This document is a Schedule of Items for the Lake Winfield Scott Campground Reconstruction - Phase 1 project by the USDA Forest Service's Chattahoochee-Oconee National Forest. The comprehensive bid schedule includes a base bid and three optional bid items covering various construction elements. The base bid encompasses administration, site preparation, North Loop Bathhouse construction, water line installation, and sanitary sewer work, with detailed line items for specific infrastructure components like PVC piping, gate valves, pavement, grading, and utility installations.
The optional bid items include a South Loop Bathhouse (Option 1), an Entrance/Dump Station (Option 2), and a Guard Shack (Option 3), each with granular breakdowns of construction activities such as site work, demolition, concrete, masonry, plumbing, electrical, and HVAC. While the unit prices are not filled in, the document provides estimated quantities for each line item, ranging from linear feet of piping to lump sum allocations for general conditions and specialized construction tasks. The final section includes a summary table for calculating the total project cost, incorporating the base bid and all optional items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 4- 12445226Q0003.pdf | ||
| A1- rev3 RFQ T and C.docx | DOCX document | |
| Amendment 3- 12445226Q0003.pdf | ||
| Amend3 LWS Campground Recon.xlsx | XLSX spreadsheet | |
| A3 - Rev SOI LWS Mar2026.pdf | ||
| A5 - rev LWS Architectural Set.pdf | ||
| A1 - rev2 RFQ T and C.docx | DOCX document | |
| A1 - rev2 RFQ T and C.docx | DOCX document | |
| Amendment 0002 - 12445226Q0003.pdf | ||
| Questions 12445226Q0006.docx | DOCX document | |
| A2 - Rev SOW LWS Feb2026.docx | DOCX document | |
| A3 - Rev SOI LWS Feb2026.pdf | ||
| Amendment 0001 - 12445226Q0003.pdf | ||
| A1 - rev RFQ Terms and Conditions 12445226Q0003.docx | DOCX document | |
| A1 -RFQ Terms and Conditions 12445226Q0003.docx | DOCX document | |
| A2 - Rev SOW LWS Final.docx | DOCX document | |
| A5 - LWS Architectural Set.pdf | ||
| A7 - LWS CIVIL_100_R1_signed-final.zip | ZIP file | |
| A8 - Info SR 180 at Slaughter Crk.docx | DOCX document | |
| A9 - WD GA20250107 Bldg Union County.pdf | ||
| A4 - Updated Combined SPECS.pdf | ||
| A6 - Past Performance Questionnaire.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA FOREST SERVICE
CHATTAHOOCHEE - OCONEE NATIONAL FOREST
LAKE WINFIELD SCOTT CAMPGROUND RECONSTRUCTION - PHASE 1
INDEPENDENT GOVERNMENT ESTIMATE
Lake Winfield Scott Campground Reconstruction Project Phase 1
Optional Bid Item 2 (Entrance/ Dump Station)
Pay Item Description Estimated Units Unit Price Subtotal
Quantity 1 Entrance/Dump Station 1 LS
Soil Erosion Control and Site Stabilization 1 LS $
Survey Staking 1 LS $
6" S DR26PVC 160 LF $
Sanitary Sewer Clean-Out 2 EA $
2"SCH80PVC 55 LF $
1"SCH80PVC 55 LF $
Gate Valve 2 EA $
Asphalt Pavement 2,100 SY $
Grading 1 LS $
Bollards 12 EA $
Dump Station 1 LS $
Demolition 1 LS $
Option 2 Total
Lake Winfield Scott Campground Reconstruction Project Phase 1
Optional Bid Item 3 (Guard Shack)
Pay Item I Description Estimated Quantity
Units Unit Price Subtotal
1 Guard Shack 1 LS General 1 LS $
Concrete 1 LS $
Masonry 1 LS $
Woods and Pasties 1 LS $
Thermo Protection 1 LS $
Openings 1 LS $
Finishes 1 LS $
Specialties 1 LS $
Furnishings 1 LS $
Plumbing 1 LS $
HVAC 1 LS $
Electrical 1 LS $
Option 3 Total
Total Am mount Including All Options and Contingency
Base $
Option 1 $
Option 2 $
Option 3 $
Total $
Pay Item Total
Pay Item Total