This is a Schedule of Items document for the Lake Winfield Scott Campground Reconstruction project administered by the USDA Forest Service Chattahoochee-Oconee National Forest. The document provides a detailed pricing template for bidders to submit unit prices and calculate subtotals and pay item totals across multiple work categories.
The base bid includes eight primary pay items: (1) Administration, Supervision, and Mobilization; (2) Survey and Staking; (3) Soil Erosion Control and Site Stabilization; (4) Pavement Repairs (6,000 SF); (5) North Loop Bathhouse reconstruction including site work, structural components, plumbing, HVAC, and electrical work; (6) Water Line installation comprising 10,800 LF of 4" C900 PVC, 2,245 LF of 1" SCH80 PVC, valve installations, and related components; (7) Sanitary Sewer system including 2,360 LF of 6" SDR 26 PVC, pump station, 21 manholes, and drain field/septic tank installations; and (8) Service Road Construction including clearing, roadway excavation, culvert installation, and aggregate base (540 tons). The document also includes three optional bid items: Option 1 for South Loop Bathhouse construction, Option 2 for Entrance/Dump Station (including 2,100 SY of asphalt pavement), and Option 3 for Guard Shack construction. All line items require bidders to enter unit prices with corresponding subtotals, and each pay item section calculates to a Pay Item Total, with a final Base Total at the project conclusion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A1- rev3 RFQ T and C.docx | DOCX document | |
| Amendment 4- 12445226Q0003.pdf | ||
| Amendment 3- 12445226Q0003.pdf | ||
| Amend3 LWS Campground Recon.xlsx | XLSX spreadsheet | |
| A3 - Rev SOI LWS Mar2026.pdf | ||
| A5 - rev LWS Architectural Set.pdf | ||
| A1 - rev2 RFQ T and C.docx | DOCX document | |
| A1 - rev2 RFQ T and C.docx | DOCX document | |
| A2 - Rev SOW LWS Feb2026.docx | DOCX document | |
| Questions 12445226Q0006.docx | DOCX document | |
| Amendment 0002 - 12445226Q0003.pdf | ||
| A1 - rev RFQ Terms and Conditions 12445226Q0003.docx | DOCX document | |
| Amendment 0001 - 12445226Q0003.pdf | ||
| A9 - WD GA20250107 Bldg Union County.pdf | ||
| A8 - Info SR 180 at Slaughter Crk.docx | DOCX document | |
| A2 - Rev SOW LWS Final.docx | DOCX document | |
| A7 - LWS CIVIL_100_R1_signed-final.zip | ZIP file | |
| A6 - Past Performance Questionnaire.pdf | ||
| A1 -RFQ Terms and Conditions 12445226Q0003.docx | DOCX document | |
| A5 - LWS Architectural Set.pdf | ||
| A3 - SOI.pdf | ||
| A4 - Updated Combined SPECS.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA FOREST SERVICE
CHATTAHOOCHEE - OCONEE NATIONAL FOREST
LAKE WINFIELD SCOTT CAMPGROUND RECONSTRUCTION
SCHEDULE OF ITEMS
Pay Item Estimated Quantity
Units Unit Price Subtotal Pay Item Total
1 1 LS $ $ $
2 1 LS $ $ $
3 1 LS $ $ $
4 6000 SF $ $ $
5 1 LS $
General Conditions 1 LS $ $
6” SDR 26 PVC 60 LF $ $
Sanitary Sewer Clean-Out 1 EA $ $
2" SCH80 PVC 130 LF $ $
Gate Valve 1 EA $ $ Asphalt Pavement 170 SY $ $ Grading 1 LS $ $ Retaining Walls 240 LF $ $ Concrete Sidewalk 120 SY $ $ Dumpster Pad 1 LS $ $
15" HDPE 50 LF $ $
Flared End Section 2 EA $ $ Demolition 1 LS $ $ Clearing and Grubbing 1 LS $ $
Concrete 1 LS $ $ Masonry 1 LS $ $ Woods and Plastics 1 LS $ $ Thermo Protection 1 LS $ $ Openings 1 LS $ $ Finishes 1 LS $ $ Specialties 1 LS $ $ Furnishings 1 LS $ $ Plumbing 1 LS $ $
HVAC 1 LS $ $
Electrical 1 LS $ $
6 1 LS $
4" C900 PVC 10,800 LF $ $
2" SCH80 PVC 295 LF $ $
1" SCH80 PVC 2,245 LF $ $
3/4" SCH80 PVC 60 LF $ $
Mobilization for Aerial Crossing 1 LS $ $ Aerial Main 60 LF $ $ 4" Gate Valves 33 EA $ $ 2" Ball Valves 26 EA $ $ 1" Ball Valve 1 EA $ $ 3/4" Ball valve 1 EA $ $
Site Work
Pavement Repairs
North Loop Bathhouse
Water Line
Description
Administration, Supervision, Mobilization
Survey and Staking
Soil Erosion Control and Site Stabilization
Lake Winfield Scott Campground Reconstruction Project - Base Bid Items
LAKE WINFIELD SCOTT CAMPGROUND RECONSTRUCTION
SCHEDULE OF ITEMS
Frostproof Hydrant 13 EA $ $ Air Release Valves 6 EA $ $ Drainage Valves 7 EA $ $ Spring Box 2 EA $ $ Clearing and Grubbing 1 LS $ $
7 1 LS $
4" SCH. 40 Force Main 500 LF $ $
6” SDR 26 PVC 2360 LF $ $
8” SDR 26 PVC 710 LF $ $
8” Epoxy lined DIP 610 LF $ $ Pump Station 1 LS $ $ Sanitary Sewer Man Hole 21 EA $ $ North Loop Drain Field & Septic Tank 1 LS $ $ Sanitary Sewer Clean-Outs 4 EA $ $ South Loop Drain Field & Septic Tank 1 LS $ $ Construct Access Road 29.87 STA $ $ Demo Sewer Line 1000 LF $ $ Demo Existing Sewer Manholes 6 EA $ $ Clearing and Grubbing 1 LS $ $
8 1 LS $
Clearing and Grubbing 1 ACRE $ $
Roadway Excavation 7.35 STA $ $
Rolling Dips 7 EA $ $
Culvert, HDPE 35 LF $ $
Geotextile 701 non-woven 12870 SF $ $
Aggregate Base 540 TON $ $
Base Total
Service Road Construction
Sanitary Sewer
LAKE WINFIELD SCOTT CAMPGROUND RECONSTRUCTION
SCHEDULE OF ITEMS
Pay Item Estimated Quantity
Units Unit Price Subtotal Pay Item Total
1 1 LS $
General Conditions 1 LS $ $
6” SDR 26 PVC 70 LF $ $
Sanitary Sewer Clean-Out 2 EA $ $
2" SCH80 PVC 120 LF $ $
Gate Valve 1 EA $ $ Asphalt Pavement 120 SY $ $ Grading 1 LS $ $ Concrete Sidewalk 120 SY $ $ Dumpster Pad 1 LS $ $
15" HDPE 70 LF $ $
Flared End Section 1 EA $ $ Demolition 1 LS $ $
Concrete 1 LS $ $ Masonry 1 LS $ $ Woods and Plastics 1 LS $ $ Thermo Protection 1 LS $ $ Openings 1 LS $ $ Finishes 1 LS $ $ Specialties 1 LS $ $ Furnishings 1 LS $ $ Plumbing 1 LS $ $
HVAC 1 LS $ $
Electrical 1 LS $ $ Clearing and Grubbing 1 LS $ $
Option 1 Total
Site Work
South Loop Bathhouse
Lake Winfield Scott Campground Reconstruction Project
Description
Optional Bid Item 1 (South Loop Bathhouse)
LAKE WINFIELD SCOTT CAMPGROUND RECONSTRUCTION
SCHEDULE OF ITEMS
Pay Item Estimated Quantity
Units Unit Price Subtotal Pay Item Total
1 1 LS $
Soil Erosion Control and Site Stabilization 1 LS $ $ Survey Staking 1 LS $ $
6” SDR 26 PVC 160 LF $ $
Sanitary Sewer Clean-Out 2 EA $ $
2" SCH80 PVC 55 LF $ $
1" SCH80 PVC 55 LF $ $
Gate Valve 2 EA $ $ Asphalt Pavement 2,100 SY $ $ Grading 1 LS $ $ Bollards 12 EA $ $ Dump Station 1 LS $ $ Demolition 1 LS $ $ Clearing and Grubbing 1 LS $ $
Option 2 Total
Pay Item Estimated Quantity
Units Unit Price Subtotal Pay Item Total
1 1 LS $
General 1 LS $ $ Concrete 1 LS $ $ Masonry 1 LS $ $ Woods and Pastics 1 LS $ $ Thermo Protection 1 LS $ $ Openings 1 LS $ $ Finishes 1 LS $ $ Specialties 1 LS $ $ Furnishings 1 LS $ $ Plumbing 1 LS $ $
HVAC 1 LS $ $
Electrical 1 LS $ $ Clearing and Grubbing 1 LS $ $
Option 3 Total
Lake Winfield Scott Campground Reconstruction Project
Description
Guard Shack
Optional Bid Item 3 (Guard Shack)
Description
Optional Bid Item 2 (Entrance/ Dump Station)
Entrance/Dump Station
Lake Winfield Scott Campground Reconstruction Project
File details come from the government source that posted it. Updated .