This is a Schedule of Items for the Lake Winfield Scott Campground Reconstruction project issued by the USDA Forest Service for the Chattahoochee-Oconee National Forest. The document presents a detailed pricing template with estimated quantities and unit prices for base bid items and three optional bid items.

The base bid consists of eight primary pay items: (1) Administration, Supervision, and Mobilization at 1 lump sum; (2) Survey and Staking at 1 lump sum; (3) Soil Erosion Control and Site Stabilization at 1 lump sum; (4) Pavement Repairs at 6,000 square feet; (5) North Loop Bathhouse reconstruction including general conditions, site work, utility lines, and building components (concrete, masonry, HVAC, electrical, plumbing) at 1 lump sum; (6) Water Line installation comprising 10,800 linear feet of 4" C900 PVC, 2,245 linear feet of 1" SCH80 PVC, gate valves, ball valves, frostproof hydrants, and related appurtenances at 1 lump sum; (7) Sanitary Sewer infrastructure including 6" and 8" SDR 26 PVC piping, pump station, 21 sanitary sewer man holes, and drain field and septic tank systems at 1 lump sum; and (8) Service Road Construction including 1 acre clearing and grubbing, 7.35 stations of roadway excavation, rolling dips, culvert installation, geotextile placement, and 540 tons of aggregate base at 1 lump sum. Three optional bid items are included: Option 1 (South Loop Bathhouse), Option 2 (Entrance/Dump Station with 2,100 square yards of asphalt pavement), and Option 3 (Guard Shack). All line items include columns for unit price, subtotal, and pay item total, with a base total and individual option totals to be completed by bidders.

View the file

Other files

File Type Posted
Amendment 4- 12445226Q0003.pdf PDF
A1- rev3 RFQ T and C.docx DOCX document
Amendment 3- 12445226Q0003.pdf PDF
Amend3 LWS Campground Recon.xlsx XLSX spreadsheet
A5 - rev LWS Architectural Set.pdf PDF
A1 - rev2 RFQ T and C.docx DOCX document
A1 - rev2 RFQ T and C.docx DOCX document
Amendment 0002 - 12445226Q0003.pdf PDF
Questions 12445226Q0006.docx DOCX document
A2 - Rev SOW LWS Feb2026.docx DOCX document
A3 - Rev SOI LWS Feb2026.pdf PDF
Amendment 0001 - 12445226Q0003.pdf PDF
A1 - rev RFQ Terms and Conditions 12445226Q0003.docx DOCX document
A1 -RFQ Terms and Conditions 12445226Q0003.docx DOCX document
A2 - Rev SOW LWS Final.docx DOCX document
A3 - SOI.pdf PDF
A5 - LWS Architectural Set.pdf PDF
A7 - LWS CIVIL_100_R1_signed-final.zip ZIP file
A8 - Info SR 180 at Slaughter Crk.docx DOCX document
A9 - WD GA20250107 Bldg Union County.pdf PDF
A4 - Updated Combined SPECS.pdf PDF
A6 - Past Performance Questionnaire.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA FOREST SERVICE

CHATTAHOOCHEE - OCONEE NATIONAL FOREST

LAKE WINFIELD SCOTT CAMPGROUND RECONSTRUCTION

SCHEDULE OF ITEMS

Pay Item Estimated Quantity

Units Unit Price Subtotal Pay Item Total

1 1 LS $ $ $

2 1 LS $ $ $

3 1 LS $ $ $

4 6000 SF $ $ $

5 1 LS $

General Conditions 1 LS $ $

6” SDR 26 PVC 60 LF $ $

Sanitary Sewer Clean-Out 1 EA $ $

2" SCH80 PVC 130 LF $ $

Gate Valve 1 EA $ $ Asphalt Pavement 170 SY $ $

Grading 1 LS $ $

Retaining Walls 240 LF $ $ Concrete Sidewalk 120 SY $ $

Dumpster Pad 1 LS $ $

15" HDPE 50 LF $ $

Flared End Section 2 EA $ $

Demolition 1 LS $ $

Clearing and Grubbing 1 LS $ $

Concrete 1 LS $ $

Masonry 1 LS $ $ Woods and Plastics 1 LS $ $ Thermo Protection 1 LS $ $

Openings 1 LS $ $

Finishes 1 LS $ $

Specialties 1 LS $ $

Furnishings 1 LS $ $ Plumbing 1 LS $ $

HVAC 1 LS $ $

Electrical 1 LS $ $

6 1 LS $

4" C900 PVC 10,800 LF $ $

2" SCH80 PVC 295 LF $ $

1" SCH80 PVC 2,245 LF $ $

3/4" SCH80 PVC 60 LF $ $

Mobilization for Aerial Crossing 1 LS $ $

Aerial Main 60 LF $ $ 4" Gate Valves 33 EA $ $ 2" Ball Valves 26 EA $ $ 1" Ball Valve 1 EA $ $

Lake Winfield Scott Campground Reconstruction Project - Base Bid Items

Water Line

Description

Administration, Supervision, Mobilization

Survey and Staking

Soil Erosion Control and Site Stabilization

Site Work

Pavement Repairs

North Loop Bathhouse

LAKE WINFIELD SCOTT CAMPGROUND RECONSTRUCTION

SCHEDULE OF ITEMS

3/4" Ball valve 1 EA $ $ Frostproof Hydrant 13 EA $ $

Air Release Valves 6 EA $ $

Drainage Valves 7 EA $ $ Spring Box 2 EA $ $

Clearing and Grubbing 1 LS $ $

7 1 LS $

4" SCH. 40 Force Main 500 LF $ $

6” SDR 26 PVC 2360 LF $ $

8” SDR 26 PVC 710 LF $ $

8” Epoxy lined DIP 610 LF $ $ Pump Station 1 LS $ $ Sanitary Sewer Man Hole 21 EA $ $ North Loop Drain Field & Septic Tank 1 LS $ $ Sanitary Sewer Clean-Outs 4 EA $ $ South Loop Drain Field & Septic Tank 1 LS $ $ Demo Sewer Line 1000 LF $ $ Demo Existing Sewer Manholes 6 EA $ $

Clearing and Grubbing 1 LS $ $

8 1 LS $

Clearing and Grubbing 1 ACRE $ $

Roadway Excavation 7.35 STA $ $

Rolling Dips 7 EA $ $

Culvert, HDPE 35 LF $ $

Geotextile 701 non-woven 12870 SF $ $

Aggregate Base 540 TON $ $

Base Total

Sanitary Sewer

Service Road Construction

LAKE WINFIELD SCOTT CAMPGROUND RECONSTRUCTION

SCHEDULE OF ITEMS

Pay Item Estimated Quantity

Units Unit Price Subtotal Pay Item Total

1 1 LS $

General Conditions 1 LS $ $

6” SDR 26 PVC 70 LF $ $

Sanitary Sewer Clean-Out 2 EA $ $

2" SCH80 PVC 120 LF $ $

Gate Valve 1 EA $ $ Asphalt Pavement 120 SY $ $ Grading 1 LS $ $ Concrete Sidewalk 120 SY $ $ Dumpster Pad 1 LS $ $

15" HDPE 70 LF $ $

Flared End Section 1 EA $ $ Demolition 1 LS $ $

Concrete 1 LS $ $ Masonry 1 LS $ $ Woods and Plastics 1 LS $ $ Thermo Protection 1 LS $ $ Openings 1 LS $ $ Finishes 1 LS $ $ Specialties 1 LS $ $ Furnishings 1 LS $ $ Plumbing 1 LS $ $

HVAC 1 LS $ $

Electrical 1 LS $ $ Clearing and Grubbing 1 LS $ $

Option 1 Total $

Site Work

South Loop Bathhouse

Lake Winfield Scott Campground Reconstruction Project

Description

Optional Bid Item 1 (South Loop Bathhouse)

LAKE WINFIELD SCOTT CAMPGROUND RECONSTRUCTION

SCHEDULE OF ITEMS

Pay Item Estimated Quantity

Units Unit Price Subtotal Pay Item Total

1 1 LS $

6” SDR 26 PVC 160 LF $ $

Sanitary Sewer Clean-Out 2 EA $ $

2" SCH80 PVC 55 LF $ $

1" SCH80 PVC 55 LF $ $

Gate Valve 2 EA $ $

Asphalt Pavement 2,100 SY $ $ Grading 1 LS $ $

Bollards 12 EA $ $

Dump Station 1 LS $ $ Demolition 1 LS $ $

Option 2 Total

Pay Item Estimated Quantity

Units Unit Price Subtotal Pay Item Total

1 1 LS $

General 1 LS $ $ Concrete 1 LS $ $ Masonry 1 LS $ $ Woods and Pastics 1 LS $ $ Thermo Protection 1 LS $ $ Openings 1 LS $ $ Finishes 1 LS $ $ Specialties 1 LS $ $ Furnishings 1 LS $ $ Plumbing 1 LS $ $

HVAC 1 LS $ $

Electrical 1 LS $ $

Option 3 Total $

Guard Shack

Optional Bid Item 3 (Guard Shack)

Description

Optional Bid Item 2 (Entrance/ Dump Station)

Entrance/Dump Station

Lake Winfield Scott Campground Reconstruction Project

Lake Winfield Scott Campground Reconstruction Project

Description

File details come from the government source that posted it. Updated .