A.2.11.3 W9128A22R0004 Kaunakakai Harbor - Drawings.pdf

PDF 2 MB Posted

Attached to
Kaunakakai Harbor Maintenance Dredging, Molokai, Hawaii and Kahului Harbor Maintenance Dredging, Maui, Hawaii
Solicitation number
W9128A22R0004
Issued by

About this file

This announcement constitutes a solicitation for the Kaunakakai Harbor Maintenance Dredging project in Molokai, Hawaii and the Kahului Harbor Maintenance Dredging project in Maui, Hawaii. The U.S. Army Corps of Engineers, Honolulu District intends to issue a solicitation to conduct maintenance dredging by mechanical clamshell dredge to remove accumulated sediments within the harbor federal limits at both locations. The Kaunakakai Harbor project requires dredging an estimated 35,000 cubic yards of material to a depth of -23 feet MLLW, while the Kahului Harbor project requires dredging an estimated 158,000 cubic yards of material to a depth of -35 feet MLLW. Offerors must have an active SAM registration and the combined period of performance is estimated at 18 months. The solicitation will utilize LPTA procedures and be set aside for small businesses. The NAICS code is 237990 and small businesses must self-perform at least 40% of dredging volume. The award will be a fixed-price construction contract between $5-10 million.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T E

D B

Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T N

O

S O

L

IC

IT

A T

IO

N N

O

IS

S

U E D

A T

E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O K

A H

A R

A A

N D A

S S

O C

IA

T E

S

IN

C

K

O H

O L

A S

T R

E E

T

H

IL

O

H A

W A

II

H O

N O

L U

L U D

IS

T R

IC

T

F T S

H A

F T

E R

H A

W A

II

P H (8

-5

®of Engineers

US Army Corps

S P

U B

L

IC

O

B

M E

Y E

R S

-- F

IL

E N

U M

B E

R

-2

-2

A N

S I

D

W

A -1

-D -0

M O

L O

K A I, H

A W

A

II

M A

IN

T E

N A

N C

E D

R E

D G

IN

G

K A

U N

A K

A K

A I

H A

R B

O R

B

M E

Y E

R S

B

M E

Y E

R S

GRAPHIC SCALE

0 300 600 900

SCALE:1"=300'

SURVEY CONTROL NETWORKLOCATION MAP

INDEX OF DRAWINGS

HAWAII

MAUI

MOLOKAI

LANAI

OAHU

KAHOOLAWE

NIIHAU

KAUAI

PROJECT SITE

ABBREVIATIONS / SYMBOLS

BM

TC

AND STORAGE AREA

DREDGE AREA

DEPARTMENT OF TRANSPORTATION

BASELINE

BEST MANAGEMENT PRACTICES

CONTRACTOR OPERATIONS

EASTING

EXISTING

FEET

STATE OF HAWAII

MEAN LOWER LOW WATER

MILE

NORTHING

NOT IN CONTRACT

SHEET

STATION

TURBIDITY CURTAIN

TYPICAL

BENCH MARK

LIGHTS

LIGHTED BUOYS

UNLIGHTED BUOYS

DEGREE OF ARC

MINUTE OF ARC, FEET

SECOND OF ARC

SLOPE

SURVEYED BOTTOM

PROJECT DEPTH

DREDGE AREA

FEDERAL PROJECT LIMITS

CROSS SECTIONS

TURBIDITY CURTAIN

B

BMPS

COSA

E

EXIST.

FT.

HDOT

MLLW

MI.

N

N.I.C.

SHT.

STA.

TC

TYP.

SCALE ALL OTHER SHEET SIZES ACCORDINGLY

THE ACTUAL SIZE OF THIS PLAN SET IS 34x22.

L

MAINTENANCE DREDGING

KAUNAKAKAI HARBOR

PACIFIC OCEAN

PACIFIC OCEAN

HARBOR

KAUNAKAKAI

PROJECT SITE

KALAUPAPA

HO'OLEHUA

KAUNAKAKAI

MAUNALOA

KALAWAO

UALAPUE

UMIPA'A

HARBOR

KAUNAKAKAI

LIMIT LINE

FEDERAL PROJECT

& PROJECT BASELINE

HARBOR CENTERLINE

(BASELINE)

1,353.09'

T

IT

L E S

H E

E T

GI001

ISLAND OF MOLOKAI

G I0

.d g n

PACIFIC OCEAN

NN NN NN

DEPTH IS -23'

REQUIRED DREDGE

(TYP.)

DREDGE AREA

JULY 2021

COSA

BM BENCHMARK

CONTROLS IN THE FIELD.

7. CONTRACTOR SHALL VERIFY HORIZONTAL AND VERTICAL

6. AZIMUTHS ARE MEASURED CLOCKWISE FROM SOUTH.

(PA11).

5. GEOGRAPHIC COORDINATES ARE REFERENCED TO NAD83

NOTED AS POSITIVE(+).

4. ELEVATIONS SHOWN ARE NEGATIVE(-) UNLESS OTHERWISE

TIDAL DATUM (NOAA 1613198), 1983-2001 TIDAL EPOCH.

3. ELEVATION DATUM REFERENCED TO KAUNAKAKAI HARBOR

LOWER LOW WATER (MLLW) DATUM.

2. ELEVATIONS IN FEET AND TENTHS REFERENCED TO THE MEAN

PLANE COORDINATE SYSTEM ZONE 2, NAD83 (PA11), FEET.

1. NORTHING AND EASTING COORDINATES ARE HAWAII STATE

SURVEY CONTROL NOTES:

MARKER: BRASS DISK

E 1517350.37

N 272109.04

ELEV.=+4.14 FT. (MLLW)

BM 161 3198 (UNSTAMPED)

MARKER: BRASS DISK

E 1517163.55

N 272148.20

ELEV.=+6.24 FT. (MLLW)

BM 161 3198 A

MARKER: BRASS DISK

E 1517461.55

N 272329.47

ELEV.=+4.44 FT. (MLLW)

BM 161 3198 B

MARKER: BRASS DISK

E 1517750.71

N 272498.95

ELEV.=+7.44 FT. (MLLW)

BM 161 3198 C

0.00 ft

1.00 ft

2.00 ft

MEAN HIGHER-HIGH WATER = 2.14

MEAN LOWER-LOW WATER = 0.00

PROJECT DATUM,

TIDAL DATUM

MEAN SEA LEVEL = 0.94

KAUNAKAKAI HARBOR, ISLAND OF MOLOKAI, HAWAII

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T E

D B

Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T N

O

S O

L

IC

IT

A T

IO

N N

O

IS

S

U E D

A T

E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O K

A H

A R

A A

N D A

S S

O C

IA

T E

S

IN

C

K

O H

O L

A S

T R

E E

T

H

IL

O

H A

W A

II

H O

N O

L U

L U D

IS

T R

IC

T

F T S

H A

F T

E R

H A

W A

II

P H (8

-5

®of Engineers

US Army Corps

S P

U B

L

IC

O

B

M E

Y E

R S

-- F

IL

E N

U M

B E

R

-2

-2

A N

S I

D

W

A -1

-D -0

M O

L O

K A I, H

A W

A

II

M A

IN

T E

N A

N C

E D

R E

D G

IN

G

K A

U N

A K

A K

A I

H A

R B

O R

B

M E

Y E

R S

B

M E

Y E

R S

0+00

1+00

2+00

3+00

4+00

5+00

6+00

7+00

8+00

9+00

10+00

11+00

12+00

13+00

14+00

15+00

15+20

15+20

CN101

O V

E R

A L L S

IT

E P

L A

N

EASTING NORTHING

FEDERAL PROJECT LINE COORDINATES

EASTING NORTHING

PROJECT CENTERLINE COORDINATES

OVERALL SITE PLAN

SCALE: 1" = 200'

& PROJECT BASELINE

HARBOR CENTERLINE

PACIFIC OCEAN

SHORELINE

S H

O R

E L

IN

E

271,023.611,516,435.94

272,328.921,517,262.72

272,596.431,516,840.30

272,565.511,516,702.58

271,387.771,515,956.61

1,516,193.24 271,205.14

272,488.831,517,006.31

190.88'

246.88'

HARBOR

KAUNAKAKAI

UNLOADING AREA

SKIFF LOADING/

C N

.d g n

S T

A T

IO

N S

T

O

B A S E B

ID

F

R O

M

GRAPHIC SCALE

332.12'

O P T

IO

N F

R O

M

NN

200 200 400 600

SCALE:1"=200'

EASTING NORTHING

COSA SITE COORDINATES

LIMIT

FEDERAL PROJECT

LIMIT

FEDERAL PROJECT

DREDGE AREA

COSA SITE

TERMINAL

FERRY

HARBOR (DLNR)

SMALL BOAT

KAUNAKAKAI

S H

E D

P

IE

R

CARGO TERMINAL

INTER ISLAND

OFFICE

HARBOR AGENT

STORAGE

PETROLEUM

°4 8' .5 6"

.0

°1

'4 .2

.2

SEE SHT. CN501

COSA SITE

1,517,176.13 272,145.02

1,517,208.28 272,195.68

1,517,250.49 272,168.88

1,517,218.34 272,118.22

TERMINAL

FERRY

MARKER: BRASS DISK

E 1517750.71

N 272498.95

ELEV.=+7.44 FT. (MLLW)

BM 161 3198 C

MARKER: BRASS DISK

E 1517461.55

N 272329.47

ELEV.=+4.44 FT. (MLLW)

BM 161 3198 B

MARKER: BRASS DISK

E 1517350.37

N 272109.04

ELEV.=+4.14 FT. (MLLW)

BM 161 3198 (UNSTAMPED)

MARKER: BRASS DISK

E 1517163.55

N 272148.20

ELEV.=+6.24 FT. (MLLW)

BM 161 3198 A

D O

C K

IN

G L

O C

A T

IO

N

D R

E D

G E P

L A

N T

GENERAL CONDITION EXISTING AT THAT TIME.

MADE ON THE DATES INDICATED AND CAN ONLY BE CONSIDERED AS INDICATING THE

4. THE INFORMATION DEPICTED ON THIS MAP REPRESENTS THE RESULTS OF SURVEYS

SEPTEMBER 28, 2003.

3. APPROXIMATE SHORELINE DIGITIZED FROM PHOTOGRAPHY TAKEN

2. SOUNDINGS ARE DEPTHS IN FEET AND TENTHS BELOW THE MLLW DATUM.

DISTRICT, PORTLAND. BASEMAP FEATURES ARE APPROXIMATE.

1. HYDROGRAPHIC SURVEY COMPLETED NOVEMBER 26, 2019 BY U.S. ARMY ENGINEER

HYDROGRAPHIC SURVEY NOTES

OPTION ITEM AREA IS STABLE.

ITEM UNTIL THE PROJECT DEPTH IS ATTAINED AND TRANSITION SLOPE ADJOINING

12. IF OPTION ITEM SHOWN IS NOT AWARDED, DREDGE AT THE LIMITS OF THE BASE BID

THE NECESSARY BUOY RELOCATIONS. THE CONTRACTOR IS NOT TO MOVE ANY BUOYS.

THE GOVERNMENT AND COORDINATE WITH THE USCG AND THE HARBOR AGENT FOR

IF TEMPORARY BUOY RELOCATIONS ARE REQUIRED, THE CONTRACTOR WILL INFORM

11. BUOY REPLACEMENT IS REGULATED BY THE UNITED STATES COAST GUARD (USCG).

HTTP://HAWAII.PORTCALL.COM

10. SHIP MOVEMENTS AND BERTHING RESERVATIONS CAN BE FOUND AT

WITH THE APPLICABLE GOVERNMENT RULES AND REGULATIONS.

9. PROPERLY DISPOSE OF ALL MAN-MADE DEBRIS THAT ARE DREDGED IN ACCORDANCE

8. SEE SURVEY CONTROL NOTES SHEET GI001 FOR COORDINATE SYSTEM INFORMATION.

OF WORK.

OFFICER'S REPRESENTATIVE AND THE HARBOR AGENT OF SAME PRIOR TO COMMENCEMENT

7. CONTRACTOR SHALL LOCATE ALL UTILITIES AND INFORM GOVERNMENT CONTRACTING

APPROVED BY THE HARBOR AGENT.

6. USE OF CONTRACTOR OPERATIONS AND STORAGE AREA SHALL BE COORDINATED WITH AND

OFFICER'S REPRESENTATIVE.

WITHIN THE WORK AREAS APPROVED BY THE MAUI DISTRICT MANAGER AND CONTRACTOR

5. ALL WORK, EQUIPMENT AND DREDGING OPERATIONS AT THE HARBOR SHALL BE CONTAINED

COORDINATED WITH THE HARBOR AGENT OR ASSIGNED STAFF.

4. ALL DREDGING OPERATIONS OCCURRING WITHIN THE FEDERAL CHANNEL SHALL BE

DEPARTING FROM PIER BERTHINGS AT ANY TIME DURING CONSTRUCTION.

DREDGING OPERATIONS SHALL NOT IMPEDE VESSELS FROM ACCESSING OR

WITH AND APPROVED BY THE HARBOR AGENT OR ASSIGNED STAFF.

3. USE OF HARBOR FACILITIES, INCLUDING LOADING DOCKS, SHALL BE COORDINATED

(808) 285-0935 TO COORDINATE DREDGING SCHEDULE.

AND VESSEL MOVEMENTS. THE CONTRACTOR SHALL CONTACT THE HARBOR AGENT AT

(DOT), HARBORS DIVISION TO FACILITATE SCHEDULING OF ADDITIONAL BERTH SPACE

2. THE CONTRACTOR SHALL COORDINATE WITH THE DEPARTMENT OF TRANSPORTATION

1. SEE SHEET CN102 FOR DESCRIPTIONS OF PROJECT AREAS.

GENERAL NOTES

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T E

D B

Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T N

O

S O

L

IC

IT

A T

IO

N N

O

IS

S

U E D

A T

E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O K

A H

A R

A A

N D A

S S

O C

IA

T E

S

IN

C

K

O H

O L

A S

T R

E E

T

H

IL

O

H A

W A

II

H O

N O

L U

L U D

IS

T R

IC

T

F T S

H A

F T

E R

H A

W A

II

P H (8

-5

®of Engineers

US Army Corps

S P

U B

L

IC

O

B

M E

Y E

R S

-- F

IL

E N

U M

B E

R

-2

-2

A N

S I

D

W

A -1

-D -0

M O

L O

K A I, H

A W

A

II

M A

IN

T E

N A

N C

E D

R E

D G

IN

G

K A

U N

A K

A K

A I

H A

R B

O R

B

M E

Y E

R S

B

M E

Y E

R S

190.88 281°50'18.85"

.8

°4

'5 .3

"GREEN 5"

"GREEN 1"

"RED 2"

"GREEN 5"

2.

9° '32 .4 5"

.2

°1

'4 .2

.0

°4 8' .5 6"

SCALE: 1" = 100'

CN102

DREDGE AREA DREDGING PLAN

D R

E D

G

IN

G P

L A

N

LIMIT LINE

FEDERAL PROJECT

& PROJECT BASELINE

HARBOR CENTERLINE

LIMIT LINE

FEDERAL PROJECT

PACIFIC OCEAN

LIMIT LINE

FEDERAL PROJECT

0+00

1+00

2+00

3+00

4+00

5+00

6+00

7+00

8+00

9+00

10+00

11+00

12+00

13+00

14+00

15+00

15+20

1519.52

THROUGH CN303

SEE SHTS. CN301

LINES (TYP.)

CROSS SECTION

HARBOR

KAUNAKAKAI

C N

.d g n

FEDERAL PROJECT LIMITS

PROJECT BASELINE

LEGEND:

SURVEY CONTROL LINE

S T

A T

IO

N S

T

O

B A S E B

ID

F

R O

M

GRAPHIC SCALE

MARKER: BENCH MARK DISK

E 1517750.71

N 272498.95

ELEV.=+7.44 FT. (MLLW)

STA. 161 3198 C

C A

R G

O B

E R

T H

B E

R T

H

T E

R M

IN

A L

F E

R R

Y

O P T

IO

N F

R O

M

100 200 300100

SCALE:1"=100'

NN

SEE SHT. CN501

COSA SITE

END AT STA. 14+25

BEGIN AT STA. 5+00

10' CORAL BUFFER

FROM PIER EDGE

DREDGE BUFFER

PROVIDE 10'

MARKER: BENCH MARK DISK

E 1517350.37

N 272109.04

ELEV.=+4.14 FT. (MLLW)

STA. 161 3198 (UNSTAMPED)

MARKER: BENCH MARK DISK

E 1517163.55

N 272148.20

ELEV.=+6.24 FT. (MLLW)

STA. 161 3198 A

MARKER: BENCH MARK DISK

E 1517461.55

N 272329.47

ELEV.=+4.44 FT. (MLLW)

STA. 161 3198 B

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T E

D B

Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T N

O

S O

L

IC

IT

A T

IO

N N

O

IS

S

U E D

A T

E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O K

A H

A R

A A

N D A

S S

O C

IA

T E

S

IN

C

K

O H

O L

A S

T R

E E

T

H

IL

O

H A

W A

II

H O

N O

L U

L U D

IS

T R

IC

T

F T S

H A

F T

E R

H A

W A

II

P H (8

-5

®of Engineers

US Army Corps

S P

U B

L

IC

O

B

M E

Y E

R S

-- F

IL

E N

U M

B E

R

-2

-2

A N

S I

D

W

A -1

-D -0

M O

L O

K A I, H

A W

A

II

M A

IN

T E

N A

N C

E D

R E

D G

IN

G

K A

U N

A K

A K

A I

H A

R B

O R

B

M E

Y E

R S

B

M E

Y E

R S

CN103

O C

E A

N D

IS

P O

S A

L S

IT

E P

L A

N

RADIUS = 9,500'

1,516,196.27 E

271,205.68 N

CENTER POINT

ENTRANCE CHANNEL

KAUNAKAKAI HARBOR

MOLOKAI

LANAI

MAUI

1,525,372.57 E

268,746.90 N

KAUNAKAKAI

KAHULUI

C N

.d g n

GRAPHIC SCALE

NN

OCEAN DISPOSAL SITE PLAN

SCALE: 1" = 8000'

8000 16000 240008000

SCALE:1"=8000'

KAUNAKAKAI HARBOR

1,507,019.98 E

273,664.46 N

RADIUS = 3,000' (SEAFLOOR)

RADIUS = 1,000' (SURFACE)

1,702,918.73 E

270,643.55 N

DISPOSAL ZONE

KAHULUI

TO/FROM THE SITE.

USE NORMAL COMMERCIAL SHIPPING LANES FOR TRANSIT

THE SITE. TUG, SCOW, AND SUPPORTING VESSELS MAY

MATERIAL DISPOSAL SITE UNLESS TRANSITIONING TO/FROM

WITHIN THE LIMITS OF THE KAHULUI OCEAN DREDGE

2. THE TUG, SCOW AND SUPPORTING VESSELS SHALL STAY

DREDGE MATERIAL DISPOSAL SITE.

SURFACE DISPOSAL ZONE WITHIN THE KAHULUI OCEAN

1. THE SCOW SHALL UNLOAD DREDGE MATERIAL IN THE

NOTES:

38 MILES

APPROXIMATELY

DISTANCE

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T E

D B

Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T N

O

S O

L

IC

IT

A T

IO

N N

O

IS

S

U E D

A T

E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

NOTES:

LEGEND:

PROJECT DEPTH

FEDERAL PROJECT LIMITS

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O K

A H

A R

A A

N D A

S S

O C

IA

T E

S

IN

C

K

O H

O L

A S

T R

E E

T

H

IL

O

H A

W A

II

H O

N O

L U

L U D

IS

T R

IC

T

F T S

H A

F T

E R

H A

W A

II

P H (8

-5

®of Engineers

US Army Corps

S P

U B

L

IC

O

B

M E

Y E

R S

-- F

IL

E N

U M

B E

R

-2

-2

A N

S I

D

W

A -1

-D -0

DREDGE AREA

PROJECT BASELINE

M O

L O

K A I, H

A W

A

II

M A

IN

T E

N A

N C

E D

R E

D G

IN

G

K A

U N

A K

A K

A I

H A

R B

O R

B

M E

Y E

R S

B

M E

Y E

R S

SURVEYED BOTTOM

DO NOT DREDGE WITHIN THESE ZONES.

6. BUFFER ZONE FOR CORAL IS 10 FEET AND BUFFER ZONE FOR THE PIER IS 10 FEET.

HARD SURFACES AND ARE NOT TO BE DREDGED.

SEDIMENT MATERIAL. STEEPER FINISHED SLOPES SHOWN ON THE DRAWINGS REPRESENT

5. THE SIDE SLOPE SHOWN ON THE DRAWINGS IS THREE HORIZONTAL TO ONE VERTICAL FOR

PROJECT LIMITS SHOWN.

RESPONSIBLE FOR DREDGING ALL AREAS ABOVE PROJECT DEPTH WITHIN THE FEDERAL

4. DREDGE AREAS SHOWN ARE AN ESTIMATE OF THE WORK AREA. CONTRACTOR IS

DREDGING OF UP TO ONE FOOT IS ALLOWABLE. SEE DREDGE PAY PRISM ON SHEET CN501.

ANGLE OF REPOSE SO THAT SIDE SLOPE DOES NOT ENCROACH ON FEDERAL LIMITS. OVERDEPTH

AT THE BASE OF SIDE SLOPE TO ALLOW MATERIAL TO SLOUGH TO THE NATURAL UNDERWATER

3. ACTIVE DREDGING OUTSIDE OF THE HORIZONTAL FEDERAL LIMITS IS NOT AUTHORIZED. DREDGE

2. STATION ORIENTATION VIEW IS UPSTATION.

1. DEPTHS IN FEET BELOW MLLW.

2+00

2+50

3+00

3+50

4+00

4+50

5+00

0-25-50-75-100-125-150-175-200-225-250-275-300

-35

-325

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

25 50 75 100 125 150 175 200 225 250 275 300 325

-35

-30

-25

-20

-15

-10

-5

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

-35

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-35

-30

-25

-20

-15

-10

-5

-35

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-35

-30

-25

-20

-15

-10

-5

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

-35

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-35

-30

-25

-20

-15

-10

-5

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

-35

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-35

-30

-25

-20

-15

-10

-5

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

-35

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-35

-30

-25

-20

-15

-10

-5

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

-35

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-35

-30

-25

-20

-15

-10

-5

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

5+50

6+00

6+50

7+00

7+50

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

-35

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-35

-30

-25

-20

-15

-10

-5

-35

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-35

-30

-25

-20

-15

-10

-5

-35

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-35

-30

-25

-20

-15

-10

-5

-35

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-35

-30

-25

-20

-15

-10

-5

-35

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-35

-30

-25

-20

-15

-10

-5

BL

CN301

(TYP.)

C N

.d g n

(TYP.)

PROJECT DEPTH

(TYP.)

SURVEY BOTTOM

60 600 120 180

20 20 40 60

GRAPHIC SCALES

(TYP.)

PROJECT LIMIT

FEDERAL

SCALE:1"=20' (VERTICAL)

SCALE:1"=60' (HORIZONTAL)

PIER

PIER

(TYP.)

DREDGE AREA (BASE BID) DREDGE AREA (BASE BID)

S T

A T

O

C R

O S

S S

E C

T

IO

N S D

R E

D G

E A

R E

A

B A

S E B

ID

ZONE (TYP.)

PIER BUFFER

ZONE (TYP.)

CORAL BUFFER

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T E

D B

Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T N

O

S O

L

IC

IT

A T

IO

N N

O

IS

S

U E D

A T

E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

NOTES:

LEGEND:

PROJECT DEPTH

FEDERAL PROJECT LIMITS

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O K

A H

A R

A A

N D A

S S

O C

IA

T E

S

IN

C

K

O H

O L

A S

T R

E E

T

H

IL

O

H A

W A

II

H O

N O

L U

L U D

IS

T R

IC

T

F T S

H A

F T

E R

H A

W A

II

P H (8

-5

®of Engineers

US Army Corps

S P

U B

L

IC

O

B

M E

Y E

R S

-- F

IL

E N

U M

B E

R

-2

-2

A N

S I

D

W

A -1

-D -0

DREDGE AREA

PROJECT BASELINE

M O

L O

K A I, H

A W

A

II

M A

IN

T E

N A

N C

E D

R E

D G

IN

G

K A

U N

A K

A K

A I

H A

R B

O R

B

M E

Y E

R S

B

M E

Y E

R S

SURVEYED BOTTOM

DO NOT DREDGE WITHIN THESE ZONES.

6. BUFFER ZONE FOR CORAL IS 10 FEET AND BUFFER ZONE FOR THE PIER IS 10 FEET.

HARD SURFACES AND ARE NOT TO BE DREDGED.

SEDIMENT MATERIAL. STEEPER FINISHED SLOPES SHOWN ON THE DRAWINGS REPRESENT

5. THE SIDE SLOPE SHOWN ON THE DRAWINGS IS THREE HORIZONTAL TO ONE VERTICAL FOR

PROJECT LIMITS SHOWN.

RESPONSIBLE FOR DREDGING ALL AREAS ABOVE PROJECT DEPTH WITHIN THE FEDERAL

4. DREDGE AREAS SHOWN ARE AN ESTIMATE OF THE WORK AREA. CONTRACTOR IS

DREDGING OF UP TO ONE FOOT IS ALLOWABLE. SEE DREDGE PAY PRISM ON SHEET CN501.

ANGLE OF REPOSE SO THAT SIDE SLOPE DOES NOT ENCROACH ON FEDERAL LIMITS. OVERDEPTH

AT THE BASE OF SIDE SLOPE TO ALLOW MATERIAL TO SLOUGH TO THE NATURAL UNDERWATER

3. ACTIVE DREDGING OUTSIDE OF THE HORIZONTAL FEDERAL LIMITS IS NOT AUTHORIZED. DREDGE

2. STATION ORIENTATION VIEW IS UPSTATION.

1. DEPTHS IN FEET BELOW MLLW.

8+00

8+50

9+00

9+50

10+00

10+50

11+00

11+50

12+00

12+50

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

-35

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-35

-30

-25

-20

-15

-10

-5

-35

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-35

-30

-25

-20

-15

-10

-5

-40 -40

-40 -40

-35

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-40

-35

-30

-25

-20

-15

-10

-5

-40

-35

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-40

-35

-30

-25

-20

-15

-10

-5

-40

-35

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-40

-35

-30

-25

-20

-15

-10

-5

-40

-35

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-40

-35

-30

-25

-20

-15

-10

-5

-40

-35

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-35

-30

-25

-20

-15

-10

-5

-35

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-35

-30

-25

-20

-15

-10

-5

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-30

-25

-20

-15

-10

-5

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-30

-25

-20

-15

-10

-5

CN302

C N

.d g n

BL

(TYP.)

SURVEY BOTTOM

(TYP.)

(TYP.)

PROJECT DEPTH

(TYP.)

(TYP.)

PROJECT LIMIT

FEDERAL

PIER

60 600 120 180

20 20 40 60

GRAPHIC SCALES

SCALE:1"=20' (VERTICAL)

SCALE:1"=60' (HORIZONTAL)

PIER

PIER

PIER

PIER

PIER

PIER

PIER

PIER

PIER

(TYP.)

DREDGE AREA (BASE BID)

S T

A T

O

C R

O S

S S

E C

T

IO

N S D

R E

D G

E A

R E

A

(B

A S

E B

ID

ZONE (TYP.)

CORAL BUFFER

PIER BUFFER

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T E

D B

Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T N

O

S O

L

IC

IT

A T

IO

N N

O

IS

S

U E D

A T

E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

NOTES:

LEGEND:

PROJECT DEPTH

FEDERAL PROJECT LIMITS

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O K

A H

A R

A A

N D A

S S

O C

IA

T E

S

IN

C

K

O H

O L

A S

T R

E E

T

H

IL

O

H A

W A

II

H O

N O

L U

L U D

IS

T R

IC

T

F T S

H A

F T

E R

H A

W A

II

P H (8

-5

®of Engineers

US Army Corps

S P

U B

L

IC

O

B

M E

Y E

R S

-- F

IL

E N

U M

B E

R

-2

-2

A N

S I

D

W

A -1

-D -0

DREDGE AREA

PROJECT BASELINE

M O

L O

K A I, H

A W

A

II

M A

IN

T E

N A

N C

E D

R E

D G

IN

G

K A

U N

A K

A K

A I

H A

R B

O R

B

M E

Y E

R S

B

M E

Y E

R S

SURVEYED BOTTOM

DO NOT DREDGE WITHIN THESE ZONES.

6. BUFFER ZONE FOR CORAL IS 10 FEET AND BUFFER ZONE FOR THE PIER IS 10 FEET.

HARD SURFACES AND ARE NOT TO BE DREDGED.

SEDIMENT MATERIAL. STEEPER FINISHED SLOPES SHOWN ON THE DRAWINGS REPRESENT

5. THE SIDE SLOPE SHOWN ON THE DRAWINGS IS THREE HORIZONTAL TO ONE VERTICAL FOR

PROJECT LIMITS SHOWN.

RESPONSIBLE FOR DREDGING ALL AREAS ABOVE PROJECT DEPTH WITHIN THE FEDERAL

4. DREDGE AREAS SHOWN ARE AN ESTIMATE OF THE WORK AREA. CONTRACTOR IS

DREDGING OF UP TO ONE FOOT IS ALLOWABLE. SEE DREDGE PAY PRISM ON SHEET CN501.

ANGLE OF REPOSE SO THAT SIDE SLOPE DOES NOT ENCROACH ON FEDERAL LIMITS. OVERDEPTH

AT THE BASE OF SIDE SLOPE TO ALLOW MATERIAL TO SLOUGH TO THE NATURAL UNDERWATER

3. ACTIVE DREDGING OUTSIDE OF THE HORIZONTAL FEDERAL LIMITS IS NOT AUTHORIZED. DREDGE

2. STATION ORIENTATION VIEW IS UPSTATION.

1. DEPTHS IN FEET BELOW MLLW.

13+00

13+50

14+00

14+50

15+00

15+20

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

0-25-50-75-100-125-150-175-200-225-250-275-300-325 25 50 75 100 125 150 175 200 225 250 275 300 325

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-30

-25

-20

-15

-10

-5

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-30

-25

-20

-15

-10

-5

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-30

-25

-20

-15

-10

-5

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-30

-25

-20

-15

-10

-5

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-30

-25

-20

-15

-10

-5

-30

-25

D E

P T

H F

T

-20

-15

-10

-5

-30

-25

-20

-15

-10

-5

CN303

C N

.d g n

BL

(TYP.)

SURVEY BOTTOM

(TYP.)

(TYP.)

PROJECT DEPTH

(TYP.)

PIER(TYP.)

PROJECT LIMIT

FEDERAL

60 600 120 180

20 20 40 60

GRAPHIC SCALES

SCALE:1"=20' (VERTICAL)

SCALE:1"=60' (HORIZONTAL)

PIER

PIER

(TYP.)

ZONE

CORAL BUFFER

DREDGE AREA (BASE BID) DREDGE AREA (OPTION 1)

D R

E D

G E A

R E

A

(O

P T

IO

N

S T

A T

O

C R

O S

S S

E C

T

IO

N S D

R E

D G

E A

R E

A

(B

A S

E B

ID

PIER BUFFER

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T E

D B

Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T N

O

S O

L

IC

IT

A T

IO

N N

O

IS

S

U E D

A T

E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O K

A H

A R

A A

N D A

S S

O C

IA

T E

S

IN

C

K

O H

O L

A S

T R

E E

T

H

IL

O

H A

W A

II

H O

N O

L U

L U D

IS

T R

IC

T

F T S

H A

F T

E R

H A

W A

II

P H (8

-5

®of Engineers

US Army Corps

S P

U B

L

IC

O

B

M E

Y E

R S

-- F

IL

E N

U M

B E

R

-2

-2

A N

S I

D

W

A -1

-D -0

M O

L O

K A I, H

A W

A

II

M A

IN

T E

N A

N C

E D

R E

D G

IN

G

K A

U N

A K

A K

A I

H A

R B

O R

B

M E

Y E

R S

B

M E

Y E

R S

190.88 281°50'18.85"

.8

°4

'5 .3

.0

°4 8' .5 6"

190.88 281°50'18.85"

BOTTOM ANCHOR

CONTINUOUS

HARBOR BOTTOM

PLAN

TURBIDITY CURTAIN NOTES:

SECTION 01 57 19

PER SPECIFICATION

LENGTH TO VARY

TURBIDITY CURTAIN

NOT TO SCALE

SECTION

TYPICAL TURBIDITY CURTAIN DETAILS

CN501

D E

T A

IL

S

C N

.d g n

CURTAINS.

AFTER REPAIRING OR REPLACING OF DAMAGED TURBIDITY

CURTAIN IS FOUND DAMAGED. WORK MAY RESUME

6. DREDGING WORKS SHALL STOP IMMEDIATELY IF TURBIDITY

5. PLACE ANCHORS IN AREAS WITH NO CORAL.

THE FLOATING BOOM TO SUBMERGE.

WITHOUT LIFTING THE BOTTOM ANCHOR OR CAUSING

TO ALLOW FOR TIDAL DIFFERENCES AND SWELLS

4. PROVIDE SUFFICIENT SLACK IN THE FILTER FABRIC

6 INCHES ABOVE THE WATER SURFACE.

CURTAIN AND MAINTAIN A FREEBOARD OF AT LEAST

UNITS SUFFICIENT TO SUPPORT THE WEIGHT OF THE

3. FLOTATION DEVICES SHALL BE FLEXIBLE BUOYANT

RECOMMENDATIONS.

2. SEAMS SHALL BE SEWN PER MANUFACTURES'

RETURNED TO AMBIENT LEVELS.

UNTIL CONSTRUCTION RELATED TURBIDITY HAS

DREDGING OPERATIONS AND REMAIN IN PLACE

1. TURBIDITY CURTAIN SHALL COMPLETELY ENCLOSE THE

NOT TO SCALE

SURVEY DEPTH

PRE-DREDGE

SURVEY DEPTH

POST-DREDGE

UNPAID OVERDEPTH

FEDERAL PROJECT LIMITS

REQUIRED DREDGING (PAID)

(TYP)

DREDGE PAY PRISM

NOTES:

(-24 FT MLLW)

OVERDEPTH

ALLOWABLE

MAXIMUM

(-23 FT MLLW)

PROJECT DEPTH

REQUIRED

DREDGING OF UP TO ONE FOOT IS ALLOWABLE.

SIDE SLOPE DOES NOT ENCROACH ON FEDERAL LIMITS. OVERDEPTH

TO SLOUGH TO THE NATURAL UNDERWATER ANGLE OF REPOSE SO THAT

NOT AUTHORIZED. DREDGE AT THE BASE OF SIDE SLOPE TO ALLOW MATERIAL

ACTIVE DREDGING OUTSIDE OF THE HORIZONTAL FEDERAL PROJECT LIMITS IS1.

NOT TO SCALE

COSA SITE PLAN

NOT TO SCALE

INSET

PAID OVERDEPTH

0.07 ACRES

COSA SITE

50'

EASTING NORTHING

COSA SITE COORDINATES

1,517,176.13 272,145.02

1,517,208.28 272,195.68

1,517,250.49 272,168.88

1,517,218.34 272,118.22

AREA

ACTIVE DREDGE

C R

A N

E B

A R

G E

D U

M P S

C O

W

SAFE

TY

ZONE

CURTAIN

RIGID TURBIDITY

DREDGE AREA

FEDERAL PROJECT LIMITS

File details come from the government source that posted it. Updated .