This is an Estimate of Quantities Detail Sheet prepared by the Massachusetts Department of Transportation Highway Division for a roadway reconstruction project in Braintree, Massachusetts. The project encompasses Allen Street (stations 103+89 to 105+27.20 and 200+00 to 213+91), Thayer Road (stations 105+27.20 to 106+10), and Shaw Street (stations 300+97 to 302+29.37), classified as Minor Collector, Minor Arterial, and Principal Arterial roads. The project is scheduled for Federal Fiscal Year 2026 with a date of August 2026. The scope includes proposed micromill and overlay work covering 730 square yards, full-depth construction on 3,295 square yards, hot mix asphalt driveways on 205 square yards, hot mix asphalt sidewalks on 36 square yards, cement concrete driveways on 130 square yards, and cement concrete sidewalks on 1,035 square yards with pedestrian curb ramps. Additional work includes tree protection and pruning at two locations, removal of 16 trees under 24 inches in diameter, removal and adjustment of drainage structures, installation of new catch basins, manholes, sanitary sewer structures, hydrants, mailbox relocation, landscape plantings including bayberry shrubs and spirea, highway lighting pole and luminaire installation and removal, and sign installation at 17 locations throughout the project corridor.

The project specifications require all Superpave hot mix asphalt to utilize warm mix asphalt technology and comply with Section 450 Hot Mix Asphalt standards and Section M3 Asphaltic Materials requirements. Pavement milling shall achieve a 2.00% cross slope or maintain existing cross slope with construction tolerances of 0.5% on sidewalk slopes, driveway slopes, and wheelchair ramps. All work is to be performed as shown on the plans and as directed by the Engineer and the Town of Braintree. The project is funded through Federal Highway Administration sources under FAP No. STP/HPP-003S(904)X, and bidders are instructed not to use COMMBUYS to submit proposals for this project.

View the file

Other files

File Type Posted
613727 - Notice to Contractors.pdf PDF
613727 - Plan Holders List 9-22-2026.pdf PDF
A00861-613727.pdf PDF
613727 Bid Items.txt TXT text file
A00820-613727.pdf PDF
A00801-613727.pdf PDF
A00808-613727.pdf PDF
A00875-613727.pdf PDF
A00844-613727.pdf PDF
A00804-613727.pdf PDF
BRAINTREE-613727-136651-A-1.pdf PDF
A00863-613727.pdf PDF
A00860-613727.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Massachusetts Department Of Transportation Highway Division Proposal No. 613727-136651

A00802 - 1

DOCUMENT A00802

DETAIL SHEETS

A00802 - 2

THIS PAGE IS INTENTIONALLY LEFT BLANK

A00802 - 3

THE COMMONWEALTH OF MASSACHUSETTS

MASSACHUSETTS DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION

TEN PARK PLAZA, BOSTON, MA

ESTIMATE OF QUANTITIES - DETAIL SHEETS

TOWN/CITY: Braintree, MA YEAR: Federal Fiscal Year 2026 ROAD: Allen Street STA. 103+89 to 105+27.20 & 200+00 to 213+91 ROAD: Thayer Road STA. 105+27.20 to 106+10 ROAD: Shaw Street STA. 300+97 to 302+29.37

CLASS: Minor Collector, Minor Arterial, Principal Arterial

TYPE OF PROJECT: Roadway Reconstruction DATE: August 2026

PAVEMENT NOTES

PROPOSED MICROMILL AND OVERLAY AREA = 730 SY

FINE MILL: 1 ½” OF EXISTING PAVEMENT

OVERLAY: 1 ½” SUPERPAVE SURFACE COURSE- 9.5 (SSC-9.5)

PROPOSED FULL DEPTH CONSTRUCTION AREA = 3295 SY

SURFACE: 1 ½” SUPERPAVE SURFACE COURSE- 9.5 (SSC-9.5)

INTERMEDIATE: 2 ” SUPERPAVE INTERMEDIATE COURSE- 12.5 (SIC-12.5)

BASE: 4” SUPERPAVE BASE COURSE – 37.5 (SBC-37.5)

SUB-BASE: 4” DENSE GRADED CRUSHED STONE FOR SUB-BASE

8” GRAVEL BORROW (TYPE B)

SUB-GRADE GRAVEL BORROW AS REQUIRED, BASED ON EXISTING

GRADE MATERIAL

PROPOSED HOT MIX ASPHALT DRIVEWAYS AREA = 205 SY

SURFACE: 1 ½” SUPERPAVE SURFACE COURSE- 9.5 (SSC-9.5)

2 ½” SUPERPAVE INTERMEDIATE COURSE- 12.5 (SIC-12.5)

SUB-BASE: 8” GRAVEL BORROW (TYPE B)

A00802 - 4

PAVEMENT NOTES (Continued)

PROPOSED HOT MIX ASPHALT SIDEWALK AREA = 36 SY

SURFACE: 1 ¼” SUPERPAVE SURFACE COURSE- 9.5 (SSC-9.5)

1 ¾” SUPERPAVE INTERMEDIATE COURSE- 12.5 (SIC-12.5)

PROPOSED CEMENT CONCRETE DRIVEWAYS AREA = 130 SY

SURFACE: 6” CEMENT CONCRETE (AIR ENTRAINED, 4,000 PSI, 0.75”, 610)

PROPOSED CEMENT CONCRETE SIDEWALKS AREA = 1,035 SY

AND PEDESTRIAN CURB RAMPS

SURFACE: 4” CEMENT CONCRETE (AIR ENTRAINED, 4,000 PSI, 0.75”, 610)

GENERAL PAVEMENT NOTES:

1. ALL SUPERPAVE HOT MIX ASPHALT SHALL BE A WARM MIX ASPHALT

TECHNOLOGY.

2. ALL HOT MIX ASPHALT PAVEMENTS SHALL BE CONSTRUCTED IN ACCORDANCE

WITH SECTION 450 HOT MIX ASPHALT AND SECTION M3. ASPHALTIC

MATERIALS.

3. TACK COAT APPLICATION SHALL BE IN ACCORDANCE WITH SUBSECTION

450.43G(2).

4. WHERE EXISTING SUBBASE/SUBGRADE IS FOUND TO MEET SPECIAL BORROW

(M1.02.0) SPECIFICATION REQUIREMENTS, THE EXISTING MATERIAL

MAY BE LEFT IN PLACE, AFTER THE APPROVAL OF THE ENGINEER.

5. UNLESS NOTED OTHERWISE ON THE DRAWINGS, PAVEMENT MILLING SHALL BE

USED TO ACHIEVE A 2.00% CROSS SLOPE OR TO MAINTAIN

EXISTING CROSS SLOPE.

6. * = TOLERANCE FOR CONSTRUCTION ± 0.5% ON SIDEWALK SLOPES, DRIVEWAY

SLOPES, AND WHEELCHAIR RAMPS.

A00802 - 5

ITEM 102.511 TREE PROTECTION- ARMORING AND PRUNING

To be used to protect isolated trees as shown on the Plans, and as directed by the Town of Braintree.

STATION SIDE

105+17 LT

105+53 LT

ITEM 103. TREE REMOVED- DIAMETER UNDER 24 INCHES

To be used to remove isolated trees under 24 inches in diameter as shown on the Plans, and as directed by the Town of Braintree.

201+29 RT

201+89 202+19 203+23 203+27 203+31 203+55 203+98 204+95 205+07 205+34 207+25 207+30 207+48 207+64 207+66

RT

RT

RT

RT

RT

RT

RT

RT

RT

RT

RT

RT

RT

RT

RT

207+95 RT

ITEM 146. DRAINAGE STRUCTURE REMOVED

See Drainage and Utility Plans for details. For removal of drainage structures in poor condition or due to the relocated curb line.

STATION SIDE

301+16 RT

201+36 RT

203+37 RT

209+62 RT

A00802 - 6

ITEM 201. CATCH BASIN

For construction of drainage structure and as directed by the Engineer.

STATION

201+37 203+95 208+38

SIDE

RT

RT

RT

203+40 209+63

ITEM 201.3 SPECIAL CATCH BASIN

For construction of drainage structures and as directed by the Engineer.

200+27

SIDE

ITEM 202. MANHOLE

209+64

ITEM 202.2 MANHOLE (9 TO 14 FOOT DEPTH)

203+46 203+89 208+34 203+59

SIDE

RT

RT

ITEM 210. SANITARY SEWER MANHOLE

205+50

A00802 - 7

ITEM 220. DRAINAGE STRUCTURE ADJUSTED

For adjusting drainage structures to grade, as shown on the Plans, and as directed by the Engineer.

103+97 104+27 104+40

SIDE

RT

LT

ITEM 220.5 DRAINAGE STRUCTURE REMODELED

For remodeling drainage structure, as shown on the Plans and as directed by the Engineer.

208+08 104+40 104+35

SIDE

RT

ITEM 220.7 SANITARY STRUCTURE ADJUSTED

For remodeling sanitary sewer structure, as shown on the Plans and as directed by the Engineer.

104+40 104+49 105+13 212+65

SIDE

RT

RT

ITEM 220.8 SANITARY STRUCTURE REMODELED

For remodeling sanitary sewer structure, as shown on the Plans and as directed by the Engineer.

210+40

ITEM 376. HYDRANT

See Drainage and Utility Plans for details. For new hydrant installation.

209+55

A00802 - 8

ITEM 376.3 HYDRANT – REMOVED AND STACKED

See Drainage and Utility Plans for details. For removal of hydrant.

208+00

ITEM 715. RURAL MAILBOX REMOVED AND RESET

To be installed in areas of new sidewalk reconstruction as shown on the Plans, and as directed by the Engineer.

206+63

ITEM 789.333 BAYBERRY SHRUB- NORTHERN 2-3 FEET / #3

To be used to plant new hedges as shown on the Plans, and as directed by the Engineer and Town of Braintree.

104+95 RT

105+05 RT

105+15 RT

ITEM 793.729 SPIREA 2-3 FEET/ #3

To be used to plant new hedges as shown on the Plans, and as directed by the Engineer and Town of Braintree.

105+00 RT

105+10 RT

ITEM 812.10 LIGHT STANDARD FOUNDATION SD3.010

As shown on the Drainage & Utility Plans, and as directed by the Engineer.

301+45.84 LT

A00802 - 9

ITEM 821.12 HIGHWAY LIGHTING POLE (ANCHOR BASE) 8 FOOT BRACKET

ITEM 823.09 HIGHWAY LIGHTING LUMINAIRE 150 WATT

ITEM 823.71 HIGHWAY LIGHTING POLE AND LUMINAIRE REMOVED

AND STACKED

301+12 RT

ITEM 823.76 HIGHWAY LIGHTING FOUNDATION REMOVED AND DISPOSED

301+12 RT

ITEM 847.1 SIGN SUP (NOT/GUIDE)+RTE MKR W/1 BRKWAY POST

ASSEMBLY - STEEL

As shown on the Traffic Sign and Pavement Marking Plans, and as directed by the Engineer.

104+22 104+84 200+13 200+16 200+23 203+08 204+66 208+50 208+83 209+83

SIDE

RT

LT

LT

RT

LT

LT

RT

LT

A00802 - 10

ITEM 847.1 (Continued)

210+93 RT

210+86 LT

211+56 RT

211+88 RT

212+38 LT

212+88 LT

213+58 RT

ITEM 853.1 PORTABLE BREAKAWAY BARRICADE TYPE III

As shown on the Traffic Management Plans, and as directed by the Engineer.

*** END OF DOCUMENT ***