A2_SOW_TO1.pdf

PDF 80 KB Posted

Attached to
HICS Boring and Erosion
Solicitation number
FA462626R0019
Issued by

About this file

This is a Statement of Work (SOW) for Task Order #1 addressing repair of HICS erosion and conduit damage. The work will be performed approximately 4 miles northeast of B-01 in Judith Basin County. The contractor is responsible for providing and placing fill material, compacting imported fill, and shaping the area to mitigate the severity of future erosion. The project requires approximately 40 cubic yards of fill to be compacted in place. Reference materials including attached maps and photographs provide additional site details and specifications.

The contractor must coordinate all work activities with the Cable Affairs Office via telephone at 731-2459. All work scope is outlined in the attached TO#1 Bid Schedule, which contains detailed specifications and requirements for task completion.

View the file

Other files

File Type Posted
A8_Subcontractor Consent.docx DOCX document
A6_Section L and M.pdf PDF
A3_Submittal Schedule.pdf PDF
A2b_Location Map_TO1.pdf PDF
A2a_Erosion Photo_TO1.pdf PDF
A4a_Bid Schedule Extended.pdf PDF
A2c_Location Map Close_TO1.pdf PDF
A1_SOW_Combined Specs.pdf PDF
Solicitation - FA462626R0019.pdf PDF
A9_CEAL_Blank.xlsx XLSX spreadsheet
A7_Past Performance Reference Sheet.docx DOCX document
A5_Combined Wage Determinations_18May26.pdf PDF
A4_Bid Schedule_Blank.xls XLS spreadsheet
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPAIR HICS EROSION/CONDUIT

TASK ORDER #1

STATEMENT OF WORK

The place of performance for Task Order #1 will be approximately 4 miles NE of B-01 in Judith Basin County (See attached map). This Task Order includes all work as outlined in attached TO#1 Bid Schedule. In general, provide and place fill, compact imported fill and shape area to decrease severity of future erosion. This work will require approximately 40cy of fill compacted in place.

See attached maps and photos.

Contractor shall coordinate all work with the Cable Affairs Office at 731-2459.