This is a Schedule of Items for the Lake Winfield Scott Campground Reconstruction project issued by the USDA Forest Service for the Chattahoochee-Oconee National Forest. The document presents a detailed pricing template with estimated quantities and unit prices for base bid items and three optional bid items.
The base bid consists of eight primary pay items: (1) Administration, Supervision, and Mobilization at 1 lump sum; (2) Survey and Staking at 1 lump sum; (3) Soil Erosion Control and Site Stabilization at 1 lump sum; (4) Pavement Repairs at 6,000 square feet; (5) North Loop Bathhouse reconstruction including general conditions, site work, utility lines, and building components (concrete, masonry, HVAC, electrical, plumbing) at 1 lump sum; (6) Water Line installation comprising 10,800 linear feet of 4" C900 PVC, 2,245 linear feet of 1" SCH80 PVC, gate valves, ball valves, frostproof hydrants, and related appurtenances at 1 lump sum; (7) Sanitary Sewer infrastructure including 6" and 8" SDR 26 PVC piping, pump station, 21 sanitary sewer man holes, and drain field and septic tank systems at 1 lump sum; and (8) Service Road Construction including 1 acre clearing and grubbing, 7.35 stations of roadway excavation, rolling dips, culvert installation, geotextile placement, and 540 tons of aggregate base at 1 lump sum. Three optional bid items are included: Option 1 (South Loop Bathhouse), Option 2 (Entrance/Dump Station with 2,100 square yards of asphalt pavement), and Option 3 (Guard Shack). All line items include columns for unit price, subtotal, and pay item total, with a base total and individual option totals to be completed by bidders.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 4- 12445226Q0003.pdf | ||
| A1- rev3 RFQ T and C.docx | DOCX document | |
| Amendment 3- 12445226Q0003.pdf | ||
| Amend3 LWS Campground Recon.xlsx | XLSX spreadsheet | |
| A5 - rev LWS Architectural Set.pdf | ||
| A1 - rev2 RFQ T and C.docx | DOCX document | |
| A1 - rev2 RFQ T and C.docx | DOCX document | |
| Amendment 0002 - 12445226Q0003.pdf | ||
| Questions 12445226Q0006.docx | DOCX document | |
| A2 - Rev SOW LWS Feb2026.docx | DOCX document | |
| A3 - Rev SOI LWS Feb2026.pdf | ||
| Amendment 0001 - 12445226Q0003.pdf | ||
| A1 - rev RFQ Terms and Conditions 12445226Q0003.docx | DOCX document | |
| A1 -RFQ Terms and Conditions 12445226Q0003.docx | DOCX document | |
| A2 - Rev SOW LWS Final.docx | DOCX document | |
| A3 - SOI.pdf | ||
| A5 - LWS Architectural Set.pdf | ||
| A7 - LWS CIVIL_100_R1_signed-final.zip | ZIP file | |
| A8 - Info SR 180 at Slaughter Crk.docx | DOCX document | |
| A9 - WD GA20250107 Bldg Union County.pdf | ||
| A4 - Updated Combined SPECS.pdf | ||
| A6 - Past Performance Questionnaire.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA FOREST SERVICE
CHATTAHOOCHEE - OCONEE NATIONAL FOREST
LAKE WINFIELD SCOTT CAMPGROUND RECONSTRUCTION
SCHEDULE OF ITEMS
Pay Item Estimated Quantity
Units Unit Price Subtotal Pay Item Total
1 1 LS $ $ $
2 1 LS $ $ $
3 1 LS $ $ $
4 6000 SF $ $ $
5 1 LS $
General Conditions 1 LS $ $
6” SDR 26 PVC 60 LF $ $
Sanitary Sewer Clean-Out 1 EA $ $
2" SCH80 PVC 130 LF $ $
Gate Valve 1 EA $ $ Asphalt Pavement 170 SY $ $
Grading 1 LS $ $
Retaining Walls 240 LF $ $ Concrete Sidewalk 120 SY $ $
Dumpster Pad 1 LS $ $
15" HDPE 50 LF $ $
Flared End Section 2 EA $ $
Demolition 1 LS $ $
Clearing and Grubbing 1 LS $ $
Concrete 1 LS $ $
Masonry 1 LS $ $ Woods and Plastics 1 LS $ $ Thermo Protection 1 LS $ $
Openings 1 LS $ $
Finishes 1 LS $ $
Specialties 1 LS $ $
Furnishings 1 LS $ $ Plumbing 1 LS $ $
HVAC 1 LS $ $
Electrical 1 LS $ $
6 1 LS $
4" C900 PVC 10,800 LF $ $
2" SCH80 PVC 295 LF $ $
1" SCH80 PVC 2,245 LF $ $
3/4" SCH80 PVC 60 LF $ $
Mobilization for Aerial Crossing 1 LS $ $
Aerial Main 60 LF $ $ 4" Gate Valves 33 EA $ $ 2" Ball Valves 26 EA $ $ 1" Ball Valve 1 EA $ $
Lake Winfield Scott Campground Reconstruction Project - Base Bid Items
Water Line
Description
Administration, Supervision, Mobilization
Survey and Staking
Soil Erosion Control and Site Stabilization
Site Work
Pavement Repairs
North Loop Bathhouse
LAKE WINFIELD SCOTT CAMPGROUND RECONSTRUCTION
SCHEDULE OF ITEMS
3/4" Ball valve 1 EA $ $ Frostproof Hydrant 13 EA $ $
Air Release Valves 6 EA $ $
Drainage Valves 7 EA $ $ Spring Box 2 EA $ $
Clearing and Grubbing 1 LS $ $
7 1 LS $
4" SCH. 40 Force Main 500 LF $ $
6” SDR 26 PVC 2360 LF $ $
8” SDR 26 PVC 710 LF $ $
8” Epoxy lined DIP 610 LF $ $ Pump Station 1 LS $ $ Sanitary Sewer Man Hole 21 EA $ $ North Loop Drain Field & Septic Tank 1 LS $ $ Sanitary Sewer Clean-Outs 4 EA $ $ South Loop Drain Field & Septic Tank 1 LS $ $ Demo Sewer Line 1000 LF $ $ Demo Existing Sewer Manholes 6 EA $ $
Clearing and Grubbing 1 LS $ $
8 1 LS $
Clearing and Grubbing 1 ACRE $ $
Roadway Excavation 7.35 STA $ $
Rolling Dips 7 EA $ $
Culvert, HDPE 35 LF $ $
Geotextile 701 non-woven 12870 SF $ $
Aggregate Base 540 TON $ $
Base Total
Sanitary Sewer
Service Road Construction
LAKE WINFIELD SCOTT CAMPGROUND RECONSTRUCTION
SCHEDULE OF ITEMS
Pay Item Estimated Quantity
Units Unit Price Subtotal Pay Item Total
1 1 LS $
General Conditions 1 LS $ $
6” SDR 26 PVC 70 LF $ $
Sanitary Sewer Clean-Out 2 EA $ $
2" SCH80 PVC 120 LF $ $
Gate Valve 1 EA $ $ Asphalt Pavement 120 SY $ $ Grading 1 LS $ $ Concrete Sidewalk 120 SY $ $ Dumpster Pad 1 LS $ $
15" HDPE 70 LF $ $
Flared End Section 1 EA $ $ Demolition 1 LS $ $
Concrete 1 LS $ $ Masonry 1 LS $ $ Woods and Plastics 1 LS $ $ Thermo Protection 1 LS $ $ Openings 1 LS $ $ Finishes 1 LS $ $ Specialties 1 LS $ $ Furnishings 1 LS $ $ Plumbing 1 LS $ $
HVAC 1 LS $ $
Electrical 1 LS $ $ Clearing and Grubbing 1 LS $ $
Option 1 Total $
Site Work
South Loop Bathhouse
Lake Winfield Scott Campground Reconstruction Project
Description
Optional Bid Item 1 (South Loop Bathhouse)
LAKE WINFIELD SCOTT CAMPGROUND RECONSTRUCTION
SCHEDULE OF ITEMS
Pay Item Estimated Quantity
Units Unit Price Subtotal Pay Item Total
1 1 LS $
6” SDR 26 PVC 160 LF $ $
Sanitary Sewer Clean-Out 2 EA $ $
2" SCH80 PVC 55 LF $ $
1" SCH80 PVC 55 LF $ $
Gate Valve 2 EA $ $
Asphalt Pavement 2,100 SY $ $ Grading 1 LS $ $
Bollards 12 EA $ $
Dump Station 1 LS $ $ Demolition 1 LS $ $
Option 2 Total
Pay Item Estimated Quantity
Units Unit Price Subtotal Pay Item Total
1 1 LS $
General 1 LS $ $ Concrete 1 LS $ $ Masonry 1 LS $ $ Woods and Pastics 1 LS $ $ Thermo Protection 1 LS $ $ Openings 1 LS $ $ Finishes 1 LS $ $ Specialties 1 LS $ $ Furnishings 1 LS $ $ Plumbing 1 LS $ $
HVAC 1 LS $ $
Electrical 1 LS $ $
Option 3 Total $
Guard Shack
Optional Bid Item 3 (Guard Shack)
Description
Optional Bid Item 2 (Entrance/ Dump Station)
Entrance/Dump Station