARFARE CENTER AD (PAX)
BLDG 433, 47060 LILJENCRANTZ ROAD
PATUXENT RIVER MD 20670
N00421 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00421-18-R-0032
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The following have been modified:
NOTES
Amendment 2 changes are:
1. Section C: page 26 10.6 from Engineering Technician IIII (BLS SOC No. 17-3029, SCA Code 30081) to
Engineering Technician III (BLS SOC No. 17-3029, SCA Code 30083)
2. Section H- H-2 Clause: page 52 added ***Applicable to MAC task orders only*** to the end of clause.
3. Section L Part A: page 76 1.0 General removed “or provides on or more Key Personnel” and added
“ hours” to sample task.
4. Section L Part A: page 76 2.0 Proposal format added “and shall be no smaller than 10 pt font. Headers and Footers shall be no smaller than 7pt font.”
5. Section L Part A: page 77 3.0 Proposal Content and Volumes table, removed “narrative” from Past
Performance Volume Title and added “plus attachment P1 to Volume 2 Past Performance page limit.
Removed “Electronic copy” from Copies Required for Volume 2 Past Performance and added CD RM.
6. Section L Part B: page 82 revised language from “The Offeror(s) shall provide a narrative in addition to each Past Performance Information Form in the “Contract Effort Description” area that clearly describes how each contract reference has relevant work effort that matches the relevancy definitions specified in Section M of the solicitation” to “The Offeror(s) shall provide a Volume 2 Past Performance narrative in addition to the Past Performance Information Form(P1) that clearly describes how each contract reference has relevant work effort that matches the relevancy definitions specified in Section M of the solicitation.”
Amendment 1changes are:
1. Section K page 72: Clause 252.204-7007 SB Size standard revised from $38,000.00 to 1,250 employees.
2. Added volume 3 EXECUTIVE SUMMARY to Section L Part A, paragraph 3.0 PROPOSAL CONTENT AND
VOLUMES table and revised Volume 2 PAST PERFORMANCE to include “narrative”
3. Revised Section L Part B paragraph 3.0 title to Volume 3 EXECUITIVE SUMMARY
4. Added to Section L Part B paragraph 4.0 moving Incumbent Contractor information to this paragraph
4. Added incumbent contractor’s contract numbers in section L Part B paragraph 4.0
Admin note: This RFP utilizes Class Deviation (2018-O0006, dated 13 DEC 2017) which permits Multiple Award
Contracts (MACs) to exclude price/cost as an evaluation factor under certain conditions.
1. The Product Service Code (PSC) for this procurement is AC65, Defense Electronics and Communication
Equipment – Operational Systems Development.
2. In accordance with NAVAIR Clause 5252.216-9506, the maximum value of this contract is $235,005,565.00.
3. A Lot is defined as a five year ordering period (no option periods) for a specific CLIN (no option periods) to include all associated task orders placed during the ordering periods.
4. The contractor will be required to have a SECRET facility clearance and a Secret clearance for personnel identified in Section Statement of Work (SOW) prior to issuance of a task order under this contract. The contractor will not be permitted access to classified information until a final DD254 is incorporated as an attachment to the contract.
POINTS OF CONTACT
Contract Specialist: Maria Mattei-Chaney
Phone: 301-757-0740
E-mail: maria.mattei-chaney@navy.mil
Procuring Contracting Officer: Frank Douglass
Phone: 301-757-0463
E-mail: frank.douglass@navy.mil
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
DESCRIPTION
DESCRIPTION
Items 0001 and 0002 – The contractor shall provide services In Accordance with (IAW) and within the scope of the
Section C Statement of Work (SOW) of the basic contract as detailed in the individual task orders.
Items 0003 – The contractor shall provide travel IAW the NAVAIR clause 5252.237-9509 and within the scope of the Section C SOW of the basic contract as detailed in the individual task orders.
Items 0004 and 0005 – The contractor shall provide material IAW the H-1 clause RESTRICTION ON THE
DIRECT CHARGING OF MATERIAL and within the scope of the Section C SOW of the basic contract as detailed in the individual task orders.
Item 0006 – The data to be furnished hereunder shall be IAW the Exhibit A, DD Form 1423, Contract Data
Requirements Lists (CDRLs) and within the scope of the Section C SOW of the basic contract as detailed in the individual task orders.
STATEMENT OF WORK
TRAINING, MAINTENANCE, AND UPGRADES FOR THE AIR TRAFFIC CONTROL DIVISION, AREA
CONTROL SYSTEMS BRANCH
1.0. INTRODUCTION. The Naval Air Warfare Center Aircraft Division (NAWCAD) Patuxent River, St. Inigoes, Air Traffic Control (ATC) Systems Division, Area Control Systems (ACS) Branch Code 4.11.7.3 is the technical/acquisition Engineering Agent for mobile air battle management systems and communication-electronic support systems. NAWCAD 4.11.7.3 provides the following support for the United States Navy (USN), United
States Air Force (USAF), United States Marine Corps (USMC) and other DoD activities: operational, technical, logistical and system engineering support in system certification; technical assistance; systems analysis and engineering; test and evaluation; installation and maintenance; hardware design, development, technical logistics support; configuration management; training support; equipment manufacturing; quality control; and project management.
1.1. Scope. The contractor shall provide technical products and services as designated by the task orders IAW this
Statement of Work (SOW) and Contract Data Requirements Lists (CDRLs) for the various systems under the
NAWCAD Code 4.11.7 ATC Systems Division's cognizance.
2.0. APPLICABLE DOCUMENTS. The following is a list of known documents that will be referred to during the performance of task order under the technical and engineering services required by this SOW, the latest version of the listed documents shall apply and can be found on the ASSIST web site at http://quicksearch.dla.mil/qsSearch.aspx, which provides direct access to Defense and Federal specifications and mailto:rhonda.garcia@navy.mil mailto:frank.douglass@navy.mil standards. Please use the most recent version of the following list of documents. Additional documents will be identified at the task order level.
2.1. REFERENCE DOCUMENTS
NUMBER TITLE
MIL-P-24534 Planned Maintenance System; Development of
OPNAVINST 3432.1 Operations Security
ISO 9001:2000 International Organization for Standardization (ISO) 9001:2000 Quality
Management Systems
AIR-7.2/7.4 Policy Memo Information Technology (IT) Positions
NAVAIRINST 4355.19D Systems Engineering
MIL-HDBK-61A(SE) Configuration Management Guidance
MIL-HDBK-2036 Electronic Equipment Specifications, Preparation of
NAVSEAINST 4790.3 Policy and Responsibility for Processing Planned Maintenance System (PMS)
Technical Feedback Reports
NAWCADINST 5510.1A NAVAIRWARCENACDIV Information Personnel and Industrial Security
Program Manual
NSDD 298 National Security Decision Directive
DoD Manual 5200.1R Information Security Program Regulations
3.0. REQUIREMENTS. CLINs 0001 through 0006. The contractor shall provide support to perform the tasks listed in paragraphs 3.1-3.10 below for DoD Air Traffic Management (ATM) Systems to include, but not be limited to: Combat Reporting Center Simulation Package (CSP); Non-Organic Radar Access (NORA); TPS-59 Radar
Control and USMC Communication Squadron Maintenance Shelters; Remote Radio Secure Voice Systems; Battle
Control Systems (BCS); Precision Approach Radar (PAR); Instrument Landing System (ILS); Ground-Based Sense and Avoid (GBSAA); Fleet Area Control Tracking Systems (FACTS); Navy Scheduling Systems (NAVSKED);
Integrated Range Status System (IRSS); AN/TPN-31A Air Traffic Navigation Integration and Coordination System
(ATNAVICS); Tactical Air Navigation (TACAN); Airfield Mobile TACAN (AMTAC); and other similar systems within NAWC Code 4.11.7 ATC Systems Division's cognizance. The contractor shall also perform the tasking below to assist in the maturation and integration of in-development systems such as Joint Precision Approach and
Landing Systems (JPALS) and unmanned initiatives in support of ATM capabilities.
3.1. System Certification.
3.1.1. Requirements CLINs 0001 through 0006. The contractor shall provide system certification support for certification and verification tests on fielded equipment at shore stations. If any existing certification and verification procedures are outdated because of hardware or software changes, the contractor shall provide recommended changes to the certification and verification procedures.
3.1.1.1. Deliverable Products. Contractor shall prepare and deliver the following:
a. Trip Report (CDRL A001)
3.1.2. Requirements CLINs 0001 through 0006. The contractor shall provide system certification support for certification and verification tests on ECP modifications to fielded equipment at shore stations. If any certification and verification procedures are outdated because of hardware and software changes, the contractor shall provide recommended changes to the certification and verification procedures.
3.1.2.1. Deliverable Products. Contractor shall prepare and deliver the following:
3.1.3. Requirements CLINs 0001 through 0006. The contractor shall provide system certification support for certification and verification tests on SCN-type equipment at shore stations. If any certification and verification procedures are outdated because of hardware and software changes, the contractor shall provide recommended changes to the certification and verification procedures.
3.1.3.1. Deliverable Products. Contractor shall prepare and deliver the following:
3.2 Technical Support.
3.2.1. Requirements CLINs 0001 through 0006. The contractor shall provide engineering and technical services for maintenance testing of fielded equipment and monitor, track, and report any unresolved deficiencies. Contractor shall respond to technical assistance requests on fielded equipment and provide technical services including but not limited to: equipment fault isolation and repair; restoration of systems to normal operating condition; on-the-job
(OJT) training of military technicians; and provide status briefing to the military chain of command and COR upon completion of the event. In some cases, technical assistance response may be provided by telephone or e-mail. The contractor shall document technical assistance responses provided by telephone or e-mail in the Monthly Progress
Status Report.
3.2.1.1. Deliverable Products. Contractor shall prepare and deliver the following:
b. Progress Status Report (CDRL A035)
3.2.2. Requirements CLINs 0001 through 0006. The contractor shall provide production engineering and technical services for test and evaluation of modifications to fielded equipment and monitor, track, and report any unresolved deficiencies. Contractor shall respond to technical assistance requests on modified fielded equipment and provide technical services in support of ECP efforts to include but not limited to: equipment fault isolation and repair;
restoration of systems to normal operating condition; on-the-job (OJT) training of military technicians; and status briefing of military chain of command and COR upon completion of the event. In some cases, technical assistance response may be provided by telephone or e-mail. The contractor shall document the technical assistance responses provided by telephone or e-mail in the Monthly Progress Status Report.
3.2.2.1 Deliverable Products. Contractor shall prepare and deliver the following:
b. Progress Status Report (CDRL A035)
3.3. Provisioning Support.
3.3.1. Requirements CLINs 0001 through 0006. The contractor shall provide provisioning support including translating technical requirements and program constraints for inputs into acquisition documentation, ordering, maintaining status accounting, receiving provisioning items, controlling inventory, and distributing equipment. The contractor shall:
a. Maintain storerooms and/or warehouses for the storage of equipment spares and repair parts and provide an inventory report IAW PGI clause. 245.103-72.
b. Monitor the spare parts inventory and recommend parts to be procured when quantities are low.
c. Order and track material and services to support equipment and projects.
d. Receive material to support equipment and projects.
e. Ship and track material to support equipment and projects.
3.3.1.1. Deliverable Products. Contractor shall prepare and deliver the following:
a. Inventory List Report (CDRL A002)
b. Provisioning Order Status Accounting Report (CDRL A003)
c. Receivables Accounting Report (CDRL A004)
d. Shipping Accounting Report (CDRL A005)
3.3.2. Requirements CLINs 0001 through 0006 The contractor shall provide provisioning support including translating technical requirements and program constraints for inputs into acquisition documentation, ordering, maintaining status accounting, receiving provisioning items, controlling inventory, and distributing equipment. The contractor shall:
a. Maintain storerooms and/or warehouses for the storage of equipment spares and repair parts and provide an inventory report IAW PGI clause. 245.103-72.
b. Monitor the spare parts inventory and recommend parts to be procured when quantities are low.
c. Order and track material and services to support equipment and projects.
3.3.2.1. Deliverable Products. Contractor shall prepare and deliver the following:
b. Provisioning Order Status Accounting Report (CDRL A003)
3.3.3. Requirements CLINs 0001 through 0006 The contractor shall provide provisioning support including translating technical requirements and program constraints for inputs into acquisition documentation, ordering, maintaining status accounting, receiving provisioning items, controlling inventory, and distributing equipment. The contractor shall:
a. Maintain storerooms and/or warehouses for the storage of equipment spares and repair parts and provide an inventory report IAW PGI 245.103-72.
b. Monitor the spare parts inventory and recommend parts to be procured when quantities are low.
c. Order and track material and services to support equipment and projects.
3.3.3.1. Deliverable Products. Contractor shall prepare and deliver the following:
b. Provisioning Order Status Accounting Report (CDRL A003)
3.3.4. Requirements CLINs 0001 through 0006. The contractor shall provide provisioning support including translating technical requirements and program constraints for inputs into acquisition documentation, ordering, maintaining status accounting, receiving provisioning items, controlling inventory, and distributing equipment. The contractor shall:
a. Maintain storerooms and/or warehouses for the storage of equipment spares and repair parts and provide an inventory report IAW PGI 245.103-72.
b. Monitor the spare parts inventory and recommend parts to be procured when quantities are low.
c. Order and track material and services to support equipment and projects.
d. Receive material to support equipment and projects.
e. Ship and track material to support equipment and projects.
3.3.4.1. Deliverable Products. Contractor shall prepare and deliver the following:
a. Inventory List Report (CDRL A002)
b. Provisioning Order Status Accounting Report (CDRL A003)
3.4 Systems Engineering.
3.4.1. Requirements CLINs 0001 through 0006. The contractor shall provide production engineering, integrated logistics support, and technical support for the improvement of production items. The contractor shall:
a. Recommend improvements for system performance, reliability, maintainability, and supportability.
b. Provide proposed system improvements, engineering change proposals (ECPs), field change bulletins
(FCBs), trouble reports (TRs), and provide recommendations as to their acceptability. Contractor shall review and conduct an analysis of equipment performance, configuration, standardization, compatibility and interface, and system specifications in support of system improvements.
c. Analyze and recommend solutions for system performance and procedural problems reported
d. Provide updated installation control drawings (ICDs) for shore stations. Interface with station personnel on installation problems. Contractor shall also provide technical support for solutions to systems installation problems at shore facilities.
e. Provide field change kits ready for installation. Kits must be complete prior to scheduled installation.
f. Analyze maintenance, material management (3M) and casualty report (CASREP) failure data to determine the annual cost of ownership for each system and to determine the obtained operational availability for each system. Data shall be submitted in a recommendations report.
g. Provide configuration management of drawings for all ATC systems equipment. Contractor shall also provide a quarterly Configuration Status Accounting Report.
h. Provide a Software Development Plan.
3.4.1.1. Deliverable Products. Contractor shall prepare and deliver the following:
b. Recommendations Report (CDRL A006)
c. Engineering Report (CDRL A007)
d. Provisioning Parts List (PPL) (CDRL A009)
e. Provisioning Technical Documentation (PTD) (CDRL A010)
f. Drawing Configuration Status Accounting Report (CDRL A011)
g. System Operation Verification Testing Report (SOVT) (CDRL A012)
h. Software Development Plan (CDRL A040)
3.4.2. Requirements CLINs 0001 through 0006. The contractor shall provide engineering, logistic, and technical support for the improvement of modifications to existing systems. The contractor shall:
a. Recommend improvements for system performance, reliability, maintainability, and supportability.
b. Provide proposed system improvements, engineering change proposals (ECPs), field change bulletins
(FCBs), trouble reports (TRs), and provide recommendations as to their acceptability. Contractor shall review and conduct an analysis of equipment performance, configuration, standardization, compatibility and interface, and system specifications in support of system improvements.
c. Analyze and recommend solutions for system performance and procedural problems reported.
d. Provide updated installation control drawings (ICDs) for shore stations. Interface with station personnel on installation problems. Provide technical support for solutions to systems installation problems at shore facilities.
e. Provide field change kits ready for installation. Kits must be complete prior to scheduled installation.
f. Analyze maintenance, material management (3M) and casualty report (CASREP) failure data to determine the annual cost of ownership for each system and to determine the obtained operational availability for each system. Data shall be submitted in a recommendations report.
g. Provide configuration management of drawings for all ATC systems equipment. Contractor shall also provide a quarterly Configuration Status Accounting Report.
h. Provide a Software Development Plan.
3.4.2.1. Deliverable Products. Contractor shall prepare and deliver the following:
b. Recommendations Report (CDRL A006)
c. Engineering Report (CDRL A007)
d. Provisioning Parts List (PPL) (CDRL A009)
e. Provisioning Technical Documentation (PTD) (CDRL A010)
f. Drawing Configuration Status Accounting Report (CDRL A011)
g. System Operation Verification Testing Report (SOVT) (CDRL A012)
h. Software Development Plan (CDRL A040)
3.5. Systems Upgrades &Development Support
3.5.1. Requirements CLINs 0001 through 0006. The contractor shall provide engineering, integrated logistics support, and technical support for system upgrades. The contractor shall:
a. Review and analyze proposed systems operational and performance specification requirements. Tasks include operational and performance requirements recommendations, review, and analyses; equipment performance, configuration, standardization and compatibility analyses; interface analyses; and system specification reviews in support of new system acquisitions.
b. Support equipment development to ensure system compatibility and compliance with applicable
Government standards, specifications, performance requirements, quality assurance, and test provisions.
Such tasks shall include review of development documentation, test documentation, and technical and operator's manuals for acceptability with SOW/specification and CDRL requirements. Contractor shall support the Government in program reviews, design reviews, and configuration audits.
c. Prepare or review ICDs for shore stations. Interface with shore station personnel and other cognizant activities to present system installation requirements and resolve any installation problems.
d. Provide configuration management of drawings for all equipment. Contractor shall provide a quarterly
Configuration Status Accounting Report.
e. The contractor shall provide support in the development and presentation of training material for use in familiarizing personnel with the operation and maintenance of new or modified software and hardware.
Training materials developed under this paragraph are subject to DFARS 252.227-7020.
f. The contractor shall provide support for the planned maintenance of the systems, development of maintenance requirement cards (MRC’s), and maintenance index pages in accordance with MIL-P-24534
Planned Maintenance System.
3.5.1.1 Deliverable Products. Contractor shall prepare and deliver the following:
b. Engineering Report (CDRL A007)
c. Recommendations Report (CDRL A006)
d. Training System Plan (CDRL A013)
e. Integrated Logistics Support Plan (CDRL A014)
f. User Logistics Support Summary (CDRL A015)
g. Maintenance Plan (CDRL A016)
h. Life Cycle Documentation (CDRL A017)
i. Installation Control Drawings (ICDs) (CDRL A008)
j. Provisioning Parts List (CDRL A009)
k. Provisioning Technical Documentation (CDRL A010)
l. Preventative Maintenance System Maintenance Requirement Cards (MRC) (CDRL A018)
m. Preventative Maintenance System Maintenance Index Pages (MIP) (CDRL A019)
n. Drawing Configuration Status Accounting Report (CDRL A011)
3.5.2. Requirements CLINs 0001 through 0006. The contractor shall provide engineering, logistic, and technical support for the development of new systems. The contractor shall:
a. Review and analyze proposed systems operational and performance specification requirements. Tasks include operational and performance requirements recommendations, review, and analyses; equipment performance, configuration, standardization and compatibility analyses; interface analyses; and system specification reviews in support of new system acquisitions.
b. Support equipment development to ensure system compatibility and compliance with applicable
Government standards, specifications, performance requirements, quality assurance, and test provisions.
Such tasks shall include review of development documentation, test documentation, and technical and operator's manuals for acceptability with SOW/specification and CDRL requirements. Contractor shall support the Government in program reviews, design reviews, and configuration audits.
c. Prepare or review ICDs for shore stations. Interface with shore station personnel and other cognizant activities to present system installation requirements and resolve any installation problems.
d. Provide configuration management of drawings for all equipment. Provide a quarterly Configuration
Status Accounting Report.
e. The contractor shall provide support in the development and presentation of training material for use in familiarizing personnel with the operation and maintenance of new or modified software and hardware.
Training materials developed under this paragraph are subject to DFARS 252.227-7020.
f. The contractor shall provide support for the planned maintenance of the systems, development of maintenance requirement cards (MRC’s), and maintenance index pages in accordance with MIL-P-24534
Planned Maintenance System.
3.5.2.1 Deliverable Products. Contractor shall prepare and deliver the following:
b. Engineering Report (CDRL A007)
c. Recommendations Report (CDRL A006)
d. Training System Plan (CDRL A013)
e. Integrated Logistics Support Plan (CDRL A014)
f. User Logistics Support Summary (CDRL A015)
g. Maintenance Plan (CDRL A016)
h. Life Cycle Documentation (CDRL A017)
i. Installation Control Drawings (ICDs) (CDRL A008)
j. Provisioning Parts List (CDRL A009)
k. Provisioning Technical Documentation (CDRL A010)
l. Preventative Maintenance System Maintenance Requirement Cards (CDRL A018)
m. Preventative Maintenance System Maintenance Index Pages (CDRL A019)
n. Drawing Configuration Status Accounting Report (CDRL A011)
3.5.3. Requirements CLINs 0001 through 0006. The contractor shall provide engineering and technical services in support of testing and evaluation of SCN equipment. The contractor shall:
a. Develop test plans and procedures to support acceptance testing of SCN systems to determine conformance to system specifications and performance and operational requirements.
b. Develop new or modify existing production acceptance test plans and procedures to support SCN systems certifications.
c. Evaluate systems using the Government approved test plans and procedures to determine the degree of conformance with system specifications and performance and operational requirements. Contractor shall prepare interim and final engineering reports detailing test completion status, test results, and recommendations for all tests and evaluations conducted.
d. Provide support in SCN acceptance tests and evaluations of systems performed by activities in other shore locations.
e. Status and track the hardware (HW) and software (SW) configuration of the equipment under test.
3.5.3.1. Deliverable Products. Prepare and deliver the following:
b. Acceptance Test Plans and Procedures (CDRL A020)
c. Test Plans and Procedures (CDRL A021)
d. Test Report (CDRL A022)
e. Engineering Report (CDRL A007)
f. Problem Report (CDRL A023)
g. Configuration Status Accounting Sheet Information (CDRL A041)
h. Version Description Document (CDRL A042)
3.6. Systems Test and Evaluation
3.6.1. Requirements CLINs 0001 through 0006. The contractor shall provide engineering and technical services in support of testing and evaluation of equipment under production systems. The contractor shall:
a. Develop test plans and procedures to support production acceptance testing of new or modified systems to determine conformance to system specifications and performance and operational requirements.
b. Develop new or modify existing production acceptance test plans and procedures to support systems certifications.
c. Evaluate systems using the Government approved test plans and procedures to determine the degree of conformance with system specifications and performance and operational requirements. Contractor shall prepare interim and final engineering reports detailing test completion status, test results, and recommendations for all tests and evaluations conducted.
d. Provide support in production acceptance tests and evaluations of systems performed by activities in other shore locations.
e. Status and track the HW and SW configuration of the equipment under test.
3.6.1.1. Deliverable Products. Prepare and deliver the following:
b. Acceptance Test Plans and Procedures (CDRL A020)
c. Test Plans and Procedures (CDRL A021)
d. Test Report (CDRL A022)
e. Engineering Report (CDRL A007)
f. Problem Report (CDRL A023)
3.6.2. Requirements CLINs 0001 through 0006. The contractor shall provide engineering and technical services in support of testing and evaluating new systems. The contractor shall:
a. Develop test plans and procedures to support acceptance testing of new or modified systems to determine conformance to system specifications and performance and operational requirements.
b. Develop new or modify existing test plans and procedures to support systems certifications.
c. Evaluate systems using the Government approved test plans and procedures to determine the degree of conformance with system specifications and performance and operational requirements. Contractor shall prepare interim and final engineering reports detailing test completion status, test results, and recommendations for all tests and evaluations conducted.
d. Provide support in tests and evaluations of new systems performed by activities in other shore locations.
e. Status and track the HW and SW configuration of the equipment under test.
3.6.2.1. Deliverable Products. Prepare and deliver the following:
b. Acceptance Test Plans and Procedures (CDRL A020)
c. Test Plans and Procedures (CDRL A021)
d. Test Report (CDRL A022)
e. Engineering Report (CDRL A007)
f. Problem Report (CDRL A023)
3.6.3. Requirements CLINs 0001 through 0006. The contractor shall make recommendations related to the design and development of SCN requirements. The contractor shall document, test, fabricate, and install operational hardware. The contractor shall:
a. Recommend engineering changes for the improvement of equipment.
b. Develop, fabricate, and install operational hardware field changes for SCN requirements.
c. Develop test plans and procedures to support testing of SCN systems and field changes to determine conformance to specifications and requirements. Test field changes using the test plans and procedures and provide test results.
d. Fabricate, assemble, and provide the hardware necessary for field change kits and other modifications and improvements to equipment.
e. Provide initial Technical Manual Revisions (TMRs) to document operational hardware
f. Provide technical inputs to Provisioning Parts List (PPL) and Provisioning Technical Documents (PTD).
g. Install operational systems into SCN platforms.
h. In support of SCN requirements: design, develop, fabricate, provide, and install operational software.
3.6.3.1. Deliverable Products. Prepare and deliver the following:
b. Recommendations Report (CDRL A006)
c. Level I/II/III Drawings (CDRL A024)
d. Test Plans and Procedures (CDRL A021)
e. Test Report (CDRL A022)
f. Technical Manual Revisions (CDRL A025)
g. Provisioning Parts List (CDRL A009)
h. Provisioning Technical Documentation (CDRL A010)
i. Version Description Document (CDRL A042)
3.7. Hardware and Software Support. The contractor shall provide hardware and software support for ATC systems and their components. The contractor shall:
3.7.1. Requirements CLINs 0001 through 0006. The contractor shall recommend, design and develop in support of ECPs, test, fabricate or assemble, install, and document field changes and modifications to operational hardware.
The contractor shall:
a. Recommend engineering changes for the improvement of equipment.
b. In support of ECP efforts: design, develop, fabricate, provide, and install prototype hardware field changes.
c. Develop test plans and procedures to support testing of system ECPs and field changes to determine conformance to specifications and requirements. Test field changes using the test plans and procedures and provide test results.
d. Fabricate, assemble, and provide the hardware necessary for field change kits and other modifications and improvements to equipment.
e. Provide Technical Manual Revisions to document field changes and modifications to operational hardware
f. Provide technical inputs to PPLs and PTD.
g. Install field changes in systems and provide an Evaluation Field Change Report (EFCR).
h. Based on accomplishments directly related to systems support, provide monthly inputs to the Fleet Metrics
Form.
i. In support of In Service Engineering Activity (ISEA) requirements and ECP efforts: design, develop, fabricate, provide, and install prototype software field changes.
3.7.1.1. Deliverable Products. Prepare and deliver the following:
b. Recommendations Report (CDRL A006)
c. Level I/II/III Drawings (CDRL A024)
d. Test Plans and Procedures (CDRL A021)
e. Test Report (CDRL A022)
f. Technical Manual Revisions (CDRL A025)
g. Provisioning Parts List (CDRL A009)
h. Provisioning Technical Documentation (CDRL A010)
i. Evaluation Field Change Report (EFCR) (CDRL A026)
j. Fleet Metrics Form (CDRL A027)
k. Version Description Document (CDRL A042)
3.7.2. Requirements CLINs 0001 through 0006. The contractor shall recommend, design, develop, test, prototype, and document field changes and upgrades to operational hardware. The contractor shall:
a. Recommend engineering changes for the improvement of equipment.
b. Design, develop, and prototype hardware field changes.
c. Develop test plans and procedures to support testing of system ECPs and field changes to determine conformance to specifications and requirements. Contractor shall test field changes using the test plans and procedures and provide test results.
d. Fabricate, assemble, and provide the hardware necessary for field change kits and other modifications and improvements to equipment.
e. Provide Technical Manual Revisions to document field changes and modifications to operational hardware
f. Provide technical inputs to PPLs and PTD.
g. Install field changes in systems and provide an EFCR.
h. Based on accomplishments directly related to systems support, provide monthly inputs to the Fleet Metrics
Form.
i. Design, develop, and prototype software field changes.
3.7.2.1. Deliverable Products. Prepare and deliver the following:
b. Recommendations Report (CDRL A006)
c. Level I/II/III Drawings (CDRL A024)
d. Test Plans and Procedures (CDRL A021)
e. Test Report (CDRL A022)
f. Technical Manual Revisions (CDRL A025)
g. Provisioning Parts List (CDRL A009)
h. Provisioning Technical Documentation (CDRL A010)
i. Evaluation Field Change Report (EFCR) (CDRL A026)
j. Fleet Metrics Form (CDRL A027)
k. Version Description Document (CDRL A042)
3.8. Production Support. The contractor shall provide engineering support during the production stage of ATC systems and their components. The contractor shall:
3.8.1. Requirements CLINs 0001 through 0006. The contractor shall fabricate upgrades for systems as follows:
a. Review engineering documentation for producibility and make recommendations for documentation changes and update engineering documentation when changes have been approved.
b. Develop a production program plan of execution and execute the planned requirements.
c. Assemble hardware in accordance with engineering documentation. Contractor shall test hardware for conformance to engineering documentation and provide status of hardware fabrication.
3.8.1.1. Deliverable Products. Prepare and deliver the following:
a. Recommendations Report (CDRL A006)
b. Level I/II/III Drawing Revisions (CDRL A024)
c. Production Program Plan (CDRL A028)
d. Test Report (CDRL A022)
3.8.2. Requirements CLINs 0001 through 0006. The contractor shall design system upgrades as follows:
a. Review engineering documentation for producibility and make recommendations for documentation changes and update engineering documentation when changes have been approved.
b. Develop a production program plan of execution and execute the planned requirements.
c. Assemble hardware in accordance with engineering documentation. Contractor shall test hardware for conformance to engineering documentation and provide status of hardware fabrication.
3.8.2.1. Deliverable Products. Prepare and deliver the following:
a. Recommendations Report (CDRL A006)
b. Level I/II/III Drawing Revisions (CDRL A024)
c. Production Program Plan (CDRL A028)
d. Test Report (CDRL A022)
3.9. Repair and Retrofit Program.
3.9.1. Requirements CLINs 0001 through 0006. The contractor shall overhaul and repair equipment in accordance with system specifications and overhaul procedures. The contractor shall:
a. Develop, revise, and provide overhaul and repair test plans and procedures.
b. Review, develop, revise, and provide Technical Repair Standards (TRS).
c. Perform electrical and mechanical overhaul and repair of equipment.
d. Perform electrical and mechanical tests on overhauled and repaired equipment to ensure proper system performance and provide test results.
3.9.1.1. Deliverable Products. Prepare and deliver the following:
b. Test Plans and Procedures (CDRL A021)
c. Test Report - provide test results and documentation. (CDRL A022)
d. Repair Status Report - provide monthly repair status reports, including shipping and scheduling status.
(CDRL A029)
e. Technical Repair Standards - provide or revise TRSs. (CDRL A030)
3.9.2. Requirements CLINs 0001 through 0006. The contractor shall repair equipment in accordance with system specifications and procedures. The contractor shall:
a. Develop, revise, and provide repair test plans and procedures.
b. Review, develop, revise, and provide Technical Repair Standards (TRS).
c. Perform electrical and mechanical overhaul and repair of equipment under production.
3.9.2.1. Deliverable Products. Prepare and deliver the following:
b. Test Plans and Procedures (CDRL A021)
c. Test Report - provide test results and documentation. (CDRL A022)
d. Repair Status Report - provide monthly repair status reports, including shipping and scheduling status.
(CDRL A029)
e. Technical Repair Standards - provide or revise TRSs. (CDRL A030)
3.10. Program Support.
3.10.1. Requirements CLIN CLINs 0001 through 0006. The contractor shall collect, consolidate, and summarize information such as historical summaries, current project status and project milestones to prepare briefing and presentation material for various program reviews.
3.10.1.1. Deliverable Products. Prepare and deliver the following:
a. Briefing and Presentation Material (CDRL A031)
3.10.2. Requirements CLINs 0001 through 0006. The contractor shall collect, consolidate, and summarize information such as historical summaries, current project status and project milestones to prepare briefing and
3.10.2.1. Deliverable Products. Prepare and deliver the following:
3.10.3. Requirements CLINs 0001 through 0006. The contractor shall collect, consolidate and summarize information such as historical summaries, current project status and project milestones to prepare briefing and
3.10.3.1. Deliverable Products. Prepare and deliver the following:
3.10.4. Requirements CLINs 0001 through 0006. The contractor shall collect, consolidate and summarize information such as historical summaries, current project status and project milestones to prepare briefing and
3.10.4.1. Deliverable Products. Prepare and deliver the following:
4.0. PROGRESS REPORTS.
4.1. Funds Expenditure Report. The contractor shall prepare monthly funds expenditure reports at the task order level. The contractor shall report the costs associated with each SOW paragraph including a breakout of costs per task. The contractor shall reconcile monthly vouchers with these cost data and explain any discrepancies.
4.1.1. Deliverable Products. Prepare and deliver the following:
a. Funds Expenditure Report (CDRL A032)
b. Voucher Reconciliation Report (CDRL A033)
4.2. Time Expenditure Report. The contractor shall prepare monthly time expenditure reports at the task order level including monthly and year-to-date work hours (straight time and overtime), hourly rate, and costs expended per individual. These reports may be reviewed by a support contractor for compilation of data and verification purposes. A nondisclosure form shall be negotiated with the support contractor and a copy provided to the
Government.
4.2.1. Deliverable Products. Prepare and deliver the following:
a. Time Expenditure Report (CDRL A034)
4.3. Segregation of Cost and Invoice Requirements.
(a) The contractor shall segregate costs incurred under each task order, at the lowest level of performance, either by task or by subtask, rather than only on a Contract Line Item Number (CLIN) or total contract basis and shall submit invoices reflecting costs incurred at that level. In addition, the Contractor shall submit invoices containing summaries of work charged during the period covered, as well as overall cumulative summaries for all work invoiced to date.
When there is more than one line of accounting, the Government will describe each ACRN preceding the accounting citation in the contract or a particular CLIN. The Government will pay contractor invoices by charging only an
ACRN corresponding to the CLIN invoiced. Accordingly, when there are many lines of accounting, the
Government will fund each CLIN separately and it will summarize the funding level for each CLIN. The contractor’s invoices shall state separate incremental and cumulative amounts for each CLIN with further segregation by task and subtask showing each element of cost.
Invoices shall contain the following cost elements by schedule and include supporting detail. The contractor shall submit invoices with two attachments. The first attachment shall contain Schedules A through D, F and G and shall be provided as fully burdened. The second attachment shall contain Schedule E.
Invoice summary for current billing period and cumulative:
(Schedule A) – Direct Labor $
(Schedule B) – Material $
(Schedule C) – Travel $
(Schedule D) – Other Direct Charges $
(Schedule E) – Indirect Charges $
(Schedule F) – Adjustments $
TOTAL $
(Schedule G) – Outstanding Commitments
Schedule A – DIRECT LABOR
Period Covered Cumulative $
Employee Identifier Labor Category Hours Billed Burdened Cost** Hours Billed Burdened Costs*
Off-site On-site*
TOTAL $ $
*On-site work is work performed at a Government installation. Off-site work is work performed at the contractor’s facility.
**The contractor shall make unburdened rate information available upon request. When requested, unburdened rate information shall not include indirect costs and shall reflect the actual rate paid.
Schedule B – MATERIAL
The contractor shall itemize material charges and shall include the invoice number, date, total amount, company, purchase order number, and description of the item. The contractor shall make a copy of the paid invoice available upon request.
Schedule C – TRAVEL
The contractor shall itemize travel charges and shall include the dates of travel, names of individuals traveling, destination, purpose, and total cost. The contractor shall make a copy of the travel voucher available upon request.
The contractor need not submit copies of back-up receipts, but should retain them, as they are subject to review, upon request.
Schedule D - OTHER DIRECT CHARGES
The contractor shall itemize other direct charges at the task order level. Copies of invoices shall be available upon request. Subcontractor invoices shall be in the same format and require the same detail.
Schedule E - INDIRECT CHARGES
Indirect charges include those charges based upon a rate that is subject to verification by DCAA at contract closeout.
Schedule F – ADJUSTMENTS
The contractor shall show current fiscal year invoice adjustments in this section along with the justification. The contractor shall invoice adjustments that pertain to prior fiscal years separately.
Schedule G – OUTSTANDING COMMITMENTS
The contractor shall show any authorized expenditure that remains unpaid that the Government will reimburse pending the receipt of a supplier invoice or travel claim in this section.
Invoices that require segregation by CLIN can either have the CLINs itemized on each schedule or have each CLIN presented individually. The contractor shall not claim nor will the Navy pay for direct costs associated with preparation of an invoice.
Program management/support charges are limited to the first level supervisor. Program management hours above the supervisory level and other support hours not identified in the RFP must be explained in the proposal with a justification of the specific duties to be performed, and shall not be permitted without approval of the contracting officer.
4.3.1. Deliverable Products. Prepare and deliver the following at the task order level:
a. Segregation of cost and invoicing requirements (CDRL A036)
4.4. Progress Report. The contractor shall prepare monthly progress reports describing tasks performed each month at the task order level.
4.4.1. Deliverable Products. Prepare and deliver the following:
a. Progress Status Report (CDRL A035)
4.5.1. Deliverable Products. Contractor shall deliver the following:
a. Executed copies of the NDAs (CDRL A039)
5.0. OTHER DIRECT COSTS (ODCS)
5.1. Material [CLIN 0004]. The Contractor shall provide material or other items at the task order level, which are necessary or integral to the performance of tasking included in the SOW IAW Section H-2 clause Restriction on the
Direct Charging of Material.
5.1.1. Deliverable Products. Prepare and deliver the following:
a. Material Tracking Report (CDRL A037)
b. Government Furnished Property (GFP) (if applicable) Excel (Attachment 6)
5.2. Travel CLIN 0003. The contractor shall comply with the procedures set forth in Section H- Clause 5252.232-
9509 Travel Approval and reimbursement Procedures for further instruction at the task order level. Travel will be allowable only when it is essential to the performance of the tasks detailed in Section 3.0. When travel to and from contractor sites is within 50 driving miles of NAS Patuxent River Webster Field Annex and Patuxent River, Maryland travel costs shall be unallowable costs. Based on historical data, the Government anticipates an average of
37 trips each year to various sites and DoD activities and U.S. Navy and Allied ship and shore facilities worldwide.
Temporary travel to other locations in support of program tasking is required. Travel authorization requests
(including plans, agenda, itinerary, or dates) shall be pre-approved by the Government. The table below provides detail of anticipated and historical travel locations, number of trips, number of peoples traveling, and the number of days per person per trip. Detailed travel requirements will be defined at the task order level.
Location Annual Trips People Days per Person per Trip
1) Aberdeen, MD 3 3 3
2) Largo, FL 6 2 5
3) Beaufort, SC 5 4 5
4) Norfolk, VA 5 4 5
5) Bremerton, WA 3 2 5
6) Yuma, AZ 8 3 5
7) San Diego, CA 4 4 5
8) Okinawa, JP 3 2 5
5.2.1. Deliverable Products. Prepare and deliver the following:
5.3. Field Services CLIN 0005. As defined at the task order level, it will be necessary for the contractor to have a field services funding allocation CLIN to provide funding for shipping, install location preparation, and other related services. Shipping services include shipment and delivery services, such as FedEx, UPS and US Postal Service.
Site services include industrial support services, such as Calibration Services, Packing Supplies and Delivery
Services, Electronic Component Repair Services, Repair/Refurbishment Services, Welding Support, Forklift
Operation, Removal and Installation of Blown Fiber Optical Strands; Cable Assembly, Removal, Installation, Modification and Testing; Mounting, Fabrication , Modification, Relocation/Installation and/or Replacement of
Equipment, Waveguide and Cables; Welding; Craning and Rigging; Tile Installation; Firewatch; Sandblasting &
Painting; Sheet Metal; Gas Free Certification; Environmental & Safety Testing & Certification; Safety Training;
Equipment Repair; Equipment Relocation; Hazmat Training; Paint & Heavy Metals Sampling; Work Authorization
Trainin…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .