A3_Submittal Schedule.pdf
PDF 79 KB Posted
- Attached to
- HICS Boring and Erosion
- Solicitation number
- FA462626R0019
About this file
This document is a Schedule of Materials Submittals for a federal construction project to repair HICS erosion and conduit work under Air Force Solicitation/Contract Number FA46-26-xx-xxxx (Project Number NZAS 26-6100).
The schedule establishes submittal requirements for 20 line items across administrative documentation, environmental compliance materials, and construction materials. Administrative submittals due prior to start work (PSW) include a Quality Control Plan, Utility Locates (811 request), contractor onsite safety and health plan, and Class II ODC Written Request. Environmental and waste management submittals include an AF Form 3952 Chemical/Hazardous Material Request (10 days prior to beginning construction), EPRCA Section 313 Form R, Waste Management Plan, Recovered Material Written Determination Form, Recycled Material Use Report, Monthly Solid Waste Disposal Diversion and Disposal report (end of month), and Affirmative Procurement documentation. Construction material submittals, all due 10 days prior to start work, cover Large Rock Rip Rap, Medium Rock Rip Rap, Small Rock Rip Rap, Fill Dirt, Top Soil, SDR 11 HDPE Conduit, SDR 9 HDPE Conduit, and Straw Wattles. All line items require four copies of documentation. The schedule includes columns for tracking dates received, civil engineering review dates, return suspense dates, contractor notifications, resubmittals, and final approval status, with contractor/administrator responsible for completing the tracking information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A4a_Bid Schedule Extended.pdf | ||
| A2_SOW_TO1.pdf | ||
| A2c_Location Map Close_TO1.pdf | ||
| A1_SOW_Combined Specs.pdf | ||
| Solicitation - FA462626R0019.pdf | ||
| A8_Subcontractor Consent.docx | DOCX document | |
| A6_Section L and M.pdf | ||
| A2b_Location Map_TO1.pdf | ||
| A2a_Erosion Photo_TO1.pdf | ||
| A9_CEAL_Blank.xlsx | XLSX spreadsheet | |
| A7_Past Performance Reference Sheet.docx | DOCX document | |
| A5_Combined Wage Determinations_18May26.pdf | ||
| A4_Bid Schedule_Blank.xls | XLS spreadsheet |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2
SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.
NZAS 26-6100 REPAIR HICS EROSION/CONDUIT FA4626-xx-xxxx
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E
N U
M B
E R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
E
S
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
T U
R E
R 'S
E C
O M
M E
N D
A T
IO
N
S
M A
N U
FA
C
T U
R E
W
A R
R A
N T
Y
C A
T A
L O
G D
A T
A
O
PE
R A
T
IN
G
ST
R U
C T
IO
N
S
O T
H E
R
R E
Q U
IR
E
D S
U B
M
IS
SI
O
N
D
T
T E
R E
C E
IV
E
C
N
T R
A C
T
IN
G
D A
T E
T O
C
IV
IL
EN
IN
EE
R
IN
G
R E
T U
R N
S U
SP
E
N
SE
D A
T E
SU
B
M
IT
T A
L N
U M
B E
R S
DATE CONTRACTOR NOTIFIED
C O
N T
R A
C T
SU
B M
IT
T
L
FI
A L
A
PP
R O
V A
L
REMARKS
APPROVED DIS- APPROVED
1 01000-14 3.13.B Quality Control Plan 4 10 CD
ANP
2 01000-8 3.21.A Utility Locates (811) 4 10 CD
PSW
3 01001-1 3.24.A.5 Contractor onsite safety and health plan 4 4 30CD
PSW x
4 01360-7 3.5.1. Class II ODC Written Request 4 4 10 D
PSW
5 01360-7 8.1.2. AF Form 3952 Chem/Haz Material Request 4 10 D
PBC
6 01360-7 7.0. EPRCA Section 313 Form R 4 10 D
AFA
7 01360-11 11.6. Attachment 1. Waste Management Plan 4 10 D
PSW
8 01360-11 11.6. Attachment 2. Recovered Material Written Determination Form 4 10 D
AFA
9 01360-11 11.6. Attachment 3. Recycled Material Use Report 4 10 D
AFA
10 01360-11 11.6. Attachment 4. Monthly Solid Waste Disposal Diversion and Disposal 4 10 D
EOM
11 01360-11 12.1, Affirmative Procurement 4 10 D
PSW
D - Days CD - Calendar Days PBC - Prior to Beginning Construction AFA- After Final Acceptance EOM - End Of Month PFI - Prior to Final Inspection AFI - After Final Inspection PSW - Prior to Start Work PPC - Prior to Project Completion ANP - After Notice to Proceed BBCW - Before Beginning Concrete Work PT - Prior to Testing ATT - After Test is Taken BD - Before Delivery WD- Working Days
Number of Copies Required
AF Form 66
02: 000510_AC01_00_90-
Attach 2 Submittal Schedule-7/9/2026 SS-1 of 3
Attachment 2
SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.
NZAS 26-6100 REPAIR HICS EROSION/CONDUIT FA4626-xx-xxxx
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E
N U
M B
E R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
E
S
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
T U
R E
C
O M
M E
N D
A T
IO
N
S
M A
N U
FA
C
T U
R E
W
R
R A
N T
Y
C A
T A
L O
G D
A T
A
O
PE
R A
T
ST
R U
C T
IO
N
S
O T
H E
R
R E
Q U
IR
E
D S
U B
M
IS
SI
T
T E
R E
C E
IV
E
C
N
T R
A C
T
IN
G
D A
T E
T O
C
IV
IL
EN
IN
EE
R
IN
G
R E
T U
R N
S U
SP
E
N
SE
D A
T E
SU
B
M
IT
T A
L N
U M
B E
R S
DATE CONTRACTOR NOTIFIED
C O
N T
R A
C T
SU
B M
IT
T
L
FI
A L
A
PP
R O
V A
L
REMARKS
APPROVED DIS- APPROVED
Number of Copies Required
13 02200-2 2A.1 Large Rock Rip Rap 4 10 D
PSW
14 02200-2 2A.2 Medium Rock Rip Rap 4 10 D
PSW
15 02200-2 2A.3 Small Rock Rip Rap 4 10 D
PSW
16 02200-2 2A.4 Fill Dirt 4 10 D
PSW
17 02200-2 2A.5 Top Soil 4 10 D
PSW
18 02200-3 2B.1.a.i SDR 11 HDPE Conduit 4 10 D
PSW
19 02200-3 2B.1.a.ii SDR 9 HDPE Conduit 4 10 D
PSW
20 02200-3 2C Straw Wattles 4 10 D
PSW
AF Form 66
02: 000510_AC01_00_90-
Attach 2 Submittal Schedule-7/9/2026 SS-2 of 3
File details come from the government source that posted it. Updated .