A4a_Bid Schedule Extended.pdf

PDF 108 KB Posted

Attached to
HICS Boring and Erosion
Solicitation number
FA462626R0019
Issued by

About this file

This is a Bid Schedule for a Horizontal Directional Drilling (HDD) and erosion control project. The schedule contains 29 line items (Sub CLINs AA through BC) organized into three primary categories: mobilization, directional boring work, and erosion control materials and services.

The mobilization line items (AA and AB) cover equipment setup costs for bore rig and erosion control operations, with lump sum pricing for one mobilization per site. Conduit line items (AC through AE) specify purchase and delivery of 4" and 6" HDPE continuous length conduit in standard and extended lengths, priced by linear foot with per-site maximums of 500-1,000 linear feet. The directional bore work items (AF through AS) are differentiated by conduit size (4" or 6") and soil/rock type (clay, cobble, rock, and shale), with further distinctions between work under and over 500 linear feet, all priced by linear foot. Erosion control materials include three classes of rip rap (AT-AV), rip rap hauling measured in ton-miles from Malmstrom AFB Montana (AW), fill dirt and topsoil for site restoration (AX-AY), and erosion repair services in two categories based on cubic yard volume (AZ-BA). Additional items include straw wattle installation (BB) priced per each and bonding (BC) as a lump sum. All work must remain within specified per-site maximums for quantities and be completed according to government contract requirements.

View the file

Other files

File Type Posted
A2_SOW_TO1.pdf PDF
A8_Subcontractor Consent.docx DOCX document
A6_Section L and M.pdf PDF
A3_Submittal Schedule.pdf PDF
A2b_Location Map_TO1.pdf PDF
A2a_Erosion Photo_TO1.pdf PDF
A2c_Location Map Close_TO1.pdf PDF
A1_SOW_Combined Specs.pdf PDF
Solicitation - FA462626R0019.pdf PDF
A9_CEAL_Blank.xlsx XLSX spreadsheet
A7_Past Performance Reference Sheet.docx DOCX document
A5_Combined Wage Determinations_18May26.pdf PDF
A4_Bid Schedule_Blank.xls XLS spreadsheet
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

SUB CLIN DESCRIPTION EXTENDED DESCRIPTION

AA Bore Rig Mobilization This line item shall be used to cover all costs related to mobilization of an equipment set necessary to perform Horizontal Directional Drilling (HDD). These costs may include general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Bore Rig Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for " Bore Rig Mobilization." The Government will exercise every effort to keep the Bore Rig mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site.

AB Erosion Control Mobilization This line item shall be used to cover all costs related to mobilization of an equipment set necessary to perform Erosion Control measures as outlined in the this project. These costs may include general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Erosion Control Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for "Erosion Control Mobilization." The Government will exercise every effort to keep the Erosion Control mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site.

AC 4” Conduit Includes the purchase and delivery of a 4” SDR 11 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site

AD 4” Conduit over 500 Feet Includes the purchase and delivery of a 4” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Estimated 500-1000 LF per Site.

AE 6” Conduit Includes the purchase and delivery of a 6” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 6” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.

AF Directional Bore Clay 4” Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can Conduit be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site

AG Directional Bore Clay Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 6”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can b 6”Conduit made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Not to excee 500 LF per site.

AH Directional Bore Clay Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can b 4”Conduit over 500 feet made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.

AJ Directional Bore Cobble 4” Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 Conduit inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.

AK Directional Bore Cobble 6” Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 6”conduit. Cobble is described as a class of rock with a particle size of 3-12 Conduit inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site

AL Directional Bore Cobble 4” Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 Conduit Over 500 Feet inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.

AM Directional Bore Rock 4” Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than Conduit one mineral and, sometimes, organic material, e.g. granite or limestone.Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.

AN Directional Bore Rock 6” Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 6”conduit. Rock is defined as any consolidated material consisting of more than Conduit one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.

AP Directional Bore Rock 4” Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than Conduit over 500 Feet one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.

AQ Directional Bore Shale 4” Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size Conduit particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500 LF per site

BID SCHEDULE

SUB CLIN DESCRIPTION EXTENDED DESCRIPTION

AR Directional Bore Shale 4” Conduit Over 500 Feet

AS Directional Bore Shale 6” Conduit

Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500-1000 LF per site Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 6”conduit. Shale is described as a sedimentary rock composed of silt and clay siz particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500 LF per site

AT Class III Rip Rap Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include Class III rip rap. Class III rip rap rock will be a minimum size of 9.24 – 33.84 inch. Not to exceed 900 cubic yards per site.

AU Class II Rip Rap Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include class II rip rap. Class II rip rap rock will be a minimum size of 7.32 - 24 inch. Not to exceed 800 cubic yards per site.

AV Class I Rip Rap Includes all work, equipment, and materials necessary to deliver, and stockpile, excavate, haul, fill, grade and compact all materials to include Class I rip rap. Class I rip rap rock will be a minimum size of 3.24 – 12.6 inch. Not to exceed 800 cubic yards per site.

AW Rip Rap Hauling Includes all labor, equipment, and materials necessary to transport/haul Class I, II, III rip rap from the approved quarry to the Erosion Control work location. Rip Rap Hauling will be paid by the Ton/Mile measured from the Malmstrom AFB, MT to the work Location

AX Fill Dirt Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include fill dirt and water needed for compaction. This item also includes placing fill dirt around cable and bringing area back to original grade as much as possible. Fill dirt is with rock less than 2 inches in diameter. Not to exceed 500 cubic yards per site

AY Top Soil Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil and water needed for compaction. This item also includes placing top soil over erosion area. Not to exceed 300 cubic yards per site

AZ Erosion Repair under 50 CY Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap, and water for compaction. This item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area under 50 cubic yards will be paid by site. This item will be paid by each site (EA)

BA Erosion Repair Over 50 Cubic Yards

Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap, and water for compaction. This item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area over 50 cubic yards will be paid by cubic yards (CY)

BB Straw Wattle Includes all work, equipment, and materials necessary to deliver and install a wattle to prevent future erosion of the HICS Right of Way. Installation of a Straw wattle will be performed using best standard practices. This item paid per EA

BC Bonding Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements